Classification: Confidential

Erth Hotel Guest Arrival Experience


Khor Al Maqta,

Al Khaleej Al Arabi Road,

29810 Abu Dhabi

Main Contractor Refurbishment Works

Invitation to Tender

22 November 2022
Classification: Internal
Erth Hotel Guest Arrival Experience, Refurbishment Works
Invitation to Tender
22 November 2022

TABLE OF CONTENTS PAGE

1.0 PROJECT OVERVIEW ..................................................................................................................... 3


2.0 OVERVIEW OF SCOPE OF WORKS ............................................................................................... 4
3.0 SUBMISSION REQUIREMENTS ...................................................................................................... 6
4.0 SUBMISSION PROCEDURE ............................................................................................................ 8
5.0 CONTRACT AWARD PROCEDURE .............................................................................................. 10
6.0 EVALUATION AND COMPARISON OF TENDERS ....................................................................... 11
7.0 GENERAL CONDITION OF THIS ITT ............................................................................................ 12
8.0 Appendices ...................................................................................................................................... 16

Appendix A - Specifications, Drawings and Guidelines

Appendix B - Tender Content

Appendix C - Form of Contract

Appendix D - Form of Tender

Appendix E - Component Porject Master Programme

Appendix F - Summary of Current Commitments

Appendix G - Bills of Quantities

Appendix H - Site Requirements

Page 2 of 28
Classification: Internal
Erth Hotel Guest Arrival Experience, Refurbishment Works
Invitation to Tender
22 November 2022

1.0 PROJECT OVERVIEW


1.1 Atkins is procuring the Works on behalf of the Employer, Erth Hotel, Armed Forces Officers Club
Hotel (AFOCH) (the “Employer”) seeks the services of a Main Contractor in respect of a Project
being the Erth Guest Experience Refurbishment located at Erth Hotel, Armed Forces Officers Club
Hotel, Abu Dhabi, Dubai. (the “Project”).

1.2 The successful Tenderer will, inter alia, be required to carry out the works (the “Works”) as further
described in Section 2 and Appendix A.

1.3 By this Invitation to Tender (“ITT”), the Employer invites pre-qualified firms (each a “Tenderer”) to
submit tenders (each a “Tender”) in accordance with this ITT for the execution of the Works.

1.4 The Works shall be carried out in accordance with the terms and conditions of the works contract
set out in Appendix C (as ultimately executed with the successful Tenderer, the “Contract”).

1.5 Each Tenderer must submit one Tender, which shall fully comply with all requirements of this ITT,
including those set out in the Tender Content attached hereto in Appendix B.

1.6 Tenderers shall focus on the submission requirements set out in Section 3, however they may
also integrate any other information that is deemed relevant by the Tenderer. Each Tender will be
evaluated on its own merits but will, ultimately, be at the sole discretion of the Employer to accept
or reject.

1.7 The Project Manager for the Project is Faithful+Gould (the “Project Manager”) who shall act for
and on behalf of the Employer in accordance with the terms of the Agreement.

1.8 Words and expressions used but not defined in this ITT shall have the meaning attributed to them
in the Contract. Unless specified otherwise, references to sections, paragraphs and Appendices
are references to sections, paragraphs and Appendices of this ITT.

Page 3 of 28
Classification: Internal
Erth Hotel Guest Arrival Experience, Refurbishment Works
Invitation to Tender
22 November 2022

2.0 OVERVIEW OF SCOPE OF WORKS


2.1 The Successful Tenderer (the “Successful Tenderer”) shall enter into the Contract with the
Employer to carry out the Works as described here and more fully in the design information
included within the appendix.

2.2 The Successful Tenderer will become an integral part of the Employer’s team and will be expected
to co-ordinate closely its work with that of any other contractors and/or consultants engaged by
the Employer.

2.3 The works will be located at Erth Hotel, Abu Dhabi, Dubai.

2.4 The appointed Contractor shall comply in full with the procedures stipulated by the Employer and
Operator teams.

2.5 Refer to Appendix H for a detailed overview of the site constraints and proposed working hours
which is to accepted by the contractor.

2.6 Refer to Appendix A for detailed description of the Works. A summary of the Works included in
the appointed fit out contractor’s scope is:
General
• Full design completion, responsibility and ownership (to the extent specified in the
Contract)
• Application and gaining approvals from all required authorities, Landlord’s and institutions
– post award
• Applications and issuance of post construction authority, Landlord, institutional approvals
to allow Client operations – post completion
• Testing of all base-build services and production of reports
• Conducting all necessary surveys to produce required drawings and to commence the
works successfully
• Full coordination of design and contractors for any Client direct works
• Demolition, modifications and associated works as required
• The contractor is to propose a phased approach to the project specified in Appendix A,
preferably over five (5) phases spread over eighteen months (18).

Ground Floor works (GF)


The Ground Floor works are but not limited to: -
• Glass cladding changed within the front door
• Supply and Installation of tiled floors.
• Modification to Pizza entrance
• Modification of existing shop fronts to glass and / or wall.
• Opening of ceiling under FF staircase
• Reception desk – East & West
• Supply and installation of Gypsum Wall cladding with textured paint as indicated within the
design
• Supply and installation of Acid etching to wall cladding as indicated within the design,
• Supply and installation of loose FFE
• Supply and installation of fixed furniture.
• Alterations made to existing toilets
• Retail areas to be demolished and left as shell and core internally
• Facade of retail units to be supplied and installed indicated within the design
• Supply and installation of lighting, as per design
• Supply and installation of all associated MEP and connections to base-build services to
allow completion of full scope

Page 4 of 28
Classification: Internal
Erth Hotel Guest Arrival Experience, Refurbishment Works
Invitation to Tender
22 November 2022

• Construction of multiple single gender toilet as per the design


• Application and receipt of all local authority and landlord approvals to allow the Employer
to operate the assets post completion

First Floor Works


The First Floor works are but not limited to: -
• Supply and Installation of tiled floors.
• Modification of existing shop fronts to glass and / or wall.
• Supply and installation of Gypsum Wall cladding with textured paint as indicated within the
design
• Supply and installation of Acid etching to wall cladding as indicated within the design
• Supply and installation of loose FFE
• Supply and installation of fixed furniture
• Alterations made to existing toilets
• Retail areas to be demolished and left as shell and core internally
• Facade of retail units to be supplied and installed indicated within the design
• Supply and installation of lighting, as per design
• Supply and installation of all associated MEP and connections to base-build services to
allow completion of full scope
• Construction of multiple single gender toilet as per the design
• Application and receipt of all local authority and landlord approvals to allow the Employer
to operate the assets post completion
• Addition of movable wall to separate areas

Each Tenderer must include within its returned submission confirmation of any additional
approvals required that are not stipulated in the above list.

2.7 The programme for the works shall be in accordance with the master programme, which indicates
the completion of the works over an 17 - 24 month period preferably divided into phases. This is
to be reviewed by the contractor in accordance with the hotels expectations, which is summarised
as follows;

Item Component Finish


1 Tender issue (50% Developed Design) 22 November
2022
2 Tender issue (100% Developed Design) 05 December
2022
3 Post Tender Interviews 22 December
2022
4 Contract Award 02 January 2022

5 Start on Site 14 January 2022

6 Completion of Phase 1 – X (TBC) June 2024

7 HO to Client Including all Approvals July 2024

Page 5 of 28
Classification: Internal
Erth Hotel Guest Arrival Experience, Refurbishment Works
Invitation to Tender
22 November 2022

3.0 SUBMISSION REQUIREMENTS


3.1 Compliance with Instructions
3.1.1 The objective of this ITT is to establish a single format to be followed by all Tenderers submitting
Tenders and thereby ensure a uniform and impartial evaluation and ranking of each Tender. As
such, this ITT also sets forth the ground rules in accordance with which the Tenders shall be
completed.
3.1.2 The Tenderer must submit its Tender in strict accordance with the requirements of this ITT and
provide all information required. Failure to strictly comply with the requirements of this ITT may
lead to immediate disqualification, in the Employer’s entire discretion. Additional or supplementary
information, data, descriptions and explanations for clarification of the Tender are desirable and
shall be considered in their applicable context. In the event that it becomes necessary to revise
any part of this ITT, revisions will be provided by the Employer or the Project Manager.
3.1.3 Any deviations from the requirements or instructions of this ITT must be clearly indicated and
explained by the Tenderer in one single place. Deviations and modifications are strongly
discouraged and the Employer reserves the right, in its sole discretion, to reject any Tender as
failing to be deemed substantially responsive pursuant to Section 7 of this ITT.
3.1.4 A Tenderer must respond to this ITT in order to be eligible to be considered for the award of the
Contract for the Works pursuant to this ITT.

3.2 Intention to Tender


Each recipient of this ITT is requested to advise the Project Manager of its intent to submit a
Tender by submitting a form of acknowledgement (via e-mail) Jack Delaney at
jack.delaney@fgould.com to be received no later than COB on 25th November 2022.

3.3 Tender Content


3.3.1 Tenders should provide a straightforward, complete and concise description of the Tenderer’s ability
to satisfy (and/or exceed) the requirements of this ITT. Tenders, submitted pursuant to this ITT,
will be evaluated based on set criteria but will, ultimately, be determined by the Employer in its
sole discretion.
3.3.2 Tenders must include, but are not limited to, the information detailed under each of the volumes
set out below. The Tenderer should ensure that its Tender describes and substantiates its abilities
in each of the areas set out below. Tenders must be comprised of three (3) volumes, entitled as
follows:
(a) “Volume 1: Executive Summary and Experience” this should include all the information required
pursuant to Appendix B under the heading “Volume 1: Executive Summary and Experience”.
(b) “Volume 2: Technical Tender” this should include all the information required pursuant to Appendix
B under the heading “Volume 2: Technical Tender”.
• Project Organisation and Resourcing
• Outline Method Statement (Incl Logistics Plan)
• Programme
• Approach to HSE Management
• Statement Relating to Site
(c) “Volume 3: Commercial Tender” this should include all the information required pursuant to
Appendix B under the heading “Volume 3: Commercial Tender”.
• Conflict of Interest/Pending Litigation
• Statement of Contract Compliance/Level of Compliance

Page 6 of 28
Classification: Internal
Erth Hotel Guest Arrival Experience, Refurbishment Works
Invitation to Tender
22 November 2022

• Financial Offer
• Cash flow (3 Years Audited Financial Records)
3.3.3 In respect of sub-section 1.1.1(a), the original of the Form of Tender attached in Appendix D must
be signed by a person or persons duly authorised to bind the Tenderer to the Tender and the
Contract, if the Tenderer is selected as the Successful Tenderer. Powers of attorney authorising
such person to sign the Form of Tender shall be provided.

3.4 Sub-Contractors (includes Subconsultants)


3.4.1 Any sub-contractor(s) required for the Component Project beyond the original Tenderer responding
to this ITT will be engaged by the Tenderer in accordance with the provisions of the Contract.
Management of the sub-contractor(s) will be the sole responsibility of the Tenderer.
3.4.2 The Employer reserves the right to require any Tenderer to exclude or replace one or more sub-
contractor(s) included in the Tender with other sub-contractors satisfactory to the Employer.

3.5 The Contract


3.5.1 The Successful Tenderer will enter into the Contract with the Employer and the terms of such
Contract will be based on the form of Contract included in Appendix C. The Contract, once
executed by the Employer and the Successful Tenderer, will set out the complete understanding
in relation to the performance by the Successful Tenderer of the Works and all related obligations
of the parties.
3.5.2 The executed Contract will contain all commercial and legal terms governing the performance of
the Works to be performed by the Successful Tenderer. The Contract, once executed, shall
constitute the entire agreement between the Employer and the Successful Tenderer in relation to
the performance by the Successful Tenderer of the Works. Except in exceptional circumstances,
the performance of the Works shall commence in accordance with the terms of the Contract
following execution.
3.5.3 Payments by the Employer to the Successful Tenderer under the Contract will be made in United
Arab Emirates Dirhams to an account established by the Successful Tenderer at a bank of the
Successful Tenderer’s choice to be approved by the Employer.
3.5.4 The Tenderer must include in its Tender either: (i) a statement that it accepts the Contract in its
entirety, or (ii) an electronically marked-up (black lined) copy of the Contract, which clearly
indicates all deletions and/or additions desired by the Tenderer and fully explains the Tenderer’s
reasons for such deletions and/or additions. Such statement of acceptance or marked-up copy of
the Contract shall be provided in Volume 1 (Executive Summary and Experience) of the Tender.
3.5.5 The Tenderers should note that the Employer reserves the right to reject any requested
modifications to the Contract. The Tenderer is advised that its Tender will be evaluated, among
other things, on the extent of its acceptance of the terms and conditions set forth in the Contract.
Significant exceptions to the Contract submitted by the Tenderer may result in its Tender failing to
be deemed substantially responsive pursuant to Section 7 of this ITT. Comments of a general
nature not specifically related to amendments to specific clauses of the Contract shall be deemed
to be not substantially responsive and the Employer reserves the right to reject any Tender which
does not address exceptions to the Contract strictly in accordance with this ITT. If the Tenderer
does not provide a marked-up copy of the Contract, it shall be deemed to have accepted the form
of Contract as set out in Appendix C and the Employer shall not be obliged to consider any
comments or any requests to amend the Contract from the Tenderer once the Tender has been
submitted.
3.5.6 The Tenderer’s attention is directed to the insurance requirements of the Contract.

3.6 Language of Tender


The Tender and all correspondence and documents relating to the Tender shall be written in
English.

Page 7 of 28
Classification: Internal
Erth Hotel Guest Arrival Experience, Refurbishment Works
Invitation to Tender
22 November 2022

4.0 SUBMISSION PROCEDURE


4.1 Tender Submission
4.1.1 This ITT has been sent only to pre-qualified candidates.
4.1.2 Tenders are due and must be received by the Employer no later than 3pm on 19th December
2022 (the “Submission Date”). Tenders received after the Submission Date or at an address or
location different to that specified in sub-section 4.1.4, at the discretion of the Employer, may not
be considered.
4.1.3 The Employer reserves the right, at its sole discretion, to extend the Submission Date by providing
notice to the Tenderers, such notice to be provided by the Project Manager. Any Tender submitted
prior to such notice may be withdrawn without prejudice.
4.1.4 Each Tenderer must submit two (2) sets of its Tender. Two (2) copies must be an original hard
copy, bound in three (3) volumes as required pursuant to sub-section 3.3.2 of this ITT, and sealed.
Of the remaining copies, one (1) must be a hard copy and one (1) an electronic copy submitted
on CD. In the event that electronic copies of the pricing document are provided in a scanned
image format, the Tenderer must also provide those copies in a format which is editable by the
Employer in order to facilitate their analysis, collaboration and discussions in respect of the
Tender. Tenders must be submitted as follows:
Attn: Mark Beavers – Director (Commercial)
Erth Hotel,
Khor Al Maqta,
Al Khaleej Al Arabi Road,
29810 Abu Dhabi

4.1.5 The front cover of the Tender should state “Erth Hotel Guest Arrival Experience
Refurbishment – Main Contractor Contract Tender” and each set of the Tender required by
Sub-section 4.1.4 should be contained in a box labelled the same.
4.1.6 Tenders must be delivered by courier and the Tenderer must obtain written confirmation of such
delivery. Tenders received by any other means will not be accepted.
4.1.7 All queries related to this ITT must be submitted in writing via e-mail no later than COB on 10
December 2022 to jack.delaney@fgould.com and ehab.elbehairy@atkinsglobal.com Requests
for clarification from a Tenderer shall be sequentially numbered (starting from #001) and shall
clearly reference the section number in this ITT to which the request for clarification relates. The
Employer (or the Project Manager on its behalf) reserves the right, where appropriate, to make all
significant clarifications available to all Tenderers.
4.1.8 Except as provided above, Tenderers are not permitted to contact or communicate with any
member of the Employer, its advisors or the Project Manager with regard to any matter relating to
this ITT.

4.2 Period of Validity of Tender


4.2.1 The Tender shall remain valid and open for acceptance by the Employer for a period of 60 (sixty)
days from the Submission Date (the “Period of Validity”). A Tender valid for a shorter period shall
be rejected by the Employer as failing to be deemed substantially responsive pursuant to section
7 of this ITT.
4.2.2 The Employer (or the Project Manager on its behalf) may, not later than fifteen (15) days prior to
the expiration of the Period of Validity, request the Tenderer’s consent to an extension of the
Period of Validity. Both the request for extension and the response shall be made in writing.

Page 8 of 28
Classification: Internal
Erth Hotel Guest Arrival Experience, Refurbishment Works
Invitation to Tender
22 November 2022

4.2.3 At any time following the Submission Date, during the Period of Validity, Tenderers’
representatives shall make themselves available to meet with the Employer and its advisers and/or
the Project Manager to finalise and/or clarify any aspect of the Tender, such meeting to be held in
Abu Dhabi (or elsewhere) and with such reasonable notice as is practicable in the circumstances.
All such attendance shall be at the cost of the Tenderer.
4.2.4 The Employer may at any time request clarification, verification or additional information in respect
of any item contained in a Tender. The Tenderer shall be required to respond to any such request
from the Employer within five (5) days of receipt of the request or such shorter or longer period as
may be specified in the request. The Tenderer shall be responsible for all costs associated with
the submission of any requested additional information.

4.3 Tenderer’s Commercial Tender


Should a Tender, as may be modified or amended in accordance with this ITT, prove acceptable
to the Employer, the Tenderer’s proposal set out in Volume 3: Commercial Tender of the Tender
shall remain fixed, for the purposes of executing the Contract, beyond the expiry of the Period of
Validity (as may be extended in accordance with sub-section 4.2.2 above) in circumstances where
the Contract is, for whatsoever reason, not capable of being entered into between the Successful
Tenderer and the Employer prior to the expiry of the Period of Validity (as may be extended).

Page 9 of 28
Classification: Internal
Erth Hotel Guest Arrival Experience, Refurbishment Works
Invitation to Tender
22 November 2022

5.0 CONTRACT AWARD PROCEDURE


5.1 Each Tender shall constitute an offer by the Tenderer capable of acceptance by the Employer.

5.2 The Employer reserves the absolute right to accept or reject any Tender or to annul or cancel the
bidding process and reject all Tenders at any time without any liability to the Tenderer(s) or any
other person and without any obligation to inform the Tenderer of the grounds for its action. Should
the Employer choose to reject any Tender or annul or cancel the bidding process the Employer
shall notify the Tender.

5.3 Should a Tender, as may be modified or amended in accordance with this ITT, prove acceptable
to the Employer, the Employer reserves the right to accept such Tender (but shall be under no
obligation to do so). Such acceptance shall be by way of both the Employer and the Contractor
executing the Contract. The Successful Tenderer will enter into the Contract with the Employer
promptly. Failure to promptly execute the Contract will lead to the Successful Tenderer’s
immediate disqualification.

Page 10 of 28
Classification: Internal
Erth Hotel Guest Arrival Experience, Refurbishment Works
Invitation to Tender
22 November 2022

6.0 EVALUATION AND COMPARISON OF TENDERS


6.1 To qualify for comparative evaluation, Tenders must first be determined to be substantially
responsive. For the purposes of this ITT, a “substantially responsive” Tender shall be a Tender
that conforms to all of the terms, conditions and requirements of this ITT without any material
deviation or reservation.

6.2 The Employer reserves the right in its absolute discretion, to reject any Tender that it deems not
to be substantially responsive.

6.3 All substantially responsive Tenders will be considered on the basis of amongst other things,
economic merit, technical merit, time for completion and delivery, experience of the Tenderer and
comments made on the Contract. The Employer will take a quality balanced selection approach
to the assessment of all Tenders, considering each Tender as a whole, and shall seek out the
Tender it deems to be the most economically advantageous.

6.4 The Employer, when making a comparative assessment of each Tender, shall take into account
all information provided and all relevant circumstances and shall consider, inter alia, the following:

Criterion
TECHNICAL
Appendix B Reference

Volume 1 Clauses 1.2.2 Project Organisation and Resourcing

Volume 2 Clause 2.3.1 Outline Method Statement (Incl Logistics Plan)

Volume 2 Clause 2.3.2 Programme

Volume 2 Clause 2.3.3 Approach to HSE Management

Volume 2 Clause 2.3.4 Statement Relating to Site

Appendix B Reference COMMERCIAL

Volume 1 Clauses 1.2.8 & 1.2.9 Conflict of Interest/Pending Litigation

Volume 1 Clause 1.2.8 Statement of Contract Compliance/Level of Compliance

Volume 3 Clause 3.2 Financial Offer

Volume 3 Clause 3.3 Cash flow (3 Years Audited Financial Records)

Page 11 of 28
Classification: Internal
Erth Hotel Guest Arrival Experience, Refurbishment Works
Invitation to Tender
22 November 2022

7.0 GENERAL CONDITIONS OF THIS ITT


7.1 Cost of Tendering
The Tenderer shall bear all costs and expenses associated with the preparation, submission,
clarification and negotiation of its Tender. Neither the Employer nor any of its advisors or
consultants (including the Project Manager) shall, under any circumstances, be responsible or
liable for any such costs, regardless of, and without limitation to, the conduct or outcome of the
bidding, evaluation and selection process.

7.2 Sufficiency of Tender


7.2.1 The information presented in this ITT is solely for the purpose of assisting a prospective Tenderer
in making its own evaluation of the Component Project and does not purport to be all inclusive or
to contain all the information a prospective Tenderer may require.
7.2.2 Each Tenderer is responsible for carefully examining all ITT documents including any and all
addenda to ensure that the information provided is adequate and clearly understood and that all
ITT documents have been received.
7.2.3 Each Tenderer shall make its own interpretation of any and all information provided in this ITT and
all addenda and shall obtain and verify all necessary data and information including informing itself
with respect to all conditions which might in any way affect the cost or the performance of the
Works. No relief or consideration will be given for errors and/or omissions contained in this ITT
and any addendum, and neither the Employer, its Affiliates, nor any of their respective advisors or
consultants (including the Project Manager) is responsible for the accuracy or completeness of
such information and/or its interpretation by the Tenderer. In no event whatsoever will the
Employer, its Affiliates or any of their respective advisors or consultants (including the Project
Manager) be liable to the Tenderer for any information contained in or omitted from this ITT or any
addenda.
7.2.4 Without prejudice to the above, in the event of an inconsistency discovered by a Tenderer (who
shall be obliged to notify its discovery immediately to the Employer and the Project Manager) or
by the Employer in this ITT, the Employer (or the Project Manager on its behalf) shall be entitled,
in its absolute discretion, to resolve such inconsistency and to issue details of such resolution to
all Tenderers by way of addendum. Any failure or delay by the Employer to issue such an
addendum shall not entitle any Tenderer to any relief or consideration or create any liability
between the Employer and any Tenderer.
7.2.5 The Tenderer is wholly responsible for compliance with, and shall be deemed to have full
knowledge of all Applicable Laws. The Successful Tenderer shall not be relieved from
responsibility for its obligations under this ITT or the execution of the Contract on account of any
non-compliance with, or lack of knowledge of, the Applicable Laws. The Contract shall be
governed by and construed in accordance with the laws of the Emirate of Dubai and the federal
laws of the United Arab Emirates as applied in the Emirate of Dubai.
7.2.6 The failure or neglect of the Tenderer to carry out these verifications and investigations shall not
absolve the Tenderer from any of its obligations under the requirements of this ITT or the Contract
subsequently executed with the Successful Tenderer.
7.2.7 No relief or consideration will be given for errors and/or omissions contained in this ITT. No action
of the Employer or any of the Employer’s Affiliates, consultants or advisors (including the Project
Manager) shall amount to an approval of the contents of the relevant Tender or acceptance of its
suitability for the Component Project.

7.3 Visit to Site


7.3.1 The Tenderer must visit the Site at such time as the Employer notifies to the Tenderer in writing.
The Tenderer will be deemed to have visited the Site or caused it to be visited on its behalf by a
competent and reliable person in order to obtain all information that may be necessary for the

Page 12 of 28
Classification: Internal
Erth Hotel Guest Arrival Experience, Refurbishment Works
Invitation to Tender
22 November 2022

purpose of preparing a Tender and entering into the Contract. All costs and charges in connection
with the above-mentioned visits shall be borne by the Tenderer.
7.3.2 The Tenderer must examine and consider the Site and its surroundings and must satisfy itself as
to the nature of the existing works and buildings in the vicinity of the proposed Works, the nature
of the existing roads or other means of communication, the access to and egress from the Site
and Works, the available accommodation as regards land for temporary purposes (inside or
outside the Site), the buildings that may be required for temporary purposes, and must make its
own enquiries as to work yard sites and such other additional areas as it may require for temporary
occupation of all the construction, completion and maintenance of the Works described in the
Specification.

7.4 Physical Conditions


The Tenderer must make local and independent examinations and enquiries as to the physical
conditions prevailing at the Site and obtain its own information on all matters and things that may
in any way influence the Tenderer in submitting a Tender. The Tenderer must also satisfy itself as
to the risks, obligations and responsibilities to be undertaken in the Contract should the Tenderer
be selected as the Successful Tenderer.

7.5 Physical Conditions


This ITT is not an offer capable of acceptance and its issue shall not bind the Employer , its
Affiliates, the Project Manager or any Governmental Authority, nor be capable of binding the
Employer, its Affiliates, the Project Manager or any Governmental Authority in any way
whatsoever. None of the Employer, its Affiliates, the Project Manager or any Governmental
Authority (nor their respective advisors and consultants) makes any representation whatsoever in
respect of the contents of this ITT or whether or not the Employer will accept any Tender received
from a Tenderer.

7.6 Eligibility and Qualification of Tenderer


The Employer may review the references provided by the Tenderer as part of the evaluation
process. Fraudulent statements or references may lead to disqualification of the Tenderer.

7.7 Permits and Licenses


The Tenderer shall, subject to the terms of the Contract, be responsible for applying for and
obtaining all permits and licenses necessary to provide the Works under the Contract. Which
include Design & Construction authority approvals. The Tenderer shall satisfy itself as to the
procedures and timeframes required for such consents and licenses. It is emphasised that the
responsibility for identifying and obtaining the consents and licenses rests solely with the
Tenderer.

7.8 Amendments
The Employer (or the Project Manager on its behalf) reserves the right to issue by addendum
changes to the ITT and/or changes to the Contract, including requiring the Tenderer to provide
the price impact for each requested change in order to permit fair comparison between the
Tenders received from all the Tenderers and/or a BAFO in accordance with sub-section 4.2.5.

7.9 Conflict of Interest


The Tenderer must describe any potential conflict of interest or appearance of impropriety, relating
to other clients of the Tenderer, employees of the Project Manager, or employees of the Employer,
that could be created by entering into the Contract and/or carrying out the Works and indicate
what procedures will be followed to detect, notify the Employer of, and resolve, any conflicts of
interest.

Page 13 of 28
Classification: Internal
Erth Hotel Guest Arrival Experience, Refurbishment Works
Invitation to Tender
22 November 2022

7.10 Litigation and Contingent Liabilities


The Tenderer must indicate any pending litigation, regulatory action or other contingent liability
that could have an adverse material impact on the Tenderer’s ability to perform the Works under
the terms of the Contract.

7.11 Confidentiality
The Tenderer acknowledges that all information relating to this ITT comprises confidential
information under the terms of the non-disclosure agreement executed by the Tenderer as a pre-
condition to receipt of this ITT.

