Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

YANBU STRATEGIC TANKS

Subject DATA SHEETS Number


SCS - Pump Stations 3002

Doc. - No.: Q A 1 0 - G - 3 0 3 2 Rev. 0

No. Description Unit Required Guaranteed Notes


1 Station
1.1 Location of installation
1.2 Reference Specifications G02, S04
2 Working Place
2.1 Operator Working Places No. G02, Drawing
2.2 Engineering Working Places No. G02, Drawing
2.3 Page Printers No. G02, Drawing
2.4 Switches No. G02, Drawing
2.5 Routers No. G02, Drawing2
2.6 Annually Availability (overall) % 99.9
3 Working Place
3.1 Manufacturer
3.2 Type
3.3 Size inch 24
3.4 Brightness cd/m ≥ 250
3.5 Contrast ≥ 1:1000
4 STATCON
4.1 Manufacture
4.2 Type
4.3 Software / Revision
4.4 LCP Size / Manufacture (if any) inch/- ≥ 17’’/ -
5 UNCON
5.1 Booster Pump
5.1.1 Manufacture
5.1.2 Type
5.1.3 Software / Revision
5.1.4 LCP Size / Manufacture inch/- ≥ 15’’/ -
5.2 Main Pump
5.2.1 Manufacture
5.2.2 Type
5.2.3 Software / Revision
5.2.4 LCP Size / Manufacture inch/- ≥ 15’’/ -
5.3 Cooling System
5.3.1 Manufacture
5.3.2 Type
5.3.3 Software / Revision
5.3.4 LCP Size / Manufacture inch/- ≥ 15’’/ -
5.4 Surge Vessels
5.4.1 Manufacture
5.4.2 Type
5.4.3 Software / Revision
5.2.4 LCP Size / Manufacture inch/- ≥ 15’’/ -
5.5 Other Subsystem
5.5.1 Manufacture
                 
2
Depends on the type of communication system

Page 1of 2
YANBU STRATEGIC TANKS
Subject DATA SHEETS Number
SCS - Pump Stations 3002

Doc. - No.: Q A 1 0 - G - 3 0 3 2 Rev. 0

No. Description Unit Required Guaranteed Notes


5.5.2 Type
5.5.3 Software / Revision
5.2.4 LCP Size / Manufacture inch/- ≥ 15’’/ -

Page 2of 2

You might also like