Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 9

TABEL HARGA INVESTASI PERALATAN POLA

Umur Jam Bunga Luas Sewa Harga


Investasi Energi
Mesin Kerja Lantai Lantai Energi
Mesin (Rp) (thn) (jam) (%) (m2) (Rp/m2) (KWh) (Rp/KWh)

Mesin Penghisap Debu 10,000,000 10 1,900 12 10 250,000.00 4.5 532.35


Mesin Gergaji Pita 13,314,600 10 1,900 12 6 250,000.00 3.3 532.35
Mesin Bor 18,866,700 10 1,900 12 6 250,000.00 3.3 532.35
Mesin ampelas Piringan 18,567,900 10 1,900 12 16 250,000.00 3.3 532.35
Mesin Frais 41,121,900 10 1,900 12 16 250,000.00 3.3 532.25
Mesin Ampelas Silinder 17,723,700 10 1,900 12 4 250,000.00 3.3 532.35
Mesin Bubut 20,745,900 10 1,900 12 12 250,000.00 3.4 532.35
Mesin Ketam Perata 15,411,600 10 1,900 12 6 250,000.00 3 532.35
Mesin Gergaji Lengan 7,000,000 10 1,900 12 15 250,000.00 3 532.35
Mesin Ketam Penebal 22,820,000 10 1,900 12 12 250,000.00 3.2 532.35
Bangku Kerja 1,400,000 10 1,900 12 6 250,000.00 0 532.35
M esin Gergaji Bundar Bermeja 65,000,000 10 1,900 12 21 250,000.00 5.5 532.35
Kerja Resin 5,187,600 10 1,900 12 21 250,000.00 1.2 532.35
Assembling Pola 5 1,900 12 1 250,000.00 532.35
Kontrol Pola 8,000,000 10 1,900 12 9 250,000.00 532.35
Finishing 5 1,900 12 20 250,000.00 532.35
Biaya Gedung 500,000,000 20 1,900 12 250 250,000.00 0.8 532.35
Perawatan Biaya Biaya Biaya Biaya Biaya Tarif Tarif
Penyusutan Bunga Lantai Energi Perawatan Mesin/jam Mesin/menit
(%) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp/jam) (Rp/mnt)
Investasi Investasi x bunga Luas lantai x Sewa lantai Energi x Harga Energi Investasi x Perawatan Jumlah Biaya Jumlah biaya
Umur mesin x jam kerja 200 x jam kerja Jam kerja 100 x jam kerja 60
10 526.32 315.79 1,315.79 2,395.58 526.32 Rp 5,079.79 Rp 84.66
10 700.77 420.46 789.47 1,756.76 700.77 Rp 4,368.23 Rp 72.80
10 992.98 595.79 789.47 1,756.76 992.98 Rp 5,127.99 Rp 85.47
10 977.26 586.35 2,105.26 1,756.76 977.26 Rp 6,402.89 Rp 106.71
10 2,164.31 1,298.59 2,105.26 1,756.43 2,164.31 Rp 9,488.90 Rp 158.15
10 932.83 559.70 526.32 1,756.76 932.83 Rp 4,708.42 Rp 78.47
10 1,091.89 655.13 1,578.95 1,809.99 1,091.89 Rp 6,227.85 Rp 103.80
10 811.14 486.68 789.47 1,597.05 811.14 Rp 4,495.48 Rp 74.92
10 368.42 221.05 1,973.68 1,597.05 368.42 Rp 4,528.63 Rp 75.48
10 1,201.05 720.63 1,578.95 1,703.52 1,201.05 Rp 6,405.20 Rp 106.75
10 73.68 44.21 789.47 0.00 73.68 Rp 981.05 Rp 16.35
10 3,421.05 2,052.63 2,763.16 2,927.93 3,421.05 Rp 14,585.82 Rp 243.10
10 273.03 163.82 2,763.16 638.82 273.03 Rp 4,111.86 Rp 68.53
10 0.00 0.00 131.58 0.00 0.00 Rp 131.58 Rp 2.19
10 421.05 252.63 1,184.21 0.00 421.05 Rp 2,278.95 Rp 37.98
10 0.00 0.00 2,631.58 0.00 0.00 Rp 2,631.58 Rp 43.86
10 13,157.89 15,789.47 32,894.74 425.88 26,315.79 Rp 88,583.77 Rp 1,476.40
Nama Benda Pola
No. Gambar -
Jumlah benda 1

Harga bahan
Bahan Nama Bahan Jumlah
(Rp)
Kayu Jati - -
Mahoni 0.90 Rp 2,475.00
Multipleks - Rp 38,402.61
Logam Al -
Polystirol
Resin Resin SG 700 A+B 1.00 Rp 211,634.50
Pemisah (parting agent) 0.02 Rp 5,500.00
Bahan Langsung 0.00 Rp 258,012.11
Bahan Penunjang (10%/15%/20%) 20.00 Rp 51,602.42
Biaya bahan Rp 309,614.53