7.12 Corrupt Practices


7.12.1 the Employer requires that Tenderers observe the highest standard of ethics during the process
of preparation of the Tenders. No Tender shall directly or through any employee, servant, agent
or Affiliate, engage in any Prohibited Acts in connection with the preparation of its Tender. For
the purposes of this ITT the term “Prohibited Acts” shall have the following meaning:
(a) offering, giving or agreeing to offer or give to, or accepting or agreeing to accept from, any person
employed by or on behalf of the Employer, an Affiliate of the Employer, any public body or
Governmental Authority any bribe, gift, gratuity, commission or consideration of any kind as an
inducement or reward:
(i) for doing or not doing (or for having done or not having done) any act in relation to this ITT, the
Contract or any other agreement or arrangement relating to the Works, the Component Project
and/or the Project; or
(ii) for showing or not showing favour or disfavour to any person in relation to this ITT, the Contract
or any other agreement or arrangement relating to the Works, the Component Project and/or the
Project;
(b) submitting a Tender, entering into the Contract or any other agreement or arrangement with the
Employer, an Affiliate of the Employer or any public body or Governmental Authority relating to
the Works, the Component Project and/or the Project in connection with which commission has
been paid or has been agreed to be paid by the Contractor or on its behalf, or to its knowledge,
unless before the Contract is entered into, the particulars of any such commission and the terms
and conditions of any such arrangement for the payment thereof have been disclosed in writing to
the Employer and any relevant public body or Governmental Authority;
(c) committing any offence under any Applicable Laws creating offences in respect of fraudulent acts
in relation to the obtaining or performance of the Contract or any other agreement or arrangement
relating to the Works, the Component Project and/or the Project;
(d) defrauding or attempting to defraud or conspiring to defraud the Employer, an Affiliate of the
Employer, any public body or Governmental Authority;
(e) engaging in a scheme or arrangement between two or more Tenderers, with or without the
knowledge of the Employer, designed to establish Tender prices at artificial, non-competitive
levels; or
(f) harming or threatening to harm, directly or indirectly, persons, or their property to influence their
participation in the ITT process.
7.12.2 In the event that the Employer, or the Project Manager on its behalf, determines that a Tenderer
has, at any time prior to or following the Submission Date, committed any Prohibited Act in relation
to the Works, the Component Project or the Project, either directly or through any employee,
servant, agent or Affiliate, the Employer, or the Project Manager on its behalf, may at its sole
discretion reject the Tenderer’s Tender and disqualify the Tenderer from any further involvement
in this ITT process. For the avoidance of doubt any Prohibited Act committed by any person with
the prior knowledge or approval of the Tenderer (through the Tenderer’s directors and/or officers
or otherwise) shall be deemed to have been committed by the Tenderer itself.

Page 14 of 28
Classification: Internal
Erth Hotel Guest Arrival Experience, Refurbishment Works
Invitation to Tender
22 November 2022

7.12.3 In the event that any Prohibited Act is or has been committed by an employee, servant, agent or
Affiliate of the Tenderer, the Employer, or the Project Manager on its behalf, may give written
notice to the Tenderer of its intention to reject the Tenderer’s Tender and disqualify the Tenderer
from any further involvement in this ITT process, as if the Prohibited Act had been committed by
the Tenderer itself, unless the Tenderer terminates that employee, servant, agent or Affiliate’s
involvement in the Component Project and/or the Project and promptly procures a suitably
qualified and experienced replacement. In the event that the Tenderer fails to do so, the Employer,
or the Project Manager on its behalf, shall proceed to reject the Tenderer’s Tender and disqualify
the Tenderer from any further involvement in this ITT process.

Page 15 of 28
Classification: Internal
Erth Hotel Guest Arrival Experience, Refurbishment Works
Invitation to Tender
22 November 2022

8.0 Appendices

Appendix A – Specifications, Drawings and Guidelines

Appendix B – Tender Content

Appendix C – Form of Contract

Appendix D – Form of Tender

Appendix E – Component Project Master Programme

Appendix F – Summary of Current Commitments

Appendix G - Bill of Quantities

Appendix H – Site Restrictions

Page 16 of 28
Classification: Internal
Erth Hotel Guest Arrival Experience, Refurbishment Works
Invitation to Tender
22 November 2022

Appendix A
SPECIFICATIONS, DRAWINGS AND GUIDELINES

Content:

1. 50% Developed Design – To provide base for initial cost exercise


2. 100% Developed Design – To be priced during this RFP

Items included in this RFP which are to be priced as a tender addendum. Tenderers to review and
familiar with the proposed works.

3. Additional Work – To be Discussed Later


4. Maintenance Work – To be Discussed Later

Page 17 of 28
Classification: Internal
Erth Hotel Guest Arrival Experience, Refurbishment Works
Invitation to Tender
22 November 2022

Appendix B
TENDER CONTENT

The Tenderer shall submit its Tender and provide all relevant information in accordance with the requirements
of this Appendix B. The Tenderer shall address individually in its Tender the requirements of each of
paragraphs 1 to 3 of this Appendix B, and in the case of paragraph 1 and paragraph 2 the Tenderer shall clearly
reference the responses set out in its Tender to each of paragraphs 1.2.1 to 1.2.10 and paragraphs 2.3.1 to 1
respectively.
1. Volume 1: Executive Summary and Experience
1.1 A brief executive summary setting out the key features and highlighting the main points of the Tender
and the key reasons the Tenderer believes that it should be awarded the Contract.
1.2 The Tenderer should set out the following requested information in a precise and fully responsive
format. In addition to providing the requested information other materials that illustrate the
Tenderer’s professional skills with similar developments would be appreciated. Required information
includes:
1.2.1 full name of Tenderer and address of Tenderer and any affiliated offices;
1.2.2 a project specific organisation diagram of the Tenderer’s proposed organisation and project
resourcing (and in the case of a Joint Tenderer an organisation diagram indicating the relationship
between the joint venture parties) and the curricula vitae of the key members of staff who it is
anticipated will take a position of responsibility in connection with the Component Project;
1.2.3 certified copies of any powers of attorney that are relevant to the ITT or affect the Tenderer, including
a specimen signature in each case of the attorney;
1.2.4 details of the Tenderer’s experience in the Middle East with developments of a size, nature and
complexity similar to that of the Project, including the name of the project, the location, name of client,
references, size of project, use and type of project, date of assignment and status of project;
1.2.5 details of the Tenderer’s current commitments. The original of the Summary of Current Commitments
attached in Appendix F must be signed by a person or persons duly authorised to bind the Tenderer to
the Tender and the Contract, if the Tenderer is selected as the Successful Tenderer.
1.2.6 details of any potential conflict of interest or appearance of impropriety that could be created by the
Tenderer or any potential subcontractors performing the Works and an indication of the procedures will
be followed to detect, notify the Employer of, and resolve, any such conflicts;
1.2.7 details of any pending litigation, regulatory action or other contingent liability that could have an adverse
impact on the Tenderer’s ability to complete the Works; and
1.2.8 the Tenderer must include either: (i) a statement that it accepts the Contract in its entirety, or (ii) an
electronically marked-up (black lined) copy of the Contract, which clearly indicates all deletions and/or
additions desired by the Tenderer and fully explains the Tenderer’s reasons for such deletions and/or
additions.
2. Volume 2: Technical Tender

2.1 Tenderers must set out in their Technical Tender detailed requirements as to how they intend to carry
out the Component Project in accordance with the requirements of the Specification set out in Appendix
A.

2.2 The Technical Tender should demonstrate how the Tenderer intends to use good engineering practice
in the design, procurement and construction of the Works. All proposed equipment and materials

Page 18 of 28
Classification: Internal
Erth Hotel Guest Arrival Experience, Refurbishment Works
Invitation to Tender
22 November 2022

should be newly manufactured by reputable manufacturers with sufficient operating experience with
regard to the specific equipment / material

2.3 The Technical Tender shall include the following information as a minimum:
2.3.1 an outline methodology statement for carrying out the Construction Works, including:
(a) a complete list of all works and services that will be required for the purposes of carrying out the
Works and details of the Tenderer’s proposed method of carrying out major items of Works.
(b) a proposed approach to risk management including details of a proposed risk management system
and a key risk register;
(c) a list of the identity (including name, address and contact details) and nature of any sub-contractor or
sub-consultant that the Tenderer proposes would undertake any part of the Works as well as a
definition of the proposed sub-contract package.
(d) the Tenderer’s approach to the management and co-ordination of the Tenderer’s own team (including
sub-contractors, sub-consultants and any novated consultants), and management of interfaces with
any other contractors or third parties working on site;
(e) demonstrate it’s ability to sufficiently source such equipment and materials for the purposes of
carrying out the Works
(f) total number of staff members that will be assigned to each major stage of the Component Project,
including proposed numbers of off-site and on-site personnel, to demonstrate the Tenderer’s ability to
source the required level of personnel in terms of quantity and qualifications;
2.3.2 a Works programme (the “Programme”) which will set out all the activities and milestones to be
completed by the Tenderer for the design (to the extent specified in the Contract), execution and
completion of the Works and will include:
(a) the order in which the Tenderer proposes to carry out the Construction Works, including the
anticipated timing of each major stage of the Works;
(b) the key deliverables and milestones required during the preconstruction phase;
(c) the sequence and timing of inspections and testing specified in the Contract;
(d) a detailed critical path programme, using [Primavera Planner Version 3.0 and above or Microsoft
Project 2007] which shall show the critical path, the float and all dependencies and links as well as
early start dates, late start dates, early completion dates and late completion dates;
(e) in developing the Tenderer’s Programme the Tenderer should respect the Component Project Master
Programme included as Appendix E. Any recommended modifications, revisions or improvements (if
needed or desirable for the purposes of ensuring good utility practice) to the Specification as set out
in Appendix A which for the avoidance of doubt the Employer shall be under no obligation to take
account of in the event that the Tenderer becomes the Successful Tenderer;
2.3.3 a draft operational health safety and environmental plan for use in connection with the Works;
2.3.4 a statement to the effect that the Tenderer (or an appropriate representative) has visited the Site and
that the Tenderer has no queries or qualifications on any matter concerning the Tender in connection
with the prevailing Site conditions.

3. Volume 3: Commercial Tender

3.1 Payment for the Works will be on the basis of a lump sum fixed price (the “Contract Price”) for the
design (to the extent specified in the Contract), construction and execution of the Works and the
remedying of any defects therein which shall be payable in monthly instalments based on valuation of
the Works carried out each month or percentage of Works complete verified by inspection of the
Works.

Page 19 of 28
Classification: Internal
Erth Hotel Guest Arrival Experience, Refurbishment Works
Invitation to Tender
22 November 2022

3.2 For the purpose of ascertaining its proposed Contract Price the Tenderer shall complete and provide
a Bill of Quantities (“BoQ”) by completing the format Bill of Quantities included as Appendix G. Note
that the Tenderer shall update, amend or modify the format Bill of Quantities as required to submit its
lump sum fixed price to comply with the ITT requirements.
3.3 The Tender shall provide a forecast cash flow broken down into estimated monthly instalments from
the date of execution of the Contract up to the Time for Completion.
The Tenderer should take care not to make any arithmetical errors in arriving at its Contract Price. If
errors are made, the Tenderer will be obliged to stand by its quoted Contract Price even if this total is
less than the actual sum of all individual prices. However, should the quoted Contract Price be more
than the arithmetically corrected sum, the Tender will be accepted on the basis of the arithmetically
corrected Contract Price.

Page 20 of 28
Classification: Internal
Erth Hotel Guest Arrival Experience, Refurbishment Works
Invitation to Tender
22 November 2022

Appendix C
FORM OF CONTRACT

Page 21 of 28
CONTRACT AGREEMENT

BETWEEN

THE ARMED FORCES OFFICERS CLUB & HOTEL

AND

_________________________

FOR

____________________________________

FOR THE ARMED FORCES OFFICER'S CLUB & HOTEL

Contract No: AFOC/P/XX/XXXX/XX

Page 1 of 5
____________________________ CONTRACT AGREEMENT

This Agreement is made the [ ] Day of [ ] 2020

Between

M/s. The Armed Forces Officer Club Hotel (“the Employer") duly licensed under the Laws of
Abu Dhabi, pursuant to License No [CN-2240700], whose address is Al Khaleej Al Arabi
Street, P.O. Box: 29810 Abu Dhabi, UAE (which expression shall include its successors in title
and permitted assignees) of the one part

And

_________________ (the "Contractor") duly licensed under the laws of the Emirate of Dubai,
UAE, pursuant to license No. [__________], and whose address
__________________________________________

each a party and together the parties.

Whereas

A The Employer desires that the Works known as


_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_________________________

This Agreement now witnesseth as follows:

1. In consideration of the payments to be made by the Employer to the Contractor as


hereinafter mentioned the Contractor hereby covenants with the Employer to execute and
complete the Works and remedy any defects therein in conformity in all respects with the
provisions of the Contract.

2. The Employer hereby covenants to pay the Contractor in consideration of the execution
and completion of the Works and remedying any defects therein the Contract Price of
AED ______________ (UAE Dirhams ________________________ only ) or such other
sums as may become payable under the provisions of the Contract at the times and in
the manner prescribed by the Contract. AED ______________ (UAE Dirhams
_______________________________________only) of this Contract Price is Provisional
Sums, as further detailed in the Bill of Quantities (Volume 4). These Provisional Sums
may or may not be instructed to be expended, if for any reason any of the Provisional
Sums is not instructed to be expended then that amount shall not be paid to Contractor
and the Contract Price will be reduced by the same amount.

3. The following documents shall be deemed to form and be read and construed as part of
the Agreement, viz.

Page 2 of 5
(a) Contract Agreement
(b) Appendix to Tender
(c) The Letter of Acceptance
(d) The Particular Conditions;
(e) The General Conditions (The Conditions of Contract- FIDIC Condition of Contract
Red Book 1st Edition 1999);
(f) The Specification - /RFIs / Post Tender Clarifications
(g) The Drawings
(h) Bills of Quantities

The parties agree as follows

1. DEFINITIONS AND INTERPRETATION

In this Contract, unless the context otherwise requires:

(a) this Contract will be interpreted in accordance with the Terms and Conditions.
(b) Capitalised terms have the meaning given in the General Conditions of Contract
as amended in the Particular Conditions; and

2. CONTRACT DOCUMENTS

This Contract consists of the following documents. Such documents shall be deemed to
form and be read and construed as part of this Contract Agreement. Any inconsistency
or discrepancy between the documents shall be resolved in the following order of
priority:
(a) Contract Agreement;
(b) The Appendix to Tender;
(c) The Letter of Acceptance and its Annexures (other than the Appendix to Tender);
(d) The Particular Conditions;
(e) The General Conditions (The Conditions of Contract- FIDIC Condition of Contract
Red Book 1st Edition 1999);
(f) The Specification clarifications and communications (Volume 2);
(g) The Drawings (Volume 3); and
(h) The Bill of Quantities (Volume 4).

3. TERM

This Contract shall have effect on and from ________________ (Commencement


Date) and shall continue in full force and effect until the full satisfactory delivery and
completion of the Works undertaken by the Contractor (the Term is from the
Commencement Date until the Date for Completion).

4. CONSIDERATION
In consideration of the Contractor's satisfactory performance and successful completion
of Works as required under the Contract, the Employer shall pay the Contractor the
Contract Price as adjusted in accordance with the Contract.

Page 3 of 5
In consideration of the payments the Employer shall pay to the Contractor, the
Contractor accepts all risks and all costs of executing and completing the Works,
remedying any defects and otherwise complying with its obligations under the Contract,
except to the extent the Contract expressly provides otherwise.

5. WORKS

a) The Contractor shall carry out the Works in accordance with this Contract.
b) If before this Contract becomes effective, the Contractor performs any of the
Works following instruction to do so from the Employer, those works shall be
governed by this contract and shall be included in the Contract Price.

6. ACCEPTED CONTRACT AMOUNT


The Accepted Contract Amount is AED _________________ - excluding VAT- (UAE
_______________________ only). AED _______________ (UAE Dirhams
____________________________) of this Accepted Contract Amount is Provisional
Sums, as further detailed in the Bill of Quantities (Volume 4). These Provisional Sums
may or may not be instructed to be expended, if for any reason any of the Provisional
Sums is not instructed to be expended then that amount shall not be paid to Contractor
and the Accepted Contract Amount will be reduced by the same amount.

7. COMMENCEMENT AND COMPLETION


The Commencement Date is ___________________, and the time for completion for
the entirety of the work is ______ calendar days from this date and as per the sequence
in the Contract Programme.
The Contractor shall be responsible for all coordination and meetings required to
complete the Services no later than the Completion Date and not to cause
any delay or disruption in the Contract or to others working in the same Site.

8. BASE DATE
The Base Date is _____________________.

9. ENTIRE AGREEMENT
The Contract Constitutes the entire agreement between the Client and the Contractor
with respect to the subject matter of the Contract and supersedes all prior arrangements,
representations communications negotiations agreements and contracts (whether written
or oral) made between or entered into by Parties prior to the date of execution of
Contract.

10. GOVERNING LAW

This Contract is governed by the laws of the Emirate of Abu Dhabi and the federal laws
of the UAE applicable to Abu Dhabi.

Page 4 of 5
In witness whereof the Parties hereto have caused this Agreement to be executed the day and year
first before written.

Executed as an agreement

On Behalf of the Employer The Armed Forces Officers


Club & Hotel

Name: Signature:

Title: Stamp:

In the presence of:

Name:

Address:

The Contractor

Name: Signature:

Title: Stamp:

In the presence of:

Name:

Address:

Page 5 of 5
APPENDIX TO TENDER

Item Sub-Clause Entry

The Employer 1.1.2.2 &1.3 Armed Forces Officers’ Club & Hotel,
P.O. Box 29810,
Abu Dhabi, UAE
Tel. +971 2 441 5900

The Engineer 1.1.2.4

Time for Completion 1.1.3.3 The time for completion for the
entirety of the work is ______
calendar days from ______

Defects Notification Period 1.1.3.7 A minimum of ___ months.

Systems of Electronic 1.3 By facsimile and Electronic e-mails


Transmission

Address for the Recipients 1.3 The Employer +971 2 441 5900
Communications The Engineer +971 2 627 0999

Law and Language 1.4 This Contract is governed by the laws of the
Emirate of Abu Dhabi and the federal laws of
the UAE applicable to Abu Dhabi.
The language shall be English.

Right of Access to the Site 2.1 As Required

Amount of Performance Bond 4.2 10% of the Contract Price

Working Hours 6.5 8 hours from 12 AM to 8 Am

Working Hours 6.5 8 hours from 12 AM to 8 Am

Delay Damages for the Works 8.7 AED _________ per day

Maximum Amount of Damages 8.7 10% (ten percent) of the Contract


Price.

APPENDIX TO TENDER Page 1 | 2


Item Sub-Clause Entry

Commencement Date 8.1 ____________

Percentage Markup (direct) 13.3 __%


Tenderer to insert

Percentage Markup (indirect on 13.3 ………..%


variations undertaken by the Tenderer to insert only after reading the
Subcontractors) provisions of Clause 13.3

Percentage Rate for Overhead 13.5 ___%


Charges and Profit for Tenderer to insert
Provisional Sums

Adjustment 13.8 Not Applicable

Advance Payment 14.2 _______.

Percentage of Retention 14.3 10% (ten percent)

Limit of Retention Money 14.3 10% (ten percent) of the Contract Price

Minimum Payment 14.6 AED __________

Currencies of Payment 14.19 UAE Dirhams (AED)

General Requirements for 18.1 14 days from Commencement Date


Insurance

Insurance for Works and 18.2 115% of the Contract Price


Contractor’s Equipment

Insurance against Injury to 18.3 AED 10 million in aggregate.


Persons and Damage to Property

APPENDIX TO TENDER Page 2 | 2


PARTICULAR CONDITIONS OF CONTRACT

The following Particular Conditions supplement, amended and, in case of any contradiction, take precedence over the Conditions of
Contract for Building & Civil Engineering Works Designed by the Employer First Edition 1999 (FIDIC Red Book 1999 General
Conditions).

1.1.1.4 “Letter of Tender” Replace all references to “Letter of Tender” with “Form of Tender to which
the completed Appendix to Tender is affixed”.

1.1.1.7 “Schedules” Delete and replace with “means the documents in Part 1 and 2 of the Tender
Documents completed by the Contractor and submitted with the Form of Tender as
included in the Contract, including data, lists, Bill of Quantities and schedules of
payments and/or prices.”

1.1.1.11 “Collateral Warranty” Add new definition “means an agreement, in the form as found in Appendix F of Part
2 of the Tender Documents, pursuant to which the Contractor or a Subcontractor
warrants to a third party or the Employer respectively that its obligations and duties in
respect of the Works arising pursuant to a primary contract and/or at law have been
fully and properly performed in accordance with such contract and laws.”

1.1.1.12 “Rules” Add new definition “means the Arbitration Rules of the Abu Dhabi
Commercial Conciliation and Arbitration Centre.”

1.1.3.1 “Base Date” Replace “28 days prior to the latest date for submission of the
Tender” with “set out in the Contract Agreement.

1.1.6.2 “Country” Replace with “means the United Arab Emirates”.

1.1.6.5 “Laws” Replace with “means any government legislation, statutes, ordinances, decrees and
the like and the regulations and bylaws of any legally constituted authority of the
Country, applicable in the Emirate of Abu Dhabi.”

Replace with “means not reasonably foreseeable as at the date of submission the
1.1.6.8 “Unforeseeable” Tender by a competent contractor experienced in carrying out works of a similar size,
type, nature and complexity to the Works. The term of Unforecastable doesn’t include
any existing MEP services for the already constructed buildings or for buildings under
construction "
1.1.6.10 “Milestones”
“Milestones” means the milestones for the completion of the Works or part of the
Works as identified in Appendix to Tender.

1.1.6.11 “Project Manager” “Project Manager” means a person responsible for managing the Project on behalf
of the Employer.

1.1.6.12 "Site Conditions" Insert new definitions as follows:

“means any conditions in relation to the Site including:

(a) the form and nature of the Site, including ground surface
conditions, physical obstructions and pollutants, sub-surface geology and
conditions and all other physical conditions and

1 of 26
characteristics on, above or below the surface which may affect
the performance by the Contractor of its obligations under this Contract;
(b) the general and local conditions for environment, meteorological, seismic
activity, hydrological, hydrographic, climatic conditions, ocean and sub-sea
conditions; and
(c) the availability and quality of both permanent and temporary access,
accommodation, facilities, personnel, labour, power, transport, water, waste
disposal, storage or materials and all other services and utilities, necessary
for the performance of the Works
in accordance with the Contract.

1.3 Communications Add at end of paragraph (b)


“(c) English Language shall be the official language and shall be used for producing
all documents and communications related to this Contract. If for any legal reason,
any document needs to be produced in a language other than English, then a true
translation in English shall also be produced and submitted. In case of any
contradiction between the two language versions of the same document, the version
in Arabic Language shall be considered as the reference for all Contractual purposes.
(d) Following Electronic communications shall be used:
(i) Microsoft Windows compatible software for the general preparation
and transmission of documents.
(ii) AutoCAD [dwg Files] compatible software for the preparation and
transmittal of drawings.
(iii) Primavera Version 3 or 6 Software or according to the requirements
of the Employer for the planning, monitoring and reporting of work
programme.
(iv) Electronic communication (e.g. e-mails etc.) for the project’s general
purpose communication between stakeholders. However, for all contractual
purposes such as progress reports, notices, claims etc. original document
(letter, report, etc.) with authorized signature shall be required.

1.4 Law and Language Delete sub-clause and replace with “The Contract Documents shall be drawn up in
the English language and the ruling language shall be English. Notwithstanding the
ruling language of the Contract, wherever any Contract Documents or any other
documents received or to be submitted by the Contractor are written in any other
language or are required to be so written, the Contractor shall procure a translation
thereof and shall bear the costs associated therewith.

The Contract shall be governed by and construed in accordance with the Laws.”

1.5 Priority of Documents Delete the existing clause and replace with the following:

“The Employer and the Contractor confirm that they are not aware of any ambiguities
or discrepancies in the several documents forming the Contract Documents. Without
prejudice to the Employer’s and Contractor’s confirmation that they are not aware of
any ambiguities or discrepancies, the several documents forming the Contract are to
be taken as mutually explanatory of one another but in the event that the Employer or
the Contractor become aware of ambiguities or discrepancies the same shall be
notified by the Party discovering the ambiguity or discrepancy to the other Party and
the Engineer shall issue any clarification or instruction using the following order of
priority of documents, which clarification or

2 of 26
instruction shall be complied with by the Contractor at no cost to the Employer:

(a) the Contract Agreement;


(b) the Letter of Acceptance
(c) the Particular Conditions and Appendix to Tender;
(d) the General Conditions The Conditions of Contract- FIDIC
Condition of Contract Red Book 1st Edition 1999
(e) the Employer’s Requirements
(f) the Appendices , namely:
Appendix 1: The Specification
Appendix 2: The Drawings
Appendix 3: The Bill of Quantities
Appendix 4: Programme of Works
Appendix 5: Non-Disclosure Agreement Appendix

1.6 Contract Agreement Delete Sub-clause

1.7 Assignment Delete this clause in its entirety and replace with:
Neither Party shall assign the whole or any part of the Agreement or any benefit or
interest in or under the Agreement, except that:
(a) either Party may assign the whole or any part of the Agreement or any
benefit or interest in or under the Agreement with the prior agreement
of the other Party, at the sole discretion of such other Party; and
(b) the Employer may, without the consent of the Contractor assign or
novate the whole or any part of the Agreement or any of its benefit or
interest in or under the Contract at its sole discretion in favour of:
(i) any of its
(ii) Affiliates;
(iii) any entity established for the purpose of executing the Project or
any other purchaser of the Works or any part thereof;
(iv) any contractor engaged to execute the Works or any part
thereof; or
(v) any lenders providing financing for the Project; (Each of the
above a "Permitted Assignee").

1.8 Care and Supply of In the second line, after the words “two copies” add the words “plus a printable
Documents electronic copy”.

1.9 Errors in the Employer’s Add the following paragraph in the beginning of the clause:
Requirements
The Contractor acknowledges and agrees that it has checked the Employer’s
Requirements and the Contractor’s Proposal consider all necessary corrections and
rectifications for any error that experienced contractor may find in the Employer’s
Requirements; and that the Contractor has allowed for all related risks of errors or
omissions in the Employer’s Requirements in the Contract Price.
Delete the words “plus reasonable profit” at Sub-Clause (b).

1.13 Compliance with Laws Deleted “the Employer shall indemnify and hold the contractor harmless against and
from the consequences of any failure to do so”

3 of 26
Insert after the word Laws in (b) the second line “and any other statutory, municipal
rules and regulations, and any other laws of other countries which have a connection
with the Works.

1.14 Joint and Several liability Add after the last paragraph:
“The Employer shall not be bound by any terms or provisions of any joint venture
agreement”

1.15 Deductions Add new Sub-Clause:

“The Employer shall be entitled to recover as a debt or by way of a deduction from


any amount otherwise due to the Contractor, any amount
due to the Employer from the Contractor pursuant to the Contract”.

1.16 Confidentiality “All information obtained by the Contractor in the course or conduct of the
contract shall be held confidential and shall not be divulged by the contractor to any third party
save to the extent necessary, to effect the execution of the contract and then only on the basis
that the recipient of such information shall be bound by similar confidentiality obligations to
those undertaken by the contractor hereunder. Provided that the contractor notifies the
Employer with the details of such information and obtains his approval on such disclosure.
Provided however that this obligation shall not apply to information which is or shall become
part of the public domain otherwise than in consequence of a breach of the Contractor of its
obligations under this clause;

The Contractor is deemed aware about the specialty and security rules, of the Project, hence
any photos or videos are not allowed to be published without a written approval from the
Employer.

The Contractor is obliged to disclose to the Employer or the Engineer all documents and
information required for the purpose to verify the Contractor's compliance with the laws and
Contract

The Contractor shall ensure that the provisions of this clause are incorporated in any sub-
contracts or supply orders and that the employees, agents or representatives of all or any of
the sub-contractors or suppliers comply with the same. This clause shall remain binding on the
Contractor notwithstanding the completion or termination or determination of this Contract for
any reasons.”

