Sample Sheets

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

C1,C2=13465

C1 C2
O.H.W.T.
C3 = 13050 CONSTRUCTION DETAILS :-
C3

TRADE: 0.23
RISER : 0.17
1. R.C.C. FRAMED STRUCTURE
PARAPET WALL LEVEL
+9.75m
300
SUNK
300
SUNK
300
SUNK C4,C5=10745 2. INTERNAL WALL THICKNESS = 100mm
TERRACE SLAB LEVEL
TERRACE WC BATH BATH TERRACE C4 C5
+8.7m 17
16
15 C6 = 9900 3. EXTERNAL WALL THICKNESS = 150mm
+7.68m
14
13
C6
12
11
10
4. FLOOR TO FLOOR HEIGHT = 2.9m
+6.82m 7
6 C7,C8=8285

SUNK

SUNK

SUNK

SUNK
5

5. TYPE OF STAIRCASE = OPEN WELL

300

300

300

300
4 C7 C8
SECOND SLAB LEVEL 3
2

+5.8m BED ROOM WC BATH 1


17
BATH WC BED ROOM
16
15
14 C9 = 6790 6. RISE = 170mm
+4.78m 13
12 C9
11

7. TREAD = 230mm
10

+3.92m 7
6
C10,C11=5295

SUNK

SUNK

SUNK

SUNK
5

300

300

300

300
C10 C11 8. FOUNDATION FOOTING = BOX FOOTING
4

FIRST SLAB LEVEL 3


2

+2.9m BED ROOM WC BATH 1


17
BATH WC BED ROOM
16

+0.86m
15
14
13 C6 = 3680
9. PLINTH LEVEL = 450mm
12
11 C12
10

50 THK FLOORING +1.02m 7


8
9
C13,C14=2835 10. EXPOSURE CONDITION = MILD
100 THK PCC 6 C13 C14
5
300 THK RUBBLE SOLING 4
3
2
1
450 11. GRADE OF CONCRETE = M20
GL
GL GL +0.0m GL
12. GRADE OF STEEL = Fe 415
C6 = 530
2000 C15
ELEVATION 0.000
C16 C17

