PROCESS FLOW-CHART WITH DESIGN VALUES FOR INPUTS AND O

MASS BALANCE DIAGRAM FOR LEACHATE TREATMENT, JAWA

Stage 1. Raw leachate Stage 2. After Pre Treatment

BOD,mg/L 9 000 BOD,mg/L 6 429

COD,mg/L 20 000 COD,mg/L 12 755

TDS,mg/L 30 000 TDS,mg/L 30 612

TSS,mg/L 3 500 TSS,mg/L 357

Flow,m3/d 2 000 Flow,m3/d 1 960


Stage - 1
Pre Treatment MVR

Stage 1. Sludge 2.0% 92.3%


BOD,mg/L 30% 1 35 000 BOD,mg/L 100%
COD,mg/L 38% 3 75 000 COD,mg/L 100%
TDS,mg/L 0% TDS,mg/L 100%
TSS,mg/L 90% 1 57 500 TSS,mg/L 99%
Flow,m3/d 40.00 15.750 Flow,m3/d 151
Sludge treatment Salt for Land Fill

Sludge Cake to
Landfill
S FOR INPUTS AND OUTPUTS FOR ALL THE UNIT OPERATIONS
CHATE TREATMENT, JAWAHAR NAGAR - MVR PROCESS

Stage 2. Treated Water

BOD, mg/L 33

COD, mg/L 315

TDS, mg/L 398

TSS, mg/L 46

Flow, m3/d 1 809


1960
Ponds / Reuse
MVR
452.27

Salt for Land Fill


1757.7