1.17 Third Party Right The Contractor acknowledges that it provides the Works to the benefit of Third
Parties which will be but not limited to the facility management company, subsidiary, a
company the Employer is a partner in it, any other beneficiary that has rented or acquired
part of the Works .The Contractor warrants the Third Parties that as at the date of the issue
of the Taking over Certificate that the Contractor has completed the Works in accordance
with the Contract, and in case of any defect or breach to this Clause, the Contractor shall be
liable to the Third Parties for the costs of the repair, renewal, reconstruction, or
reinstatement of any part of the Works.

2.1 Right of Access to the Add “sufficient” before the right of access in paragraph 1 and 2.
Site
Delete the words “plus reasonable profit” at Sub-Clause (b).

4 of 26
2.2 Permits, Licences or Add “the Contractor is responsible for obtaining all and any municipal and
Approvals authorities approvals on the design, certificate of occupation and any other similar
approvals, permits, certificates and licenses regarding the design and construction,
completion and I or occupation of the Works. The Contractor shall however be deemed
to have satisfied himself as to which permits, licenses and approvals may be required by
the laws and regulations of Abu Dhabi and UAE that fit into the purpose.”

2.4 Employer’s Financial Delete Sub-Clause as well as all references made to it in the general and particular
Arrangements conditions.

2.5 Employer’s Claim Delete the words "only" and "or to otherwise claim against the Contractor, in
accordance with this Sub-Clause" in the last paragraph.

3.1 Engineer’s Duties and Delete the second sentence of the third paragraph “If the Engineer required to obtain
Authority the approval of the Employer before exercising a specified authority, the requirements
shall be as stated in the Particular Conditions.”

Add after the last paragraph:

“Notwithstanding the obligation of the Engineer, as set out above, to obtain approval,
if, in the opinion of the Engineer, an emergency occurs affecting the safety of life or of
the Works or of adjoining property, he may, without relieving the Contractor of any of
his duties and responsibilities under the Contract, instruct the Contractor to execute all
such work or to do all such things as may, in the opinion of the Engineer, be necessary
to abate or reduce the risk. The Contractor shall forthwith comply, despite the absence
of approval of the Employer, with any such instruction of the Engineer. The Engineer
shall determine an addition to the Contract Price and Contract Period, in respect of
such instruction, in accordance with Sub-Clause 3.5 [Determinations] and shall notify
the Contractor accordingly, with a copy to the Employer.”

“The Engineer is required to obtain the written approval of the Employer before
exercising the following authority:

1. Instructing the Contractor to suspend progress of part or all of the works in


accordance with clause 8.8 of these conditions or terminate the Contract under
Clause 15;

2. issuing a taking-over certificate in accordance with clause 10.1 and or


10.2 of these conditions;

3. issuing a performance certificate in accordance with clause 11.9 of these


conditions;

4. initiating and evaluating variations in accordance with clauses 13.1 and


13.3 of these conditions respectively;

5. certifying the payment of retention money in accordance with clause


14.9 of these conditions;

6. authorizing any changes in materials or suppliers previously proposed or agreed;


and

7. issuing the Final Payment Certificate under Sub-Clause 14.13 [Issue of Final
Payment Certificate]

5 of 26
8. determining and / or awarding any extension to the Time for
Completion; settling any claims

3.2 Delegation by the Engineer In the second line, after the first sentence add the following:

“The Engineer shall notify to the Contractor the names, duties and scope of authority of
such persons.”

In the first line, insert “upon Employer’s Approval” after the words “from time to time”

3.3 Instructions of the Engineer Add the following to (a):


“the instruction may be given verbally and a written instruction confirming the verbal
instruction shall be issued within 48 hours of the verbal instruction.”

3.4 Replacement of the Delete Sub-Clause 3.4 in its entirety and replace with the following:
Engineer " If the Employer intends to replace the Engineer, the Employer shall, not less than 14
days before the date of replacement, give notice to the Contractor of the name,
address and relevant experience of the intended replacement Engineer. If the
Contractor reasonably objects to such replacement engineer, the Contractor shall
within 7 days of receipt of the Employer's notice provide to the Employer a detailed
substantiation in writing of such objection. Upon receipt by the Employer of such
detailed substantiation, the Employer shall in its sole discretion make a determination
regarding the suitability of the replacement engineer.

Add the following paragraph:

The Employer may from time to time employ a Project Manager who shall, in addition to
the Engineer, be responsible for managing the Project on behalf of the Employer. The
nature and scope of the Project Manager shall be determined by the Employer from time
to time and will be notified to the Contractor. The Contractor shall comply with any and all
directions and instructions of the Project Manager regarding the performance of the
Works."

3.5 Determinations Add the following paragraph:

“Any agreement and/or determination pursuant to Sub-Clause 3.5 [Determinations]


shall not prejudice or in any way alter the basis on which other like claims pursuant to
the Contract fall to be determined.”

Add the following paragraph:

“the Engineer shall not be bound to seek agreement unless the Contractor has complied
with the procedure set out in Clause 20.1.”

3.6 Offices for the Engineer Add new Sub-Clause:

“The Contractor shall allow for the provision, erection, maintenance, daily
operation and dismantling of Offices for the Engineer in accordance with the
Specification.”

6 of 26
4.1 Contractor’s General Insert the words "exercising the skill, care and diligence reasonably to
Obligations be expected of an appropriately qualified contractor with experience in carrying
out and properly completing works of a similar type, purpose, nature and
complexity to the Works and otherwise" after the
words "execute and complete the Works" in paragraph 1. At the

end of paragraph 3, add new paragraphs:

“The Contractor shall notify the Engineer, with a copy to the Employer of any
facts, matters or circumstances of which the Contractor becomes aware and
which the Contractor knows or reasonably to know, threaten the Employer with
loss or damage or threaten the health, safety or welfare of any person engaged in
connection with the performance of the Works or any user of the Works. Such
notification shall not prejudice the liability or responsibility of the Parties for or in
respect of the facts, matters or circumstances so notified.

In the event that the Contractor has or believes to have any right or entitlement
pursuant to the Contract or otherwise, the Contractor shall in all cases take such
steps (if any) which can reasonably be taken to eliminate or mitigate any such
entitlement and any additional losses may be incurred by the Employer, to the
extent that such elimination or mitigation can be achieved without any additional
Cost to the Contractor.

Add new sub-clauses:

"(e) the Contractor shall ensure that any design is prepared by suitably qualified
designers who are engineers or other relevant professionals;
the Contractor shall obtain the Engineer's consent to the Contractor's appointment of
any designer and/or design sub-contractor before such parties undertake any design
works;
(f) the Contractor shall be solely responsible for the design regard less of
whether such design is prepared by any sub-contractor;
(g) the Contractor shall ensure that the designers are available to attend
discussions with the Engineer at all reasonable times during performance of
the works;
(h) subject to Sub Clause 18.5, the Contractor shall effect and maintain, and
shall ensure any design sub-contractor effects and maintains, professional
indemnity insurance on terms reasonably acceptable to the Employer with a
limit of indemnity not less than the amount stated in the Appendix to Tender;
(i) the Contractor must maintain such professional indemnity insurance in
full force and effect throughout the period of its liability under the Contract
and under any Laws; and
(h) The Contractor shall procure a collateral warranty in a form attached here in
Appendix F, from the sub-consultant , or sub- contractor who has completed the
design in favour of the Third Parties and the Employer"

4.2 Performance Security Revise second paragraph from “the Particular Conditions” to “Annex of these
Particular Conditions”.

Add a new paragraph:

7 of 26
The Contractor shall deliver the Performance Security to the Employer within 14
days of the date of the Contract Agreement and shall send a copy to the Engineer.
The Performance Security shall be issued by an entity and from within a country (or
other jurisdiction) to be approved by the Employer.

Add a new paragraph at the end of the Sub-Clause as follows:

"The amount of the Performance Security shall be increased within 28 days of the
written request of the Engineer, so that it corresponds to any increase in the amount
of the Contract Price and adjusted pursuant to the Contract and in such
circumstances the Contractor shall provide an amended Performance Security in
the correct amount within such period. The cost shall be borne by the Contractor,
including any extensions to the period of validity of the guarantee and increases in
the amount of the guarantee."

Replace 42 days in Sub Clause (b) &(c) with 7 days

Delete the penultimate paragraph

4.2A Collateral Warranty Add new Sub-Clause:

“The Employer may, by notice, require the Contractor to provide a Collateral


Warranty in favour of the Employer and/or any third party beneficiary of the Works
from any Sub-contractor. The Collateral Warranty, shall be duly executed and
produced to the Employer with 7 days following the Employer’s notice pursuant to
this Sub-Clause. Any costs associated with providing such a Collateral Warranty
shall be borne by the Contractor.”

4.2B Parent Company Add new Sub-Clause:


Guarantee
“The Employer may, by notice, require the Contractor to procure from the
Contractor’s Parent a Parent Company Guarantee in favour of the Employer. The
Parent Company Guarantee, duly executed, shall be produced to the Employer
within 7 days following the Employer’s notice pursuant to this Sub-Clause. Any costs
associated with providing such Parent Company Guarantee shall be borne by the
Contractor.”

4.2C Contractors Further “The Contractor warrants to the Employer and the Third Parties (as defined by:
Warranties facility management, maintenance company, a contractor performing other works
related to the Works, that In carrying out the execution and completion of the works,
and any design which is the responsibility of the contractor, he has exercised and
shall exercise the skill, care and diligence reasonably to be expected of an
appropriate qualified contractor with experience in carrying out such work for
projects of an similar type, nature and complexity to the works. In carrying out the
execution and completion of the works and any design which is the responsibility of
the contractor he has not, and shall not, specify for use of permit to be used any
materials which at the time the works are being carried out are generally accepted
or reasonably suspected of being prohibited materials, and shall, when requested
issue to the employer may require a certificate that no such materials have been
specified for use or permitted to be used;

8 of 26
The design, execution and completion of the works will be carried out in such a way
as to ensure the full, efficient, economic and safe commercial operation with the
minimum interruption for maintenance or repair.”

4.3 Contractor’s Delete and replace paragraph 6 with the following:


Representative
“A reasonable proportion of the Contractor’s Representative’s technical team shall be
fluent in the English Language and a reasonable proportion of foremen/site supervisors
shall have a working knowledge of the English Language.

In addition, the Contractor shall ensure that a reasonable proportion of its


supervision personnel shall have a working knowledge of the Arabic language to
enable proper supervision of all Works at Site.”

4.4 Subcontractors Add the words “Materials and Plant supplied by and” after the words “responsible
for the” in the second paragraph. Add the words in brackets “(including a nominated
sub-contractor)” after the words “any Sub-contractor” in the second paragraph.

Add the words “The following condition shall apply to sub-contracting” in the second
paragraph.

Add new paragraph “The contractor shall be responsible for the payment of all sub-
contractors pursuant to the terms of the relevant subcontracts and evidence of
payment at the Engineer’s request.

Add new paragraph:

“The Contractor shall procure collateral warranty from each of his


Subcontractors”

4.5 Nominated Add the following new paragraph:


Subcontractor
“The Contractor is deemed to have already considered general attendance,
special attendance, builder’s work and overheads/ mark- up in their Contract
Price.”

Add as the last paragraph:

“For the avoidance of doubt the Contractor shall be responsible for the acts
of defaults of any nominated Sub-contractor, his agents or
employees, as if they were the acts or defaults of the Contractor”.
4.6 Co-operation Add the words “of the Country” after the words “public authorities” in
sub-section (c) and add the words “whether or” after the word “work” in the sentence
after sub-section (c).
Add “subject to prior approval of the Employer” after “any such instruction.”

Add new paragraph:

“The Contractor has acknowledged that other contractors and consultants work in
areas within the vicinity of or inside the Site; and that he can and could reasonably
foresee the activities of the Employer’s personnel, and the other contractors and
personnel of public authorities or public utility service providers, referred to in the
Contract.

9 of 26
The Contractor shall co-operate fully and pro-actively with, and co- ordinate his
activities with, all contractors, consultants and suppliers employed by the Employer
in relation to the project. The Contractor acknowledges that the Employer may
engage other contractors,
consultants and suppliers identified by the Employer or the Engineer, or
subsequently notified to the Contractor by the Employer or the Engineer, who may
be employed in the execution of works or services on or near the Site and that the
Contractor reasonably foresees the activities and/or works and services of those
other contractors, consultants and suppliers. The Contractor shall attend the
Employer's project meetings at the time and venues specified by the Engineer, the
Employer or the Project Manager. The Contractor shall ensure that the
Contractor's Representative attends all such meetings, together with all of the
Contractor's other personnel and/or the Subcontractor's personnel as are
necessary to resolve the issues raised in any agenda for such meetings."

4.7 Setting Out Delete the words “plus reasonable profit” in Sub-Clause (b). Insert at

the end of this Sub-Clause:

“In the inspection of the Site, the Contractor will be deemed to have conducted a
visual survey of the site to determine the physical condition of the site, including the
position of any underground and above ground services and drainage visible from
a visual survey and will carry out the works as per client’s design.” The Contract
Price shall be deemed to be inclusive of all costs which may be incurred in carrying
out the Works including any diversions thereof and the costs of the Contractor's
operations in the vicinity of any such services, unless otherwise provided for in the
Employer's requirements as set out in the Drawings or the Specification.”

4.10 Site Data Delete the following from the first line of the second paragraph:

“To the extent which is practical (taking account of cost and time), the” Add to the first

line of the second paragraph:

“The”

Insert the following at the end of the Sub-Clause:

“The Contractor shall be deemed to have obtained and allowed for all information
as to the risks and other contingencies in connection with the Works; and inspected
and examined the Site and its surroundings and conditions and to have satisfied
himself before the date of the Contract as to the form and nature of the Site, the
nature and difficulty of the work and Materials necessary for the completion of the
Works (any information in connection therewith may have been provided by or on
behalf of the Employer being provided by way of information only without warranty
or representation as to its accuracy, reliability or completeness), the means of
communication with and restrictions of access to the Site, the accommodation he
may require, and in general to have obtained for himself all necessary information
as to risks, contingencies and all other circumstances influencing or affecting the
Works. The Contractor shall not be entitled to any extension of time or

10 of 26
to any additional payment on grounds of any misunderstanding or misinterpretation
of any such matter, nor shall the Contractor be released from any of the risks
accepted or the obligations undertaken by him under the Contract on the grounds
that he did not or could not have foreseen any matter which might affect or have
affected the execution of the Works.”

Replace sub paragraphs (a) to (e) with the following:

(a) the form and nature of the Site, including Site Conditions;
(b) the extent and nature of the work and Goods necessary for the execution and
completion of the Works and the remedying of any defects;
(c) the Laws, procedures and labour practices of the Emirate of Abu Dhabi, the
United Arab Emirates and relevant Authorities; and
(d) the Contractor's requirements for access, accommodation, facilities, personnel,
power, transport, water and other services.

4.12 Unforeseeable Physical To the end of the second paragraph, add the words “but, in any event, not later than
Conditions 5 days after first encountering the adverse physical condition”.

Insert at the end of this Sub-Clause:

“In the inspection of the Site, the Contractor will be deemed to have conducted a
survey of the site to determine the physical condition of the site, including the
position of any underground and above ground services and drainage visible from
a visual survey and will carry out the works as per design documents.” The Contract
Price shall be deemed to be inclusive of all costs which may be incurred in carrying
out the Works including any diversions thereof and the costs of the Contractor's
operations in the vicinity of any such services, unless otherwise provided for in the
Employer's requirements as set out in the Drawings or the Specification.”

4.14 Avoidance of Interference Add new paragraph

“The Contractor shall co-operate with the relevant traffic authorities including,
without limitation, the Abu Dhabi Municipality and Department of Civil Aviation to
accomplish the foregoing”.

4.21 Progress Reports Add new paragraph

“Any failure by the Contractor to comply with this Sub-Clause shall, without
prejudice to any other remedies and/or provisions of the Contract, be taken into
account by the Engineer in any assessment of the Contractor’s entitlement to an
extension of the Time for Completion and/or any additional payment.”

Add new paragraph

“Any other matters set out in the Contract and other information reasonably required
by the Employer and notified to the Contractor in
advance of the relevant monthly report."

11 of 26
4.23 Contractor’s Operations Add "within 7 days." after the end of "The Contractor shall leave that
on Site part of the Site and the Works in a clean and safe condition." in the second third
paragraph.

Add new paragraph

"The Contractor shall not use any part of the Site for any purpose not connected
with the execution of the Works without the prior approval of the Employer. The
Contractor shall not destroy, damage or pull down any plant, wall or building outside
the area where the Works are being performed (but within the Site) without the prior
consent of the Employer.”

4.25 Details to be Confidential Add new Sub-Clause:

“The Contractor shall treat the details of the Contract as private and confidential,
save in so far as may be necessary for the purposes thereof, and shall not publish
or disclose the same or any particulars thereof in any trade or technical paper or
elsewhere without the previous consent in writing of the Employer or the Engineer.
If any dispute arises as to the necessity of any publication or disclosure for the
purpose of the Contract the same shall be referred to the Employer whose
determination shall be final.”

4.26 Site Notice Boards Add new Sub-Clause:

“The Contractor shall provide Site Notice Boards in accordance with the
Specification.”

4.27 Import and Customs law Add the following Clause:

“Contractor/ suppliers/ bidders acknowledge that the import and Custom laws and
regulations of the United Arab Emirates shall apply to the furnishing and shipment of any
products thereof to the United Arab Emirates.”

4.28 Product Guarantees As a precondition to the issue of a Taking Over Certificate, the Contractor shall provide
the Employer with product guarantees/warranties for all significant items of Plant,
Materials and equipment installed as part of the Works as prescribed or required by the
Specification. The coverage period of such guarantees/warranties shall be in line with
required period set out in the Specifications, the product guarantees shall be in favour of
the Employer and any Beneficiaries specified by the
Employer. Without prejudice to any other right or remedy the Employer may have, the
Employer shall be entitled to withhold the sum often percent (10%) of the value of the
works or goods to which a product guarantee relates from any Payment Certificate for
each and every product guarantee which has not been provided by the Contractor.

4.29 Employer’s policies The Contractor acknowledges that it has received copies of the Employer's policies. In
carrying out its obligations under the Contract, the Contractor
shall comply with the Employer's policies.

12 of 26
5.1 General Design Delete “within the period stated in the Appendix to Tender, calculated
Obligations from the Commencement Date” in the third paragraph and replace it by “within 14
days from the Commencement Date” Delete “(taking account of cost and time)”
after the word “that” in the last paragraph. Insert the following after “Tender,” in the
last paragraph:

“and the Employer’s personnel have done material change in the Site after the Base
Date”

5.4 Technical Standards and Add the following paragraph at top:


Regulations “The Contractor acknowledges the business activities of the Employer and the
purpose that the Employer has intended from the Works, and covenants that the
Works shall be fit for that purpose. The Contractor acknowledges that it has allowed
for and considered all authorities’ requirements and standards for the purpose of
issuance or renewal of the trade (commercial or tourism) licenses related to the
business activities purpose intended for the Employer’s facilities under design.

6.6 Facilities for Staff and Add new paragraph at the end of the clause:
Labour
“Facilities for the use of persons employed on the Works shall be provided and
maintained by the Contractor to the extent and in such a manner and at such
places as shall be approved by the Engineer, Authorities, HSE, etc. and all
persons connected with the Works shall be required to use them. The Contractor
shall make all temporary arrangements for the proper discharge and removal of
sewage, and shall maintain the same to the satisfaction of the Engineer as long
as they may be required.

The Contractor shall, having regard to local conditions, provide on Site adequate
supply of drinking water and other water for use of his staff, labour and Engineer’s
/ Employer’s staff.”

6.12 Festivals and Religious Add new Sub-Clause:


Customs
“The Contractor shall, in all his dealings with staff and labour, have due regard to
all foreseeable recognised holidays, festivals and religious or other customs
without any redress for an extension of Time for Completion.”

6.13 Control of Contractor’s Add new Sub-Clause:


Workmen
“The Employer or the Engineer at their discretion may require the Contractor to
remove and replace any of his staff or labour although the same was approved
previously by any of them. The Contractor shall remove any such person or
persons in 7 days and replace such person or persons in 7 days with other
suitably qualified, experienced and competent person or persons. Costs
associated with such removal and replacement of staff or labour shall all be borne
by the Contractor.”

6.14 Observance by Sub- Add new Sub-Clause:


Contractors

13 of 26
“The Contractor shall ensure that his Sub-contractors also familiarise themselves
with these Particular Conditions.”

6.15 Bribery Add new Sub-Clause:

“Any commission, advantage, gift, gratuity, reward or bribe given, promised or


offered or accepted by or on behalf of the Contractor or his agent or servant or
any other person on his or their behalf shall, in addition to any criminal liability
which may be thereby incurred, subject the Contractor to the termination of the
Contractor’s employment under this and all other Contracts with the Employer
and also to the payment of any loss or damage suffered by the Employer as a
result of such termination.”

7.1A Quality of Plant and Add new Sub-Clause:


Materials
“All Plant and Materials forming part of or otherwise supplied in connection with the
Works shall:

(a) be of the respective kinds described in the Contract and,


subject to all other provisions of the Contract, be in
accordance with the Engineer’s instructions (if any), and
(b) be new, of satisfactory quality and free from defects, and
(c) not contain or comprise any materials generally recognized
as being deleterious and/or hazardous, and
(d) be accompanied, if required by the Engineer, by a certificate
of the country of origin and/or a certificate of compliance
issued by a duly authorized representative of the
manufacturer or supplier.”

7.7 Ownership of Plant and Add the following paragraph


Materials
“The Contractor shall ensure that all its subcontracts and supply agreements
contain similar provisions which pass title in each item of Plant and Material to the
Contractor at the times and in the manner referred to in the preceding paragraph."

8.1 Commencement of Delete the first paragraph and replace with the following:
Works
"The Commencement Date shall be the date stated in the Appendix to Tender."

8.2 Time for Completion Add sub paragraph (c)

“achieving each Milestone or Section by the relevant Milestone or Completion


Date”

8.3 Programme Revise “28 days” in first paragraph to “7 days”.

Replace sub paragraph (a) with the following

“the order in which the Contractor intends to carry out the Works high lighting all
critical activities, including all Milestones and Milestone

14 of 26
Dates, the anticipated timing of each stage of design (where relevant to the
Works), Contractor's Documents, procurement, manufacture,
inspection, delivery to Site, construction, erection, testing,
commissioning and trial operation.”

Add the following paragraphs to the end of the Sub-Clause:

“Failure of the Contractor to submit the programme of works, cash flow and any
other information reasonably required by the Engineer or the Employer or any
update thereof may result in the withholding of any payments due to the Contractor
until the programme or subject monthly update has been submitted.

Add the following paragraph

"The Contractor shall be solely responsible for each revision of the Contractor's
programme and construction scheduling to be done for the Project and for
completing the Works on or before the Time for Completion. The Engineer's and I
or the Employer's approval of the Contractor's programme from time to time shall
not in any manner relieve the Contractor from any of his responsibilities or
obligations under the Contract."

The programme of works shall be used as the basis for progress reporting and be
updated monthly to reflect current forecasting.

8.4 Extension of Time for In Sub-Clause (a), add “to the extent that the varied works have caused the
Completion Contractor’s delay, if any,” after “Variations”
Delete the following words from sub-paragraph 8.4(e): "or the Employer's other
Contractors on Site".

To the end of Sub-Clause (e) add “provided that:


the Contractor shall have no entitlement to an extension of time for any delay or
disruption to the Works caused by any third party save insofar as Sub-Clause 8.5
[Delays Caused by Authorities] is applicable to any such third party;

Add the following paragraphs to the end of the Sub-Clause:

“Notwithstanding the foregoing, the entitlement of the Contractor to an extension


of time shall be subject to the following:

(i) the Contractor has made reasonable and proper efforts to mitigate
such delay;
(ii) the Contractor shall not be entitled to a separate extension of time for
each one of several causes of delay running concurrently;

15 of 26
(iii) the Contractor has demonstrated, to the reasonable
satisfaction of the Employer (which may include, if requested, a critical
path analysis, as-built schedule, window analysis, and time impact
analysis, to the level of detail specified by the Employer), that the delay
was on the critical path of the programme of the Works;
(iv) the Contractor can demonstrate, to the reasonable satisfaction of the
Employer, that the Contractor has taken all reasonable steps to mitigate
the costs and losses caused by the delay
(v) any such delay which is concurrent with another delay for which the
Contractor is responsible shall not be taken into account; and
(vi) the Contractor has complied with Clause 20.1 [Contractor’s Claims].”

8.5 Delays Caused by In sub-paragraph 8.5(b), insert "such that the Time for Completion is delayed" after
Authorities the words "disrupt the Contractor's work"

8.7 Delay Damages Add the following paragraph

In addition to delay damages, should the Employer incur additional costs in


relation to the Engineer and or Project Manager as a result of the Contractor's
failure to comply with subparagraph 8.2 (Time for Completion], the Employer shall
subject to sub-paragraph 2.5 [Employer's claims] be entitled to recover such costs
from the Contractor as a debt or by deducting the amount from any sum
otherwise to be included in an Interim Payment Certificate or Final Payment
Certificate as the case may be."

8.8 Suspension of Work Delete Sub-clause in its entirety and replace with:

“The Employer may at any time and from time to time, instruct the Contractor to
suspend progress of part or all of the Works, and may at any time after any such
instruction give an instruction to the Contractor to proceed with normal working.
During any such suspension, the Contractor shall protect, store and secure such
part of the works against any deterioration, loss or damage, and (unless otherwise
instructed by the Employer) shall maintain the Contractor’s personnel ready to
resume normal working within seven days after receipt of an instruction from the
Employer to proceed.
The Engineer may also notify the cause for the suspension. If and to the extent that
the cause is notified and is the responsibility of the Contractor, the following sub-
clauses 8.9, 8.10 and 8.11 shall not apply.”

Add the following paragraph

“If the Contractor contravenes health and safety requirements during any construction
activities, the Engineer shall have the right to suspend the Works or any construction
activities in such part or parts affected by the Contractor's default until he provides the
health and safety requirements to the satisfaction of the Engineer. The Contractor
shall not be entitled for any kind of claims whatsoever due to such
suspension.”

16 of 26
8.10 Payment for Plant and Add sub paragraph 8.10 (c)
Materials in Event of “the Plant and Materials are ready to be delivered to the Site”
Suspension

8.13 Early Warning Insert new Sub-Clause 8.13

“The Contractor shall operate an "early warning" system whereby the Contractor
shall notify the Employer and the Engineer as soon as it is aware of any matter
adversely affecting or threatening the Works and/or the project and/or a Party's
performance under the Contract and (within the scope of its agreed role, expertise
and responsibilities) shall include in such notification, proposals for avoiding or
remedying such matter. The Engineer shall convene a meeting of the Parties within
seven (7) days from the date of any such notification to discuss with the Parties
and subsequently issue a direction on an appropriate course of action unless the
Parties and the Engineer agree such course of action without a meeting.”

8.14 Meetings “The Contractor will attend weekly progress meetings or any other meeting with the
Employer’s Personnel to be held at a mutually agreed time to review programme,
procurement, outstanding requests for inspection, approvals and report generally
on the progress of the works, encumbrances and difficulties. Where delays are
forecast the Contractor will prepare interim programmes to identify actions to
address delay.

In addition the Contractor will attend and report to a monthly executive meeting
summarizing the progress of the Works, issues of the day and forecast completion.
An agenda for all meetings to be mutually agreed between the Parties.”