SECTION A-A

C3,C15=6212.5

C6,C9,C12=7292.5
C7,C10=225

C8,C11=3225
C2,C5,C14,

0.000
1 2 3 4 C17=3262.5
C1,C4,C13,
7105 C16 = 187.5
3075 2950 1080
PB1
A FOUNDATION PLAN

415
PB2
B
C1 C2 DETAILS OF SLABS
C3
1 2 3 4
SR.NO. DESIGNATION DIMENSION DETAILS

PB13

PB18
7105

2305
3075 2950 1080
S1, S11,S12,

PB24
FB1 1 2.99m x 2.49m TWO WAY
PB3 A
S22, S23, S33

415
FB2 FB3
C C1 C2
B S2, S9, S13 ,
C4 C5

845
PB4 C3 2 2.72m x 2.92m TWO WAY
S20, S24, S31

FB27
D

FB14

FB19
PB14

PB19

2305
C6
S3, S10, S14,
S12 3 0.85m x 2.92m ONE WAY

1615

FB25
S21, S25, S32
PB5 FB4 S13 S14

PB26
E C S4, S8a, S15,
C4 C5 4 2.20m x 0.8m ONE WAY
19a, S26, S30a

845
1000 C7 C8
DN FB5

1495
FB5' S15
D
S4a, S8, S15a,

FB15
PB6 C6
S15b 5 2.20m x 1.2m ONE WAY
13350

PB21
PB15

PB20
19, S26a, S30

1615
F
S15a

FB20
C9
1495
FB6 S4b, S8b, S15b,

FB28
UP E 6 2.20m x 0.56m ONE WAY
230 PB7
19b, S26b, S30b
C7 C8 S16

PB27
G

1495
C10 C11 S5, S7, S16,
7 3.8m x 2.88m TWO WAY
FB7 S18, S27, S29
1615

13350

FB21
FB16

FB22
F
PB16

PB22
PB8 C12 C9 C10
8 S6, S17, S28 0.92m x 2.76m ONE WAY

1495
H S17
845

PB9 FB8

FB29
I G TWO WAY
C11 C12 9 S34 2.99m x 2.76m

FB22'
C13 C14 (STAIRCASE HEAD ROOM)
S18

PB25

1615
S19
2305

FB17
FB8'
PB17

PB23

FB9 C13
S19b
H

FB23
S19a

845
PB11 FB10
J I
415

PB10 C15
K C14 C15 S21

FB26
C16 C17

2305
S20

FB18

FB24

FB30
WORKING PLAN AT PARKING LEVEL BEAM LAYOUT AT PLINTH LEVEL
S22
FB12 FB13
J

415
FB11 C16
A 1 2 3 4 K
7480 C17 C18
7105 BRICKWORK
3150 150 BEAM AND SLAB LAYOUT AT SECOND FLOOR LEVEL
150 3075 2950 1080 50 THK FLOORING
150 2800 150
W B1
1 2 3 4 COLUMN
980 A
W
415

C1 C2 B2 B3
B 7105
C3 3075 2950 1080
100
TB1 300 SUNK 100 THK PCC
B27
2700

BEDROOM
B14

B19

A
2305
0.98 x 3.05
TERRACE

50 THK CEMENT AND

415
3.15 x 2.7 C1 C2 TB2 TB3
3050

KITCHEN S1 CHEMICAL GROUTING


100

B
B25

W 2.80X3.00 S3 C3
B4 S2 100 THK BRICK BAT COBA

TB27
TB14

TB19
100 D C

2305
D C4 C5 FLOOR SLAB
845

150
B19'

WC D S23
930

TB25
V S4 B5
1.2 x 0.93 OP D B5'
100 D TB4 S24 S25 TYPICAL SECTION FOR SUNK SLAB AT TOILET
B15

C6
S4b C ( SCALE:-1:50 )
1615

BATH
1200

V S4a C4 C5

845

TB19'
B20

150 2.20x1.20 S26 TB5


LIVING ROOM B6 TB5'
3000

D
B28

E S26b

TB15
3.88X3.00 C6
1000 C7 C8 S5

1615
DN

TB20
1495

W
D S26a
150 TB6

TB28
B7
13580

12750

13350
2920

B21

E
B16

B22

1000 F
C9 C7 C8 S27
ALL DIMENSIONS ARE IN MM
1495
1495

D S6
UP
TB7
B8 Sinhgad Technical Education Society's
13350

TB21

TB22
TB16
LIVING F
3000

B29

G
3.88X3.00 C9 C10
SINHGAD COLLEGE OF ENGINEERING, PUNE 411 041
C10 C11
B22'

150 S7
1495

BATH
1200

S28
1615

V 2.20X1.20 S8
B8' TB8
B17

150 B9 C12
TITLE :- STRUCTURAL PLAN

TB29
100 D S8b G
WC OP H C11 C12
TB22'
B23
930

V 1.2 x 0.93 D S8a S29


845

DATE SIGNATURE REMARKS SYMBOL


B30

1615

D B10 S30
100 D I
TB17

TB8'
TB9 C13
0.98 x 3.05

C13 C14 S10


TERRACE

S30b
KITCHEN H STARTING
B26
3050

W
TB23
100

S30a
845

2.80X3.00
2305

BEDROOM S9 TB10
2700

CONTINUATION
B24
B18

3.15 x 2.7 I
S11 C14 C15 S32

TB26
J
B12 B13 CONTINUATION SHEET No.:- 1
2305
415

B11

TB30
C15 S31
TB24
TB18

W K
980 100
W 2800 150 C16 C17
COMPLETION SCALE :- 1:100
S33
150 150 TB12 TB13
3150 150 J NAME:- GANESH NARAYAN SHINDE CLASS :- TE (CIVIL), A
415

