Apd Oktober 2020
Apd Oktober 2020
Demerit point
KPI Performance Deduction Weightage Scheduled Component Parameter Parameter Value per Performance
of parameter
No. Indicator (PDI) Payment Value (RM) Unit parameter Deduction (APD)
(W) (MSP) (P) (RMp) (D) (APD = RMp x D)
Have all Planned Preventive
Maintenance (PPM) for
No. of PPM
Mechanical & Electrical
1a 0.250 139,144.99 34,786.25 for the 2850 12.21 17 207.50
System been completed for
month
the month?
RM207.50
PPM (prev.
BIL BIDANG PPM month -
open)
1.0 ELEKTRIK 1723
2.0 MEKANIKAL 1127
JUMLAH 2850
JUMLAH PARAMETER 2850