The document is a renovation work order for an auditorium in Bhind, India. It details 7 items of work to be dismantled including doors, windows, stone flooring, GI pipes, road gully chambers, flushing cisterns, and old plaster. The items list the quantity, dimensions, and unit of each component to be dismantled. A total of 1,141.821 square meters of stone slab flooring and over 2,500 square meters of internal and external plaster are scheduled to be removed.
The document is a renovation work order for an auditorium in Bhind, India. It details 7 items of work to be dismantled including doors, windows, stone flooring, GI pipes, road gully chambers, flushing cisterns, and old plaster. The items list the quantity, dimensions, and unit of each component to be dismantled. A total of 1,141.821 square meters of stone slab flooring and over 2,500 square meters of internal and external plaster are scheduled to be removed.
The document is a renovation work order for an auditorium in Bhind, India. It details 7 items of work to be dismantled including doors, windows, stone flooring, GI pipes, road gully chambers, flushing cisterns, and old plaster. The items list the quantity, dimensions, and unit of each component to be dismantled. A total of 1,141.821 square meters of stone slab flooring and over 2,500 square meters of internal and external plaster are scheduled to be removed.
UADD SOR S.no Vol. 2 . 2021 Description of Items Nos length width Height Quantity Unit Item no
Dismantling doors, windows, and clerestory windows
(steel or wood ) shutter including chowkhats, 1 15.10 architrave, holdfasts etc. complete and stacking within 50 meters lead. 15.10.1 Of area 3 Sq meters and below 45 45 Each
2 15.10.2 Of area beyond 3 sq. meters 6 6 Each
Dismantling stone slab flooring laid in cement mortar
3 15.23 including stacking servicable material and disposal of unservicable material within 50 meters lead. Ground Floor 1 22.12 3.52 77.8624 1 18.49 33.2 613.868 2 25.08 7.13 357.6408 1 18.49 5 92.45 Total 1141.821 Sq Mt
Dismantling G.I pipes (external work) including
excavation and refilling trenches after taking out the 4 15.39 pipes, manually by mechanical means including stacking of pipes withing 50 mts lead as per direction of Engineer -in charge 15.39.1 Upto 40 mm nominal bore 60 60 Meter
Dismantling of road gully chamber of various sizes
including CI grating with frame including stacking of 5 15.41 useful materials near the site and disposal of unservicable material into municipal dumps within 50 mts lead including refilling the excavated gap. 15 15 Each
Dismantling of flushing cistern of any size including
6 15.42 stacking of useful materials near the site and disposal of unservicable material within 50 mts lead. Each 287
Dismantling Old plaster or skirting upto 15 mm thick
7 15.45 ness raking out joints amd cleaning the surface for plater upto Two Floor level including disposal of rubbish within 50 meters lead and including scaffolding etc. External Plaster 2 7.14 6 85.68 2 25.5 6 306 2 3 6 36 2 8.76 6 105.12 2 1.22 6 14.64 2 5 6 60 2 13 6 156 1 1.7 6 10.2 1 1.7 6 10.2 4 3 6 72 2 6 6 72 1 11.05 6 66.3 1 1.74 6 10.44 2 33.2 6 398.4 2 18.49 7 258.86 Internal 4 33.2 10 1328 4 18.49 10 739.6 NAGAR PARISHAD BHIND HEAVENS DESIGN BHOPAL