BEAM AND SLAB LAYOUT AT FIRST FLOOR LEVEL TB11 C16


A K
C17 C18 ROLL No. :- 301089
WORKING PLAN FIRST AND SECOND AT FLOOR LEVEL BEAM AND SLAB LAYOUT FOR TERRACE FLOOR LEVEL
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

MAIN STEEL
10mm # @ 270mm c/c

230
ALT. BENT UP
115

3NOS. -10mm DIA. #

150
765

IN EACH LAYER
A' MAIN STEEL
10mm # @ 270mm 100
c/c ALT. BENT UP C'
230

815
10mm # @ 270mm c/c
ALT. BENT UP

MAIN STEEL
115 S1

10mm # @ 240mm
c/c ALT. BENT UP
2490

100
MAIN STEEL

@ 240mm c/c ALT. BENT UP


S1

8mm # @ 210mm c/c


185mm C/C DISTR
MAIN STEEL 10mm #
0.1L
SCHEDULE OF SLABS

ALT. BENT UP
MAIN STEEL
6mm DIA @
0.1L

2910
S3
S2 S3
STEEL ALONG
SLAB THK. SPANNING
300 115
SHORT SPAN LONG SPAN
SUNK S4
185 C/C DISTR

230 S1, S11,S12,


6mm DIA @

100
THICKNESS
115 10 # @ 270 C/C 10 # @ 240 C/C TWO WAY
8mm # @ 210 C/C

S22, S23, S33


100mm

105
2230

S4b S2, S9, S13 ,


S4a 115 10 # @ 270 C/C 6 Ø @ 185 C/C TWO WAY
S20, S24, S31
MAIN STEEL

10mm # @ 270mm c/c

10mm # @ 270mm c/c


100 10mm # @ 210mm c/c ALT. BENT UP S3, S10, S14,
100 8 # @ 210 C/C 6 Ø @ 185 C/C ONE WAY

ALT. BENT UP

ALT. BENT UP
MAIN STEEL

MAIN STEEL
S21, S25, S32

10mm # @ 240mm c/c

2880
S5
S4, S8a, S15, ONE WAY

MAIN STEEL
100 8 # @ 210 C/C 6 Ø @ 185 C/C
19a, S26, S30a 300 SUNK
105 S5
S4a, S8, S15a, ONE WAY
100 100 8 # @ 210 C/C 6 Ø @ 185 C/C
19, S26a, S30 300 SUNK

SECTION :- C-C'
SECTION :- A-A'

S4b, S8b, S15b,


100 8 # @ 210 C/C 6 Ø @ 185 C/C ONE WAY
2760

19b, S26b,S30b
S6

100

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


S5, S7, S16,
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

6mm DIA @ 185mm


105 10 # @ 240 C/C 10 # @ 210 C/C TWO WAY
C/C DISTR S18, S27, S29

10mm # @ 240mm c/c


S6 S6, S17, S28 8 # @ 210 C/C 6 Ø @ 185 C/C

MAIN STEEL
100 ONE WAY

10mm # @ 270mm c/c

10mm # @ 270mm c/c


105

ALT. BENT UP

ALT. BENT UP
MAIN STEEL

MAIN STEEL

2880
S34 135 10 # @ 240 C/C 10 # @ 210 C/C TWO WAY
S7
MAIN STEEL
S8 10mm # @ 210mm c/c ALT. BENT UP Lx/5
8mm# @ 210 C/C

185 C/C DISTR


6mm DIA @
2230

S8b
105
100
230 Lx/5
300 S8a

@ 240mm c/c ALT. BENT UP


SUNK

MAIN STEEL 10mm #


115 D D'

DISTRIBUTION STEEL

8mm # @ 210mm c/c


185mm C/C DISTR
S10 6mm @ 185mm c/c

ALT. BENT UP
S9

MAIN STEEL
6mm DIA @

2910
S10
10mm # @ 270mm c/c

10mm # @ 240mm

0.1L
c/c ALT. BENT UP

MAIN STEEL
ALT. BENT UP

MAIN STEEL
2490

0.1L
S11

Lx/5

100
115 MAIN STEEL
S11 8mm # @ 210mm c/c
ALT. BENT UP D
B'

