Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 6

Republic of the Philippines

Department of Education
REGION III-CENTRAL LUZON
SCHOOLS DIVISION OF ZAMBALES
BANI ELEMENTARY SCHOOL
PUROK DUHOK BANI MASINLOC, ZAMBALES

PROJECT WASP (Wastong Alalay Sa Pagbabasa)


A. Project Context

PROGRAM READING PROGRAM FOR STRUGGLING


LEARNERS IN GRADE 1

Proponents KATHERINE E. ECIJAN


ROSSEL E. TORRIJAS
TRIXIA MAE CANTILLO
CRIS JERIC E. BANGI
Teacher Advisers
Name of School Head
MARIA CONSUELO E. DAMASO
School Principal II

Region, Division, District REGION III


SCHOOLS DIVISION OF ZAMBALES
DISTRICT OF MASINLOC

Name of School BANI ELEMENTARY SCHOOL

Key changes in your school The key to literacy is reading development, a


as a result of this project progression of skills that begins with the ability to
What key changes do you understand spoken words and decode written words, and
want to see in your school as culminates in the deep understanding of text. Reading is
a result of your remedial a skill, which is the ground of almost all processes of
program for Grade 1 learning and its necessary for students to acquire.
learners? What are your
specific, verifiable indicators Based on the pre assessment in reading that we
of these changes? 150-200 conducted, some of our pupils can recognized letters and
words letter sounds, can read simple words and sentences but
sadly the percentage of pupils who cannot read at all was
high. This provides the best opportunity to encourage
teachers, parents and guardians to take a greater role in
children's when it comes to reading.

We vehemently believed that once this skill was


acquired, the learner can attain full language literacy,
which includes the abilities to apply to printed material
critical analysis, inference, and synthesis; to write with
accuracy and coherence; and to use information and
insights from text as the basis for informed decisions and
creative thought.

In the realization of our Application Project, 116


Grade 1 learners shall directly benefit from it. Project
WASP( Wastong Alalay Sa Pagbabasa) shall be used as an

[Type here]
Republic of the Philippines
Department of Education
REGION III-CENTRAL LUZON
SCHOOLS DIVISION OF ZAMBALES
BANI ELEMENTARY SCHOOL
PUROK DUHOK BANI MASINLOC, ZAMBALES

intervention material.

As this project progresses, it is envisioned that


more innovative programs through research shall be
conducted at Bani Elementary School in order to find
solutions to problems and issues encountered in school
particularly reading, learners’ achievement rate, parent
involvement and stakeholders participation.

Target Competency In the implementation of the Project WASP, series


Improvement of instructional activities shall be done and various
What teacher’s instructional materials shall be used thus creativity,
competency/ies will you critical thinking, collaboration and communication
apply through your project? shall be applied.
Identify a maximum of three
that are directly related to Parent Involvement can also be applied and
your project. strengthened the project through follow up at home.
50-80 words
Describe the current Bani Elementary School is one of the well-known
situation (problem or schools in Masinloc, Zambales because of the built power
opportunity) you need to plant that provides livelihood to the community. Most of
address through your project the parents are working here, some are farmers and
in your school. fishermen to sustain the needs of the family.

Give specific, quantifiable, The pandemic has led the children to struggle in
observable details. For learning especially in reading through distant learning.
example, number of Due to parents busy schedule, they cannot allot time for
nonreaders in Grade 1; their children in reading. Some parents did not finish
number of teachers that need their studies thus it becomes difficult for them to teach
training by a certain period; their children at home especially the young ones.
150-200 words
Records show that Grade 1 learners has number
of slow and non-reader. As teachers assigned in this
department, we would like to take a step to help the
children learn how to read by reading remediation and
monitoring parent’s follow up at home.

Based on the Early Registration report, 116


learners have been enrolled in Grade 1. Half of the
learners did not attend limited face-to-face classes due to
the present health crisis.

Through Project WASP, it is our hope that these


116 grade learners will complete their course and become
readers.

Title of Application Project Project WASP (Wastong Alalay sa Pagbabasa)

PROJECT OBJECTIVE/S: This Project aims to:


SMART-Specific, measurable,
attainable, results-oriented, 1. capacitate Grade 1 learners by teaching them the
[Type here]
Republic of the Philippines
Department of Education
REGION III-CENTRAL LUZON
SCHOOLS DIVISION OF ZAMBALES
BANI ELEMENTARY SCHOOL
PUROK DUHOK BANI MASINLOC, ZAMBALES

and with timeframe basics of beginning reading such as naming and


sounding of the letters of the alphabet, reading
syllables, phrases and sentences.
2. develop and complete an action research through
Project WASP;
3. develop instructional materials in reading for Grade 1;
4. develop collegial relationship with parents; and
5. strengthen partnership between parents and teachers.
Start date FEBRUARY 13, 2023
Length of project This project is expected to be completed within four (4)
The project should be months.
completed within 3 to 6
months.
Expected Outputs 50-80 1. After capacitating the learners, they can be able to
words decode words and eventually read phrases and
sentences.
2. An action research shall be completed.
3. Different instructional materials will be developed.
4. Partnership with parents will be strengthened.
Beneficiary/ies The beneficiaries will be the following:
1. The 116 identified grade 1 learners
2. The parents and guardian of 116 identified learners.
Identify Success Indicators or This project will be a success when the following indicators
measures of success have been achieved and verified through unbiased means
(maximum of 3):

1. 85-100 percent of the identified learners are


capacitated or instructed.

