3 GENERAL NOTES:
4 1. OPERATING CONDITIONS
5 - NPSHA @ DESIGN FLOW IS 9,0 m WITH 1,0 m SAFETY MARING INCLUDED. NPSHA @ 126% OF DESIGN FLOW IS 9,3 m (WITHOUT SAFETY MARGIN INCLUDED). 02
6 THE NPSHR @ 126% OF RATED CAPACITY SHALL NOT EXCEED NPSHA AT THAT CAPACITY
02
7 - MAX. POSSIBLE SHUT OFF PRESSURE 9,5 kg/cm²(g) TO BE VERIFIED BY PUMP VENDOR 02
8 - VENDOR TO ADVISE MINIMUM CONTINUOUS CAPACITY.
9 - TURNDOWN FLOWRATE: 50% OF NORMAL FLOWRATE
10 - THE TEMPERATURE CONSIDERED IN THE START UP OF THE CLOSED CIRCUIT COOLING WATER SYSTEM IS 22ºC
11 - MAXIMUM SUCTION PRESSURE IS STATED AT THE PUMP CENTER LINE ELEVATION, CONSIDERING: THE STATIC SUCTION HEAD OF 0,6 m, OPERATING PRESSURE
12 AT SUCTION EXPANSION VESSEL OF 0 kg/cm2g AND THE MAXIMUM HEIGHT LIQUID LEVEL (HLL) IN THE EXPANSION VESSEL OF 2,0 m ABOTE TL. 02
13 2. SITE DATA / UTILITY CONDITIONS
14 - ENVIRONMENTAL CONDITIONS INCLUDE REFINERY, HIGH HUMIDITY, MARINE ATMOSPHERE AND SALTY AIR.
15 - PUMP SHALL BE DESIGNED TO OPERATED IN A TOTALLY UNPROTECTED, OUTDOOR ENVIRONMENT.
16 3. PUMPED FLUID
17 - CLOSED CIRCUIT COOLING WATER TYPICAL COMPOSITION:
18 PARAMETER UNIT VALUE
19 Conductivity µS/cm < 3000
20 pH -- 8.4 - 9.0
21 Iron (total) ppm Fe <1
22 Corrosion Rate mil/year 1 (Coupon)
23 Chlorides ppm Cl < 100
24 Hydrocarbon ppm <5
25 Molibdate ppm MnO4 200 - 300
26 4. MATERIALS
27 - MAXIMUM TEMPERATURE FOR MATERIAL SELECTION: 70ºC
28 - BASEPLATE MATERIAL WILL BE C.S. VENDOR TO RECOMMEND BEST MATERIAL SELECTION.
29 5. PUMP PERFORMANCE
30 - STABLE HEAD/CAPACITY CURVES ARE REQUIRED WITH CONTINUOUSLY RISE TO SHUT OFF.
31 6. ELECTRIC MOTOR REQUIREMENTS
32 - MOTORS WITH POWER EQUAL OR GREATER THAN 75 kW SHALL BE EQUIPPED WITH SPACE HEATERS 230V/1 PH/60 Hz (SURFACE TEMPERATURE LIMITATION 160 °C)
33 - SIX WINDING TEMPERATURE DETECTOR (2 PER PHASE) ARE FORESEN FOR MOTORS POWERS GREATER THAN 150 Kw. ALL DETECTOR LEADS SHALL BE
34 METALLIC ARMORED AND BROUGHT TO SEPARATE TERMINAL BOX
35 7. PUMP CONSTRUCTION
36 - PUMPS TO BE MANUFACTURED IN ACCORDANCE WITH API 610 10th EDITION AND GP-10-01-01
37 - COUPLING SHALL BE SPACER TYPE FLEXIBLE COUPLING BETWEEN PUMP AND DRIVER
38 - COUPLING SHALL BE NON-LUB, SPACER, STEEL HUBS. MIN SPACER LENGTH SHALL BE 125 mm.
39 - COUPLING SHALL BE RATED IN ACCORDANCE WITH GP-10-01-01.