MAIN STEEL C
230
B
10mm # @ 270mm c/c
ALT. BENT UP
100
A
115 MAIN STEEL
10mm # @ 270mm c/c SECTION :- D-D'
ALT. BENT UP

BEAM AND SLAB LAYOUT AT FIRST FLOOR UPTO


TERRACE LEVEL
3NOS. -10mm DIA. # 3NOS. -10mm DIA. #
IN EACH LAYER IN EACH LAYER
MAIN STEEL ALL DIMENSIONS ARE IN MM
MAIN STEEL MAIN STEEL 6mm DIA @
D D' 8mm # @ 210mm c/c
10mm # @ 270mm c/c 10mm # @ 270mm c/c 185 C/C DISTR Sinhgad Technical Education Society's
ALT. BENT UP
ALT. BENT UP ALT. BENT UP
SINHGAD COLLEGE OF ENGINEERING, PUNE 411 041
115 100 TITLE :- DESIGN OF SLAB
DATE SIGNATURE REMARKS SYMBOL
0.1L 0.1L
STARTING
MAIN STEEL MAIN STEEL
10mm # @ 240mm c/c 10mm # @ 240mm c/c CONTINUATION
ALT. BENT UP ALT. BENT UP
CONTINUATION SHEET No.:- 2
2990 2720 850
230 COMPLETION SCALE :- 1:40
PLAN OF TOP REINFORCEMENT PLAN OF BOTTOM REINFORCEMENT
S11 S9 S10 NAME:- GANESH NARAYAN SHINDE CLASS :- TE (CIVIL), A
SECTION :- B-B' ROLL No. :- 301089

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


23.73 kN/m
DISTRIBUTION STEEL
8 # @ 270 c/c

13.31kN/m

155 Ld
=
47 100
0
S6
DISTRIBUTION STEEL
8 # @ 270 c/c FBD

230 1.035m 1.265m


230
155 155
PLINTH LEVEL 2.3m
MAIN STEEL 170 155
10 # @ 300 c/c
RA = 18.93 kN
RA = 24.86 kN
STAIRCASE DETAILS
MAIN STEEL
10 # @ 300 c/c
230 230
SIZE
Sr. No. DESCRIPTION
18.93 kN (m)
L1 = 2300 L1 = 2300

1 FLOOR TO FLOOR HEIGHT 2.9m


5.16 kN
OPEN - WELL STAIRCASE FOR FLIGHT 1st OPEN - WELL STAIRCASE FOR FLIGHT 3rd
SFD 2 FOR 1st AND 3rd FLIGHT

1.252
3 LANDING WIDTH 1m
150 1000 1150 1000
C D 24.86 kN 4 RISER 0.17m

5 No. of RISER 6

6 TREAD 0.23m
1000

DN

7 No. of TREAD 5
13.02 kN/m
12.46 kN/m

8 FLOOR TO 2nd FLIGHT

BMD 9 No. of RISER 5


2920

920

23.73 kN/m
10 TREAD 0.23m

13.31kN/m 13.31kN/m
PLINTH BEAM 11 No. of TREAD 4

12 GRADE OF CONCRETE M20 N/mm^2


1000

UP FBD
13 GRADE OF STEEL Fe 415 N/mm^2
230
1.035m 0.92m 1.035m

2.99m
B A
150 RA = 24.69 kN RB = 24.69 kN
PLAN

DISTRIBUTION STEEL 24.69 kN


8 # @ 270 c/c

10.92 kN

0 155
=
47 SFD
Ld
1.495
MAIN STEEL 10.92 kN
10 # @ 270 c/c 230
ALL DIMENSIONS ARE IN MM
24.69 kN Sinhgad Technical Education Society's
230
170 155
SINHGAD COLLEGE OF ENGINEERING, PUNE 411 041
155 TITLE :- DETAILS OF STAIRCASE
DATE SIGNATURE REMARKS SYMBOL
STARTING
20.94 kN/m
230 CONTINUATION

