3. Manual Handling Personal Injury 4 2 8 1. Proper material 1. Undertake a manual handling RA for Safety 2 1 2
handling >50kg and unusual objects Supervisor,
2. PPE’s 2. Use mechanical tools when is workers
1. Heavy materials such
as DC/AC Cable , possible.
Cable trays are lifted 3. Use team lifting by competent fit
by CRANE personnel
2. Lift any heavy 4. Any high risk task should be
equipment as much identified and mechanized.
as possible using 5. Supervisors and OHS team to
mechanical lifting monitor manual handling.
tools if possible
6. Worker Exhaustion, 1.Personal 3 2 6 1. Tool box , listening to 1. Make a formal assessment of the Supervisor, 2 1 2
Physical inability injury workers, and risks of burnout and fatigue workers
ensuring the worker's among workers according to the
physical ability before OSHAD guide
starting 2. Review the number of working
2. Always provide hours for workers and ensure
drinking water on rest periods at least twice every 8
surfaces and maintain hours
3. Encouraging workers to quickly
report any symptoms of
regular breaks
Exhaustion or dizziness
Serious injuries
requiring off-site
Minor injuries, Injuries requiring
treatment by
which may require on-site
medical
self-administered treatment by
practitioner or
Human Health first aid. Injured medical
immediate Single fatality.
and Safety personnel can practitioner.
evacuation to
continue to Personnel unable
hospital. Potential
perform normal to continue to
long-term or
duties. perform duties.
permanently
disabling effects.
Incident event Production loss or Production loss or Production loss or
Production Loss without causing delay up to one delay of one week delay for over one
production loss. week. to one month. month.
Rare (1) 1 2 3 4
Possible (2) 2 4 6 8
Likely (3) 3 6 9 12
Frequent/ Almost Certain 4 8 12 16
(4)
9-12 High Risk Activity or industry should not proceed in current form.
4-8 Moderate Risk Activity or industry can operate subject to management and /or modification.
1-3 Low Risk No immediate action required, unless escalation of risk is possible.