BARANGAY ZAMORA-MELLIZA

CITY PROPER, ILOILO CITY


MESSAGE
Nature has its own fury and no force of man can stop the devastating
power of it. However, enable for us to caution the effect of it we must study
and make necessary preventive action to reduce or even eliminate the risk
that may arise.

The Importance of BDRRM for us is to be prepared of any disaster that


may occur and by doing so, we minimize the impact of disaster. Ultimately
to educate the people and be aware of any impending natural calamities that
may occur.

I, Peter B. Abadiano, Punong Barangay together with the Sangguniang


Barangay present this 2022 Barangay Disaster Risk Reduction Management
Plan of Barangay Zamora-Melliza to address the challenges
and adopt the necessary programs for the
community-based disaster risk reduction
management.

We are looking forward to work hand and


hand with all Government agency to assure the
success of our BDRRMC.

God bless us all!

HON. PETER B. ABADIANO


Punong Barangay
TABLE OF CONTENT

I MESSAGE Hon. PETER B. ABADIANO


Punong Barangay

II EXECUTIVE SUMMARY

a. Introduction
b. Ecological Profile
c. Risk Profile
 Background
 Risk Information
 Hazard Severity Ranking
 Historical/Disaster Timeline
 Seasonal Calendar
 Resources Mapping
 Hazard Mapping
 Capacity Assessment
 Indicators of Adaptive Capacity
 Vulnerability Mapping and Assessment
 Institutional Diagram
 List of Evacuation Center
 Situational Analysis
 Thematic Area No.1 Prevention & Mitigation
 Thematic Area No.2 Disaster Preparedness
 Thematic Area No.3 Disaster Response
 Thematic Area No.4 Disaster Rehabilitation & Recovery
 Risk Analysis

III BDRRMC STRATEGIC PLAN FOR 2022-2024

IV REFERENCES

 R.A. 10121
 NDRRM Framework

V ANNEXES

 Executive Order Organizing the BDRRMC


 Barangay DRRM Committee Structure
 Communication Flow Chart
 Early Warning System (EWS)
 Hazard & Capacity Maps
 Evacuation Map & Route
 Evacuation Center Floor Plan
EXECUTIVE SUMMARY
I. INTRODUCTION
A disaster risk management is the systematic process of using administrative
directives, organizations and operational skills and capacities to implement
strategies, policies and improved coping capacities in order to lessen the
adverse impacts of hazards and the possibility of disaster.

Barangay Disaster Risk Reduction and Management Plan of Barangay


Zamora-Melliza was carefully crafted to ensure that it remains true to the
essence of the National Disaster Risk Reduction and Management
Framework and the National Disaster Risk Reduction and Management Plan
and is consistent with the salient provisions of Republic Act 10121 otherwise
known as the Philippine Disaster Risk Reduction and Management Act of
2010.
II. ECOLOGICAL PROFILE
The Barangay Zamora-Melliza is more or less 100 meters from the Iloilo City
hall bounded by the following Barangay’s:
North : Barangay Monica
South : Barangay Sto.Rosario
East : Barangay Concepcion
West : Barangay Muelle Loney

We are one of the 10 Waterfront Barangay of the City Proper District with a
population of 2,875 (2020 PSA Census) residents
Barangay National Tax Allotment : 4, 692,394.00
Barangay 2022 Annual Budget : 5,894,920.96
5% Local Disaster Risk Reduction Management Fund : 294,746.00
III. RISK PROFILE

I. Background

 No. of zones/ Sitio / Blks in the barangay: 7 zones


 Total no. of population: 2,875 as of 2020
(Source PSA)
 No. of Household: 400 as of 2021
 No of Children: 624 as of 2021
 No. of Youth: 738 as of 2021
 No. of Adults: 1,277 as of 2021
 No. of Senior Citizen: 236 as of 2021
 No. of PWD: 18 as of 2021
 Barangay 5% of the IRA ( BDRRMC FUND) Php 294,746.00 (2022)

YEAR BUDGET

2019 Php 182,807.00

2020 Php 212,574.00

2021 Php 225,000.00

 Total annual Budget: Php 5,894,920.96


 1. Focal Person: PB Peter B. Abadiano
 Contact Number: 0948-3527170/ 396-19-15
 2 Focal Person: BS Yuri P. Villanueva
 Contact Number: 0931-7160804/ 327-8578
II. RISK INFORMATION

