The document provides details on cementing calculations for a well, including displacement volumes for different casing and drill pipe sizes, plug heights, cement slurry design with volumes of cement, water, defoamer and retarder. It specifies a cement design of 1.113 cubic feet per sack requiring 380.9 sacks for a total of 16.2 metric tons, and a mix fluid volume of 43.1 barrels.
The document provides details on cementing calculations for a well, including displacement volumes for different casing and drill pipe sizes, plug heights, cement slurry design with volumes of cement, water, defoamer and retarder. It specifies a cement design of 1.113 cubic feet per sack requiring 380.9 sacks for a total of 16.2 metric tons, and a mix fluid volume of 43.1 barrels.
The document provides details on cementing calculations for a well, including displacement volumes for different casing and drill pipe sizes, plug heights, cement slurry design with volumes of cement, water, defoamer and retarder. It specifies a cement design of 1.113 cubic feet per sack requiring 380.9 sacks for a total of 16.2 metric tons, and a mix fluid volume of 43.1 barrels.