10.1 Taking of the Works and Insert the following after the end of the first paragraph of Sub-Clause 10.1:
Sections
"provided however that it shall be a condition precedent to the issue of the
Taking-Over Certificate for the Works that the Contractor shall have:

(a) provided the Employer with the as-built documents, the operation and
maintenance manuals and training which the Contractor is obliged to provide
pursuant to this Contract;

(b) all applicable Laws regarding the use and occupation of the Works or
relevant Section have been complied with and any and all permits and no
objection certificates have been obtained and passed on to the Employer;

(c) all direct agreements requested by the Employer pursuant to the Contract
prior to completion and take over have been executed and provided in favour of
the Employer and/or any third party identified by the Employer;

(d) the Works or relevant Section have passed the Tests on Completion and duly
certified reports of the tests have been forwarded to the Employer and the
Employer or the Engineer have endorsed the

17 of 26
Contractor's test certificate or issued a certificate to the Contractor to that effect in
accordance with Clause 7.4 [Testing];

(e) all costs, expenses and damages payable by the Contractor to the
Employer on the date on which the Employer issues Taking Over
Certificate have been paid in full;
and any and all of the stipulations identified in the Contract as being pre-requisites
of Taking Over have been satisfied.

(f) the product guarantees and Collateral Warranties specified in Clause


4.1 have been provided to the Engineer”

10.2 Taking Over of Parts of Delete the words “plus reasonable profit” and “and profit” from the fourth paragraph.
the Works

10.3 Interference with Tests on Delete the words “plus reasonable profit” from Sub-Clause (b) in the third paragraph.
Completion

10.5 Access to install Equipment The Contractor shall co-ordinate his activities with the Employer in order
and Fit-out to provide other Employer`s contractors and suppliers
reasonable access to the Site to commence and complete their works by the date(s)
notified by the Employer.
The Contractor acknowledges and agree to coordinate with these Employer's other
contractors and suppliers who may work in the same time with the Contractor in the
same area of works and buildings.
The Contractor shall allow in his programme of works reasonable time allocated for
such contractors. the Employer will provide the Contractor with a list of the contracts
already placed or to be placed with those contractors and suppliers within the time of
programme submission under clause 8.3.
Prior to the issue of a Taking-Over Certificate, the Contractor shall retain control of and
responsibility for the Site and the Works during the time such relevant works are being
undertaken ."

11.1 Completion of Outstanding Delete the last two lines of the Sub-Clause (b) and replace with “Upon the failure of
Work and Remedying any part or component or the appearance of any defect of the Permanent Works during
Defects the Defects Notification Period, the Contractor shall repair or replace such defective
part or component as soon as reasonably practicable after receiving notice from the
Engineer or the Employer.”

11.2 Cost of Remedying Defects Add after the word “Contractor” in the third line the words “who shall also pay all the
costs of the Engineer incurred in the inspection thereof”

Delete the last paragraph and replace with:

“Without prejudice to Sub-Clause 11.1 [Completion of Outstanding Work and


Remedying Defects], if and to the extent that such work is attributable to any other
cause, the Contractor shall notify the Engineer accordingly pursuant to Sub-Clause
20.1 [Contractor’s Claims] and upon receipt of a valid notification, the Engineer shall
agree or determine pursuant to Sub-Clause 3.5 [Determinations] whether Sub-Clause
13.3 [Variation Procedure] and/or any other provision by the Contract shall

18 of 26
apply and the entitlement, if any, of the Contractor to additional payment
thereunder.”

11.6 Further Tests Add the words “or affects” in the first line of the first paragraph after the
words “may affect”.

11.10 Unfulfilled Obligations Add the following paragraph

"After the Performance Certificate has been issued, each Party shall remain liable for
the fulfilment of any obligation which remains unperformed at that time and for on-
going obligations; such on-going obligations at that time include, for the avoidance of
doubt, the provision of collateral warranties under sub-paragraph 11 .12 [Collateral
Warranties] which the Contractor shall procure and provide them to the Employer after
the issue of the Performance Certificate. For the purposes of determining the nature
and extent of unperformed and on- going obligations, the Contract shall be deemed to
remain in force".
Insert the following new Sub-Clauses after Sub-Clause 11.11 "11.12 Collateral
warranties The Contractor shall, within 14 days of the Employer's written request from
time to time to do so, procure one or more collateral warranty agreements in favour of
one or more Beneficiaries in the respective form set out in Annex 6 with only such
amendments as the Engineer shall, acting reasonably, approve. Such collateral
warranties s hall be validly executed by the Contractor, and, in the case of any
collateral warranties to be provided by any Subcontractor, by the Subcontractor as
well. The obligation for the provision of such collateral warranties shall continue
notwithstanding termination of the Contract or of the Contractor's employment under
the Contract for any reason whatsoever including (without limitation) breach by the
Employer. However, any such agreement provided after such termination shall be
amended by the Employer so as to refer to the fact and date of such termination, to
omit any obligations to continue to exercise skill, care and diligence after such
termination, and to omit any provision enabling a third party to assume the position of
the Employer. Without prejudice to any other right or remedy available to the Employer,
the Employer shall be entitled to withhold the sum of ten percent ( I0%) of the Contract
Price from any payment to be certified in a Payment Certificate for each and every
collateral warranty agreement requested but not provided pursuant to this sub-
paragraph. 11.13 Latent defects Notwithstanding the expiry of the Defects Notification
Period or the issue of the Performance Certificate, the Contractor shall remain liable for
any defects in the Works or any failure of the Works to comply with the Contract or with
the Laws for a period of ten years from the date of the relevant Taking-Over
Certificate."

11.11 Clearance of Site Revise “28 days” in second paragraph to “7 days”.

11.12 Collateral Warranty Add new sub clause

The Contractor shall, within 14 days of the Employer's written request from time to time
to do so, procure one or more collateral warranty agreements in favour of one or more
of Third Parties or of the Employer itself in the respective form set out in Annex F with
only such amendments as the Engineer shall, acting reasonably, approve. Such
collateral warranties shall be validly executed by the Contractor, and, in
the case of any collateral warranties to be provided by any

19 of 26
Subcontractor, by the Subcontractor as well. The obligation for the provision of
such collateral warranties shall continue notwithstanding
termination of the Contract or of the Contractor's employment under the
Contract for any reason.

11.13 Latent Defects Add new sub clause

Notwithstanding the expiry of the Defects Notification Period or the issue of the
Performance Certificate, the Contractor shall remain liable for any defects in the
Works or any failure of the Works to comply with the Contract or with the Laws for
a period of ten years from the date of the relevant Taking-Over Certificate."

13.1 Right to vary Delete ” A Variation shall not comprise the omission of any work which is to be
carried out by others” at the first paragraph.

Add the following paragraph

“To avoid doubt, the Contractor shall not be entitled to claim any extension of
time or additional Costs where it fails to notify the Engineer in accordance with
this Sub-Clause”

13.3 Variation Procedure Add a new paragraph at the end of the Sub-Clause as follows:

“Unless otherwise agreed, all Variations instructed under this Sub-Clause


13.1 [Right to Vary] and Sub-Clauses 13.2 [Value Engineering] and 13.3
[Variation Procedure] (for the purpose of this Sub-Clause referred to as “Varied
Work”) shall be valued at the rates and prices set out within the Bill of Quantities
or other applicable schedules.
If the Bill of Quantities does not contain any rates or prices applicable to the
Varied Work, the rates and prices contained within the Bill of Quantities shall
be used as the basis for valuation so far as may be reasonable, failing which,
suitable rates or prices shall be agreed upon between the Engineer and the
Contractor after due consultation with the Employer. In the event of
disagreement the Engineer shall make a fair determination in accordance with
Sub-Clause 3.5 [Determinations] of the Contract, taking due regard of all
relevant circumstances and shall
notify the Contractor accordingly, with a copy to the Employer.”

20 of 26
13.5 Provisional Sums Add the following paragraph

The Employer may omit in part or in full any Provisional Sum. No claims will
be entertained due to the same.

13.6 Daywork Add to the end of the Sub-Clause the paragraph “An instruction pursuant to
Sub-Clause 13.6 [Daywork] shall not entitle the Contractor to an extension of
the Time for Completion pursuant to Sub-Clause 8.4 [Extension of Time for
Completion].”

13.7 Adjustments for Changes in Add “and which the Contractor could not reasonable have foreseen at the base
Legislation date” in the last part of paragraph 1.

Add “which the Contractor could not reasonably have foreseen at the Base
Date” in paragraph 2.
13.8 Adjustments for Changes in Delete the text of the Sub-Clause and replace with
Cost
"Except only as expressly stated otherwise in this Contract, the Contract Price
is not subject to adjustment, rise, fall or escalation (including for increases in
the cost of goods, labour or materials or any other matters affecting the cost of
the execution of the Works)."

(a) Delete words “and Sub-Clause 13.8 [Adjustments for Changes in Cost]”
14.3 Application for Interim Payment
from sub paragraph (b)
Certificates

21 of 26
Add the following paragraph

“The estimated valuation amount is to be based on the rates as included


in the Schedules”

14.5 Plant and Materials intended for Add sub paragraph (a) item iii
the Works
“provided a vesting certificate to the Employer for any delivered Plant or
Material. “

14.6 Issue of Interim Payment Add the following text to the end of the first sentence of the first paragraph
Certificates
“or the insurances as specified in the relevant clauses of this Contract
Agreement (to be submitted to the Engineer in original). The approval by the
Engineer/ Employer to be in writing”.

14.7 Payment amend 56 days to be 28 days after the Employer has received the payment
certificate from the Engineer.

14.8 Delayed Payment Delete the Sub-Clause in its entirety.

15.2 Termination by the Employer Add words after” terminate the Contract” in paragraph 1

“without the need for a court order”

Delete paragraph 4 and replace with “Immediately upon receipt of notice of


termination, whether or not the Contractor disputes the validity of the
termination, the Contractor shall leave the Site and deliver any required Goods,
all Contractors’ Documents, and other design documents made by or for him,
to the Engineer. However, the Contractor shall use his best efforts to comply
immediately with any reasonable instructions included in the notice, (i) for the
assignment of any sub-contract, and (ii) for the protection of life or property or
for the safety of the Works. The Contractor shall refrain from taking any action
that could hinder or prevent the Employer from proceeding with the Works in a
timely and cost efficient manner.”

Add new Sub-Clauses:

“(g) is liable to pay delay damages in excess of the maximum amount stated in
the Appendix to tender”

(h) uses of has used deception or fraud in its transactions with the Employer or

(i) refused or ignored the instructions of the Engineer without reasonable


justification which shall be duly submitted in writing upon immediate receipt of
the instruction.”

Add “and such Contractor’s equipment and temporary works as he or they may
require” in the last part of paragraph 5.

15.5 Employer’s Entitlement to Replace Sub-Clause 15.5 with the following:


Termination "The Employer shall be entitled to terminate the Contract at any time for the
Employer's convenience by giving notice of such termination to the

22 of 26
Contractor without the need for a court order. The termination shall take effect
14 calendar days after the date the Contractor receives the termination notice.
After such termination, the Contractor shall be paid solely for Works performed
up to the time of such termination and for Materials and Plant reasonably and
as per the Contract delivered to the Site. After this termination, the Contractor
shall proceed in accordance with sub-paragraph 16.3 [Cessation of Work and
Removal of Contractor's Equipment]."

15.6 Employer’s Entitlement to Upon termination of the Contract by the Employer for any reason
Complete the Works whatsoever, the Employer may complete the Works himself and/or arrange for
following Termination any other entities to do so. The Employer and these entities may use such
Materials, Plant, Contractor's Documents and other design documents made
by or on behalf of the Contractor and such Temporary Works as he or they may
require. The Contractor shall co-operate fully with the Employer and any such
new contractor(s) for the orderly transfer of the Works.

16.2 Termination by Contractor Delete Sub-Clause (a) and (b)

Replace sub paragraph (c) with

“the Contractor has lawfully exercised its right to suspend under Sub- Clause
16.1 and such period of suspension has exceeded 60 days;”

Replace the last two paragraphs with:

“the Contractor to send a notice to correct, if not corrected within 60 days


following the Employer`s receipt of the notice, the Contractor may send 14 days
prior notice to the Employer terminating the Contract.”

16.3 Cessation of Work and Add new Sub-Clause (d) “refrain from taking any action that could hinder or
Removal of Contractor’s prevent the Employer from proceeding with the Works in a timely and cost
Equipment efficient manner.”

Add new sub paragraph (e)

“mitigate any loss, cost, expense or damage arising from such termination."

16.4 Payment on Termination Delete Sub-clause (c).

17.1 Indemnities Add sub paragraphs

"(c) any breach of Contract by the Contractor or caused by nominated or


domestic Subcontractors; and
(d) any act or omission of any Subcontractor including any claim made against
the Employer by a Subcontractor."

17.2 Contractor’s Care of the Insert as a new final paragraph “If the Contract is terminated in accordance with
Work the provisions of these Conditions, for the purposes of this Sub-Clause, the date
of issue of the Taking-Over Certificate shall be
deemed to be the date of expiry of the Notice of Termination given under

23 of 26
Clause 15 [Termination by Employer] and Clause 16 [Suspension and
Termination by Contractor].”

17.4 Consequences of Employer’s In the first sentence of the first paragraph, replace the word “Goods”
Risks with “Materials, Plant and Temporary Works”.

Delete the sentence “In the case of sub-paragraph (f) and (g) of Sub- Clause
17.3 [Employer’s Risks], reasonable profit on the Cost shall also be included.”
in Sub-Clause (b).

18.1 General Requirements for Delete 1st Paragraph:


Insurances
“In this Clause, “Insuring Party” means, for each type of insurance, the Party
responsible for effecting and maintaining the insurance specified in the relevant
Sub-Clause.”

Insert after paragraph 6, before Sub-Clause 18.1 (a):

“The Contractor shall, within respective periods stated in the Appendix to tender
(calculated from the commencement date) submit to the Employer”

Add the words “and Sub-Clause 18.4 [Insurance for Contractor’s Personnel] and
Sub-Clause 18.5 [Additional Insurances]” to the end of Sub-Clause 18.1 (b).

Delete Paragraph 10.

18.2 Insurance for Works and In the second line of the first paragraph insert the words “on the Site” after
Contractor’s Equipment “Contractor’s Documents”.

18.4 Insurance for Contractor’s Add the following paragraph to the end of the Sub-Clause:
Personnel
“This Insurance shall be for a limit per occurrence of not less than the amount stated
in the Appendix to Tender, with no limit on the number of occurrences.”

18.5 Additional Insurances Insert new Sub-Clause 18.5

“Notwithstanding anything contained in Clause 18, the Contractor shall effect and
maintain such additional insurances in accordance with the Laws, and with limits not
less than those set forth in the Appendix to Tender, as may be required by the
Employer, such as, but not limited to:

A) Motor Vehicles Third Party Liability Insurance.

B) Professional Indemnity Insurance for work designed by the Contractor.”

C) Insert new Sub-Clause 18.6


18.6 Decennial Liability Insurance
“Prior to commencement of the Works on Site, the Contractor shall provide an
undertaking letter stating that they will take out a project specific decennial liability
insurance policy to provide full coverage against the liability of the Contractor and
the Engineer under Article 880

24 of 26
of the United Arab Emirates Civil Code. The Engineer shall be named as a co-
insured under this policy. The policy shall be valid for a period of 10 years measured
from the date of the Taking-Over Certificate. The terms of the policy shall be subject
to the approval of the Engineer, and the costs thereof shall be borne by the
Contractor. The undertaking letter shall be provided to the Engineer within 14 days
of the Commencement Date.”

20.1 Contractor’s Claims Change the words “Engineer” to “Employer”.

Insert new fourth paragraph as follows:

“In the event that the Contractor has any right or entitlement pursuant to the Contract
or otherwise, the Contractor shall in all cases take such steps (if any) which can
reasonably be taken to eliminate or mitigate any such entitlement, to the extent that
such elimination or mitigation can be achieved without any additional Cost to the
Contractor. In the event that mitigation measures are available to the Contractor but
require the Contractor to incur additional Cost, the Contractor shall consult with the
Engineer and the Engineer shall issue such instructions as the Engineer considers
appropriate and shall proceed in accordance with Sub-Clause
3.5 [Determinations] to agree or determine the entitlement of the Contractor to any
additional cost incurred by the Contractor in complying with such instructions.”

20.1A Contractor’s Claims Add new Sub-Clause

"Upon any termination or suspension of Contractor, the Employer shall not be liable
to the Contractor for any loss of profit or loss of opportunity arising out of or in
connection with such termination or suspension."

20.1B Contractor’s Claims " In no event shall the Contractor have the right to suspend the execution of the
Works due to the submittal of a claim under the Contract."

20.2 Appointment of the Dispute Delete the Sub-Clause in its entirety.


Adjudication Board

20.3 Failure to Agree Dispute Delete the Sub-Clause in its entirety.


Adjudication Board

20.4 Obtaining Dispute Adjudication Delete Sub-Clause 20.4 as well as all references made to it in the general and
Board’s Decision particular conditions.

20.5 Amicable Settlement Delete Sub-Clause 20.5 in its entirety and substitute with the following:

“If a dispute (of any kind whatsoever) or breach thereof arises between the
Parties in connection with, or arising out of, the Contract or the execution of
the Works including any dispute as to any certificate, determination,
instruction or opinion or valuation of the Engineer, both Parties shall
attempt to settle the dispute by notice from the Party alleging the dispute or
difference to the other Party for an amicable settlement before the
commencement
of arbitration.”

25 of 26
20.6 Arbitration Delete Sub-Clause 20.6 in its entirety and substitute with the following:

20.6.1 This Contract is governed by the laws of the Emirate of Abu Dhabi and the
federal laws of the UAE as applied and implemented in the Emirate of Abu Dhabi.

20.6.2 Any dispute or difference arising out of or in connection with this Contract
including, without limitation, any dispute regarding the existence, formation,
performance, interpretation, nullification, termination or invalidation of this
Contract, shall be referred to and finally resolved by the Abu Dhabi Commercial
Conciliation & Arbitration Center (ADCCAC) in accordance with its Rules, which
rules are deemed to be incorporated by reference into this Sub-Clause 20.6. For
the purposes of any arbitration proceedings commenced pursuant to the Rules
15.3:

(a) the number of arbitrators shall be three;

(b) the legal place of arbitration shall be Abu Dhabi

(c) the language to be used in the arbitral proceedings shall be English; and

(d) the arbitrator shall have the power to issue directions in respect of all
costs.

20.7 Failure to Comply with Dispute Delete Sub-Clause 20.7 as well as all references made to it in the general and
Adjudication Board’s Decisions particular conditions.

20.8 Expiry of Dispute Adjudication Delete Sub-Clause 20.8


Board’s Appointment

20.9 Submissions The Contractor must submit to the Engineer with 21 days from signing the Contract
the following documents:
(a) programme of Works; - except programme required in 7 days
(b) manpower histogram;
(c) list of Plant, Materials, Equipment and Facilities;
(d) the Site visit acknowledgment;
(e) projected cash flow for the Works;
(f) proposed organization chart & CV of key personnel;
(g) quality assurance system;
(h) health and safety management system;
(i) environmental management system;
(j) proposed Subcontractors & Suppliers list;
(k) details of proposed resources; and
(I) schedule for the submittal of shop drawings and samples.

26 of 26
GENERAL CONDITIONS OF CONTRACT

The General Conditions of Contract shall be the FIDIC Conditions of Contract for Construction for
Building and Engineering Works designed by the Employer, First Edition 1999. ISBN 2-88432-022-9

The Contractor is deemed to be in possession of this document.

The General Conditions of Contract are published by:

International Federation of Consulting Engineers (FIDIC)

World Trade Centre II


P.O. Box311
1215 Geneva 15
Switzerland

Phone +41 22 799 49 00


Fax +41 22 799 49 01
E-mail fidic@fidic.org
WWW http://www.fidic.org
Classification: Internal
Erth Hotel Guest Arrival Experience, Refurbishment Works
Invitation to Tender
22 November 2022

Appendix D
FORM OF TENDER
SPECIMEN

FORM OF TENDER (to be issued on Tenderer’s Company Letterhead)

Date:

To: Erth Hotel, Armed Forces Officers Club Hotel

Dear Sir

RE: Erth Hotel Guest Arrival Experience, Rennovation, Abu Dhabi

(1) Having examined the Tender Documents (as described in Invitation to Tender Conditions of
Contract, Drawings, Specifications, Bill of Quantities but for this purpose also including any document
issued by the Employer or Tenderer and intended to form part of the Tender Documents) for the
execution of the above named Works, we, the undersigned, offer to execute and complete such Works
and remedy any defects therein in conformity with the said Tender Documents for the sum of
U.A.E. Dirhams [ Dhs.......................................]
or such other sum or sums as may be ascertained in accordance with the Agreement included in the
Tender Documents (the “Conditions of Contract”).

2) We acknowledge receipt of the following addenda issued by the Consultant:

Addendum number Date of Addendum


N/A N/A
N/A N/A
N/A N/A
N/A N/A

We confirm that we have taken account of these addenda in our Tender.

3. We have included with our Tender all the required and relevant information and enclosed
herewith all the information requested in the Tender Documents.

4. We acknowledge that the Attachment(s) hereto form part of our Tender.

5. We undertake, if our Tender is accepted, to commence the Works within 14 days of receipt of
the Employer’s notice to commence issued by the Consultant.

6. We undertake, if our Tender is accepted, to complete and deliver the whole of the Works
comprised in the Agreement within the time stated in the Appendix E of Invitation to Tender.

7. The periods stated include all Fridays, Public Holidays etc., and other non-working days caused
by inclement weather, etc., and shortened working hours during the Holy Month of Ramadan.

8. We agree to abide by this Tender for ninety (90) days from the last date of submission of Tenders
and it shall remain binding upon us and may be accepted at any time before the expiry of the ninety
(90) days.

9. If our Tender is accepted we will provide the Performance Security as described in Clause 4 of
the Standard Terms and Conditions.

10. If our Tender is accepted we shall obtain the insurances as required by the Tender before
commencing the Works.

Page 22 of 28
Classification: Internal
Erth Hotel Guest Arrival Experience, Refurbishment Works
Invitation to Tender
22 November 2022

11. Unless and until a formal agreement is prepared and executed, this Tender together with the
Employer’s Letter of Acceptance issued by the Consultant shall constitute a binding contract between
us.

12. We understand that you are not bound to accept the lowest or any Tender you may receive.

Signature .................................................................

Name ................................................................

Date ................................................................

Duly authorised to sign this Tender for and on behalf of

Contractor ...........................................................................................

In the presence of

Signature ..........................................................

Name ...........................................................

Date ...........................................................

Page 23 of 28
Classification: Internal
Erth Hotel Guest Arrival Experience, Refurbishment Works
Invitation to Tender
22 November 2022

Appendix E
COMPONENT PROJECT MASTER PROGRAMME

Page 24 of 28
Date: Septe,ber 2022
ERTH Guest Arrival
Master Programme
ID Task Name Duration Start Finish Half 1, 2022 Half 2, 2022 Half 1, 2023 Half 2, 2023
J M M J S N J M M J S
1 ERTH Guest Arrival - Programme 31.8 mons Wed 09/02/22 Wed 17/07/24
2 Consultant Appointments 7.65 mons Wed 09/02/22 Fri 09/09/22
6 Design Stage 10.4 mons Thu 10/02/22 Mon 28/11/22
35 Authority Approvals 1.75 mons Wed 16/11/22 Wed 04/01/23
39 Tender 7.95 mons Thu 19/05/22 Wed 28/12/22
51 Construction 20.02 mons Wed 04/01/23 Wed 17/07/24

Task External MileTask Manual Summary Rollup


Split Inactive Task Manual Summary
Milestone Inactive Milestone Start-only
Summary Inactive Summary Finish-only
Project Summary Manual Task Progress
External Tasks Duration-only Split

Prepared by: Chris Moult - Atkins


Classification: Internal
Erth Hotel Guest Arrival Experience, Refurbishment Works
Invitation to Tender
22 November 2022

Appendix F
Summary of Current Commitments

Page 25 of 28
Classification: Internal
Erth Hotel Guest Arrival Experience, Refurbishment Works
Invitation to Tender
22 November 2022

SUMMARY OF CURRENT COMMITMENTS

We hereby confirm the below provides a true and accurate reflection of our current commitments:

Project Employer Contract Sum / Value of Value of Anticipated Comments


Revised Contract Works Works completion
Sum complete remaining

Signature .................................................................

Name ................................................................

Date ................................................................

Duly authorised to sign this Tender for and on behalf of

Contractor ...........................................................................................

In the presence of

Signature ..........................................................

Name ...........................................................

Date ...........................................................

Page 26 of 28
Classification: Internal
Erth Hotel Guest Arrival Experience, Refurbishment Works
Invitation to Tender
22 November 2022

Appendix G
BILL OF QUANTITIES

Page 27 of 28
The Armed Forces Officers Club and Hotel

Erth Guest Experience

Fit-out Works

Issued on: 15/11/2022


The Armed Forces Officers Club and Hotel

Erth Guest Experience

Fit-out Works

BILL 1

PRICING PREAMBLES NRM2

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 1 PP/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 1 - PRICING PREAMBLES NRM2

Item Description Quantity Unit Rate AED Amount AED

PRICING PREAMBLES

A Scope of work includes for the construction and completion of the Erth Guest Experience - Fit-out Works Package as shown
in the drawings.

GENERALLY

B The Lump sum amount entered by the Main Contractor in these Bills of Quantities shall constitute the entire claim for
compensation for the work under this contract in accordance with the Conditions of Contract. The works shall not be
remeasured and will be subject to adjustment only as a result of changes in the scope of work through changes in drawings
and/or specifications.

C Upon award of contract, the Bills of Quantities shall be used solely for evaluation of progress payments due to the Main
Contractor, and as a schedule of rates for changes.

D The Bills of Quantities herein, including all notes and instructions, shall form an integral part of the Contract Documents.
However, the descriptions contained in the Bills of Quantities for each item are not necessarily complete. The Main
Contractor is referred to the Conditions of Contract and other Documents, Specifications and Drawings as well as relevant
Standards and Codes of Practice for further information as no claim or variation will be considered on account of the Main
Contractor's failure to do so.

E The Main Contractor is cautioned to familiarize himself with the full content of other Contract Documents including the
Drawings and Specifications (or any other information that can be reasonably inferred from any of them) and all obligations
contained in the documents shall be included in the tender prices and lump sum tender price, even if specific items relating to
them are not listed in the Bills of Quantities.

F Drawings, Specifications, Conditions of Contract and Bills of Quantities and all other Contract documents are complementary
and if any item is included in any of them, it shall be deemed included in all.

G The Main Contractor's bid for the entire work shall provide for supervision of any and all trades that are not intended to be
performed with his own resources. No extra compensation for services, as a General Main Contractor will be paid.

H The Main Contractor is required to provide with his Tender one complete copy of the Bills of Quantities fully priced out in
waterproof ink with summation sheets properly completed.

J Amendment shall not be made to these Bills of Quantities without the authority, in writing, of the Engineer.

K The Main Contractor shall not use these Bills of Quantities as the basis for a construction programme or for the purpose of
ordering materials or arranging Sub-contracts, be they Nominated or otherwise. The references for these activities shall be
the drawings, specifications and instructions issued by the Engineer.