18.43 kN/m 18.43 kN/m CONTINUATION SHEET No.:- 3


L1 = 2.99m
COMPLETION SCALE :- 1: 20
OPEN - WELL STAIRCASE FOR FLIGHT 2nd NAME:- GANESH NARAYAN SHINDE CLASS :- TE (CIVIL), A
ROLL No. :- 301089
BMD
FLOOR BEAMS:-

2.720 230 2.46 TOP BOTTOM SHEAR


REINFORCEMENT REINFORCEMENT REINFORCEMENT
DESIGNATION SIZE
0.3 x L = 816 0.3 x L = 738 0.3 x L = 933
X Z EXTRA @ DIA. SPACING
2 Nos. - 10mm dia. of bars 2 Nos. - 12mm dia. of bars
SUPPORT FULL FULL MID
Y (mm) (mm)
B1,B11,FB1,FB11,TB1,TB11 230 415 2-10 mm # 2-10 mm # - 8 290

B2,B12,FB2,FB12,TB2,TB12 230 415 2-10 mm # 2-12 mm # - 8 280


280 280

B3,B13,FB3,FB13,TB3,TB13 230 350 2-10 mm # 2-10 mm # - 8 240


Ld = 752mm

B4,B10,FB4,FB10,TB4,TB10 230 415 2-12 mm # 2-16 mm # - 8 290


Y'
X' 2 Nos. - 10mm dia. of bars 2 Nos. - 16mm dia. of bars Z' B5,B9,FB5,FB9,TB5,TB9
C2 2 LEGGED CLOSED C5 2 LEGGED CLOSED C8 230 415 2-12 mm # 2-16 mm # - 8 290
B19 STIRRUPS 8mm dia. B20 STIRRUPS 8mm dia.
@ 280mm @ 280mm 2-12 mm # - 8

B5', B8',FB5', FB8',TB5', TB8' 230 350 2-10 mm # 2-12 mm # - 8 240


793 1488
2 - 10 # 2 - 10 # 2 - 10 # B6,B8,FB6,FB8,TB6,TB8 230 350 2-10 mm # 2-12 mm # - 8 240

115
B7,FB7,TB7 230 405 2-10 mm # 5-12 mm # - 8 285

B14, B18 230 415 2-10 mm # 2-12 mm # - 8 270


400

400

400
2 LEGGED CLOSED 2 LEGGED CLOSED 2 LEGGED CLOSED

300
STIRRUPS 8mm dia. STIRRUPS 8mm dia. STIRRUPS 8mm dia. B15,B17,FB15,FB17,TB15,TB17 230 350 2-10 mm # 2-12 mm # - 8 240
@ 280mm @ 280mm @ 280mm
25 25 25 1-10 mm # -

2 - 12 # 2 - 10 # 2 - 12 # B16,FB16,TB16 230 415 2-10 mm # 2-12 mm # - 8 280


230 230 230 B19,B24,FB19,FB24,TB19,TB24 230 400 2-10 mm # 2-10 mm # 2-12 mm # - 8 280
SECTION :- X - X' SECTION :- Y - Y' SECTION :- Z - Z' B19',B22',FB19',FB22',TB19',TB22' 230 350 2-10 mm # 3-12 mm # - 8 240

