The document is a bill of quantities for construction materials and labor. It lists 21 items of building materials needed for a project along with their amounts. The total amount of materials is 662,400. Labor costs are estimated at 250,000. The total projected costs for materials and labor is 912,400.
The document is a bill of quantities for construction materials and labor. It lists 21 items of building materials needed for a project along with their amounts. The total amount of materials is 662,400. Labor costs are estimated at 250,000. The total projected costs for materials and labor is 912,400.
The document is a bill of quantities for construction materials and labor. It lists 21 items of building materials needed for a project along with their amounts. The total amount of materials is 662,400. Labor costs are estimated at 250,000. The total projected costs for materials and labor is 912,400.