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 1 PP/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 1 - PRICING PREAMBLES NRM2

Item Description Quantity Unit Rate AED Amount AED

GENERALLY (CONT*D)

A The Bills of Quantities have been prepared in such a manner that the description of each item (which description shall imply
reference to any heading or sub-heading, preamble or other clause or item which shall apply), shall be held to include for all
that is necessary to fulfil the liabilities and obligations arising out of the performance of the Contract, including (but not limited
to) the following:

a) Mobilization and demobilization,

b) Labour and supervisory labour with all associated payroll additives costs,

c) Materials, goods and all associated costs (including purchasing, conveyancing, delivering, unloading, positioning,
handling, hoisting, lowering, returning packing and the like),

d) Letters of credit, bank guarantees, bank charges and the like,

e) Travel time to and from the Work site,

f) Customs duties, port dues, import duties, taxes, charges, insurances and other dues levied by any authority or imposed by
the government,

g) Landing charges and transport charges of whatever description,

h) Temporary storage facilities,

i) Fitting and fixing materials and goods in position,

j) Provision and use of plant, equipment, small tools and maintenance of same,

k) Straight, raking or circular cutting,

l) Wastage on materials,

m) Working in girths, widths or heights,

n) Short lengths,

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 1 PP/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 1 - PRICING PREAMBLES NRM2

Item Description Quantity Unit Rate AED Amount AED

GENERALLY (CONT*D)

o) Safety,

p) Protection,

q) Provision of samples,

r) Consumables,

s) Testing,

t) Establishment charges,

u) Temporary works, including scaffolding and the like.

v) Replacing goods damaged, broken, lost or stolen,

w) Making good,

x) Attendance, coordination and maintaining a permit to work system for items of install only, or supply only or both supply
and install.

y) Preliminaries and management indirect costs

z) Transportation

aa) Camp facilities and operations,

ab) Overtime and Ramadan premiums

ac) Vacation and holiday pay

ad) All other incidental costs to complete the Works.

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 1 PP/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 1 - PRICING PREAMBLES NRM2

Item Description Quantity Unit Rate AED Amount AED

GENERALLY (CONT*D)

Format of Descriptions

A In addition to common abbreviations the following have been adopted:

B m - Meter

C m2 - Square Meter

D m3 - Cubic Meter

E Nr - Number

F Kg - Kilograms

G KN - Kilo Newton

H ITEM - Composite item

METHOD OF MEASUREMENT

J The Bills of quantities have been prepared in accordance with the NRM 2: Detailed measurement for building works, as
published by the Royal Institution of Chartered Surveyors. In addition to these preambles any specific departures from the
NRM 2 to suit local custom has been incorporated into the headings and descriptions of scheduled items.

K The following amendments to NRM 2 have been included and are to be read in conjunction with the specifications and the
drawings.

L These preambles form the Appendix to the NRM 2: Detailed measurement for building works, of which Tenderers shall be
deemed to be in possession of their own copies of the NRM 2.

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 1 PP/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 1 - PRICING PREAMBLES NRM2

Item Description Quantity Unit Rate AED Amount AED

PRICING

A The Main Contractor's unit rates are to be fully inclusive value of the work described and must include all related work,
accessory or consumable materials, incidental labour, supervision, administration, tools, construction equipment, overhead
and profit and all costs and expenses which may be required in and for the completion of the work described together with all
costs and expenses in complying with all general risks, liabilities and obligations set forth or implied in the Drawings,
Specifications and Conditions of Contract.

B The unit rate inserted by the Main Contractor for any item of work shall apply to the completed work as described in the
Contract Documents covering everything necessary including expenses of labour, material and equipment required for
executing that item of work. These general expenses shall include but are not restricted to the following, unless entered as a
separate item in the BOQ:

a) Preparation and submission of bids including the site Inspection.

b) Labour, plant, tools and vehicles and all costs in connection therewith.

c) Costs related to the Contractors site, temporary construction including the provision of all utilities and facilities.

d) Work at any location or height.

e) Provision of wastage of materials and for consumable materials.

f) Cost of laboratory testing, survey work and assistance to the Engineer as required in the Contract.

g) Duties, Customs, taxes, insurance and all other related costs.

h) Cost of bank guarantees.

j) Cost of permission to use private or public land.

k) Compliance with traffic regulations.

C Lump sums shall not be given where unit rates are applicable.

D Where the word "allow" is used, the cost of the items shall be the responsibility of the Main Contractor.

E Where the word "item" is used, the cost of the items shall be the responsibility of the Main Contractor.

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 1 PP/6
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 1 - PRICING PREAMBLES NRM2

Item Description Quantity Unit Rate AED Amount AED

PRICING (CONT*D)

A The amounts set against any items of profit shall include for all costs in connection with the letters of credit, bank charges,
interest charges and insurance after the materials come under the control of the Main Contractor.

B No variation will be allowed for any error in the computation of the Tender discovered after date of issue of letter of
acceptance of the tender and award of the Contract.

Definitions

C "Prices also to include"; items under this heading fall into two categories:

(i) Those which are deemed to be included in descriptions and, therefore, in prices.

(ii) Those for which the Main Contractor shall allow for in his prices.

D "Falls", "Slopes", "Weathered: inclined from the horizontal in one plane.

E "Cross Falls", "Cross Slopes", "Cross Weathered": inclination from the horizontal in more than one plane.

Fix Only

F The expression "fix only" used in these Bills of Quantities means that the Main Contractor shall provide the following facilities:

(i) Unloading, storing, distributing and hoisting goods and materials.

(ii) Supplying full size templates.

(iii) Giving and marking dimensions and taking responsibility for their accuracy.

(iv) Getting in, protecting, handling, distribution and placing in position.

(v) Assembling as required.

(vi) Casing up and protection, including clearing away protection on completion of the works.

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 1 PP/7
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 1 - PRICING PREAMBLES NRM2

Item Description Quantity Unit Rate AED Amount AED

PRICING (CONT*D)

Fix Only (CONT*D)

(vii) Full cost of replacement of any items which are damaged, broken, lost or stolen after the acceptance of the items from
the supplier or client and until handing over the complete works.

(viii) Other necessary and usual facilities and documentation.

Supply Only

A The expression "supply only" used in these Bills of Quantities means that the Main Contractor is to include for all liabilities
and obligations arising out of the Contract except fixing in position.

B Any Sub-Main Contractors or Suppliers which the Main Contractor proposes to use for the works are subject to the approval
of the Engineer and Employer. Any Sub-Main Contractor or Supplier who has not been approved by the Engineer and
Employer shall not be used in connection with the carrying out of the works.

C The Main Contractor should ascertain from Sub-Main Contractors and Suppliers before the work is put in hand particular of
positions in which chases, holes, mortises and the like will be required to be formed or left. No claim for the extra costs of
cutting away work already built due to the Main Contractor's failure to ascertain these particulars will be admitted.

D The Main Contractor shall allow for any additional costs incurred due to Sub-Main Contractors working different hours from
and extended hours to those worked by the Main Contractor.

E The word "attendance" means the following:

Attendances to be provided by the Main Contractor to all Sub-Main Contractors and Nominated Sub-Main Contractors

F The Main Contractor shall be responsible for providing, including but not limited to, the following attendances:

(I) Use of Main Contractor's administrative arrangements.

(ii) Use of Constructional Plant.

(ii) Use of Main Contractor's mess room, sanitary and welfare facilities.

(iv) Co-ordination and scheduling of all works related to each Sub-contract and Nominated Sub-contract.

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 1 PP/8
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 1 - PRICING PREAMBLES NRM2

Item Description Quantity Unit Rate AED Amount AED

PRICING (CONT*D)

Supply Only (CONT*D)

Attendances to be provided by the Main Contractor to all Sub-


Main Contractors and Nominated Sub-Main Contractors
(CONT*D)

(v) Use of standing scaffolding

(vi) Use of temporary works including water and electricity.

(vii) Supplying full size setting out templates.

(viii) Giving and marking dimensions and taking responsibility for their accuracy.

(ix) Space for Sub-Main Contractor offices and stores be they Domestic or Nominated.

(x) Providing work space

(xi) Offloading all Sub-Main Contractors' or Suppliers' materials and placing in stores be they Domestic or Nominated.

(xii) Clearing away all and any rubbish be it generated by Main Contractor, Nominated or Domestic SubMain Contractors.

(xiii) Other necessary and usual facilities, documentation, general inter-trades attendances, labour and assistance.

Attendances to be provided by the Sub-Main Contractor or Nominated Sub-Main Contractor

A The Sub-Main Contractor or Nominated Sub-Main Contractor shall be responsible for providing, including but not limited to,
the following attendances:

(i) All special scaffolding required by him in the execution of his works.

(ii) Taking from stores, distributing, hoisting and placing in position, all items of plant, equipment and materials required by
him in the execution of his works.

(iii) All labour, plant etc (other than included in Attendances to be provided by the Main Contractor).

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 1 PP/9
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 1 - PRICING PREAMBLES NRM2

Item Description Quantity Unit Rate AED Amount AED

PRICING (CONT*D)

Supply Only (CONT*D)

Attendances to be provided by the Sub-Main Contractor or


Nominated Sub-Main Contractor (CONT*D)

(iv) Site offices and stores required by him for the execution of his works.

(v) Obtaining security passes for access of work people to the site.

(vi) Offloading from material delivery vehicles his materials, placing in temporary stores on-site, distributing, hoisting and
placing in position.

Provisional Sums

A For all work executed, or goods, materials, plant or services supplied by any Nominated Sub-Main Contractor or Nominated
Supplier the Main Contractor shall be entitled to:

(i) The actual price paid or due to be paid by the Main Contractor, on the instructions of the Engineer.

(ii) In respect of all other charges, profit and attendance, a sum being a percentage rate of the actual price paid or due to be
paid. The Main Contractor shall insert the percentage or sum as applicable required for all other charges, profit and
attendance against each item in the Bills of Provisional Sums.

(iii) The Main Contractor is responsible for ensuing that the works of the Sub-Main Contractor are complete. No variation by
the Main Contractor or Sub-Main Contractor will be accepted in this regard.

B Provisional Sums included in these Bills of Quantities may be expended totally, in part or not at all and as directed by the
Engineer.

C The Main Contractor will have no entitlement to any claim for loss of profit in the event that any or all Provisional Sums are
omitted in part or in their entirety. Where the Main Contractor has inserted an associated %age (not composite items) for
attendances and builders work these shall also be adjusted for any omission or addition as required under the Conditions of
Contract.

D Percentage or adjustment of Provisional Sums shall not be applicable to any direct payments made by the Employer to a
third party or where no approved sub-contract agreement exists.

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 1 PP/10
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 1 - PRICING PREAMBLES NRM2

Item Description Quantity Unit Rate AED Amount AED

PRICING (CONT*D)

PC Supply Only rates in description contained in the Bills of Quantities

A PC rates of Supply Only rates for Nominated Suppliers of materials and equipment shall be deemed to include delivery to site
and exclude the Main Contractor's percentage for overheads and profit as stated in the Preliminaries section of the Bills of
Quantities. At the time the Engineer has approved the actual material to be used in the works, the actual delivered to site
cost plus Main Contractor's overheads and profit percentage as stated in the Bills of Quantities shall be inserted into the Main
Contractor's rate following the deduction of the original PC supply only rate contained in the Main Contractor's rates against
the particular item description in the Bills of Quantities.

B The Main Contractor when pricing items in the Bills of Quantities which contain PC supply only rates shall add to the PC rate
the percentage required to cover for profit and overheads, and fixed prices for the unloading from delivery vehicle to site
store, loading and transporting from site store, hoisting and lowering and distribution to various positions, assembly as
necessary, cutting, fixing, casing up and protecting and finally cleaning down and, where appropriate, oiling and adjusting and
leaving in perfect order, all necessary straight, curved and irregular cutting, wastage and all other allowances required to fully
fix, install or place the particular item in accordance with the specification and the written instructions of the Engineer. These
allowances shall be fixed and will not be adjusted against the final value of the supply rates adopted. Should the item
including PC supply only rates be deleted from the Contract no payment against that item will be made to the Main
Contractor.

C The Employer shall select the Supplier from those listed in the specifications and shall procure the materials and equipment
with assistance from the Engineer. The Employer shall be responsible for obtaining any competitive or negotiated prices from
the Nominated Suppliers with assistance from the Engineer. Once the award for Supply only has been completed by the
Employer, the Engineer shall instruct the Main Contractor and inform him of the details. The Main Contractor shall arrange for
all co-ordination of deliveries be they in part or full loads to suit the Main Contractor's Programme of Works.

Builders Work

D Within the Bills for Provisional Sums the Main Contractor is to allow for all the builders work required in connection with the
various work elements covered by Provisional Sums as noted. To assess the builder's work required, the Main Contractor
may review the drawings related to these Works at the offices of the Engineer.

E All other Charges and Profit

F All other Charges and Profit includes Profit, Overheads, Builder's works, Facilities, Assistances and Attendances in
connection with the expenditure of Provisional Sums in favour of Sub-Main Contractors.

(i) General Attendances on Subcontract Works

G The expression General Attendances shall mean, but is not limited to the following:

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 1 PP/11
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 1 - PRICING PREAMBLES NRM2

Item Description Quantity Unit Rate AED Amount AED

PRICING (CONT*D)

Builders Work (CONT*D)

(a) The use of the Main Contractor's administrative facilities.

b) The use of general construction Plant.

c) The use of the Main Contractor's facilities, including mess rooms, sanitary accommodation and welfare facilities.

d) The use of temporary works

e) Space for SubMain Contractors offices, stores and lay down areas.

f) The clearing away of all rubbish, waste and debris on a regular basis.

g) The provision and removal of general scaffolding for general use.

h) Unloading, distributing, hoisting or lowering to the respective floor levels, and placing in suitable positions for the SubMain
Contractor all plant, machinery or the like to be installed by the SubMain Contractor.

i) The provision of electrical power by Main Contractor for the SubMain Contractor's works, including all lighting and 3-phase
or heavy supplies, which may be required for purposes of testing and commissioning.

j) The provision of water for the Sub-Main Contractor's works, including the requirements for testing and commissioning and
subsequent removal of water.

k) The provision of all fuel necessary for the testing and commissioning of the Subcontract works.

l) The general co-ordination and integration of all Subcontract works into the general Programme.

m) Ascertaining full details of any work to be executed by other SubMain Contractor's in connection with the Subcontract
works and arranging for such work to be executed at the correct time.

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 1 PP/12
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 1 - PRICING PREAMBLES NRM2

Item Description Quantity Unit Rate AED Amount AED

PRICING (CONT*D)

Engineers Overtime

A The Main Contractor will be liable for the payment of "Engineers Overtime" for site supervisory staff required to work beyond
normal site office hours for inspection/supervision of the Works in accordance with clause 6.5 of the Conditions of Contract.
The Main Contractor shall allow for such costs within his tender.

B Overtime Rates for Designated Site Staff

Position Regular Overtim


e after
9.00pm

Overtime Fridays
Rates &
Public
Hol

AED / Hr AED /
Hr

Project Manager / Resident Engineer TBA TBA

Senior Civil / Structure Engineer / ARE TBA TBA

Quantity Surveyor TBA TBA

Planner TBA TBA

Senior Architect TBA TBA

Mechanical Engineer TBA TBA

Electrical Engineer TBA TBA

Safety Officer TBA TBA

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 1 PP/13
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 1 - PRICING PREAMBLES NRM2

Item Description Quantity Unit Rate AED Amount AED

PRICING (CONT*D)

Engineers Overtime (CONT*D)

Document Controller TBA TBA

Civil Inspector TBA TBA

Architectural Inspector TBA TBA

Mechanical Inspector TBA TBA

Electrical Inspector TBA TBA

Land Surveyor TBA TBA

Measurement Demarcation

Building / Substructure Definition

A Building, Substructure measurement demarcation shall include for all works commencing from the excavation surface of the
Enabling Works up to and including structural slab level on the ground floor level. It shall include for such works as level and
compact bottoms of excavation, prepare top of the foundation raft. It shall also include, Works up to and including Concrete
floor slab at ground floor with formation of all holes, inserts, MEP services cast into the ground floor slab and below.
Completion of Substructure, Superstructure and External Works should be shown as separate key milestone dates on the
Main Contractor's Programme of Works.

Building / Superstructure Definition

B Building, Superstructure measurement demarcation is from the ground floor slab level up to and including the uppermost part
of the roof. It shall include for all floor finishes on ground floor level and all works up to and including the Roof level. All works
to be instructed under Provisional Sums will also for part of the works for which the Main Contractor will be responsible.

External Works Definition

C External Works measurement demarcation is all works outside the gross external area and footprint of the Building
depending upon the level. It shall include for all hard and soft landscaping at ground floor level up to and including the hard
and soft landscaping and all other External Works at Ground Floor Structural Slab Level. Landscape structures is included in
the external works.

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 1 PP/14
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 1 - PRICING PREAMBLES NRM2

Item Description Quantity Unit Rate AED Amount AED

PRICING (CONT*D)

Permitting

A The Employer shall be responsible for paying direct all fees associated with Permitting for the Project be it the Building Permit
or the like. However, should the Employer or Engineer request the Main Contractor or his Nominated or Domestic SubMain
Contractors to collect the approved application and pay the associated Permit Fees to the statutory/governing authority on
behalf of the Employer, then the Main Contractor shall be entitled to a Variation Order to recover these Permit Fees in
accordance with the Conditions of Contract. The Main Contractor should provide all necessary invoices, 'Stamped Paid' and
all documentation associated with the approved application to the Employer and Engineer.

Section 1 Preliminaries

B Payment for the establishment of the items for site office and facilities will be lump sum which will be made only after the
completion of all facilities. A breakdown of all lump sum amounts to be submitted together with the Tender Submission.

C Payment for the maintenance of site office and facilities items will be in monthly instalments.

D Payment for the removal of site office and facilities items will be by lump sum which will be made only after the completion of
their removal. The removal of the Site Office for the Engineer shall be one month after the completion of the Works.

E Payment for Main Contractors supervision and the like - bill items shall be in monthly instalments.

F Instalments can be suspended, reduced or deleted from any Contract Payment, if, in the opinion of the Engineer, the Main
Contractor is not fulfilling his obligations.

G The rate inserted for General Protection of the site shall include for the cost to maintain access to areas adjacent to the work
site.

H The item for Traffic safety and control shall include the cost of all temporary traffic diversions and traffic management
necessary to complete the works. The item shall include for liaison with the Police, the Engineer and Municipality and
conforming to their requirements for safety.

J Temporary works, diversions, site cleaning, etc, and other items not otherwise covered in this preamble or otherwise detailed
in the Bills of Quantities will be cost related items and will be paid as a percentage of work completed to total value of work.

K Payment for the establishment of surveying equipment will be lump sum and it will be made only after the delivery of all the
equipment specified. Payment for items maintained will be in monthly Instalments.

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 1 PP/15
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 1 - PRICING PREAMBLES NRM2

Item Description Quantity Unit Rate AED Amount AED

PRICING (CONT*D)

Section 1 Preliminaries (CONT*D)

A Payment for assisting Engineer shall be in monthly Instalments and is deemed to cover all costs in providing assistance to
the Engineer by the Main Contractor as stated in the Contract.

B Payment for Project Sign Boards shall include for erection, maintenance, removal within one month of completion and
reinstatement of ground to its original state.

C Payment for progress photographs will be by set of monthly progress photographs as defined in the Specification.

D Payment for conditions of contract will be by monthly Instalments and shall cover all costs and expenses including overhead
and profits incurred by the Main Contractor in carrying out the requirements of the Conditions of Contract not otherwise
included in the Bill of Quantities. Breakdown of all lump sum amounts to be submitted together with the Tender Submission.

E Items for which the measurement unit is in days, such items shall be measured for the actual period for which facilities,
services, etc., are provided in accordance with the construction programme. Measurement will commence only after the
completion of the Mobilization period and on the day as approved by the Engineer in agreement for the facilities, services,
etc., when fully provided.

F These Instalments can be suspended, reduced or deleted from any contract Payment, if in the opinion of the Engineer, the
Main Contractor is not fulfilling his obligations.

G Items which relate to the final completion works will be certified only upon issuance of Taking over certificate for the Works

H The Employer requires that the Contractor will within one (1) month of signing of the Contract review and agree with the
Employer the redistribution of costs within the Preliminaries section of their Bill of Quantities and that these redistributed costs
will reflect a fair and equitable representation of the actual costs incurred by the Contractor during the mobilization, recurring
and de-mobilization stages of the preliminaries works and avoid any possible “front loading”.

Section 3 Demolitions

J All works as described in the scope of works


Section 11 In-situ concrete works

K Concrete shall be measured in cubic metres (m3) irrespective of reinforcement percentage, slope and ground conditions.

L Form work to sides of foundations and/or bases shall be measured as a single item regardless of the thickness.

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 1 PP/16
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 1 - PRICING PREAMBLES NRM2

Item Description Quantity Unit Rate AED Amount AED

PRICING (CONT*D)

Section 11 In-situ concrete works (CONT*D)

A Form work to sides and soffits of beams shall be measured as a single item regardless if it is attached to slabs, attached to
walls or isolated.

B Form work to sloping surfaces shall be so described irrespective of angle or slope.

C Reinforcement bars are measured as a single item regardless of their horizontal or vertical lengths and regardless if they are
straight, bent or curved.

Section 14 Masonry

D All items as mentioned below shall be measured by area (m²), stating the overall thickness. Battering, tapering and curved
walls shall be measured separately. No deductions are made for void areas equal to or less than 0.10 m2. Brickwork and
block work are measured on the centre line of the materials.

a) Walls
b) Diaphragm walls
c) Isolated piers
d) Isolated casings

E The rates for this work shall be deemed to include for scouring the face; and for plumbing angles and surfaces, all square
cutting, wedging and pinning against columns, beams, slabs, etc. for all waste cutting and wire ties required in tying skins
together.

F Reinforcement, insulation, forming and closing cavities, pointing and jointing is included in the rates for brickwork and block
work.

Section 19 Waterproofing

G Each item mentioned below shall be measured by area (m²) and grouped together under the term ‘generally’ irrespective of
width. No deductions shall be made for void areas equal to or less than 1.00 m2:

a)Flooring and underlay


b)Roofing and paving

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 1 PP/17
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 1 - PRICING PREAMBLES NRM2

Item Description Quantity Unit Rate AED Amount AED

PRICING (CONT*D)

Section 19 Waterproofing (CONT*D)

A The following items are not measured separately but deemed included in the rates in which they occur.

a)Fair edges
b)Rounded edges
c)Drips
d)Arrises
e)Turning asphalt nibs into grooves
f)Edge trims

B The following items are deemed included in the rates in which they occur.

a)Cleaning and preparing of surfaces to be waterproofed, protection from damage and cleaning down, flood testing, if
required and handing over in an acceptable and guaranteed watertight condition at completion, unless otherwise stated.
b)Dressing, bending, narrow widths, angles, intersections, cutting and waste where applicable, for the extra material
required lapping and for sealing laps as described.

C Unless otherwise stated turning-ups should be provided to all wet areas/rooms and shall be measured by linear metres (m)
stating the height.

Section 20 Proprietary linings and partitions

D Notwithstanding the Measurement Rules stated in Section 20, proprietary Partitions may be measured and given in square
metres in the Bills of Quantities Irrespective of different heights.

E Items for linings to walls, beams, columns and reveals and soffits of openings and recesses shall be measured in area (m²) in
the Bills of Quantities irrespective of heights and widths.

F The following items shall not be given separately in the bills and shall be deemed to be included in the rates for partitions or
linings in which they occur:

a)Extra over for angles


b)Extra over for junctions
c)Extra over for forming openings

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 1 PP/18
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 1 - PRICING PREAMBLES NRM2

Item Description Quantity Unit Rate AED Amount AED

PRICING (CONT*D)

Section 20 Proprietary linings and partitions (CONT*D)


d)Extra over for access panels
e)Angles to linings
f)Fair ends to partitions
g)Angles to linings
h)Beads

A Raised access floors shall be measured by area (m²) stating the thickness of panel and height of cavity. No deduction shall
be made for voids equal or less than 0.50 m². Raised access floors to ramp areas shall be enumerated, stating the thickness,
length, width and height.

B Skirtings and perimeter edge trims which are executed as part of the raised access floors are not measured separately but
deemed to be included in the rates for raised access floors

C Panel cubicles shall be enumerated per set. Cubicle sets include doors and ironmongery. Framing, stiffening, connecting and
fixing devices, supporting legs and brackets are deemed to be included

D Ceilings shall be measured by area (m²), stating the thickness of linings and method of fixing. No deduction shall be made to
voids equal or less than 0.50m2. The depth of suspension shall not be stated.

Section 21 Cladding and covering

E The following amendments shall apply to above items.

F Items for raking and curved cutting shall not be given separately but deemed to be included in the rates for cladding and
covering in which they occur.

G Items for weathering, flashings and fixing members at tops, bottoms and sides where part of the component shall be deemed
to be included in the rates for cladding and covering.

H Curtain walling shall be measured by area (m²). Dimensions shall be included in the description. Flat, sloping and curved
(radii stated) curtain walling shall be measured separately with no deductions made for void areas equal to or less than 1.00
m². Cleats, brackets, bolts and fixings are deemed to be included. Doors shall be enumerated as extra over items to curtain
walling, stating the appropriate dimensions

J All items stated above are deemed to include:

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 1 PP/19
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 1 - PRICING PREAMBLES NRM2

Item Description Quantity Unit Rate AED Amount AED

PRICING (CONT*D)

Section 21 Cladding and covering (CONT*D)

a)for all short lengths, cutting, waste and fitting at intersections to flashings, aprons, capping, etc
b)bedding washers
c)coating projecting ends of hook bolts and nuts, etc with bitumen after fixing
d)all square notches, square cutting and waste, laps, fitting and drilling. All quantities are measured net and no allowance
has been made for laps

A All items stated below, which are integral parts of the roof coverings and wall cladding sections shall not be measured
separately. These items are only measured if considered to be isolated or known to be installed and constructed by two or
more different Contractors.

a)Abutments, eaves, verges, ridges and hips


b)Vertical angles
c)Valleys
d)Expansion joints
e)Barge boards
f)Skirtings
g)Flashings
h)Aprons/sills
i)Gutters and linings
j)Jambs
k)Filler pieces
l)Special care to preserve the arrises and faces
m)Protection from damages, mortar splashes
n)Bedding washers in mastic sealing compound
o)Coating projecting ends of hook bolts and nuts with bitumen after fixing
p)All square notches, square cutting and waste, laps, fittings and drilling with no allowance for the laps.

B Items for holes and fire stops shall not be measured but deemed to be included in the rates in which they occur.

C Roof and wall coverings shall be measured by area (m²), stating the pitch. No deduction is made for voids area equal to or
less than 1.00 m². Underlay and battens are deemed to be included

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 1 PP/20
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 1 - PRICING PREAMBLES NRM2

Item Description Quantity Unit Rate AED Amount AED

PRICING (CONT*D)

Section 23 Windows, screens and lights

A Windows, window shutters, sun shields, roof lights, skylights, lantern lights, screens, shop fronts, louvre and frames shall be
described as overall dimensions and measured as numbers (nr).

B Ironmongery to windows, shop fronts, roof lights, screens, louvers and shutters shall be deemed to be included in the rates.

Section 24 Doors, shutters and hatches

C Multi-leafed doors shall be described stating overall structural opening or overall size and will be measured as one (1)
number (nr).

D Door frames, linings, stops, fire stops, trims and smoke stops shall be deemed to be included in the rates as identified and
given in door schedule and details.

E Any trims and the like fixed to the set after installation shall be deemed to be included in the rates as identified and given in
door schedule and details.

F Ironmongery shall be measured in number (nr) described in sets as referred in the given schedule and rate shall include all
constituent parts of the units or sets.

G Finishes to door panels/shutters and door frames shall be deemed to be included in the rates as identified and given in door
schedule and details.

Section 25 Stairs, walkways and balustrades

H Staircases, loft ladders, ladders, extra over for quarter landings and half landings shall be measured by number (nr) stating
the dimensions and types. Attached balustrades and newel posts are deemed to be included.

J Catwalks, walkways shall be measured by linear metres (m) stating the dimensions, flat / curved and radius.

K Balustrades, handrails, barriers, guard rails and balcony units shall be measured by linear metre (m) or number (nr) stating
the dimensions. These items are measured when not forming an integral part of staircase unit.

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 1 PP/21
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 1 - PRICING PREAMBLES NRM2

Item Description Quantity Unit Rate AED Amount AED

PRICING (CONT*D)

Section 28 Floor, wall, ceiling and roof finishings

A All screed, beds, toppings, raised access floors, finish to roofs, finish to floors, walls, ceilings and staircases shall be
measured by area (m²) regardless of the width unless noted otherwise.

