The document contains technical data for a piping system including pipe numbers, collection points, flow rates, diameters, slopes, depths and elevations. There are 23 collection points labeled C1 through C23 that flow into the main Pipe 1. Information is provided on flow rates, pipe sizes, depths, slopes, and elevations at the inlet and outlet of each section.
The document contains technical data for a piping system including pipe numbers, collection points, flow rates, diameters, slopes, depths and elevations. There are 23 collection points labeled C1 through C23 that flow into the main Pipe 1. Information is provided on flow rates, pipe sizes, depths, slopes, and elevations at the inlet and outlet of each section.
The document contains technical data for a piping system including pipe numbers, collection points, flow rates, diameters, slopes, depths and elevations. There are 23 collection points labeled C1 through C23 that flow into the main Pipe 1. Information is provided on flow rates, pipe sizes, depths, slopes, and elevations at the inlet and outlet of each section.