CONTRACT AGREEMENT _GASSIM CEMENT NEW CEMENT MILL BURAYDAH J KSA
‘APPENDIX 02c-TECHNICAL SPECIFICATION - DESIGN CRITERIA & TECHNICAL SPECIFICATION
10. BUILDING WORKS
10.1 CONCRETE FLOORS AND PAVED AREAS
10.1.1 Sub-grade Preparation
Backfilling and compaction over and around the foundation and structures and the sub-grade
preparation (excavation, filling and compaction} of al surfaces shall be carried out as specified in
§ 3.3 hereinabove.
Sub-grade for concrete ground floor slabs inside production buildings and for external paved
areas shall be prepared so as to develop an in-situ C.B.R. test value of more than 10 %.
10.1.2 Sub-base
The sub-base for concrete floors inside production buildings shall be 20 cm thick, made of,
hardcore according to the Specifications of § 3.3. After compaction the hardcore shall have a
‘minimum in-situ C.B.R. test value of more than 45 %.
10.1.3 Concrete Slabs and Pavement
Concrete for floor slabs and paved areas shall be Concrete Type 2, (or HS cement as per required)
and aggregates grading from 32 mm down. Thickness of the concrete slab shall not be less than
200m.
Concrete shall be cast in bays not exceeding 5 x 5m and shall be well compacted with vibrators,
Unless by approved design, welded wire mesh, weighing no less than 3 kg/m2 may be laid 5 cm
below the surface.
Doweled expansion joints shall be formed at every third jointin each direction, and shall be 2 em
thick and filled with an approved bituminized joint material
The intermediate joints are to be unpainted and formed as tied warping joints with cracks
inducers at the joint. Sealing groves are to be formed at the top of all joints neatly pointed with
approved tropical mastic. The grove shall be 2.5 cm wide by 3 cm deep for expansion joints and
1 cm wide by 2 cm deep for warping joints.
The finish for internal floors shall be as indicated on the drawings.
The concrete surface of the external paved areas shall be dressed with an approved hardener
and floated to a ridged finish by machine (as defined above In § 6).
10.2 Brock works
10.2.1 Laying, Jointing and Pointing
Blocks shall be soaked in water before use. The tops of walls where work has been left off shall
be thoroughly wetted before work is recommenced.
wer