1. Hazard Severity Ranking

HAZARD IMPACT (a) LIVELIHOOD (b) SEVERITY (a x RANK


b)
Estimated Probability of the
percentage of hazard event to occur
people, properties,
and other 1-3 = not within
elements-at-risk lifetime
affected by the 4-7 = within lifetime
occurrence of the (75 years)
hazard 8-9 = within ten (10)
(geographical years
coverage) 10= every year

1=10%
6=60%
2=20%
7=70%
3=30%
8=80%
4=40%
9=90%
5=50%
10=100%
FIRE 8 8 64 1

TYPHOON 3 10 30 2

EARTHQUAKE 2 8 10 3
2. Historical/Disaster Timeline

YEAR HAZARDS/ DAMAGES RESPONSES(WHAT/W LESSONS

DISASTER AND LOSSES HO) LEARNED

1994 Typhoon Ruping None None Be prepared


Typhoon Frank None None Continuous
awareness

2016 Fire 5 – totally BFP, Relief Assistance Continuous


damaged DSWD awareness
7 – partially
damaged

2021 Fire 2 – Totally BFP, Relief Assistance Continuous


Damaged DSWD awareness

2021 Super Typhoon 18-Partially Relief Assistance - DSWD Continuous


Odette Damaged awareness

2020- COVID-19 2-Death Iloilo City Government, Follow Health


2021 Pandemic 36 – Tested DOH Protocols
Positive Continuous
awareness
3. Seasonal Calendar

KEYS JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC

Fire

COVID-19

Rainy Season

Typhoon

Summer

Scarce water
supply
Flu

Cough

Brgy. Fiesta

Halloween

Brgy.
Christmas
party and gift
giving
Barangay
Assembly
Day
Declogging
of Drainages
4. List of Available Equipment and Resources

HAZARDS RESOURCES NUMBER OF LOCATION


AVAILABLE RESOURCES
Fire  Dry hydrant  4  Zamora and
with axle Dela Rama
Compound
 Fire  9  Zamora
extinguisher
 Handheld  6  Zamora
Radio  Zamora and
 Trumpa  14 Dela Rama
 CCTV camera  11 Compound
 Deep well  70  Zamora and
 Generator  1 Dela Rama
 Submersible  1 Compound
Pump  Zamora
 Fire Buckets  20  Zamora
 Zamora

Typhoon  Headlamp  12  Zamora


 Helmet  12  Zamora
 Butas  12  Zamora
 Ladder  2  Zamora
 Raincoat  12  Zamora
 30% quick  30%  Zamora
response LDRRMF
budget  Zamora
 medical supply  Php  Zamora
100,000
 Chain Saw  1
5. Exposure Data

Bilang ng Sanggol Bata Adult Elderly Persons With


Level No. of BIlang Tao (No. of (Infant) (children) (18-59 (60 y/o with sickness Pregnant Livelihood Infrastructure
Hazard Area of houses ng persons) (0-11 (17 y/0 y/o) & Disability (all Women Affected Affected
Risk affected Pamilya months) and above) (PWD) ages)
below)
M F M F M F M F M F M F M F

SARI-SARI
STORE HOUSES
FIRE ZAMORA HIGH 2 4 6 8 0 0 1 3 4 4 1 1 0 0 0 0 0
TRISIKAD
SARI-SARI
STORE HOUSES
FIRE DELA RAMA HIGH 7 12 14 22 2 1 4 7 4 10 4 4 0 1 0 0 0
TRISIKAD

VENDORS
SARI-SARI
STORE HOUSES
TYPHOON ZAMORA/ MID 18 18 27 24 2 3 7 10 10 10 8 1 0 0 1 0 0
DELA RAMA TRISIKAD SCHOOLS
VENDORS

EARTHQUAKE ZAMORA/ LOW 1 1 2 1 0 0 1 0 1 1 0 0 0 0 0 0 0 SARI-SARI HOUSE


DELA RAMA STORE

PRIVATE BUSINESS
COVID-19 ZAMORA/ HIGH 400 725 1523 1341 11 8 325 280 1126 970 72 91 12 6 0 0 21 ALL PUBLIC OFFICES
DELA RAMA SCHOOLS
6. Capacity Assessment

Existing Capacities Effectiveness Attractiveness Capacity Rating


(a) (b) (a x b)
degree to which the identified degree to which an existing
capacity addresses the capacity can be enhanced and/or
identified hazard and modified to address the identified
vulnerabilities hazard and vulnerabilities
1-2= Poor 9-10= Less attractive
3-5= Average 6-8= Somewhat Attractive
6-8= Above Average 3-5= Reasonably
9-10= High Attractive
1-2= Highly Attractive