B All plaster, render, finishes to walls, finishes to columns shall be measured by area (m²) regardless of the width unless noted
otherwise.

Section 29 Decoration

C Painting shall be measured by area (m²) to all surfaces shall be identified as follows:

a)Floors, which includes landings


b)Ceilings, which includes beams, bulkheads and light coves
c)Walls, which includes isolated and attached columns to walls.

D Painting to curved surfaces shall not be given separately.

Section 30 Suspended ceilings

E No deduction shall be made to voids equal or less than 1.0 m².

F The depth of suspension shall not be stated.

G Trims, fittings, shadow gap battens and associated finishes are deemed to be included in the measurement and rates of
ceiling works.

H Collars integral with the fire barriers are deemed to be included in the measurement and rates of ceiling systems.

Section 31 Insulation, fire stopping and fire protection

J All works as described in the scope of works

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 1 PP/22
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 1 - PRICING PREAMBLES NRM2

Item Description Quantity Unit Rate AED Amount AED

PRICING (CONT*D)

Section 32 Furniture, fittings and equipment

A All works as described in the scope of works

Section 33 Drainage above ground

B The rates for pipework shall be deemed to include for all the fittings (e.g. bends, tees, junctions and branches, reducers, end
caps, etc.).

C The following items shall be considered in Section 41:

a)Pipe sleeves through walls, floors and ceilings


b)Marking, position of and leaving or forming all holes, mortises, chases and the like required in the structure
c)Identification such as plates, discs, labels, tapes, symbols or numbers, bands and charts or diagrams

D The following items shall be considered in Section 1:

a)Preparing drawings
b)Operating manuals and instructions

Section 34 Drainage below ground

E The rates for pipework shall be deemed to include for all the fittings (e.g. bends, tees, junctions and branches, reducers, end
caps, etc.).

F The rates for pressure pipes (sump pump discharge pipes) shall be deemed to include for all necessary thrust blocks and
concrete support.

G The rates for manholes, inspection chambers and the like shall be deemed to include for all sundry items such as covers and
frames, step irons, intercepting traps, backdrops, etc. and all necessary earthwork items such as excavation, bedding,
surrounds, backfilling, compacting and disposal of surplus excavated materials

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 1 PP/23
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 1 - PRICING PREAMBLES NRM2

Item Description Quantity Unit Rate AED Amount AED

PRICING (CONT*D)

Section 35 Site works

A Unless stated as included, all associated excavation, disposal and filling is measured in accordance with Section 5:
Excavating and filling. No deductions made in superficial items for voids of equal to or less than 1.00 m²

B All of the following items are measured in accordance with rules of Work Section 11: In-Situ concrete works:

a)In-situ concrete
b) Form work
c) Reinforcement
d)Joints
e)Worked finishes
f)Accessories cast in

C All of the following items are measured in linear metre (m) and extra over items measured in (nr):

a)Kerbs
b) Edging
c) Channels
d).
Paving accessories – deemed included
e).Line markings, width of less than 300 mm; width stated

D All of the following items measured in area (m²) if the width is over 300mm, girth and thickness stated, and linear metre (m) if
not exceeding 300mm and extra over items measured in (nr):

a)
Coated macadam and asphalt – thickness and girth on face stated.
b) Gravel, hogging and woodchip
c).Interlocking, brick and blocks, slabs, bricks, blocks, setts and cobbles
d).
Accessories – deemed included
e).Liquid applied surfacing, sheet surfacing, proprietary coloured surfacing and surface dressings
f).Sheet lining to pools, lakes, ponds, waterways and the like, but measured in linear metre (m) if width equal to or less than
500mm

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 1 PP/24
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 1 - PRICING PREAMBLES NRM2

Item Description Quantity Unit Rate AED Amount AED

PRICING (CONT*D)

Section 35 Site works (CONT*D)

A All of the following items are measured in (nr):

a) Site furniture
b) Letters, figures, and symbols
c) Spot items

Section 37 Soft landscaping

B Not used

C The rates for plants shall be deemed to include for all associated excavation, disposal and filling, unless stated as measured
separately.

D Soft landscaping is measured in area (m²) are as follows:

a) Cultivating – depth stated


b) Surface application – type, rate and method of application stated, working in is deemed included
C) Seeding – rate stated, raking in, harrowing and rolling is deemed included
d) Turfing – cutting is deemed to include trimming edges, measurement can be in area (m²) type and the thickness stated,
and in linear metre (m), width and thickness stated.

E The following shall be measured in (nr) and identified in botanical name, supports and ties are deemed included:

a) Trees
b) Young nursery stock trees
c) Shrubs
d) Hedge plants – can measured in linear metre (m), height, spacing, number of rows and layout stated.
e) Plants – can measured in area (m²), size and number per m² stated
f) Bulbs, corns and tubers – can be measured in area (m²), size and weight per m² stated.

F Permanent fencing is measured in accordance with the rules of Work Section 36: Fencing.

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 1 PP/25
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 1 - PRICING PREAMBLES NRM2

Item Description Quantity Unit Rate AED Amount AED

PRICING (CONT*D)

Section 38 Mechanical services

A The rates for equipment and pipework ancillaries shall be deemed to include for all necessary insulation and fire rating
enclosure.

B The rates for pipework shall be deemed to include for all the fittings (e.g. bends, tees, junctions and branches, reducers, end
caps, etc.).

C The following items shall be considered in Section 41:

a)Pipe sleeves through walls, floors and ceilings


b)Marking, position of and leaving or forming all holes, mortises, chases and the like required in the structure
c)Identification such as plates, discs, labels, tapes, symbols or numbers, bands and charts or diagrams
d)Bases, plinths and the like

D The following items shall be considered in Section 1:

a)Preparing drawings
b)Operating manuals and instructions

Section 39 Electrical services

E Work related to these Sections is classified in accordance with Section 39 and given under an appropriate Work Section
heading:

Primary Equipment

F Switchgear, distribution boards, contractors and starters and motor drives are enumerated (nr) stating the type, size, rated
capacity and method of fixing.

G The rates for switchboards, switchgear, distribution boards, control gear, fittings, equipment and the like shall include for:

a)All identification labels, warning notices, circuit schedules and the like.
b)The completion of the circuit schedules

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 1 PP/26
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 1 - PRICING PREAMBLES NRM2

Item Description Quantity Unit Rate AED Amount AED

PRICING (CONT*D)

Section 39 Electrical services (CONT*D)

Primary Equipment (CONT*D)


c)All necessary gland plates and cable entry boxes
d)All earth tapes, cables and connections to associated cable terminating glands, conduit and/or trunking.

Terminal equipment and fittings

A The rates for incandescent and fluorescent lighting fittings shall include for boxes, conduit boxes, wood blocks, moulded
patterae, break joint rings, ceiling roses, connector blocks, flexible cords, earth continuity, chokes, capacitors, starters, lamp
holders and the like.

B The rates for all light fittings shall include for all associated lamps, control gear, diffusers, shades and the like.

C The rates for clocks, telephones, fire alarms, burglar alarms, loudspeakers and the like shall include where required for all
boxes, conduit boxes, wooden blocks, moulded patterae, cover plates and the like.

D The rates for all socket outlets shall include for associated plug tops.

E The rates for surface accessories shall include for any necessary backplates and surface mounting boxes.

F The rates for all flush, semi-flush, recessed, semi-recessed and insertion items shall include for any necessary boxes.

Cable Containment

G Containment is enumerated (nr) stating the type, material, finish, section shape, dimensions, number of compartments,
method of jointing, fixings, and background for fixing.

H Conduit is measured in linear metres (m) and deemed to include:

a)Bending, cutting, screwing, jointing and all conduit fittings excluding boxes
b)Clips, saddles and crampets.
c)Forming holes for conduit entry.
d)Draw wires, draw cables, and the like.

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 1 PP/27
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 1 - PRICING PREAMBLES NRM2

Item Description Quantity Unit Rate AED Amount AED

PRICING (CONT*D)

Section 39 Electrical services (CONT*D)

Cable Containment (CONT*D)


e)Components for earth continuity.

A Cable trunking, cable tray, ladders and racks are measured by linear metre (m) and are deemed to include components for
fittings, earth continuity, cutting and jointing to fittings.

Cables

Final Circuits

B Cables in conduit or trunking and cables fixed to trays are measured in linear metre (m) as the net length of the conduit,
trunking or tray. Other cables are measured as fixed without allowance for sag.

C The following allowances shall be made to those cables measured net:

a)0.30 m on each cable entering fittings, luminaries or accessories.


b)0.60 m on each cable entering equipment or control gear.

D Cable joints and termination glands are deemed to be included in the measurement of cables.

E Cable and conduit in final circuits are measured on an enumerated points basis (nr) where they form part of a domestic or
similar simple installation from distribution boards and the like. The rates shall include conduit boxes, wiring accessories,
fittings, pullwires, clamps, bending, cutting , jointing and the likes.

Busbar

F Busbar is measured by linear metre (m) stating the type, size and rated capacity and any associated fittings are enumerated
(nr).

G Cutting and jointing busbar trunking to fittings, tap off units, feeder units and fire barriers are deemed to be included.

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 1 PP/28
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 1 - PRICING PREAMBLES NRM2

Item Description Quantity Unit Rate AED Amount AED

PRICING (CONT*D)

Section 41 Builder's work in connection with mechanical,


electrical and transportation installations

A Pipe duct fittings and accessories shall be deemed to be included in the measurement of pipes.

B Builder’s work shall include all of the below, but it should be noted that this list is not intended to be exhaustive and
everything necessary will be deemed to be included.

(i) Drilling, cutting or leaving of holes for pipes, ducts and the like through walls, floors, partitions, roofs, etc and subsequently
making good.
(ii) Cutting and pinning ends of supports for pipes, equipment, appliances, fittings and the like to walls, floors, partitions,
soffits, etc., and making good.
(iii) Cutting or leaving mortises, sinkings, etc., for holding down bolts, brackets, supports and the like and grouting in.
(iv) Cutting chases for pipes and the like in walls, floors, partitions, etc., and subsequently making good.
(v) Cutting and fitting around, boring holes through and making good of finishings up to pipes, supports, brackets, and the
like.
(vi) The formation of small concrete bases, plinths, etc. for plant, tanks and equipment, including anti-vibration pads as
necessary.
(vii) The painting of exposed pipe work, fittings, equipment, etc.

SERVICES GENERALLY

C The Main Contractor shall be completely responsible for obtaining the requirements for holes, fixings, and any other builder’s
work. He shall coordinate the requirements for builders work between trades and ensure that such information is as shown
on the drawings in accordance with his own and the employer’s requirements. Details of builder’s work which is not shown on
the drawings but which is required by the Main Contractor shall be forwarded to the engineer for his written approval before
the work is put in hand. Any cost of unnecessary work due to the Main Contractor failing to comply with these conditions or
failing to act upon such information given will be borne entirely by the Main Contractor.

D The drilling, cutting or leaving of holes or apertures through structural floors, walls, beams, etc., shall be avoided, but where
this becomes a necessity the Main Contractor must obtain the written approval of the Engineer before such work is put in
hand.

Issued on: 15/11/2022


The Armed Forces Officers Club and Hotel

Erth Guest Experience

Fit-out Works

BILL 2

PRELIMINARIES & GENERAL CONDITIONS

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 2 PR/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 2 - PRELIMINARIES & GENERAL CONDITIONS

Item Description Quantity Unit Rate AED Amount AED

PRELIMINARIES
Conditions of Contract

A The Contractor should price here the cost and expense of all the 1 Item
works related to his obligations mentioned in the Conditions of
Contract

Non-Recurring Preliminary Costs incurred at the


Commencement of the Works

EMPLOYER'S/ENGINEER'S SITE OFFICE AND FACILITIES

B Design, fabrication, supply and on-site installation of 1 Item


prefabricated/portable Employer's/Engineer's site office and
facilities including foundation, structure, roof, wall cladding,
windows, external doors, stairs (if any) and the like, internal
partitions, internal finishes, internal doors, MEP (rain water
drainage, sanitary installation, AC split units, electrical and
plumbing works, fire and lightning protection, communication,
security and control systems, testing and commissioning and other
required works

C Fittings, Furnishings And Equipment (FF&E) within the 1 Item


Employer's/Engineer's Site Office

D Employer's/Engineer's Car parking, crushed stone as ground 1 Item


cover

E Employer's/Engineer's Car parking shade structure (fabric shade 1 Item


with steel posts and frame)

CONTRACTOR'S SITE OFFICES AND FACILITIES

F Provision of Contractor's Offices and facilities with all services 1 Item


fixtures and equipments

G Contractor's Car Parking, crushed stone as ground cover 1 Item

H Contractor's Car parking shade structure 1 Item

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 2 PR/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 2 - PRELIMINARIES & GENERAL CONDITIONS

Item Description Quantity Unit Rate AED Amount AED

PRELIMINARIES (CONT*D)

Non-Recurring Preliminary Costs incurred at the


Commencement of the Works (CONT*D)

TEMPORARY WORKS

Access Road and Parking

A Access road from nearest asphalted road to the site offices 1 Item

B Crushed stone as ground cover to other unpaved areas to the 1 Item


offices

Drainage and Waste water Management

C Drainage and Waste water external network including manholes, 1 Item


connections to the temporary site offices and facilities and
temporary sewage tank

Water

D Potable water external network including connections to the site 1 Item


offices cluster and to water storage tank

E Temporary Water tank (Contractor to specify capacity) 1 Item

Electricity

F Electricity external network including connections to the temporary 1 Item


portable office facilities to power supply/generator

G Supply, installation and commissioning of temporary generator 1 Item


(Contractor to specify capacity)

H External/street lighting including pole and lighting fixtures, 1 Item


foundations, cabling, ducting, feeder pillar and connection to
power supply and other necessary works

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 2 PR/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 2 - PRELIMINARIES & GENERAL CONDITIONS

Item Description Quantity Unit Rate AED Amount AED

PRELIMINARIES (CONT*D)

Non-Recurring Preliminary Costs incurred at the


Commencement of the Works (CONT*D)

Security

A Provision of temporary external fencing/hoarding surrounds the 1 Item


site location, all required quality assurance and quality control
during the progress of work

B Provision of temporary internal hoarding surrounds the work area, 1 Item


all required quality assurance and quality control during the
progress of work

C Provision of external security system (CCTV), including monitor 1 Item


and connections to security guardhouse

D Provision of Security Guardhouse / Security Gate 1 Item

Project Sign Board

E Provision of project sign board 1 Item

INSURANCES, BONDS AND WARRANTIES

F Provision of performance bond 1 Item

G Provision of advance payment bond in accordance with the 1 Item


Contract

H Provision of insurance for the Works 1 Item

J Provision of Third Party Liability Insurance 1 Item

K Provision of Workmen's Compensation Insurance 1 Item

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 2 PR/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 2 - PRELIMINARIES & GENERAL CONDITIONS

Item Description Quantity Unit Rate AED Amount AED

PRELIMINARIES (CONT*D)

Non-Recurring Preliminary Costs incurred at the


Commencement of the Works (CONT*D)

Project Sign Board (CONT*D)

A Provision of all guarantees and warranties for all materials, 1 Item


components, equipments as required under Preliminaries, all
guarantees and warranties shall commence from the actual date
of completion stated in the taking over certificate issued under the
Main Works Contract and shall be valid for a minimum of 1 year
unless otherwise stated

OTHER COSTS

A Construction Management Plan to be provided by the


Contractor for approval prior` to construction works. The plan is to
comprise:

B Dust Management Plan 1 Item

C Noise and Vibration Management Plan 1 Item

D Waste Management Plan 1 Item

Recurring Preliminary Costs incurred during the execution of


the Works

EMPLOYER'S/ENGINEER'S SITE OFFICE AND FACILITIES

E Cleaners and maintenance staffs 1 Item

F Cleaning and sanitary supplies such as toilet paper, towels, 1 Item


cleaning and detergent agents, etc.

G Office stationary supplies includes but is not limited to paper for 1 Item
photocopiers (w/paper selection of A4/A3 and letter sizes),
facsimiles and printers, colour and black & white cartridges,
sharpeners, writing pads, pens, pencil, staplers, tape, hole
punchers, files and folders and other supplies

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 2 PR/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 2 - PRELIMINARIES & GENERAL CONDITIONS

Item Description Quantity Unit Rate AED Amount AED

PRELIMINARIES (CONT*D)

Recurring Preliminary Costs incurred during the execution of


the Works (CONT*D)

A Office boys 1 Item

B Consumables such as coffee various types, tea, sugar, fresh milk, 1 Item
soft drinks, fruit juices, bottled mineral water, biscuits, paper and
plastic products (cups, paper towels serviettes, etc.)

C Internet data subscription and maintenance 1 Item

D Personal Protection Equipment 1 Item

CONTRACTOR'S SITE OFFICES AND FACILITIES

E Maintenance of Contractor's site offices and facilities 1 Item

TEMPORARY WORKS

F Maintenance of temporary access from outside to project, site 1 Item


security, barriers etc.

G Provision of traffic diversion including necessary traffic signs, 1 Item


traffic lights, barriers and other related works and its maintenance
/ relocation as required throughout the project duration

H Provision of lighting and power for the Works and provision of 1 Item
supply/refill of fuel for generators dedicated to site offices and
facilities and generators maintenance

J Provision of water for the Works and provision of supply/refill of 1 Item


water dedicated to site offices and facilities

K Provision of sanitation for the Works and sewage disposal and 1 Item
maintenance of site offices and facilities

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 2 PR/6
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 2 - PRELIMINARIES & GENERAL CONDITIONS

Item Description Quantity Unit Rate AED Amount AED

PRELIMINARIES (CONT*D)

Recurring Preliminary Costs incurred during the execution of


the Works (CONT*D)

A Removal of rubbish, protective casings and coverings and 1 Item


cleaning of the Works

B Provision of construction plants and equipments including small 1 Item


plants and tools, scaffolding, cranes and lifting plants, site
transport and plant required for specific trades.

C Provision of monthly site photographs and reports 1 Item

CONTRACTOR'S ADMINISTRATIVE ARRANGEMENTS

D Provision of Contractor's site supervisory and administrative staff 1 Item

E Security personnel 1 Item

F Safety, health and welfare of work people 1 Item

G Provision of Transport of work people 1 Item

H Provision of Coordination to third parties, Local authorities and 1 Item


statutory approvals

J Allow for undertaking and implementing the required Contract 1 Item


procedures and documentation during the execution of the Works
to include, but not limited to the required correspondence, reports,
design details, working/shop drawings, as-built drawings, progress
records and any other documentations as may be required by the
Engineer

K Allow for Consultant's overtime as required by the Contractor 1 Item

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 2 PR/7
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 2 - PRELIMINARIES & GENERAL CONDITIONS

Item Description Quantity Unit Rate AED Amount AED

PRELIMINARIES (CONT*D)

Non-Recurring Preliminary Costs incurred at the Completion


of the Works

A Demobilisation of all plants, equipments, site offices and facilities 1 Item


and removal from site

Other costs

B The Contractor shall allow for all other obligations in accordance 1 Item
with the Employer's Requirements, Policies and Guidelines and
other relevant documents of the Contract, not specifically
identified under non-recurring preliminary costs incurred at the
completion of the Works. The Contractor is to detail below any
such obligations, together with the relevant clause, number or
reference as applicable

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 2 PR/8
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 2 - PRELIMINARIES & GENERAL CONDITIONS

Item Description Quantity Unit Rate AED Amount AED

PRELIMINARIES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : PR/1

Page : PR/2

Page : PR/3

Page : PR/4

Page : PR/5

Page : PR/6

Page : PR/7

Carried To Bill Summary Page AED


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 2 PR/9
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 2 - PRELIMINARIES & GENERAL CONDITIONS

Item Description Quantity Unit Rate AED Amount AED

BILL 2 - PRELIMINARIES & GENERAL CONDITIONS

BILL SUMMARY

Total Brought Forward from Page No.

PRELIMINARIES PR/8

Carried To General Summary Page AED 0


Issued on: 15/11/2022
The Armed Forces Officers Club and Hotel

Erth Guest Experience

Fit-out Works

BILL 3

GF GUEST ENTRANCE + CAFE + ATM NOOKS

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 3 3.1/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 3 - GF GUEST ENTRANCE + CAFE + ATM NOOKS

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS

DEMOLITION WORKS

3 Demolitions

Demolish and off site disposal of existing ceilings and MEP


services as per drawings and specification

A Demolition of existing ceiling finishes 427 m2

B Demolition of existing MEP services 427 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 3 3.1/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 3 - GF GUEST ENTRANCE + CAFE + ATM NOOKS

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 3.1/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 3 3.2/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 3 - GF GUEST ENTRANCE + CAFE + ATM NOOKS

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE

STAIRS AND RAMPS

4 Alterations, repairs and conservation

Alteration of existing floor finishes; all in accordance with the


Drawings and Specifications

A Allow for modification of existing staircase of Pizza restaurant 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 3 3.2/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 3 - GF GUEST ENTRANCE + CAFE + ATM NOOKS

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

WINDOWS AND EXTERNAL DOORS

24 Doors, shutters and hatches

Glass doors; including ironmongery and all necessary fixing


accessories; all in accordance with the Drawings and
Specifications

A Allow for replacement of main entrance glazed doors; single leaf 2 nr


door including ironmongery

Revolving doors; including ironmongery and all necessary fixing


accessories; all in accordance with the Drawings and
Specifications

B Allow for replacement of revolving door 1 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 3 3.2/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 3 - GF GUEST ENTRANCE + CAFE + ATM NOOKS

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

INTERNAL WALLS AND PARTITIONS

20 Proprietary linings and partitions

Block work; including reinforcement and all necessary fixing


accessories; all in accordance with the Drawings and
Specifications

A Partition wall to close existing shop front to receive final finish; 56 m2


assumed 200mm thick block wall

B Partition wall to ATM machines; assumed 100mm thick partition 47 m2

Glazed partition; including all necessary fixing accessories; all in


accordance with the Drawings and Specifications

C Glazed partition to retail zone 2 31 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 3 3.2/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 3 - GF GUEST ENTRANCE + CAFE + ATM NOOKS

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

INTERNAL DOORS

24 Doors, shutters and hatches

Doors (size, type and material to be confirmed); including


ironmongery and all necessary fixing accessories; all in
accordance with the Drawings and Specifications

A Single leaf door including ironmongery 7 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 3 3.2/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 3 - GF GUEST ENTRANCE + CAFE + ATM NOOKS

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 3.2/1

Page : 3.2/2

Page : 3.2/3

Page : 3.2/4

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 3 3.3/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 3 - GF GUEST ENTRANCE + CAFE + ATM NOOKS

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES

WALL FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to walls and columns

Texture paint; including all accessories and works required; all in


accordance with the Specifications

A Type W200 25 m2

B Type W201 13 m2

C Type W203 471 m2

D Type W204 32 m2

E Type W206 39 m2

Fenomastic paint; including all accessories and works required; all


in accordance with the Specifications

F Type W202 31 m2

Mirror cladding; including all accessories and works required; all in


accordance with the Specifications

G Type W501 62 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 3 3.3/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 3 - GF GUEST ENTRANCE + CAFE + ATM NOOKS

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

WALL FINISHES (CONT*D)

28 Floor, wall, ceiling and roof finishings (CONT*D)


Bronze cladding; including all accessories and works required; all
in accordance with the Specifications

A Type W901 13 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 3 3.3/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 3 - GF GUEST ENTRANCE + CAFE + ATM NOOKS

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

FLOOR FINISHES

28 Floor, wall, ceiling and roof finishings

Screeds

Backgrounds; self levelling compound 2mm thick; to receive floor


finishes; all in accordance with the Specifications

A To floors 645 m2

Finish to floors

Porcelain Floor tile; Matt finish, colour: sand, size:


1200mmx2400mm, laid on self levelling compound (measured
separately) including preparation and all works required; all in
accordance with the Specifications

B Type F-300B 633 m2

Entrance mat; laid on self levelling compound (measured


separately) including preparation and all works required; all in
accordance with the Specifications

C Type F-102 12 m2

Brushed brass metal skirting; including preparation and all works


required; all in accordance with the Specifications

D Brushed brass metal 157 m

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 3 3.3/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 3 - GF GUEST ENTRANCE + CAFE + ATM NOOKS

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

CEILING FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to ceilings

Texture paint; including all accessories and works required; all in


accordance with the Specifications

A Type C-201 4 m2

Ceiling paint; including all accessories and works required; all in


accordance with the Specifications

B Type C-202 491 m2

Suspended Ceilings

Suspended Gypsum Board; including fastenings and all


accessories and works required; all in accordance with the
Specifications

C For Type C201 & C202 495 m2

Ceiling bulkhead; including fastenings and all accessories and


works required; all in accordance with the Specifications

D 400mm high 172 m

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 3 3.3/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 3 - GF GUEST ENTRANCE + CAFE + ATM NOOKS

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

CEILING FINISHES (CONT*D)

28 Floor, wall, ceiling and roof finishings (CONT*D)


Acoustic insulation; including fastenings and all accessories and
works required; all in accordance with the Specifications

A For Type C201 & C202 495 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 3 3.3/6
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 3 - GF GUEST ENTRANCE + CAFE + ATM NOOKS

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 3.3/1

Page : 3.3/2

Page : 3.3/3

Page : 3.3/4

Page : 3.3/5 0.00

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 3 3.4/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 3 - GF GUEST ENTRANCE + CAFE + ATM NOOKS

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING

32 Furniture, fittings and equipment

Signage

Door Signs, as per Specifications

A Type ST01 1 nr

B Type ST03 2 nr

Directional Signs, as per Specifications

C Type DS01 2 nr

D Type DS02 3 nr

Directory Signs, as per Specifications

E Type LD01 1 nr

F Type LD02 1 nr

Digital Signs, as per Specifications

G Type ES02 1 nr

Fire and Life Safety Signs, as per Specifications

H Allowance for fire and life safety signs 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 3 3.4/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 3 - GF GUEST ENTRANCE + CAFE + ATM NOOKS

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING (CONT*D)

Furnitures

Loose furnitures, as per Specifications

A Woven Vase; Ref. A02 2 nr

B Custom rugs; Ref. A03 7 nr

C Accessories; Ref. A05 6 nr

D Vase; Ref. A07 2 nr

E Al Turath Carts - Customized; Ref. A08 3 nr

F Chair; Ref. CH01 20 nr

G Floor lamp; Ref. LT10 2 nr

H Armchair; Ref. S04 3 nr

J Pouf; Ref. S13 10 nr

K Bench seating; Ref. S17_10m x 0.5m 2 nr

L Bench seating; Ref. S18_5250mm x 700mm 1 nr

M Bench seating; Ref. S18_9830mm x 500mm 1 nr

N Armchair; Ref. S26 9 nr

P High table; Ref. T06 3 nr

Q High table; Ref. T07 3 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 3 3.4/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 3 - GF GUEST ENTRANCE + CAFE + ATM NOOKS

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING (CONT*D)

Furnitures (CONT*D)

Loose furnitures, as per Specifications (CONT*D)

A Banquette Table; Ref. T08 4 nr

B Reception table; Ref. T09 2 nr

C Dining table; Ref. T10 10 nr

Artwork

D Allow for provision of artwork 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 3 3.4/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 3 - GF GUEST ENTRANCE + CAFE + ATM NOOKS

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 3.4/1

Page : 3.4/2

Page : 3.4/3

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 3 3.5/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 3 - GF GUEST ENTRANCE + CAFE + ATM NOOKS

Item Description Quantity Unit Rate AED Amount AED

SERVICES

SPACE HEATING AND AIR CONDITIONING

38 Mechanical services

Ductwork

Galvanised steel sheet rectangular ductwork and fittings, including


insulation, supports, manufactured and fitted in accordance with
the relevant standards, complete as shown on drawings and
Specifications

