SAMPRE NUTRITIONS LIMITED

AGREEMENT
This Agreement is made on this date 21 st July 2020 between M/s SAMPRE
NUTRTIONS LIMITED, plot no 133,Industrial estate, Medchal - 501401, Medchal -
Malkajgiri District, Telangana State having Place of business at Plot No: 127 & 128,
Medchal Industrial Estate, Medchal- Malkajgiri Dist, Telangana State-501401

AND

M/s. Sai Charan Services represented by its proprietor Mr. Syam Pal S/o _____, aged
37 years residing at H.NO:13-11/1/A, Plot No: 1, SY NO: 421/a, Near Check Post,
Medchal -501401 (Here in after referred to as the contractor).

Whereas the management is desirous in engaging outside party as contractor for


man power supply used for UNLOADING - BIO FUEL used in boiler operations, carry
out the given assignment to them, and where as the contractor offered to provide
the necessary arrangement and service as required by the management for which
the management has agreed to utilize the service of the contractor without any
undue influence, coercion and fraud under the terms and conditions as stated
hereunder.

Terms and conditions

1. You will be paid monthly Rs 140/- per ton upto 25 tons in a truck.
2. You will be paid monthly Rs 4,000/- per truck for the truck load weight is in
between 25-35 tons in a truck.
3. You must obtain the required licenses under the various enactments like
the contract labour licenses, EFI, PF, PAN Card and professional tax etc.
4. You are supposed to inspect the boiler place and carry out various checks
and adjustments.
5. You should ensure continuity of boiler unloading manpower including
helpers at any given point of time for the duty.
6. Invoice should be raised for every 30 days and same should be cleared in
20 days of receipt of same.

1|Page2
SAMPRE NUTRITIONS LIMITED

7. The contract will be for a period of one year initially which can be renewed
for further period based on performance.
8. The contract may be terminated by giving 30days notice by either side.
9. Monthly payment will be made on 21st of next month.
10. All safety equipment will be provided by company.

11. Any incidents (threat/intentional activities) which can effect food safety
need to be reported to sampre management.
12. Awareness Training should be provided to workers regarding food safety/
threat security topics.

In witness where of both the management and the contractor have here in set
their hands on this day 21st July 2020.

Sampre Nutritions Ltd M/s. Sai Charan Services

Authorised Signatory Authorised Signatory

2|Page2
SAMPRE NUTRITIONS LIMITED
AGREEMENT
This agreement is made on this Date-19.03.19between M/s. SAMPENUTRITIONS
LTD here in after called the first party and FAST TECH ENGENEERING here in
after called second party as agreed to AC Maintenance of SAMPRE NUTRITIONS
LTD. It has become expedient enter into an agreement between the parties.

TERMS AND CONDITIONS


1. AC Mechanic should visit twice in a month and when required
2. The contractor shall ensure that the operating procedure is per equipment
design & manual, and all safety measures the operators are conversant and
are being followed without exception
3. . The contractor shall train the personnel on operation, efficiency, safety, &
usage of personal protective equipments
4. The contract will be for a period of one year initially which can be renewed for
further period based on performance
5. The contract may be terminated by giving 30days notice by either side.
6. Monthly payment will be made on 21st of next month.
7. All safety equipment will be provided by company.
8. The tenure of the agreement initially for the period of one year from 19.03.19
to 20.3.2020.
9. Any incidents (threat/intentional activities) which can effect food safety need to be
reported to sampre management.

10. Awareness Training should be provided to workers regarding food safety/ threat
security topics.

11. Background verification should be done while recruitment of new joinees

Sampre Nutrtions Ltd Fast Tech Engineering