Human Resources like the 9 2 18


Youth Sector, Senior
Citizens, volunteer from
the Academe, NGOs,
GOs, Barangay Devt.
Council ,Barangay
Tanod,Barangay Nutrition
Scholar, Barangay Health
Worker, Barangay Service
Point Officer

Physical Amenities 8 2 16
(Projects like the
emergency siren,
standpipe, fire
extinguishers, drums and
buckets, ropes, boots,
helmets, reflectorized vest
etc..

Financial Power (RPT, 9 1 9


IRA)

KSA which can be 7 2 14


achieved through, IEC and
trainings and seminars
7. Indicators For Adaptive Capacity

CC Negative
Effects and Wealth Technology Information Infrastructure Institutions Social Capital
Impacts (Govt.)

Lifesaving Multi-purpose Hall


rescue Radio / with Day Care
5% equipment Television/ Center/ Covered BDRRMC CDRRMO
TYPHOON LDRRMF / EWS Telephone/ Gym/ A. Montes 1
Equipment Internet/ ES/ A. Montes 2 ES
Brgy. Hall

Fire Reel Multi-purpose Hall


Fire Radio / with Day Care
Extinguisher Television/ Center/ Covered BDRRMC CDRRMO
FIRE 5% Chainsaw Telephone/ Gym/ A. Montes 1 Brgy. Fire BFP
LDRRMF Ladder Internet/ ES/ A. Montes 2 ES Brigade
Submersible Brgy. Hall
Pump

Radio / Multi-purpose Hall


5% Chainsaw Television/ with Day Care BDRRMC CDRRMO
EARTHQUAKE LDRRMF Ladder Telephone/ Center/ Covered BFP
Internet/ Gym/ A. Montes 1
Brgy. Hall ES/ A. Montes 2 ES

Radio /
Television/ Multi-purpose Hall
5% Nebulizer Telephone/ Barangay Health BDRRMC CDRRMO
COVID-19 LDRRMF Oxygen Tank Internet/ Center BHERT BFP
5% Thermal Brgy. Hall
GAD Scanner
8. Vulnerability Assessment

Degree of Importance
Exposure (b)
(a) degree of importance to the community
percentage of the life survival
elements-at-risk that are
1-2= less important
exposed to the force of Vulnerability
Hazard/Elements at-Risk the hazard vis-à-vis the 3-5= somewhat important
population/total number 6-8= reasonably important Rating (a x b)
in the 9-10= highly important
barangay/municipality
1=10% 6=60%
2=20% 7=70%
3=30% 8=80%
4=40% 9=90%
5=50% 10=100%

Informal Settlers (400 7 10 70


families/household)

Structures/Assets 5 9 45
(house made of light
materials, old
commercial buildings)

People (Senior 5 5 25
Citizens, children,
informal settlers)
9. Institutional Diagram

ORGANIZATIONS ADDRESS/LOCATION ORGANIZATION DRR activities Level of

AL PROFILE implemented Relationship

with the LGU

City Government LGU Iloilo City Gov’t Infrastructure/ High

Medical/ Food

CDRRMO Iloilo City Gov’t Operation Center High

DILG Iloilo City Gov’t Financial/ High

Technical

PNP - ICPO Iloilo City Gov’t Peace and Order High

DSWD M.H. Del Pilar Gov’t Medical/financial High

Ilonggos asc. Southern ca, usa Private Medical mission High

Zamora’s pride Zamora-milleza Brgy. Homeowners Brgy. Affairs High

Hiligaynon Community of Texas Murphy, texas Private Education/ Feeding High

Love of Jesus Canada Religious Finance and High

feeding

Lion’s club Sarabia hotel Civic group Medical mission High

DOH City hall Gov’t Medical mission Medium

Dios Gugma Sports complex Religious Community aid Medium

Iloilo Vision Church Zamora St. Religious Feeding/ Relief Op Medium

Iglesia ni Cristo Rizal city proper Religious Medical mission Medium

BFP Iloilo City Gov’t Fire Fighting Medium


10. Evacuation Centers
A. Montes I A. Montes
Name of Evacuation Centre
Elem. Brgy. Hall Brgy. Gym II elem.

Location Zamora St. Zamora St. Zamora St. Duran St.

