BEST PRACTICE CASE PHARMACEUTICAL INDUSTRY

Internal use only


Application Information Customer Information
Target Group: Pharmaceutical Target Group: Pharmaceutical
Field of activity: vacuuming of tablet dust during the process and manually Customer: Farmak

Initial situation Solution Benefit


During the manufacturing of pharmaceutical directly connection to the machine where  time saving, fast cleaning
pills a lot of dust occurs. the dust occurs (right picture) 
 higher process quality
The main problem is that the dust is very automatically vacuuming
 healthier environment for the employees
fine and often hazardous for the health of cleaning of different rooms (left picture) 
the employees. manual vacuuming  various accessories help at different levels
of accessibility

1 ISM-T | Basic Training | Moskow | Sep.2016


TECHNICAL DETAILS ABOUT THE PROJECT

Project Farmak
suction unit RA711 D3x8kW (24 kW in total)

suction points in total 14 suction points

suction points works at the same time 7 suction points

Total length of vacuum pipe 145meter

Distance between suction unit and farthest away suction 85 meter


point
Working time 16 h / day

Timeline First part – March 2015 ( RA 711 5x3kW )


Second part – March 2016 ( + RA 200 and 3 turbines with
each 3kW) because of five additional suction points