Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

 

Contact
Sajee Kaleel - BSc (Hons) Civil
www.linkedin.com/in/sajee-kaleel-
bsc-hons-civil-eng-238624a1 Eng.
(LinkedIn) Quantity Surveyor/Cost Engineer - Actively Seeking for the Post of
Quantity Surveyor |Take-offs| Measurement |Estimating
Top Skills Dubai, United Arab Emirates
Engineering
Project Management Summary
Administration
I am a highly capable professional Quantity Surveyor with More
than (05) Five-year’s professional experience gained mostly in
Languages
the United Arab Emirates and Sri Lanka construction industry with
English (Full Professional)
strong skills of Pre & post contract administration, quantity surveying,
Tamil (Native or Bilingual)
take-off measurements, procurement, cost estimating, cost control,
Sinhalese (Professional Working)
subcontract management and data management. I can strive for
all aspects of the management as an individual and as good team
player with my career goals.

Major activities involved / Expertise:

• Preparing the civil variations.


• Preparing interim payment application.
• Undertaking costs analysis for sub contract packages.
• Attending meetings and liaising with stakeholders on commercial
matters.
• Preparing Bill of Quantities (BOQ) for Provisional Sum.
• Certifying subcontract payment application and assist the team on
final account measurement with
subcontractors.
• Quantity measurement for subcontractor work and procurement
work.
• Writing reports and correspondences.
• Preparing cost proposal submission for variations and negotiating
with stakeholders.
• Produce monthly cost & value reports, quarterly reports & cash flow
information.
• Developing procedures towards the final account close out with
sub-contractors.

  Page 1 of 3
   

Experience
Parkway International Contracting LLC
Quantity Surveyor
February 2019 - January 2020 (1 year)
Dubai, United Arab Emirates

The major responsibilities are, as regular Pre Contract & post contract for
the Villas projects, Residential and Commercial buildings - QS roles which
includes;

 Preparing the civil variations.


 Preparing interim payment application. .
 Undertaking costs analysis for sub contract packages.
 Attending meetings and liaising with stakeholders on commercial matters.
 Preparing Bill of Quantities (BOQ) for Provisional Sum.
 Certifying subcontract payment application.
 Procurement and measurement works.
 Writing reports and correspondences.
 Preparing cost proposal submission for variations and negotiating with
stakeholders.
 Developing procedures towards the final account close out with sub-
contractors.

Project Involved;
 MBR-Dubai Hills Estate – PA 02 – Fairway Vistas (65 Nos. Villas) and PA
03 – Parkway Vistas (61 Nos. Villas)- Dubai, UAE (Project Value AED. 485
Million)
 MBR-Dubai Hills Estate – PA 07 – Golf Course Club House – Dubai, UAE
(Project Value AED. 86 Million)
 Proposed Residential & Commercial Bloom Heights (G + 4P + 29)
Residential & Retail on Plot No.JVC15SHRA200 at Jumeirah Village Dubai
(Project Value AED. 207 Million)

Shapoorji Pallonji Group


Quantity Surveyor
January 2017 - December 2018 (2 years)
Sri Lanka

Project Involved;

  Page 2 of 3
   

Proposed Multi Storied Office Building for Commissioner General of Labour


(MOL), Colombo, Sri Lanka: This is a one of the large scale construction
project of government owned, complete project value nearly 7.891 Billion
Sri Lankan Rupees, the building has 35 stories including ground floor, two
basements, five levels were reserved for parking (two basements & 1-3 levels)
level 4 to level 27 typical, mainly custom portioned office areas. Level 28 to 30
for Auditorium. The main contractor is SP- Seirra Joint Venture (Pvt) Ltd. and
Design Consortium Ltd. is consultant and Project management is Department
of Building.

Sanken Constructions (Pvt) Ltd.


Site Engineer cum Quantity Surveyor
January 2015 - December 2016 (2 years)
Sri Lanka

Project Involved;

Proposed 60 Rooms Beach Hotel (marine) Project in (Paasikkudah, Srilanka):


The Proposed 60 Rooms Hotel project was monitored by two consultancy
firms, one for structural Deepal Wickramsinghe Associates and the other for
architectural ATS Consultant (PVT) Ltd. Budgeted value of the project hiked up
to 583 Million LKR which in a rough conversion results 40 Million USD.

Education
Liverpool John Moores University
BSc (Hons) Civil and Structural Engineering , Construction
Engineering · (2017 - 2018)

Cardiff Metropolitan University


Higher Diploma in Civil Engineering, Civil Engineering  · (2015 - 2017)

Zahira College, Kalmunai - Sri Lanka


 · (2000 - 2012)

  Page 3 of 3

You might also like