B20,B23,FB20,FB23,TB20,TB23 230 400 2-10 mm # 2-10 mm # 2-10 mm # - 8 280


LONGITUDINAL SECTION OF B19, B20
B22,FB22,TB22 230 400 2-10 mm # 2-16 mm #

B21 230 350 2-10 mm # 3-12 mm # - 8 240

B25,B26,FB25,FB26,TB25,TB26 230 415 2-10 mm # 3-12 mm # - 8 290

2.72m B27,B30,FB27,FB30,TB27,TB30 230 415 2-10 mm # 2-10 mm # 2-12 mm # - 8 280

B28,B29,FB28,FB29,TB28,TB29 230 415 2-10 mm # 2-10 mm # 2-10 mm # - 8 280


X 2 Nos. - 10mm dia. of bars

280
PLINTH BEAMS:-
Ld = 752mm

TOP BOTTOM SHEAR


X' 2 Nos. - 12mm dia. of bars
REINFORCEMENT REINFORCEMENT REINFORCEMENT
793
DESIGNATION SIZE
2 - 10 # 2 LEGGED CLOSED EXTRA @ DIA. SPACING
STIRRUPS 8mm dia. SUPPORT FULL FULL MID
(mm) (mm)
115
@ 280mm
PB1,PB10 230 450 2-10 mm # 2-10 mm # - 8 290
415

2 LEGGED CLOSED PB2,PB11 230 450 2-10 mm # 2-12 mm # - 8 280


STIRRUPS 8mm dia.
@ 280mm PB3,PB9 230 450 2-10 mm # 2-10 mm # - 8 240
25
PB4,PB8 230 450 2-12 mm # 2-16 mm # - 8 290
2 - 10 #
PB5,PB7 230 450 2-12 mm # 2-16 mm # - 8 290
230

SECTION :- X - X' PB6 230 450 2-10 mm # 2-12 mm # - 8 240

LONGITUDINAL SECTION OF B14 PB13,PB17 230 450 2-10 mm # 2-10 mm # 8 290

PB14,PB16 230 450 2-10 mm # 2-12 mm # - 8 240

PB15 230 450 2-10 mm # 2-12 mm # - 8 280

PB20 230 450 2-10 mm # 2-12 mm # - 8 280


2.720 230 2.46
PB18,PB23 230 450 2-10 mm # 2-10 mm # 2-12 mm # - 8 280
0.3 x L = 816 0.3 x L = 738 0.3 x L = 933
X Z PB19,PB22 230 450 2-10 mm # 2-10 mm # 2-12 mm # - 8 280
2 Nos. - 10mm dia. of bars 2 Nos. - 12mm dia. of bars
Y
PB20 230 450 2-10 mm # 2-12 mm # - 8 280

PB21 230 450 2-10 mm # 2-10 mm # 2-10 mm # - 8 280


280 280
PB24,PB25 230 450 2-10 mm # 3-12 mm # - 8 290

PB26,PB27 230 450 2-10 mm # 2-10 mm # 2-10 mm # - 8 280


Ld = 752mm

Y'
X' 2 Nos. - 10mm dia. of bars 2 Nos. - 16mm dia. of bars Z'
C2 2 LEGGED CLOSED C5 2 LEGGED CLOSED C8
PB18 STIRRUPS 8mm dia. B19 STIRRUPS 8mm dia. ALL DIMENSIONS ARE IN MM
@ 280mm @ 280mm Sinhgad Technical Education Society's

793 1488 SINHGAD COLLEGE OF ENGINEERING, PUNE 411 041


2 - 10 # 2 - 10 # 2 - 10 #
TITLE :- DETAILS OF RCC BEAMS
115
DATE SIGNATURE REMARKS SYMBOL
450

450

450

2 LEGGED CLOSED 2 LEGGED CLOSED 2 LEGGED CLOSED STARTING


300

STIRRUPS 8mm dia. STIRRUPS 8mm dia. STIRRUPS 8mm dia.