Floor Area (sq.m.) 100 sq.m. 100 sq.m. 400 sq.m. 100 sq.m.

Capacity
400 sq.m. 100 sq.m.
(Total Floor Area/1.5 sq.m.) 100 sq.m. 100 sq.m.

Is the identified evacuation centre prone to any


Strong winds n
hazards? n n

With Electricity
(Y or N) y y y y

Available Water Resource? y y y Y


Y or N

Toilet (attached; detached or others) y y y y

Available Generator
Y or No? n n n y

With identified Kitchen Area?


Y or N y y y y

With Assigned Storage Area?


Y or N? y y n y

With signage
Y or N? y y y y

With Available open space (indicate land area)


Y or N? y y y y

Has an assigned Children Friendly Space


Y or N? y y y y

Has an assigned Women Friendly Space?


Y or N? y y y y

Has an assigned Breastfeeding Area?


Y or N? y y y y

Has an assigned Counselling Room?


Y or N? y y y y

Has an assigned couples room?


Y or N? n n n n

Has an assigned Animal/ Livestock Area?


Y or N? y n n y
IV. SITUATIONAL ANALYSIS

Thematic Area No. 1: DISASTER PREVENTION AND MITIGATION

STRENGTHS WEAKNESSES
Has to establish the BDRRM There are no specific or delineated funds
Committee and has identified focal to some of the activities under the
persons on some activities related to BDRRM Funds.
prevention and mitigation.

Has developed and implemented regular Not all residents are cooperative when
activities such as fire drill and other it comes to attending drills.
programs related to prevention and
mitigation

OPPORTUNITIES THREATS
Presence of organization and institution There is no MOA signed to ensure their
that can provide assistance. full support.

Climate change adaptation is a Current we haven’t employed the


support of organization on these CCA
government priority. efforts.
Thematic Area No. 2: DISASTER PREPAREDNESS

STRENGTHS WEAKNESSES
There is now clear direction on the Lack of skills and training, pertaining on
activities that the barangay has to rescue and operation.
pursue.

Some of the Barangay Officials and Lack of funds and government support
volunteers undergone training on Fire to barangay activities.
and Earthquake drill.

Conduct Regular General Assembly Current DRRM equipment are not


meetings. enough to fully strengthen the capacity
of the barangay.
There are existing DRRM equipment.

OPPORTUNITIES THREATS
Support of government organizations in Counterpart training should be provided
providing training related to DRRM. by the barangay and that is where we
sometimes are not able to provide.
Thematic Area No. 3: DISASTER RESPONSE

STRENGTHS WEAKNESSES

There are trained and organized The Barangay cannot stock relief
responders for rescue and teams to goods due to food expiration issues
handle disaster operations and sometimes lack of funds.

OPPORTUNITIES THREATS
The Barangay can ask assistance from No existing network or MOA with
the NGO’s/PO’s. business establishment

These are business establishment within


the barangay that can be utilized to
ensure food supplies and other resources
during calamities.
Thematic Area No. 4: DISASTER REHABILITATION AND RECOVERY

STRENGTHS WEAKNESSES
Majority of the residents have the ability There no clear programs and measures
to cope with any situation they are faced to be implemented geared towards
with, recovery

The population are knowledgeable and


have different skills and abilities.

The barangay can directly access


government aids during emergency.

OPPORTUNITIES THREATS
There are number of organizations The most apparent stumbling block that
waiting to be tapped for recovery efforts hinders rehabilitation is due to
including government agencies for bureaucratic red tape.
lending and financing activities.
OBJECTIVES ACTIVITIES PERFORMANCE BASELINE 2022 2023 2024 ASSUMPTION MEANS
INDICATOR AND 2021 OF VERIFICATION
TERMINAL TARGET
(2024)

DISASTER PREVENTION AND MITIGATION

-To stop flooding Conduct regular by 2024 the Brgy. Conducted 2 3 times 4 times 4 times Streets and canals will Documentation
on alleys and declogging of brgy. Conducted a total of declogging declogging declogging declogging be garbage free and Pictures
streets Drainage and canals 6 declogging operation operation operation operation flood free Payroll of workers
operation After activity report

Elevation of public by 2024 the Brgy. Constructed 10 20 meters 20 meters 20 meters No flooded Public alleys Procurement forms
alleys Constructed 60 meters of during rainy season Memorandum
meters of elevated elevated Public Receipts
public alley alley Physical availability