40 - PUMP VENDOR SHALL HAVE UNIT RESPONSABILITY FOR THE COORDINATION OF DESIGN AND SATISFACTORY MECHANICAL OPERATION OF THE
41 PUMP/ELECTRIC MOTOR TRAIN.
42 - DRAIN AND VENT CONNECTIONS SHALL BE FLANGED AND VALVED
43 8. SURFACE PREPARATION AND PAINT
44 - THE FINAL COLOUR OF THE EQUIPMENT WILL BE IN ACCORDANCE WITH PLANT STANDARDISED COLOURS AS PER PROJECT SPECIFICATIONS
45 9. MECHANICAL SEAL
46 - MECHANICAL SEAL SHALL BE CONTACTING WET TYPE.
47 - ALL THREADED CONNECTIONS IN FLAMMABLE, TOXIC OR HARZADOUS APPLICATIONS SHALL BE SEAL WELDED, EXCEPT AT MECHANICAL SEAL
48 GLAND AND INSTRUMENT CONNECTIONS.
49 - THE FINAL SELECTION OF SEAL SYSTEM AND GUARANTEE OF SEAL PERFORMANCE SHALL BE RESPONSIBILITY OF PUMP/SEAL SUPPLIERS IN
50 ACCORDANCE WITH PURCHASER REQUIREMENTS.
51
52
53
54
55
56
57
58
59
60
PAGE 4 OF 8
JOB NO. 02070 ITEM NO.(S) CWC-P-002-A/B
REQ / SPEC NO. 020700528 /
PURCH ORDER NO. DATE
CENTRIFUGAL PROCESS PUMP DATA SHEET REVISION NO 02 BY A. GALÁN DATE 20/01/2017
API 610 10th Ed(ISO 13709) S.I. UNITS
1 CONSTRUCTION SURFACE PREPARATION AND PAINT
2 ROTATION: (VIEWED FROM COUPLING END) CW CCW MANUFACTURER'S STANDARD OTHER (SEE BELOW)
3 PUMP TYPE: (4.1) SPECIFICATION NO. GP 19-01-01 (SEE NOTE 1)
4 OH2 OH3 OH6 OTHER PUMP:
5 CASING MOUNTING: PRIMER
6 CENTERLINE IN-LINE OTHER FINISH COAT
7 BASEPLATE: (6.3.17)
8 CASING TYPE: PRIMER
9 SINGLE VOLUTE MULTIPLE VOLUTE DIFFUSER FINISH COAT
10 CASE PRESSURE RATING: DETAILS OF LIFTING DEVICES(6.3.20)
11 SHIPMENT: (7.4.1)
12 MAX ALLOWABLE WORKING PRESSURE kg/cm²(g) DOMESTIC EXPORT EXPORT BOXING REQUIRED
13 @ 70 (°C) OUTDOOR STORAGE MORE THAN 6 MONTHS
14 HYDROTEST PRESSURE kg/cm²(g) SPARE ROTOR ASSEMBLY PACKAGED FOR:
15 NOZZLE CONNECTIONS: (5.4.2) HORIZONTAL STORAGE VERTICAL STORAGE
16 SIZE FLANGE FAC'G POSITION TYPE OF SHIPPING PREPARATION
17 RATING
44 REMARKS
45 (NOTE 2)
46 INSPECTION OR TEST REQUIRED WITNESSED CERTIFIED DATA
47 HYDROSTATIC TEST YES NO (4) YES
48 PERFORMANCE TEST YES NO (2) YES
49 NPSH TEST (1) (1) YES
50 INSPECTION BY PURCHASER
51 (PER GP 20-01-01) YES -- --
52 DISMANTLED INSPECTION (3) -- --
53 Notes:
54 1) If the NPSH required by the pump differs from the specified available NPSH by 3 ft (1.0 m) or less, an
55 NPSH test and witnessed performance test is required.
56 2) Performances test shall be witnessed if:
57 a) The manufacturing facility has no previous experience with the pump.