@ 280mm @ 280mm @ 280mm CONTINUATION
25 25 25
CONTINUATION SHEET No.:- 4
2 - 12 # 2 - 10 # 2 - 12 #
COMPLETION SCALE :- 1:75
230 230 230
NAME:- GANESH NARAYAN SHINDE CLASS :- TE (CIVIL), A
SECTION :- X - X' SECTION :- Y - Y' SECTION :- Z - Z'
ROLL No. :- 301089
LONGITUDINAL SECTION OF PB18, PB19
6mm bar 230mm c/c
230
BAR BENDING SCHEDULE OF COLUMN
0.3 L 0.3 L SIZE LONGITUDINAL TRANSVERSE
2 - 10 # mm bar 2 - 10 # mm bar Sr. No. COLUMN
( mm ) REINFORCEMENT REINFORCEMENT

1 UNIAXIAL 230 x 250


4 Nos. of 20mm # bar 6mm bar 230mm c/c

415
2 BIAXIAL 230 x 250

2 - 10 # mm bar 2 - 10 # mm bar
8mm BAR @ 230mm C/C TERRACE BEAM
BAR BENDING SCHEDULE OF FOOTING
C C'
4 - 20 # mm bar SIZE STEEL ALONG 'X' STEEL ALONG 'Y'
Sr. No. FOOTING
(m) DIRECTION DIRECTION
4 - 20 # mm bar
Lf Bf Df

2900
250
8mm BAR @ 6mm bar 230mm c/c UNIAXIALLY LOADED
12mm # bar 12mm # bar
230mm C/C 1 PAD FOOTING 1.325 1.325 0.45
@ 180mm c/c @ 180mm c/c
230
SECTION C-C'
230 BIAXIALLY LOADED 12mm # bar 12mm # bar
2 PAD FOOTING 1.06 1.06 0.45
6mm bar 230mm c/c 4 - 20 # mm bar @ 130mm c/c @ 130mm c/c

2 - 10 # mm bar 0.3 L 0.3 L

600
2 - 10 # mm bar

12mm # bar @
130mm c/c
CONSTRUCTION NOTES

415
1. GRADE OF CONCRETE = M20

450
2 - 10 # mm bar 300
2 - 10 # mm bar 8mm BAR @ 230mm C/C 2. GRADE OF STEEL = Fe 415
SECOND FLOOR BEAM

3. EXPOSURE CONDITION = MILD


B B'

150
4. EFFECTIVE COVER FOR COLUMN = 40mm
4 - 20 # mm bar
SECTION D-D' 5. EFFECTIVE COVER FOR FOOTING = 50mm

2900
250

8mm BAR @
230mm C/C

230
SECTION B-B
230
6mm bar 230mm c/c 1325

2 - 10 # mm bar 0.3 L 0.3 L


2 - 10 # mm bar

12mm # bar @
130mm c/c
415

4 - 20 # mm bar
D D'

1325
2 - 10 # mm bar 2 - 10 # mm bar
8mm BAR @ 230mm C/C FIRST FLOOR BEAM

A A'

4 - 20 # mm bar
2900
250

8mm BAR @
230mm C/C

230
PLAN 12mm # bar @
230 SECTION A-A
130mm c/c
6mm bar 230mm c/c

2 - 10 # mm bar 0.3 L 0.3 L 2 - 10 # mm bar

ALL DIMENSIONS ARE IN MM


Sinhgad Technical Education Society's
280
450

SINHGAD COLLEGE OF ENGINEERING, PUNE 411 041


TITLE :- DETAILS OF COLUMN AND FOOTING
DATE SIGNATURE REMARKS SYMBOL
2 - 12 # mm bar 2 - 12 # mm bar
8mm BAR @ 230mm c/c PLINTH BEAM STARTING

CONTINUATION

CONTINUATION SHEET No.:- 5


COMPLETION SCALE :- 1:75
SECTION OF COLUMN
( UNIAXIAL C5 )
NAME:- GANESH NARAYAN SHINDE CLASS :- TE (CIVIL), A
ROLL No. :- 301089

You might also like