Perencanaan Waktu Pengerjaan Biaya Waktu Produksi


Over Head 20
Biaya Produksi + Over Head
Harga Penawaran Pola

Keuntungan (%) -
Biaya Tenaga Kerja/jam 3,947

UMR Bandung 600,000 38 3,947

Harga bahan
Bahan Nama Bahan Jumlah
(Rp)
Kayu Mahoni - 2,640
Multipleks - 88,076
Resin Resin SG 700 A+B 2 317,452
Pemisah (parting agent) 0.02 5,500
Bahan Langsung - 322,952
Bahan Penunjang (10%/15%/20%) 20 64,590
Biaya bahan 387,542
Perhitungan Biaya Produksi
Proses
Jam Biaya
Persiapan
Desain 4 -
Menggores 2 -
Persiapan 5 - Biaya Persiapan -
Proses
Kerja ban 30 -
Poles 2 -
Resin Nega 2 -
Cor Resin 5 -
Bubut - -
Milling - -
Assembling Biaya proses -
Proses akh 3 -
Kontrol 1 -
Finishing 2 -
Lain-lain 2 - Biaya Finishing -
Total 58 jam -

-
-
-
309,615
Kurs dolla10,000
Data Bahan Pola

Harga/unit PPN (10%) Harga / dm3


No. Nama Bahan Unit
$ Rp Rp Rp/dm3
1 Kayu Jati m3 2500000 2750000 2750
2 Kayu Mahoni m3 2500000 2750000 2750
3 Multipleks 5 mm lbr. 42500 46750 3246.52778
4 Multipleks 12 mm lbr. 90000 99000 3437.5
5 Multipleks 15 mm lbr. 110000 121000 3501.15741
6 Multipleks 20 mm lbr. 130000 143000 2482.63889
7 Multipleks 25 mm lbr. 145000 159500 2215.27778
8 Resin SG 700 A+B kg 192395 211634.5
16 Pemisah (parting agent) kg 25 250000 275000
17 Dempul san pollack kg 16500 18150
18 Cat Meni abu-abu kg 21000 23100
19 Cat meni merah kg 21000 23100
20 Cat finishing kg 0
21 Thinner ltr. 4750 5225
22 Sekrup kayu 3 cm kg 4000 4400
23 Paku 3 cm kg 6000 6600
p l t
2400 1200 5 14400000
2400 1200 10 28800000
2400 1200 12 34560000
2400 1200 20 57600000
2400 1200 25 72000000
Multipleks
Bahan p l t jml. total P
Mahoni 30 x 150 x 30 mm 2 bh. 270000 mm3 (mm)
Multipleks 100 x 100 x 3 mm 2 bh. 60000 mm3

Pola Awal

Nama P
Bahan (mm)
Multipleks 100
Mahoni 100

Negatif Pola

Nama P
Bahan (mm)
Multipleks 30
Resin SG 700 -
Mahoni 100

Pola Kotak Inti

Nama P
Bahan (mm)
Resin SG 700 -
Mahoni 300
Multipleks 600
Multipleks 750
Multipleks 700
Multipleks 300
Multipleks
L T Jml Jml. Harga Bahan Harga Bahan Harga Bahan
(mm) (mm) bh. dm3 per lembar per dm3

total Rp 29,915.80

Pola Awal

L T Jml Jml. Harga Bahan


Harga Bahan
(mm) (mm) bh. dm3 per dm3
100 3 2 60000 Harga / dm3 #VALUE!
150 30 2 900000 Rp - Rp -
total #VALUE!

Negatif Pola

L T Jml
Jml. Harga Bahan Harga Bahan
(mm) (mm) bh.
150 25 8 900000 Rp 3,246.53 Rp 25,972.22
- - - 0,25 kg Rp 99,000.00 Rp 24,750.00
150 30 2 900000 Rp - Rp -
total Rp 50,722.22

Pola Kotak Inti

L T Jml
Jml. Harga Bahan Harga
(mm) (mm) bh.
- - - 0.75 Rp 99,000.00 per-kilo Rp 74,250.00
40 40 2 0.48 Rp 2,750.00 per-dm3 Rp 5,500.00
400 20 2 4.8 Rp 2,482.64 per-dm3 Rp 11,916.67
300 25 4 5.625 Rp 2,215.28 per-dm3 Rp 12,460.94
100 25 2 1.75 Rp 2,215.28 per-dm3 Rp 3,876.74
100 25 4 0.75 Rp 2,215.28 per-dm3 Rp 1,661.46
Total Biaya Bahan Rp 109,665.80

You might also like