B. Action Steps -

Identify significant Milestones that could be achieved by the end of 30 days and
every 30 days thereafter. Milestones are (a) significant changes achieved; and/or (b)
major steps taken towards achieving the desired improvement in your school

Target Milestone Actions Responsible Support Target


Person Needed Date
Who will from: When
will this step be
do this
accomplished?
step?

Milestone 1 *Inform the Teacher Parents February 13, 2023


parents of the Adviser and
Pre-Implementation conduct of the Guardian
project for their
support.

[Type here]
Republic of the Philippines
Department of Education
REGION III-CENTRAL LUZON
SCHOOLS DIVISION OF ZAMBALES
BANI ELEMENTARY SCHOOL
PUROK DUHOK BANI MASINLOC, ZAMBALES

Planning Meeting Teacher Parents and February 15


with the teachers Adviser Guardian 2023

Preparation of the Teacher February 16


instructional Adviser 2023
materials needed
Preparation of Teacher February 16
Training Needs Adviser 2023

Orientation of the School Head Parents February 17


parents and Teachers Stakeholders 2023
scheduling Parents
Guardians
Milestone 2 Launching of the Teachers Parents February 20,
project Stakeholders 2023
Implementation
Conduct of the School Head Parents February 13-
Technical Teachers Stakeholders June 30, 2023
Assistance / And
Training to the learning
Parents and facilatator
Guardians
Milestone 3 Survey / Data Parents June 26, 2023
Gathering on the Teachers Stakeholders
Post- Effectiveness of Parents
Implementation the intervention Guardians
done
Focus Group School Head Parents June 28, 2023
Discussion on the Teachers Stakeholders
Analysis of
Results
Presentation and School Head Parents June 29,
Communication Teachers Stakeholders 2023
of the Results Parents SDO
Guardians
Issuance of School Head Parents June 30,
Certificates of Teachers Stakeholders 2023
Recognition & Parents
Participation to Guardians
the participants

C. Required Resources

Provide Specific Details of the physical and human resources required to implement
your Application Project successfully.

Milestone Resources Needed Budget Approvals needed

[Type here]
Republic of the Philippines
Department of Education
REGION III-CENTRAL LUZON
SCHOOLS DIVISION OF ZAMBALES
BANI ELEMENTARY SCHOOL
PUROK DUHOK BANI MASINLOC, ZAMBALES

Planning Meeting with Printer None School Head


the Kindergarten Bond Paper
Teacher

Preparation of the Printer None School Head


Training matrix Bond Paper

Preparation of Printer None School Head


Training Needs Bond Paper
Conduct of the Bond Paper
Technical Handouts
Assistance / Training
to the Parents and
Guardians
Survey / Data Printer none School Head
Gathering on the Bond Paper
Effectivity of the
intervention done

Focus Group Bond Paper None School Head


Discussion on the
Analysis of Results

Presentation of the Bond Paper None School Head


Results Handouts

Issuance of Printer none School Head


Certificates of Bond Papers
Recognition &
Participation to the
participants

D. Risk Management Plan

Milestone Likely Risk Impact on Specific Action If Risk


Project if Risk to Prevent Risk Happens,
Happens Specific Action
to Soften
Impact of Risk

1. Pre- Schedule of Delay of Constant Move the date


implementation parents orientation and communication the day after the
scheduling with parent/s schedule
Communicate
with the
parent/s thru
text, phone call
or visitation
Parents’ Objectives may Proper Contact the
unwillingness not be attained motivation involved person
to participate Home visitation

2. Conduct of the Non- Objective of the Massive Contact the


Technical Participation or Project won’t information involved

[Type here]
Republic of the Philippines
Department of Education
REGION III-CENTRAL LUZON
SCHOOLS DIVISION OF ZAMBALES
BANI ELEMENTARY SCHOOL
PUROK DUHOK BANI MASINLOC, ZAMBALES

Assistance / cooperation of be realized dissemination person. Home


Training to the the Parents of the visitation
Parents and and Guardians importance of
Guardians the activity

E. APPROVALS:

Printed Name Signature Date

Prepared by February 08, 2023


KATHERINE E. ECIJAN
ROSSEL E. TORRIJAS
TRIXIA MAE CANTILLO
CRIS JERIC E. BANGI
Teacher Advisers

Recommending MARIA CONSUELO E.


Approval DAMASO

LANI A. MIRAFLOR Approval of the Plan:


Approved by Public Schools District _____________
Supervisor
Approval of the
Implementation
Report/

Accomplishment:
_____________

Reminder: Please adjust the layout of the application paper to ensure that the signature of
the approving authority is not hanging or on a separate blank page.

[Type here]

You might also like