A Supply/Return air ductwork 404 m2

Duct ancillaries

Flexible duct with damper, including insulation complete all in


accordance with the Specifications

B 200 mm Diameter 132 nr

Linear slot diffuser, complete all in accordance with the


Specifications

C 1000mm 4 slot supply air linear diffuser 66 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 3 3.5/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 3 - GF GUEST ENTRANCE + CAFE + ATM NOOKS

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION

39 Electrical services

Primary equipment

Distribution panel board complete with all necessary


accessories all in accordance with the Specification

A DB 1 nr

Small Power Installation

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

Socket outlets

B 13A Single Switch Socket Outlet 18 nr

C 13A Twin Switch Socket Outlet 7 nr

D Floor Box 8 nr

Terminal equipment and fittings

Devices complete as described, all in accordance with the


Specification

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 3 3.5/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 3 - GF GUEST ENTRANCE + CAFE + ATM NOOKS

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Small Power Installation (CONT*D)


Socket outlets

A 13A Single Switch Socket Outlet 18 nr

B 13A Twin Switch Socket Outlet 7 nr

C Floor Box 8 nr

Lighting Installation

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

D Lighting points 118 nr

E Linear lighting points; for Lighting type C (1) 1 Item

Terminal equipment and fittings

Light fittings including fixings, lamps and connections complete in


accordance with the Specifications

F Lighting type A (1) 29 nr

G Lighting type A (2) 38 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 3 3.5/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 3 - GF GUEST ENTRANCE + CAFE + ATM NOOKS

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Lighting Installation (CONT*D)

Light fittings including fixings, lamps and connections complete in


accordance with the Specifications (CONT*D)

A Lighting type A (3) 16 nr

B Lighting type B (1) 11 nr

C Lighting type C (1) 142 m

D Lighting type C (2) 4 nr

E Lighting type F (3) 6 nr

F Lighting type H (1) 14 nr

Lighting Control Installation

Lighting control system including but not limited to panels, wiring,


containment, as shown on drawings all in accordance with the
Specification

G Lighting control installation 1 Item

Emergency Lighting

Final circuits

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 3 3.5/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 3 - GF GUEST ENTRANCE + CAFE + ATM NOOKS

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Emergency Lighting

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

A Emergency lighting points 14 nr

B Emergency exit sign points 5 nr

Terminal equipment and fittings

Emergency light fittings including fixings, lamps and connections


complete in accordance with the Specifications

C Emergency Light; LED T5; self contained led emergency lights, 14 nr


non maintained,surface mounted type with 3 hrs. battery backup
(IP-65)

D Emergency Exit Sign; self contained led exit lights, maintained, 5 nr


single sided 3 hrs. battery backup (IP-20)

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 3 3.5/6
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 3 - GF GUEST ENTRANCE + CAFE + ATM NOOKS

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION

38 Mechanical services

Sprinkler Installations

Pipework

Above ground galvanized steel pipes; including fittings, all


necessary fixings, accessories, supports and connections in
accordance with the Specifications

A 25mm Diameter pipes 117 m

B 32mm Diameter pipes 7 m

C 40mm Diameter pipes 8 m

D 50mm Diameter pipes 28 m

E 65mm Diameter pipes 6 m

F 80mm Diameter pipes 12 m

G 100mm Diameter pipes 9 m

Pipe ancillaries

Zone control valve assembly; including OS&Y valve, check valve,


flow switch, pressure gauge, alarm test, sight glass and test valve,
interconnecting pipework and all necessary accessories and
ancillaries; all in accordance with the Specification

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 3 3.5/7
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 3 - GF GUEST ENTRANCE + CAFE + ATM NOOKS

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION (CONT*D)

Sprinkler Installations (CONT*D)

Zone control valve assembly; including OS&Y valve, check valve,


flow switch, pressure gauge, alarm test, sight glass and test valve,
interconnecting pipework and all necessary accessories and
ancillaries; all in accordance with the Specification
A Fixed to 150 mm diameter pipe 1 nr

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification

B Pendent type sprinkler heads 40 nr

C Upright type sprinkler heads 40 nr

D Side wall type sprinkler heads 4 nr

Fire hose reel and department valve assembly; comprising of fire


department landing valve, rack with hose, nozzle, 25mm diameter
pressure reducing valve, swing hose reel, fire extinguishers,
pipework inside cabinet, all necessary accessories and
connections ; all in accordance with the Specification

E Fire hose reel cabinet 1 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 3 3.5/8
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 3 - GF GUEST ENTRANCE + CAFE + ATM NOOKS

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS

39 Electrical services

Fire Detection & Voice Evacuation System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

A Intelligent optical Smoke Detector with standard base 14 nr

B Ceiling void Intelligent optical Smoke Detector with LED remote 12 nr


Indicator

C Manual Call Point 5 nr

D Flasher 3 nr

E PAVA/BGM Ceiling Speaker 9 nr

F BGM Volume Controller & Source selector 1 nr

Terminal equipment and fittings

Supply and installation of fire alarm devices, all in accordance with


the Specification

G Intelligent optical Smoke Detector with standard base 14 nr

H Ceiling void Intelligent optical Smoke Detector with LED remote 12 nr


Indicator

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 3 3.5/9
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 3 - GF GUEST ENTRANCE + CAFE + ATM NOOKS

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Fire Detection & Voice Evacuation System (CONT*D)

Supply and installation of fire alarm devices, all in accordance with


the Specification (CONT*D)

A Manual Call Point 5 nr

B Flasher 3 nr

C PAVA/BGM Ceiling Speaker 9 nr

D BGM Volume Controller & Source selector 1 nr

IT System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

E Dual Data Outlet 4 nr

F Fiber Connection for ATM 3 nr

G WIFI Ceiling 1 nr

Terminal equipment and fittings

Supply and installation of IT devices, all in accordance with the


Specification

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 3 3.5/10
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 3 - GF GUEST ENTRANCE + CAFE + ATM NOOKS

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

IT System (CONT*D)

Supply and installation of IT devices, all in accordance with the


Specification

A Dual Data Outlet 4 nr

B Fiber Connection for ATM 3 nr

C 65" TV 2 nr

D WIFI Ceiling 1 nr

Security System

CCTV

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

E Dome Camera 12 nr

F Box Camera 3 nr

Terminal equipment and fittings

Supply and installation of CCTV devices, all in accordance with


the Specification

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 3 3.5/11
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 3 - GF GUEST ENTRANCE + CAFE + ATM NOOKS

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Security System (CONT*D)

Supply and installation of CCTV devices, all in accordance with


the Specification

A Dome Camera 12 nr

B Box Camera 3 nr

Access Control

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

C Door with card reader, Electric lock, BGU and exit Push button 7 nr

Terminal equipment and fittings

Supply and installation of Access control devices, all in


accordance with the Specification

D Door with card reader, Electric lock, BGU and exit Push button 7 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 3 3.5/12
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 3 - GF GUEST ENTRANCE + CAFE + ATM NOOKS

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

BUILDER'S WORK IN CONNECTION WITH SERVICES

41 Builder's work in connection with mechanical, electrical


and transportation installations

A Builder's work in connection with services 1 Item

B Allow for integrating the new MEP services to the existing services 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 3 3.5/13
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 3 - GF GUEST ENTRANCE + CAFE + ATM NOOKS

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 3.5/1

Page : 3.5/2

Page : 3.5/3

Page : 3.5/4

Page : 3.5/5

Page : 3.5/6

Page : 3.5/7

Page : 3.5/8

Page : 3.5/9

Page : 3.5/10

Page : 3.5/11

Page : 3.5/12

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 3 3.6/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 3 - GF GUEST ENTRANCE + CAFE + ATM NOOKS

Item Description Quantity Unit Rate AED Amount AED

EXTERNAL WORKS

35 Site works

Hardscape

Supply and install gravel including binding course asphalt,


compacted sub-base, joints, fixing, accessories, all necessary
associated works, complete in accordance with the Drawings and
Specifications.

A Gravel; 15-25mm dia, 50mm depth, Light beige/ grey color natural 12 m2
finish

Softscape

Supply and Install; shrubs succulents, perennials ground covers


and the like planted in prepared ground as detailed, including
compost and fertilizers, compaction, with all necessary associated
works, complete in accordance with the Drawings and
Specifications.

Shrubs

B Lawsonia-inermis 30 nr

C Allow for drainage to the planting area 1 Item

D Allow for irrigation to the planting area 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 3 3.6/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 3 - GF GUEST ENTRANCE + CAFE + ATM NOOKS

Item Description Quantity Unit Rate AED Amount AED

EXTERNAL WORKS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 3.6/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 3 D/Add/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 3 - GF GUEST ENTRANCE + CAFE + ATM NOOKS

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS
Any items that may not be covered elsewhere in the Bills of
Quantities which the tenderer deemed to be necessary in order to
carry out the works in full compliance with the Drawings,
Specifications and any other items necessary to form a complete
Installations, must be itemised and priced below. The tenderer
may provide additional sheets for this purpose if necessary. All
items under this section must be summarised under a separate
cover.

A Item

B Item

C Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 3 D/Add/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 3 - GF GUEST ENTRANCE + CAFE + ATM NOOKS

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : D/Add/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 3 D/Add/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 3 - GF GUEST ENTRANCE + CAFE + ATM NOOKS

Item Description Quantity Unit Rate AED Amount AED

BILL 3 - GF Guest Entrance + Cafe + ATM Nooks

BILL SUMMARY

Total Brought Forward from Page No.

Facilitating works 3.1/2

Superstructure 3.2/5

Internal Finishes 3.3/6

Fittings and Furnishing 3.4/4

Services 3.5/13

External works 3.6/2

ADDITIONAL ITEMS D/Add/2

Carried To General Summary Page AED 0


Issued on: 15/11/2022
The Armed Forces Officers Club and Hotel

Erth Guest Experience

Fit-out Works

BILL 4

GF CENTRAL CORRIDOR

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 4 4.1/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 4 - GF CENTRAL CORRIDOR

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS

DEMOLITION WORKS

3 Demolitions

Demolish and off site disposal of existing ceilings and MEP


services as per drawings and specification

A Demolition of existing ceiling finishes 312 m2

B Demolition of existing MEP services 312 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 4 4.1/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 4 - GF CENTRAL CORRIDOR

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 4.1/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 4 4.2/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 4 - GF CENTRAL CORRIDOR

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE

INTERNAL DOORS

24 Doors, shutters and hatches

Doors (size, type and material to be confirmed); including


ironmongery and all necessary fixing accessories; all in
accordance with the Drawings and Specifications

A Single leaf door including ironmongery 3 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 4 4.2/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 4 - GF CENTRAL CORRIDOR

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 4.2/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 4 4.3/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 4 - GF CENTRAL CORRIDOR

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES

WALL FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to walls and columns

Texture paint; including all accessories and works required; all in


accordance with the Specifications

A Type W206 237 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 4 4.3/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 4 - GF CENTRAL CORRIDOR

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

FLOOR FINISHES

28 Floor, wall, ceiling and roof finishings

Screeds

Backgrounds; self levelling compound; to receive floor finishes; all


in accordance with the Specifications

A To floors 314 m2

Finish to floors

Porcelain Floor tile; Matt finish, colour: sand, size:


1200mmx2400mm, laid on self levelling compound (measured
separately) including preparation and all works required; all in
accordance with the Specifications

B Type F-300B 314 m2

Metal insert; including preparation and all works required; all in


accordance with the Specifications

C Metal insert; 5 mm thick 63 m

Brushed brass metal skirting; including preparation and all works


required; all in accordance with the Specifications

D Brushed brass metal 76 m

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 4 4.3/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 4 - GF CENTRAL CORRIDOR

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

CEILING FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to ceilings

Ceiling paint; including all accessories and works required; all in


accordance with the Specifications

A Type C-202 303 m2

Textured paint; including all accessories and works required; all in


accordance with the Specifications

B Type C-800 10 m2

Suspended Ceilings

Suspended Gypsum Board; including; fastenings and all


accessories and works required; all in accordance with the
Specifications

C For Type C-202 303 m2

Acoustic insulation; including fastenings and all accessories and


works required; all in accordance with the Specifications

D For Type C202 303 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 4 4.3/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 4 - GF CENTRAL CORRIDOR

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 4.3/1

Page : 4.3/2

Page : 4.3/3

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 4 4.4/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 4 - GF CENTRAL CORRIDOR

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING

32 Furniture, fittings and equipment

Signage

Directional Signs, as per Specifications

A Type DS01 2 nr

Fire and Life Safety Signs, as per Specifications

B Allow for fire and life safety signs 1 Item

Artwork

C Allow for provision of artwork 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 4 4.4/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 4 - GF CENTRAL CORRIDOR

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 4.4/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 4 4.5/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 4 - GF CENTRAL CORRIDOR

Item Description Quantity Unit Rate AED Amount AED

SERVICES

DISPOSAL INSTALLATIONS

33 Drainage above ground

Pipework

Supply and installation of drainage pipes including insulation,


fittings, supports, hangers and all required accessories in
accordance with drawings and specifications.

Waste Pipe (UPVC)

A 50mm diameter 11 m

B 75mm diameter 11 m

Pipe ancillaries

Supply and installation of the following with fittings, fixings,


supports and all required accessories complete; in accordance
with drawings and specifications.

Clean out

C 50mm diameter 2 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 4 4.5/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 4 - GF CENTRAL CORRIDOR

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

WATER INSTALLATIONS

38 Mechanical services

Pipework

Supply and installation of water supply pipes including insulation,


fittings, supports, hangers and all required accessories in
accordance with drawings and specifications.

Water Supply Pipe (PEX)

A 15mm diameter 23 m

B 22mm diameter 30 m

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 4 4.5/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 4 - GF CENTRAL CORRIDOR

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

SPACE HEATING AND AIR CONDITIONING

Ductwork

Galvanised steel sheet rectangular ductwork and fittings, including


insulation, supports, manufactured and fitted in accordance with
the relevant standards, complete as shown on drawings and
Specifications

A Supply/Return air ductwork 101 m2

Duct ancillaries

Flexible duct with damper, including insulation complete all in


accordance with the Specifications

B 200 mm Diameter 38 nr

Linear slot diffuser, complete all in accordance with the


Specifications

C 1000mm 4 slot supply air linear diffuser 19 nr

D 1000mm 4 slot Return air linear diffuser 8 nr

Variable air volume boxes; including all necessary insulation,


accessories and connections; complete all in accordance with the
Specifications

E Ref. VAV-GE-G-2/3-02 1 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 4 4.5/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 4 - GF CENTRAL CORRIDOR

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATIONS

39 Electrical services

Small Power Installation

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

Socket outlets

A 13A Switch Socket Outlet 4 nr

B 13A Switch Socket Outlet Twin 2 nr

Terminal equipment and fittings

Devices complete as described, all in accordance with the


Specification

Socket outlets

C 13A Switch Socket Outlet 4 nr

D 13A Switch Socket Outlet Twin 2 nr

Lighting Installation

Final circuits

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 4 4.5/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 4 - GF CENTRAL CORRIDOR

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATIONS (CONT*D)

Lighting Installation

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

A Lighting points 45 nr

B Linear lighting points; for Lighting type C(1) 1 Item

Terminal equipment and fittings

Light fittings including fixings, lamps and connections complete in


accordance with the Specifications

C Lighting type A (1) 10 nr

D Lighting type C (1) 96 m

E Lighting type D (5) 24 nr

F Lighting type D (3) 11 nr

Lighting Control Installation

Lighting control system including but not limited to panels, wiring,


containment, as shown on drawings all in accordance with the
Specification

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 4 4.5/6
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 4 - GF CENTRAL CORRIDOR

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATIONS (CONT*D)

Lighting Control Installation

Lighting control system including but not limited to panels, wiring,


containment, as shown on drawings all in accordance with the
Specification
A Lighting control installation 1 Item

Emergency Lighting

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

B Emergency lighting points 6 nr

C Emergency exit sign points 2 nr

Terminal equipment and fittings

Emergency light fittings including fixings, lamps and connections


complete in accordance with the Specifications

D Emergency Light; LED T5; self contained led emergency lights, 6 nr


non maintained,surface mounted type with 3 hrs. battery backup
(IP-65)

E Emergency Exit Sign; self contained led exit lights, maintained, 2 nr


single sided 3 hrs. battery backup (IP-20)

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 4 4.5/7
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 4 - GF CENTRAL CORRIDOR

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION

38 Mechanical services

Sprinkler Installations

Pipework

Above ground galvanized steel pipes; including fittings, all


necessary fixings, accessories, supports and connections in
accordance with the Specifications

A 25mm Diameter pipes 33 m

B 32mm Diameter pipes 15 m

C 40mm Diameter pipes 16 m

D 50mm Diameter pipes 11 m

E 65mm Diameter pipes 13 m

Pipe ancillaries

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification

F Pendent type sprinkler heads 30 nr

G Upright type sprinkler heads 30 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 4 4.5/8
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 4 - GF CENTRAL CORRIDOR

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION (CONT*D)

Sprinkler Installations (CONT*D)


Fire hose reel and department valve assembly; comprising of fire
department landing valve, rack with hose, nozzle, 25mm diameter
pressure reducing valve, swing hose reel, fire extinguishers,
pipework inside cabinet, all necessary accessories and
connections ; all in accordance with the Specification

A Fire hose reel cabinet 1 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 4 4.5/9
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 4 - GF CENTRAL CORRIDOR

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS

39 Electrical services

Fire Detection & Voice Evacuation System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

A Intelligent optical Smoke Detector with standard base 6 nr

B Ceiling void Intelligent optical Smoke Detector with LED remote 6 nr


Indicator

C Manual Call Point 3 nr

D Flasher 1 nr

E PAVA/BGM Ceiling Speaker 5 nr

F BGM Volume Controller & Source selector 1 nr

Terminal equipment and fittings

Supply and installation of fire alarm devices, all in accordance with


the Specification

G Intelligent optical Smoke Detector with standard base 6 nr

H Ceiling void Intelligent optical Smoke Detector with LED remote 6 nr


Indicator

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 4 4.5/10
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 4 - GF CENTRAL CORRIDOR

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Fire Detection & Voice Evacuation System (CONT*D)

Supply and installation of fire alarm devices, all in accordance with


the Specification (CONT*D)

A Manual Call Point 3 nr

B Flasher 1 nr

C PAVA/BGM Ceiling Speaker 5 nr

D BGM Volume Controller & Source selector 1 nr

IT System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

E Dual Data Outlet 2 nr

F WIFI Ceiling 2 nr

Terminal equipment and fittings

Supply and installation of IT devices, all in accordance with the


Specification

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 4 4.5/11
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 4 - GF CENTRAL CORRIDOR

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

IT System (CONT*D)

Supply and installation of IT devices, all in accordance with the


Specification
A Dual Data Outlet 2 nr

B 65" TV 2 nr

C WIFI Ceiling 2 nr

Security System

CCTV

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

D Dome Camera 2 nr

Terminal equipment and fittings

Supply and installation of CCTV devices, all in accordance with


the Specification

E Dome Camera 2 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 4 4.5/12
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 4 - GF CENTRAL CORRIDOR

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

BUILDER'S WORK IN CONNECTION WITH SERVICES

41 Builder's work in connection with mechanical, electrical


and transportation installations

A Builder's work in connection with services 1 Item

B Allow for integrating the new MEP services to the existing services 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 4 4.5/13
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 4 - GF CENTRAL CORRIDOR

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 4.5/1

Page : 4.5/2

Page : 4.5/3

Page : 4.5/4

Page : 4.5/5

Page : 4.5/6

Page : 4.5/7

Page : 4.5/8

Page : 4.5/9

Page : 4.5/10

Page : 4.5/11

Page : 4.5/12

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 4 D/Add/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 4 - GF CENTRAL CORRIDOR

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS
Any items that may not be covered elsewhere in the Bills of
Quantities which the tenderer deemed to be necessary in order to
carry out the works in full compliance with the Drawings,
Specifications and any other items necessary to form a complete
Installations, must be itemised and priced below. The tenderer
may provide additional sheets for this purpose if necessary. All
items under this section must be summarised under a separate
cover.

A Item

B Item

C Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 4 D/Add/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 4 - GF CENTRAL CORRIDOR

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : D/Add/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 4 D/Add/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 4 - GF CENTRAL CORRIDOR

Item Description Quantity Unit Rate AED Amount AED

BILL 4 - GF Central Corridor

BILL SUMMARY

Total Brought Forward from Page No.

Facilitating works 4.1/2

Superstructure 4.2/2

Internal Finishes 4.3/4

Fittings and Furnishing 4.4/2

Services 4.5/13

ADDITIONAL ITEMS D/Add/2

Carried To General Summary Page AED 0


Issued on: 15/11/2022
The Armed Forces Officers Club and Hotel

Erth Guest Experience

Fit-out Works

BILL 5

GF WEST CIRCULATION 01

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 5 5.1/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 5 - GF WEST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS

DEMOLITION WORKS

3 Demolitions

Demolish and off site disposal of existing ceilings and MEP


services as per drawings and specification

A Demolition of existing ceiling finishes 228 m2

B Demolition of existing MEP services 228 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 5 5.1/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 5 - GF WEST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 5.1/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 5 5.2/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 5 - GF WEST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE

INTERNAL WALLS AND PARTITIONS

20 Proprietary linings and partitions

Glazed partition; including all necessary fixing accessories; all in


accordance with the Drawings and Specifications

A Glazed partition to retail zone 5; Type W400 27 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 5 5.2/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 5 - GF WEST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

INTERNAL DOORS

24 Doors, shutters and hatches

Glass doors (size and type to be confirmed); including


ironmongery and all necessary fixing accessories; all in
accordance with the Drawings and Specifications

A Double leaf door including ironmongery 2 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 5 5.2/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 5 - GF WEST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 5.2/1

Page : 5.2/2

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 5 5.3/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 5 - GF WEST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES

WALL FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to walls and columns

Texture paint; including all accessories and works required; all in


accordance with the Specifications

A Type W203 244 m2

B Type W206 84 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 5 5.3/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 5 - GF WEST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)


FLOOR FINISHES

28 Floor, wall, ceiling and roof finishings

Screeds

Backgrounds; self levelling compound; to receive floor finishes; all


in accordance with the Specifications

A To floors 229 m2

Finish to floors

Woven Vinyl Carpet; laid on self levelling compound (measured


separately) including preparation and all works required; all in
accordance with the Specifications

B Type F-101B 229 m2

Brushed brass metal skirting; including preparation and all works


required; all in accordance with the Specifications

C Brushed brass metal 113 m

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 5 5.3/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 5 - GF WEST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

CEILING FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to ceilings

Ceiling paint; including all accessories and works required; all in


accordance with the Specifications

A Type C-200 65 m2

B Type C-202 110 m2

Textured paint; including all accessories and works required; all in


accordance with the Specifications

C Type C-800 5 m2

Suspended Ceilings

Suspended Gypsum Board; including; fastenings and all


accessories and works required; all in accordance with the
Specifications

D For Type C-200 & C-202 175 m2

Acoustic insulation; including fastenings and all accessories and


works required; all in accordance with the Specifications

E For Type C-200 & C-202 175 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 5 5.3/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 5 - GF WEST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 5.3/1

Page : 5.3/2

Page : 5.3/3

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 5 5.4/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 5 - GF WEST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING

32 Furniture, fittings and equipment

Signage

Identity Signs, as per Specifications

A Type ID01 2 nr

Fire and Life Safety Signs, as per Specifications

B Allow for fire and life safety signs 1 Item

Artwork

C Allow for provision of artwork 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 5 5.4/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 5 - GF WEST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 5.4/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 5 5.5/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 5 - GF WEST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

SERVICES

SPACE HEATING AND AIR CONDITIONING

38 Mechanical services

Ductwork

Galvanised steel sheet rectangular ductwork and fittings, including


insulation, supports, manufactured and fitted in accordance with
the relevant standards, complete as shown on drawings and
Specifications

A Supply/Return air ductwork 121 m2

Duct ancillaries

Flexible duct with damper, including insulation complete all in


accordance with the Specifications

B 200 mm Diameter 24 nr

Linear slot diffuser, complete all in accordance with the


Specifications

C 1000mm 4 slot supply air linear diffuser 12 nr

D 1000mm 4 slot Return air linear diffuser 9 nr

Variable air volume boxes; including all necessary insulation,


accessories and connections; complete all in accordance with the
Specifications

E Ref. VAV-GE-G-2/3-02 1 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 5 5.5/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 5 - GF WEST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION

39 Electrical services

Small Power Installation

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

Socket outlets

A 13A Switch Socket Outlet 3 nr

Terminal equipment and fittings

Devices complete as described, all in accordance with the


Specification

Socket outlets

B 13A Switch Socket Outlet 3 nr

Lighting Installation

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 5 5.5/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 5 - GF WEST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Lighting Installation

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

A Lighting points 24 nr

B Linear lighting points; for Lighting type C(1) 1 Item

Terminal equipment and fittings

Light fittings including fixings, lamps and connections complete in


accordance with the Specifications

C Lighting type C (1) 117 m

D Lighting type D (4) 24 nr

Lighting Control Installation

Lighting control system including but not limited to panels, wiring,


containment, as shown on drawings all in accordance with the
Specification

E Lighting control installation 1 Item

Emergency Lighting

Final circuits

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 5 5.5/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 5 - GF WEST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Emergency Lighting

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

A Emergency lighting points 6 nr

B Emergency exit sign points 2 nr

Terminal equipment and fittings

Emergency light fittings including fixings, lamps and connections


complete in accordance with the Specifications

C Emergency Light; LED T5; self contained led emergency lights, 6 nr


non maintained,surface mounted type with 3 hrs. battery backup
(IP-65)

D Emergency Exit Sign; self contained led exit lights, maintained, 2 nr


single sided 3 hrs. battery backup (IP-20)

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 5 5.5/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 5 - GF WEST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION

38 Mechanical services

Sprinkler Installations

Pipework

Above ground galvanized steel pipes; including fittings, all


necessary fixings, accessories, supports and connections in
accordance with the Specifications

A 25mm Diameter pipes 52 m

B 32mm Diameter pipes 20 m

C 40mm Diameter pipes 20 m

D 50mm Diameter pipes 5 m

E 80mm Diameter pipes 11 m

F 150mm Diameter pipes 13 m

Pipe ancillaries

Zone control valve assembly; including OS&Y valve, check valve,


flow switch, pressure gauge, alarm test, sight glass and test valve,
interconnecting pipework and all necessary accessories and
ancillaries ; all in accordance with the Specification

G Fixed to 150 mm diameter pipe 1 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 5 5.5/6
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 5 - GF WEST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION (CONT*D)

Sprinkler Installations (CONT*D)


Sprinkler heads; including all necessary accessories and
connections; complete in accordance with the Specification

A Pendent type sprinkler heads 20 nr

B Upright type sprinkler heads 20 nr

Fire hose reel and department valve assembly; comprising of fire


department landing valve, rack with hose, nozzle, 25mm diameter
pressure reducing valve, swing hose reel, fire extinguishers,
pipework inside cabinet, all necessary accessories and
connections ; all in accordance with the Specification

C Fire hose reel cabinet 1 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 5 5.5/7
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 5 - GF WEST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS

39 Electrical services

Fire Detection & Voice Evacuation System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

A Intelligent optical Smoke Detector with standard base 6 nr

B Ceiling void Intelligent optical Smoke Detector with LED remote 6 nr


Indicator

C Manual Call Point 1 nr

D Flasher 2 nr

E Response Indicator 6 nr

F PAVA/BGM Ceiling Speaker 4 nr

Terminal equipment and fittings

Supply and installation of fire alarm devices, all in accordance with


the Specification

G Intelligent optical Smoke Detector with standard base 6 nr

H Ceiling void Intelligent optical Smoke Detector with LED remote 6 nr


Indicator

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 5 5.5/8
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 5 - GF WEST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Fire Detection & Voice Evacuation System (CONT*D)

Supply and installation of fire alarm devices, all in accordance with


the Specification (CONT*D)

A Manual Call Point 1 nr

B Flasher 2 nr

C Response Indicator 6 nr

D PAVA/BGM Ceiling Speaker 4 nr

IT System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

E WIFI Ceiling 1 nr

Terminal equipment and fittings

Supply and installation of IT devices, all in accordance with the


Specification

F WIFI Ceiling 1 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 5 5.5/9
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 5 - GF WEST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)
Security System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

A Dome Camera 2 nr

Terminal equipment and fittings

Supply and installation of CCTV devices, all in accordance with


the Specification

B Dome Camera 2 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 5 5.5/10
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 5 - GF WEST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

BUILDER'S WORK IN CONNECTION WITH SERVICES

41 Builder's work in connection with mechanical, electrical


and transportation installations

A Builder's work in connection with services 1 Item

B Allow for integrating the new MEP services to the existing services 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 5 5.5/11
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 5 - GF WEST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 5.5/1

Page : 5.5/2

Page : 5.5/3

Page : 5.5/4

Page : 5.5/5

Page : 5.5/6

Page : 5.5/7

Page : 5.5/8

Page : 5.5/9

Page : 5.5/10

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 5 D/Add/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 5 - GF WEST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS
Any items that may not be covered elsewhere in the Bills of
Quantities which the tenderer deemed to be necessary in order to
carry out the works in full compliance with the Drawings,
Specifications and any other items necessary to form a complete
Installations, must be itemised and priced below. The tenderer
may provide additional sheets for this purpose if necessary. All
items under this section must be summarised under a separate
cover.

