To,
The Manager - Human Resources Department
‘Subject: Application for the post of Quantity Survey Engineer
Dear Sir/Madam,
| would like to have this opportunity to submit my CV for the above-me
your esteemed Organization. As elucidate in my CV,
ned post in
| have more than 3 years of experience and currently working as Quantity Survey
Engineer with The Rivoli S.p.A Oman Branch.
| have Three year Diploma of Associate Engineering (Civil), One year Diploma in
Surveying, and in additional, | am certified in Auto CAD 2D and Ms Office certifications.
| am sure with my experience and initiative; | would be able to contribute positively to
the above job profile.
Herewith | am attaching my Detailed Resume for your kind reference.
Thanking you for an encouraging response.
Yours faithfully
ABDUL RAZA.ABDUL RAZA S/O ABDUL MAJEED
ADDRESS
SHARIFABAD, KORAL, ISLAMABAD (PAKISTAN)
ceLLNO 0096891395319
enc No:- 37405-4315476-7
PASSPORT NO:- 70574762
NATIONALITY: PAKISTANI
DOMICILE: - ISLAMABAD
DATE OF BIRTH:- 23-01-1990
PROFESSION: - CIVIL SITE ENGINEER, Q.S ENGINEER
DEGREE/CETIFICATE PASSING YEAR NUMBER OUTOFF GRADE FROM
D.AE (CIVIL) 2012 2356 3350 A PBTE LAHORE
AUTOCAD 2009 A+ GRAPHISOFT
CIVIL SURVEYOR 2009 477 700 8 PBTELAHORE
RAWALPINDI
MATRIC (SCIENCE) 2007 406 850 D BOARD
DIPLOMA OF COMPUTER H/W
PRIMAVERA,
MS OFFICE (WORD, EXCEL, POWERPOINT)
SDCIVIL
EXCEL ADVANCEEXPERIENCE
Mone THEN GVEARS iv DIFFERENT DISIPLINS OF CIVIL ENGINEERING FIELDS
OTHER TECHNICAL KNOWLEDGE
> WELL KNOWLEDGE ABOUT CIVIL LAB TECHNICIANING, MATERIAL TESTING IN THE FIELD AND
LAB.
> SURVEVING OF ROAD AND BUILDING WORK WITH USING TOTAL STATION AND LEVELS.
SPACILITY
PROJECT SUPER VISION OF BRIDGES, ROADS, PILE FOUNDITIONS, RAFT FOUNDATIONS, CAD DRAFTING,
ESTIMATION AND BILLING
REPORT WRITING
WEL KNOWLEDGE ABOUT TECHNICAL REPORT WRITING i.e CORRESPONDANCE WITH CLIENT AND.
CONSULTANT THROUGH LETTERING, PREPARATION OF CHECK LIST, ETC.
EMPLOYMENT HOSTORY
EMPLOYER
COMPANY: - HABIB RAFIQ PVT LIMITED
PROJECT NAME: - NEW CITY MIRPUR DEVELOPMENT PROJECT
FROM To
Nov 2008, Now 2009
buty
WORK AS A ASSITENT SURVEYOR, ON ALL STRUCTUREL WORKEMPLOYER
CLINT: ~ IBECHS
COMPANY: - AL KAMAL CONSTRUTION ENGINEERS
COMPANY: = URBAN PLANNING AND DESIGNING (UPDL)
PROJECT NEME: ~ GULBERG GREENS ISLAMABAD.
FROM To
April 2012 Feb2014
bury
SUPERVISION ON ALL ROAD FINISHING WORK, DRAINAGE, SEWRAGE.
TAKEING ALL MEASUREMENTS AND BILLING OF ALL SUB CONTRECTORS.
SUBMENT ALL SITE WORK DETAIL TO CONSULTANT, ALSO PREPAIR INSPECTION REQUEST TO.
‘THE CONSULTANT.EMPLOYER
CLINT: ~ IBECHS
COMPANY: - POWER CONSULTANT ENGINEERS
PROJECT NAME: ~ GULBERG GREENS ISLAMABAD,
FROM To
Feb 2014 lee
bury
SITE INSPECTION AND QUALITY CONTROL OF UNDER GROUND DUCKTING AND ALSO
TAKING MEASUREMENT, PREPARE BILL AND SUBMISSION FOR APPROVAL, PLANNING OF
PROJECT, CONSTRUCTION SUPERVISION AND CO-ORDINATION WITH AUTHORITY.PREASENTLY
CLINT: - MINISTRY OF TRANSPRTATION AND COMMUNICATIONS OMAN i
COMPANY: - RIVOLI S.P.A OMAN BRANCH
CONSULTANT: DAR AL HANDASAH (Shair & Partners)
PROJECT NAME DUALIZATION OF BIDBID-SUR ROAD
FROM To
July 2014 Till continue
bury
WORKING AS A QUANTITY SURVEY ENGINEER
TOTAL ESTIMATION OF 6 BALANCED CANTILEVER BRIDGS, PREPAIR DRAWINGS FOR SITE INSPECTIONS.
PREPAIRING RFI’S TO CONSULTANT FOR DAILY INSPECTIONS SHEDULE.
ESTIMATION OF ALL STEEL WITH SCRAP AND ORDER FOR NEXT WORK.
PREPAIRING CHECK LISTS FOR PRECAST SEGMENTS INSPECTIONS.
CALCULATE ALL TYPES OF PERMANENT AND TEMPORARY MATERIALS FOR BRIDGES1AM INSTRUCTOR OF CIVIL SURVAYING AND QUANTITY SURVEYING AT NIGHTT PROGEAMME (HOME
BASE)
LANGUAGE KNOWN AND DEGREE OF PROFECIENCY
LANGUAGE READING WRITING SPEAKING
ENGLISH Goop coop coop
URDU coop coop coop
ARABIC coop Goon Goon