KP 03R FJC 25 Jan 23
KP 03R FJC 25 Jan 23
INSPECTION REPORT
FIELD JOINT COATING
Shrinkable Sleeves
Surface Preparation Holiday Test
Pipe Temperature
Relative Humidity
Visual Check
Type of Heat
Time (WIB)
Surface Profile
(RH) %
Cleanliness
Test
No. KP No. JOINT No. Remarks
Kv Result
1 KP 03R-20 M-06 10:45 77.0 27.0 31.2 SP3 48µm 100 - M 80 OK 12 ACC
2 KP 03R-20 M-04 11:05 74.8 26.6 33.3 SP3 48µm 100 - M 80 OK 12 ACC
3 KP 03R-20 M-02 11:25 71.5 26.2 35.2 SP3 48µm 100 - M 80 OK 12 ACC