58 b) Manufacturer has made significant changes to standard designs in critical areas such as hydraulic
59 Eachbalance and shaftasealing.
pump receiving witnessed performance test shall be dismantled by Manufacturer for
60
61 3) inspection by Inspector following the final performance test, inspection shall include bearings and
61 housings
62 4) Hydrostatic tests shall be witnessed for all high alloy castings (e.g., 300 series S. S., Incolloy, Inconel
62 and Monel
63
PAGE 6 OF 8
JOB NO. 02070 ITEM NO.(S) CWC-P-002-A/B
REQ / SPEC NO. 020700528 /
PURCH ORDER NO. DATE
CENTRIFUGAL PROCESS PUMP DATA SHEET REVISION NO 02 BY A. GALÁN DATE 20/01/2017
API 610 10th Ed(ISO 13709) S.I. UNITS
1 APPLICABLE TO: PROPOSALS PURCHASE AS BUILT
2 FOR PETROPERU S.A. UNIT CLOSED CIRCUIT COOLING WATER SYSTEM (CWC)
3 SITE PMRT-TALARA, PERU SERVICE CWC BLOWDOWN PUMPS
4 NOTES: INFORMATION BELOW TO BE COMPLETED: BY PURCHASER BY MANUFACTURER BY MANUFACTURER OR PURCHASER
5 PRESSURE VESSEL DESIGN CODE REFERENCES.
43 FLUID DATA - (FOR QUENCH, BUFFER AND BARRIER FLUID DATA, SEE PAGE 2)
44 PUMPED STREAM HAZARDOUS FLAMMABLE
45 TYPE OR NAME COOLING WATER CONC'N % FLUID SOLID @ AMBIENT
46 DISSOLVED CONTAMINANT H2S PPM WET SOLIDIFIES @ °C POUR POINT °C
47 Cl2 <100 PPM OTHER @ PPM PUMPED STREAM SOLIDIFIES UNDER SHEAR
48 SOLID CONTAMINANT PUMPED STREAM CONTAINS AGENTS THAT POLYMERIZE
49 CONCENTRATION (MASS FRACTION) SPECIFY AGENTS @ TEMP °C
50 PUMPING TEMPERATURE PUMPED STREAM CAN PLATE OUT OR DECOMPOSE:
02
51 MIN 22 °C NOR 37 °C MAX 37 °C SPECIFY CONDITIONS
52 RELATIVE DENSITY (TO WATER @ 25°C) AT REF. TEMP. PUMPED STREAM IS REGULATED FOR FUGITIVE OR
53 @ NORMAL TEMP
02
0.9934
@ MAX TEMP OTHER EMISSIONS. REGULATION LEVEL PPM
54 ABSOLUTE VAPOR PRESSURE AT REFERENCE TEMP. SPECIAL PUMP CLEANING PROCEDURES
55 @NOR TEMP 0.064 kg/cm²(a) @MAX TEMP 02 kg/cm²(a) SPECIFY;
56 ATMOSPHERIC BOILING POINT. °C ALTERNATE PROCESS FLUIDS & CONCENTRATION
57 VISCOSITY @ NORMAL PUMPING TEMP. 0.69 02 cP (INCL. COMMISIONING)
58 FLUSH FLUID (PLAN 32) If flush fluid is pumpage, then flush fluid data is not required. ABSOLUTE VAPOR PRESSURE AT REFERENCE TEMP.
59 TYPE OR NAME CONC'N % @NOR TEMP kg/cm²(g)
60 SEAL VENDOR REVIEW REQUIRED @MAX TEMP kg/cm²(g)
61 FLUID TEMPERATURE ATMOSPHERIC BOILING POINT. °C
62 MIN °C NOR °C MAX °C VISCOSITY @ NORMAL PUMPING TEMP. (cP)
63 RELATIVE DENSITY (TO WATER @ 25°C) AT REF. TEMP. FLOW RATE REQ'D MAX/MIN / m3/h
64 @ NORMAL TEMP @ MAX TEMP PRESS REQD MAX/MIN / kg/cm²(g)