- To early warn Purchase and install By 2024 the Brgy. Purchased and Purchase 2 device Purchase Brgy. Residents are well Procurement forms
residents on early warning Purchased and installed 1 siren siren horns and 3 horn speakers 2 megaphones informed on disaster Memorandum
Hazards and device around the installed a total of 3 horn and 14 Horn additional for public preparedness, during Receipts
during disasters barangay siren horns, 12 horn speakers Purchase address calamities and alarmed Physical availability
speakers around speakers for devices if evacuation is
barangay mobile public necessary
address

-To prevent Fire Conduct monthly by 2024 the 12 monthly 12 monthly 12 monthly 12 monthly individual households Certificate of
incidents in the assessment and barangay is zero fire assessment and assessment and assessment and assessment and are annually assessed Appearance
Barangay house inspection incident house inspection house house house and Brgy. Is free from Documentation
for Fire Safety for Fire Safety inspection for inspection for inspection for illegal connection of Photos
conducted Fire Safety Fire Safety Fire Safety electricity Assessment and
inspection reports
- To early warn Reproduce 1500 By 2024 the Brgy. 100 copies IEC 500 copies IEC 500 copies IEC 500 copies IEC Brgy. Residents are well Procurement forms
residents on copies of IEC Reproduce 1500 Materials Materials Materials Materials informed on disaster Memorandum
Hazards and Materials copies of IEC preparedness, during Receipts
during disasters Materials distributed calamities Physical availability
to whole barangay

-To address Construct Rain by 2024 the Brgy. 0 1 1 1 Brgy. Is water sufficient Procurement forms
water shortage Water harvesting Will be water during evacuation and Memorandum
facilities at through the during fire fighting Receipts
identified areas of construction of 3 Physical availability
the barangays Rain Water
harvesting facilities
at the barangay

DISASTER PREPAREDNESS

- To raise Conduct series of By 2024 the Brgy. Conducted a 1 1 1 Brgy. Residents are Documentation
awareness to symposiums in Conducted 4 Symposium on knowledgeable on how Pictures
residents on how relation to flood symposiums Proper Waste to prevent flooding in Program &
to prevent prevention Disposal & the streets during rainy Invitations
flooding and on Segregation season Attendance Sheets
proper waste Certificate of
disposal Attendance

-To ensure the Purchase rescue by 2024 the Brgy. Purchased 1 Purchase 1 Purchase Purchase of 10 The barangay search, Procurement forms
efficiency of the equipment Search, Rescue & chainsaw small, Chain block, 1 Additional 6 Hard Hats, 1 rescue, retrieval team is Memorandum
response team Retrieval Team will 1submersible Big chainsaw, 2 Hand Held Bolt cutter, efficient, functional, and Receipts
have equipments for pump big, 10 Equipment Radios, 2 First- 10 Safety equipped with complete Physical availability
disaster response Rubber boots storage Aid Kit Harness, equipment
cabinet, 1 Rubber boots,
submersible Additional 6
pump small Hand Held
Radios

- To have a well Conduct Annual By 2024 the Brgy. 0 Training 1 Training 1 Training 1 Training Brgy. Fire Brigade are After activity reports
organized , training for Brgy. Fire Brigade is 100% Conducted Conducted Conducted Conducted well equipped with skill Development reports
skillful, and Fire Brigade functional, well and knowledge on Fire Documentation
effective Brgy. skilled and effective disaster Response Photos
Fire Brigade Fire fighting team of
the barangay

-To equip the Purchase additional By 2024 the Brgy. 8 Fire 5 Fire 7 Fire 10 Fire The barangay is Procurement forms
barangay with Fire Extinguishers Fire Brigade is Extinguishers Extinguishers Extinguishers Extinguishers equipped with fire Memorandum
first defense and Refill empty fire equipped with 30 extinguishers essential Receipts
against fire extinguishers tank tanks of fire for fire preparedness Physical availability
extinguishers

DISASTER RESPONSE

-To ensure Distribution of food By 2024 the Distributed food Distributed Distributed food Distributed A total of 2000 families Procurement forms
sufficient food supplies such as rice, Barangay have supplies such as food supplies supplies such as food supplies avail Relief goods from
supplies during noodles. Canned purchase 60 sacks of 15 sacks rice, such as 15 15 sacks rice, such as 15 the barangay Memorandum
relief operation Sardines and Meat rice, 4000 pieces 1000 pieces sacks rice, 1000 1000 pieces sacks rice, 1000 Receipts
loaf noodles, 2000, cans noodles. 500 pieces noodles. noodles. 500 pieces noodles.
Physical availability
sardines, 2000 cans Canned Sardines 500 Canned Canned Sardines 500 Canned
meatloaf for the and 500 Meat Sardines and and 500 Meat Sardines and
period of 4 years loaf 500 Meat loaf loaf 500 Meat loaf

- To have a well Conduct Annual By 2024 the Brgy. 80% 100% 100% 100% Brgy. Fire Brigade are After activity reports
organized , training for Brgy. Fire Brigade is 100% well equipped with skill
skillful, and Fire Brigade functional, well and knowledge on Fire Development
effective Brgy. skilled and effective disaster Response reports
Fire Brigade Fire fighting team of
Documentation
the barangay
Photos
- To provide and Activate Emergency By 2024 the 100% 100% 100% 100% Barangay Emergency RDANA
coordinate Operation Center Barangay Emergency Operation Center fully
warning, disaster (EOC) Operation Center activated Situational reports
evacuation, asset
(EOC) fully
inventory and Documentation
emergency operational during
Photos
services disaster and
integration emergency situation
during disaster

DISASTER REHABILITATION & RECOVERY

- To help the Conduct Livelihood By 2024 the Brgy. 100 residents 100 residents 100 residents 100 residents A total of 400 residents Documentation
Livelihood of the Trainings for 400 Conducted 4 avail the Livelihood Pictures
affected family residents Livelihood Training Training
to the different Program &
sectors of the Invitations
barangay
Attendance Sheets

Certificate of
Attendance

Prepared by: Attested by: Approved by:

YURI P. VILLANUEVA HON. PETER B. ABADIANO DONNA P. MAGNO


Brgy. Secretary Punong Barangay City DRRM Officer
REPUBLIC OF THE PHILIPPINES
BARANGAY ZAMORA – MELLIZA
CITY PROPER, CITY OF ILOILO

LOCAL DISASTER RISK REDUCTION MANAGEMENT FUND 2022


AIP REF PROGRAMS/PROJECTS/ACTIVITIES IMPLEMENTING SCHED. OF EXPECTED OUTPUTS FUNDING AMOUNT ( IN THOUSAND PESOS ) TOTAL
OFFICE/AGENCY SOURCES
CODE IMPLEMENTATION
Start Completion PERSONAL Maintenance & Capital
Date SERVICES Other Operating
Date Expenses
Outlay
( MOOE)
LOCAL DISASTER RISK REDUCTION & SB JAN. DEC. LDRRMF 294,746.00
MANAGEMENT (LDRRMF) 2022 2022
30 %
A. QUICK RESPOND (QRF) Provide a quick relief operation to disaster (LDRRMF) 88,424.00 88,424.00
affected residents of the barangay
70%
B. PRE-DISASTER PROGRAM SB (LDRRMF) 157,500.00 206,322.00

1. PURCHASE OF RESCUE MATERIALS


1.1 Submersible Pump
1.2 Chain Block 1 ton
1.3 Chain Saw Purchased Additional Rescue Equipment 130,000.00 130,000.00
1.4 Bolt Cutter
1.5 Tarpaulin
1.6 Ladder
Training of Barangay Fire/ Rescue team with BFP
2. TRAINING OF BRGY. FIRE/ RESCUE TEAM and Red Cross 30,000.00 30,000.00

Printed 2,000 copies of IEC Material distributed


3. REPRODUCTION OF IEC MATERIALS to Brgy. Residents 2,000.00 2,000.00

Refill 10 empty and expired fire extinguishers


4. REFILL OF FIRE EXTINGUISHERS 40,000.00 40,000.00

Conducted Livelihood Training to affected


5. LIVELIHOOD TRAINING Residents 4,322.00 4,322.00

86, 322.00 120,000.00 206,322.00


SUB-TOTAL FOR PRE-DISASTER PROGRAMS >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>
GRAND TOTAL >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> PHP 294,746.00

Prepared by : Attested by : Reviewed as to conformity with the LDRRMF 2022

MA. TERESA DANQUE HON. MERCEDES LOBATON HON. PETER B. ABADIANO DONNA P. MAGNO
Barangay Treasurer Kagawad Chairman Committee on Appropriation Punong Barangay CITY DRRM OFFICER
ILOILO CITY DRRM OFFICE