A Item

B Item

C Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 5 D/Add/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 5 - GF WEST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : D/Add/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 5 D/Add/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 5 - GF WEST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

BILL 5 - GF West Circulation 01

BILL SUMMARY

Total Brought Forward from Page No.

Facilitating works 5.1/2

Superstructure 5.2/3

Internal Finishes 5.3/4

Fittings and Furnishing 5.4/2

Services 5.5/11

ADDITIONAL ITEMS D/Add/2

Carried To General Summary Page AED


Issued on: 15/11/2022
The Armed Forces Officers Club and Hotel

Erth Guest Experience

Fit-out Works

BILL 6

GF WEST CIRCULATION 02

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 6 6.1/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 6 - GF WEST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS

DEMOLITION WORKS

3 Demolitions

Demolish and off site disposal of existing ceilings and MEP


services as per drawings and specification

A Demolition of existing ceiling finishes 300 m2

B Demolition of existing MEP services 300 m2

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 6 6.1/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 6 - GF WEST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 6.1/1

Carried To Bill Summary Page AED


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 6 6.2/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 6 - GF WEST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE

INTERNAL DOORS

24 Doors, shutters and hatches

Doors (size, type and material to be confirmed); including


ironmongery and all necessary fixing accessories; all in
accordance with the Drawings and Specifications

A Single leaf door including ironmongery 4 nr

B Double leaf door including ironmongery 5 nr

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 6 6.2/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 6 - GF WEST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 6.2/1

Carried To Bill Summary Page AED


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 6 6.3/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 6 - GF WEST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES

WALL FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to walls and columns

Texture paint; including all accessories and works required; all in


accordance with the Specifications

A Type W203 16 m2

Wall paint; including all accessories and works required; all in


accordance with the Specifications

B Type W202 431 m2

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 6 6.3/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 6 - GF WEST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

FLOOR FINISHES

28 Floor, wall, ceiling and roof finishings

Screeds

Backgrounds; self levelling compound; to receive floor finishes; all


in accordance with the Specifications

A To floors 342 m2

Finish to floors

Porcelain Floor tile; Matt finish, colour: sand, size:


1200mmx2400mm, laid on self levelling compound (measured
separately) including preparation and all works required; all in
accordance with the Specifications

B Type F-300B 172 m2

Woven Vinyl Carpet; laid on cement and sand screed (measured


separately) including preparation and all works required; all in
accordance with the Specifications

C Type F-101B 170 m2

Brushed brass metal skirting; including preparation and all works


required; all in accordance with the Specifications

D Brushed brass metal 148 m

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 6 6.3/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 6 - GF WEST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

CEILING FINISHES

28 Floor, wall, ceiling and roof finishings

Ceiling paint; including all accessories and works required; all in


accordance with the Specifications

A Type C-200 65 m2

B Type C-202 231 m2

Textured paint; including all accessories and works required; all in


accordance with the Specifications

C Type C-800 5 m2

Suspended Ceilings

Suspended Gypsum Board; including; fastenings and all


accessories and works required; all in accordance with the
Specifications

D For Type C-200 & C-202 296 m2

Acoustic insulation; including fastenings and all accessories and


works required; all in accordance with the Specifications

E For Type C-200 & C-202 296 m2

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 6 6.3/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 6 - GF WEST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 6.3/1

Page : 6.3/2

Page : 6.3/3

Carried To Bill Summary Page AED


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 6 6.4/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 6 - GF WEST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING

32 Furniture, fittings and equipment

Signage

Directional Signs, as per Specifications

A Type DS01 2 nr

Directory Signs, as per Specifications

B Type LD03 1 nr

C Type LD04 1 nr

Fire and Life Safety Signs, as per Specifications

D Allow for fire and life safety signs 1 Item

Furnitures

E Chair; Ref. CH01 4 nr

Artwork

F Allow for provision of artwork 1 Item

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 6 6.4/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 6 - GF WEST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 6.4/1

Carried To Bill Summary Page AED


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 6 6.5/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 6 - GF WEST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

SERVICES

WATER INSTALLATION

38 Mechanical services

Pipework

Supply and installation of water supply pipes including insulation,


fittings, supports, hangers and all required accessories in
accordance with drawings and specifications.

Water Supply Pipe (PEX)

A 22mm diameter 7 m

Pipe ancillaries

Supply and installation of the following with fittings, fixings,


supports and all required accessories complete; in accordance
with drawings and specifications.

Gate Valve

B 22mm diameter 2 nr

Automatic Air Vent

C 22mm diameter 1 nr

Shock Absorber/Water Hammer Arrester

D 22mm diameter 1 nr

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 6 6.5/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 6 - GF WEST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

SPACE HEATING AND AIR CONDITIONING

Ductwork

Galvanised steel sheet rectangular ductwork and fittings, including


insulation, supports, manufactured and fitted in accordance with
the relevant standards, complete as shown on drawings and
Specifications

A Supply/Return air ductwork 140 m2

Duct ancillaries

Flexible duct with damper, including insulation complete all in


accordance with the Specifications

B 200 mm Diameter 42 nr

Linear slot diffuser, complete all in accordance with the


Specifications

C 1000mm 4 slot supply air linear diffuser 21 nr

D 1000mm 4 slot Return air linear diffuser 6 nr

Variable air volume boxes; including all necessary insulation,


accessories and connections; complete all in accordance with the
Specifications

E 2100 l/s max air flow, ref. VAV-GE-G-3/7-01 1 nr

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 6 6.5/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 6 - GF WEST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION

39 Electrical services

Panel boards

Primary equipment

Distribution panel board complete with all necessary


accessories all in accordance with the Specification

A DB 1 nr

Small Power Installation

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

Socket outlets

B 13A Switch Socket Outlet 6 nr

C 13A Switch Socket Outlet Twin 2 nr

Terminal equipment and fittings

Devices complete as described, all in accordance with the


Specification

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 6 6.5/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 6 - GF WEST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Small Power Installation (CONT*D)


Socket outlets

A 13A Switch Socket Outlet 6 nr

B 13A Switch Socket Outlet Twin 2 nr

C Floor Box 3 nr

Lighting Installation

Terminal equipment and fittings

Light fittings including fixings, lamps and connections complete in


accordance with the Specifications

D Lighting type C (1) 27 m

Lighting Control Installation

Lighting control system including but not limited to panels, wiring,


containment, as shown on drawings all in accordance with the
Specification

E Lighting control installation 1 Item

Emergency Lighting

Final circuits

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 6 6.5/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 6 - GF WEST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Emergency Lighting

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

A Emergency lighting points 7 nr

B Emergency exit sign points 2 nr

Terminal equipment and fittings

Emergency light fittings including fixings, lamps and connections


complete in accordance with the Specifications

C Emergency Light; LED T5; self contained led emergency lights, 7 nr


non maintained,surface mounted type with 3 hrs. battery backup
(IP-65)

D Emergency Exit Sign; self contained led exit lights, maintained, 2 nr


single sided 3 hrs. battery backup (IP-20)

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 6 6.5/6
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 6 - GF WEST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION

38 Mechanical services

Sprinkler Installations

Pipework

Above ground galvanized steel pipes; including fittings, all


necessary fixings, accessories, supports and connections in
accordance with the Specifications

A 25mm Diameter pipes 50 m

B 32mm Diameter pipes 19 m

C 40mm Diameter pipes 19 m

D 50mm Diameter pipes 18 m

E 65mm Diameter pipes 5 m

F 80mm Diameter pipes 4 m

G 100mm Diameter pipes 20 m

H 150mm Diameter pipes 29 m

Pipe ancillaries

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 6 6.5/7
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 6 - GF WEST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION (CONT*D)

Sprinkler Installations (CONT*D)

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification

A Pendent type sprinkler heads 29 nr

B Upright type sprinkler heads 29 nr

C Sidewall type sprinkler heads 5 nr

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 6 6.5/8
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 6 - GF WEST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS

39 Electrical services

Fire Detection & Voice Evacuation System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

A Intelligent optical Smoke Detector with standard base 7 nr

B Ceiling void Intelligent optical Smoke Detector with LED remote 7 nr


Indicator

C Manual Call Point 1 nr

D Flasher 3 nr

E Response Indicator 3 nr

F PAVA/BGM Ceiling Speaker 5 nr

Terminal equipment and fittings

Supply and installation of fire alarm devices, all in accordance with


the Specification

G Intelligent optical Smoke Detector with standard base 7 nr

H Ceiling void Intelligent optical Smoke Detector with LED remote 7 nr


Indicator

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 6 6.5/9
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 6 - GF WEST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Fire Detection & Voice Evacuation System (CONT*D)

Supply and installation of fire alarm devices, all in accordance with


the Specification (CONT*D)

A Manual Call Point 1 nr

B Flasher 3 nr

C Response Indicator 3 nr

D PAVA/BGM Ceiling Speaker 5 nr

IT System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

E WIFI Ceiling 2 nr

Terminal equipment and fittings

Supply and installation of IT devices, all in accordance with the


Specification

F WIFI Ceiling 2 nr

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 6 6.5/10
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 6 - GF WEST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)
Security System

CCTV

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

A Dome Camera 7 nr

Terminal equipment and fittings

Supply and installation of CCTV devices, all in accordance with


the Specification

B Dome Camera 7 nr

Access Control

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

C Door with card reader, Electric lock, BGU and exit Push button 3 nr

Terminal equipment and fittings

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 6 6.5/11
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 6 - GF WEST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Security System (CONT*D)

Supply and installation of Access control devices, all in


accordance with the Specification

A Door with card reader, Electric lock, BGU and exit Push button 3 nr

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 6 6.5/12
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 6 - GF WEST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

BUILDER'S WORK IN CONNECTION WITH SERVICES

41 Builder's work in connection with mechanical, electrical


and transportation installations

A Builder's work in connection with services 1 Item

B Allow for integrating the new MEP services to the existing services 1 Item

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 6 6.5/13
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 6 - GF WEST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 6.5/1

Page : 6.5/2

Page : 6.5/3

Page : 6.5/4

Page : 6.5/5

Page : 6.5/6

Page : 6.5/7

Page : 6.5/8

Page : 6.5/9

Page : 6.5/10

Page : 6.5/11

Page : 6.5/12

Carried To Bill Summary Page AED


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 6 D/Add/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 6 - GF WEST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS
Any items that may not be covered elsewhere in the Bills of
Quantities which the tenderer deemed to be necessary in order to
carry out the works in full compliance with the Drawings,
Specifications and any other items necessary to form a complete
Installations, must be itemised and priced below. The tenderer
may provide additional sheets for this purpose if necessary. All
items under this section must be summarised under a separate
cover.

A Item

B Item

C Item

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 6 D/Add/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 6 - GF WEST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : D/Add/1

Carried To Bill Summary Page AED


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 6 D/Add/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 6 - GF WEST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

BILL 6 - GF West Circulation 02

BILL SUMMARY

Total Brought Forward from Page No.

Facilitating works 6.1/2

Superstructure 6.2/2

Internal Finishes 6.3/4

Fittings and Furnishing 6.4/2

Services 6.5/13

ADDITIONAL ITEMS D/Add/2

Carried To General Summary Page AED 0


Issued on: 15/11/2022
The Armed Forces Officers Club and Hotel

Erth Guest Experience

Fit-out Works

BILL 7

GF WEST CIRCULATION 03

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 7 7.1/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 7 - GF WEST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS

DEMOLITION WORKS

3 Demolitions

Demolish and off site disposal of existing ceilings and MEP


services as per drawings and specification

A Demolition of existing ceiling finishes 116 m2

B Demolition of existing MEP services 116 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 7 7.1/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 7 - GF WEST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 7.1/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 7 7.2/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 7 - GF WEST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE

INTERNAL WALLS AND PARTITIONS

20 Proprietary linings and partitions

Curtain wall mullion painting; all in accordance with the Drawings


and Specifications

A Allow for painting of mullion 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 7 7.2/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 7 - GF WEST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

INTERNAL DOORS

24 Doors, shutters and hatches

Doors (size, type and material to be confirmed); including


ironmongery and all necessary fixing accessories; all in
accordance with the Drawings and Specifications

A Single leaf door including ironmongery 1 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 7 7.2/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 7 - GF WEST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 7.2/1

Page : 7.2/2

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 7 7.3/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 7 - GF WEST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES

WALL FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to walls and columns

Texture paint; including all accessories and works required; all in


accordance with the Specifications

A Type W203 26 m2

B Type W206 16 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 7 7.3/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 7 - GF WEST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

FLOOR FINISHES

28 Floor, wall, ceiling and roof finishings

Screeds

Backgrounds; self levelling compound; to receive floor finishes; all


in accordance with the Specifications

A To floors 114 m2

Finish to floors

Woven Vinyl Carpet; laid on self levelling compound (measured


separately) including preparation and all works required; all in
accordance with the Specifications

B Type F-101B 114 m2

Brushed brass metal skirting; including preparation and all works


required; all in accordance with the Specifications

C Brushed brass metal 13 m

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 7 7.3/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 7 - GF WEST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

CEILING FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to ceilings

Ceiling paint; including all accessories and works required; all in


accordance with the Specifications

A Type C-202 104 m2

Bronze metal insert; including all accessories and works required;


all in accordance with the Specifications

B Type J-900 23 m

Textured paint; including all accessories and works required; all in


accordance with the Specifications

C Type C-800 10 m2

Suspended Ceilings

Suspended Gypsum Board; including; fastenings and all


accessories and works required; all in accordance with the
Specifications

D For Type C-202 104 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 7 7.3/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 7 - GF WEST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

CEILING FINISHES (CONT*D)

28 Floor, wall, ceiling and roof finishings (CONT*D)


Acoustic insulation; including fastenings and all accessories and
works required; all in accordance with the Specifications

A For Type C-202 104 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 7 7.3/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 7 - GF WEST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 7.3/1

Page : 7.3/2

Page : 7.3/3

Page : 7.3/4

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 7 7.4/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 7 - GF WEST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING

32 Furniture, fittings and equipment

Signage

Fire and Life Safety Signs, as per Specifications

A Allow for fire and life safety signs 1 Item

Artwork

B Allow for provision of artwork 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 7 7.4/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 7 - GF WEST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 7.4/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 7 7.5/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 7 - GF WEST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

SERVICES

SPACE HEATING AND AIR CONDITIONING

38 Mechanical services

Ductwork

Galvanised steel sheet rectangular ductwork and fittings, including


insulation, supports, manufactured and fitted in accordance with
the relevant standards, complete as shown on drawings and
Specifications

A Supply/Return air ductwork 71 m2

Duct ancillaries

Flexible duct with damper, including insulation complete all in


accordance with the Specifications

B 200 mm Diameter 44 nr

Linear slot diffuser, complete all in accordance with the


Specifications

C 1000mm 4 slot supply air linear diffuser 22 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 7 7.5/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 7 - GF WEST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION

39 Electrical services

Panel boards

Primary equipment

Distribution panel board complete with all necessary


accessories all in accordance with the Specification

A DB 1 nr

Small Power Installation

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

Socket outlets

B 13A Switch Socket Outlet 2 nr

Terminal equipment and fittings

Devices complete as described, all in accordance with the


Specification

Socket outlets

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 7 7.5/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 7 - GF WEST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Small Power Installation (CONT*D)

Socket outlets

A 13A Switch Socket Outlet 2 nr

Lighting Installation

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

B Lighting points 17 nr

C Linear lighting points; for Lighting type C(1) 1 Item

Terminal equipment and fittings

Light fittings including fixings, lamps and connections complete in


accordance with the Specifications

D Lighting type C (1) 67 m

E Lighting type D (2) 12 nr

F Lighting type D (3) 5 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 7 7.5/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 7 - GF WEST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Lighting Control Installation

Lighting control system including but not limited to panels, wiring,


containment, as shown on drawings all in accordance with the
Specification

A Lighting control installation 1 Item

Emergency Lighting

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

B Emergency lighting points 4 nr

C Emergency exit sign points 1 nr

Terminal equipment and fittings

Emergency light fittings including fixings, lamps and connections


complete in accordance with the Specifications

D Emergency Light; LED T5; self contained led emergency lights, 4 nr


non maintained,surface mounted type with 3 hrs. battery backup
(IP-65)

E Emergency Exit Sign; self contained led exit lights, maintained, 1 nr


single sided 3 hrs. battery backup (IP-20)

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 7 7.5/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 7 - GF WEST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION

38 Mechanical services

Sprinkler Installations

Pipework

Above ground galvanized steel pipes; including fittings, all


necessary fixings, accessories, supports and connections in
accordance with the Specifications

A 25mm Diameter pipes 14 m

B 32mm Diameter pipes 3 m

C 40mm Diameter pipes 4 m

D 50mm Diameter pipes 15 m

E 65mm Diameter pipes 8 m

Pipe ancillaries

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification

F Pendent type sprinkler heads 9 nr

G Upright type sprinkler heads 9 nr

H Side wall type sprinkler heads 3 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 7 7.5/6
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 7 - GF WEST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION (CONT*D)

Sprinkler Installations (CONT*D)


Fire hose reel and department valve assembly; comprising of fire
department landing valve, rack with hose, nozzle, 25mm diameter
pressure reducing valve, swing hose reel, fire extinguishers,
pipework inside cabinet, all necessary accessories and
connections ; all in accordance with the Specification

A Fire hose reel cabinet 1 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 7 7.5/7
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 7 - GF WEST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS

39 Electrical services

Fire Detection & Voice Evacuation System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

A Intelligent optical Smoke Detector with standard base 4 nr

B Ceiling void Intelligent optical Smoke Detector with LED remote 4 nr


Indicator

C Manual Call Point 2 nr

D Flasher 1 nr

E PAVA/BGM Ceiling Speaker 3 nr

Terminal equipment and fittings

Supply and installation of fire alarm devices, all in accordance with


the Specification

F Intelligent optical Smoke Detector with standard base 4 nr

G Ceiling void Intelligent optical Smoke Detector with LED remote 4 nr


Indicator

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 7 7.5/8
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 7 - GF WEST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Fire Detection & Voice Evacuation System (CONT*D)

Supply and installation of fire alarm devices, all in accordance with


the Specification (CONT*D)
A Manual Call Point 2 nr

B Flasher 1 nr

C PAVA/BGM Ceiling Speaker 3 nr

IT System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

D WIFI Ceiling 1 nr

Terminal equipment and fittings

Supply and installation of IT devices, all in accordance with the


Specification

E WIFI Ceiling 1 nr

Security System

CCTV

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 7 7.5/9
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 7 - GF WEST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Security System (CONT*D)

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

A Dome Camera 1 nr

B Box Camera 1 nr

Terminal equipment and fittings

Supply and installation of CCTV devices, all in accordance with


the Specification

C Dome Camera 1 nr

D Box Camera 1 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 7 7.5/10
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 7 - GF WEST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

BUILDER'S WORK IN CONNECTION WITH SERVICES

41 Builder's work in connection with mechanical, electrical


and transportation installations

A Builder's work in connection with services 1 Item

B Allow for integrating the new MEP services to the existing services 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 7 7.5/11
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 7 - GF WEST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 7.5/1

Page : 7.5/2

Page : 7.5/3

Page : 7.5/4

Page : 7.5/5

Page : 7.5/6

Page : 7.5/7

Page : 7.5/8

Page : 7.5/9

Page : 7.5/10

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 7 D/Add/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 7 - GF WEST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS
Any items that may not be covered elsewhere in the Bills of
Quantities which the tenderer deemed to be necessary in order to
carry out the works in full compliance with the Drawings,
Specifications and any other items necessary to form a complete
Installations, must be itemised and priced below. The tenderer
may provide additional sheets for this purpose if necessary. All
items under this section must be summarised under a separate
cover.

A Item

B Item

C Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 7 D/Add/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 7 - GF WEST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : D/Add/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 7 D/Add/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 7 - GF WEST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

BILL 7 - GF West Circulation 03

BILL SUMMARY

Total Brought Forward from Page No.

Facilitating works 7.1/2

Superstructure 7.2/3

Internal Finishes 7.3/5

Fittings and Furnishing 7.4/2

Services 7.5/11

ADDITIONAL ITEMS D/Add/2

Carried To General Summary Page AED 0


Issued on: 15/11/2022
The Armed Forces Officers Club and Hotel

Erth Guest Experience

Fit-out Works

BILL 8

GF EAST CIRCULATION 01

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 8 8.1/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 8 - GF EAST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS

DEMOLITION WORKS

3 Demolitions

Demolish and off site disposal of existing ceilings and MEP


services as per drawings and specification

A Demolition of existing ceiling finishes 194 m2

B Demolition of existing MEP services 194 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 8 8.1/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 8 - GF EAST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 8.1/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 8 8.2/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 8 - GF EAST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE

INTERNAL WALLS AND PARTITIONS

20 Proprietary linings and partitions

Glazed partition; including all necessary fixing accessories; all in


accordance with the Drawings and Specifications

A Glazed partition to retail shop front zone 3 and 4; Type W400 99 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 8 8.2/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 8 - GF EAST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

INTERNAL DOORS

24 Doors, shutters and hatches

Glass doors (size and type to be confirmed); including


ironmongery and all necessary fixing accessories; all in
accordance with the Drawings and Specifications

A Double leaf door including ironmongery 8 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 8 8.2/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 8 - GF EAST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 8.2/1

Page : 8.2/2

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 8 8.3/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 8 - GF EAST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES

WALL FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to walls and columns

Texture paint; including all accessories and works required; all in


accordance with the Specifications

A Type W203 138 m2

B Type W206 80 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 8 8.3/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 8 - GF EAST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

FLOOR FINISHES

28 Floor, wall, ceiling and roof finishings

Screeds

Backgrounds; self levelling compound; to receive floor finishes; all


in accordance with the Specifications

A To floors 200 m2

Finish to floors

Porcelain Floor tile; Matt finish, colour: sand, size:


1200mmx2400mm, laid on self levelling compound (measured
separately) including preparation and all works required; all in
accordance with the Specifications

B Type F-300B 23 m2

Woven Vinyl Carpet; laid on cement and sand screed (measured


separately) including preparation and all works required; all in
accordance with the Specifications

C Type F-101B 177 m2

Brushed brass metal skirting; including preparation and all works


required; all in accordance with the Specifications

D Brushed brass metal 108 m

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 8 8.3/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 8 - GF EAST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

CEILING FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to ceilings

Ceiling paint; including all accessories and works required; all in


accordance with the Specifications

A Type C-200 79 m2

B Type C-202 121 m2

Suspended Ceilings

Suspended Gypsum Board; including; fastenings and all


accessories and works required; all in accordance with the
Specifications

C For Type C-200 & C-202 200 m2

Acoustic insulation; including fastenings and all accessories and


works required; all in accordance with the Specifications

D For Type C-200 & C-202 200 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 8 8.3/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 8 - GF EAST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 8.3/1

Page : 8.3/2

Page : 8.3/3

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 8 8.4/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 8 - GF EAST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING

32 Furniture, fittings and equipment

Signage

Fire and Life Safety Signs, as per Specifications

A Allow for fire and life safety signs 1 Item

Artwork

B Allow for provision of artwork 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 8 8.4/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 8 - GF EAST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 8.4/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 8 8.5/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 8 - GF EAST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

SERVICES

DISPOSAL INSTALLATIONS

38 Mechanical services

Pipework

Supply and installation of drainage pipes including insulation,


fittings, supports, hangers and all required accessories in
accordance with drawings and specifications.

Waste Pipe (UPVC)

A 50mm diameter 4 m

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 8 8.5/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 8 - GF EAST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

SPACE HEATING AND AIR CONDITIONING

38 Mechanical services

Ductwork

Galvanised steel sheet rectangular ductwork and fittings, including


insulation, supports, manufactured and fitted in accordance with
the relevant standards, complete as shown on drawings and
Specifications

A Supply/Return air ductwork 98 m2

Duct ancillaries

Flexible duct with damper, including insulation complete all in


accordance with the Specifications

B 200 mm Diameter 18 nr

Linear slot diffuser, complete all in accordance with the


Specifications

C 1000mm 4 slot supply air linear diffuser 9 nr

D 1000mm 4 slot Return air linear diffuser 6 nr

Variable air volume boxes; including all necessary insulation,


accessories and connections; complete all in accordance with the
Specifications

E Ref. VAV-GE-G-2/3-01 1 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 8 8.5/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 8 - GF EAST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

SPACE HEATING AND AIR CONDITIONING (CONT*D)

38 Mechanical services (CONT*D)

Bell mouth with wire mesh

A 750x800 Bell mouth with Stainless Steel wire mesh 1 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 8 8.5/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 8 - GF EAST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION

39 Electrical services

Small Power Installation

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

Socket outlets

A 13A Switch Socket Outlet 3 nr

B 13A Switch Socket Outlet Twin 1 nr

Terminal equipment and fittings

Devices complete as described, all in accordance with the


Specification

Socket outlets

C 13A Switch Socket Outlet 3 nr

D 13A Switch Socket Outlet Twin 1 nr

Lighting Installation

Final circuits

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 8 8.5/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 8 - GF EAST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Lighting Installation

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

A Lighting points 16 nr

B Linear lighting points; for Lighting type C(1) 1 Item

Terminal equipment and fittings

Light fittings including fixings, lamps and connections complete in


accordance with the Specifications

C Lighting type C (1) 78 m

D Lighting type D (4) 16 nr

Lighting Control Installation

Lighting control system including but not limited to panels, wiring,


containment, as shown on drawings all in accordance with the
Specification

E Lighting control installation 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 8 8.5/6
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 8 - GF EAST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)


Emergency Lighting

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

A Emergency lighting points 5 nr

B Emergency exit sign points 1 nr

Terminal equipment and fittings

Emergency light fittings including fixings, lamps and connections


complete in accordance with the Specifications

C Emergency Light; LED T5; self contained led emergency lights, 5 nr


non maintained,surface mounted type with 3 hrs. battery backup
(IP-65)

D Emergency Exit Sign; self contained led exit lights, maintained, 1 nr


single sided 3 hrs. battery backup (IP-20)

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 8 8.5/7
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 8 - GF EAST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION

38 Mechanical services

Sprinkler Installations

Pipework

Above ground galvanized steel pipes; including fittings, all


necessary fixings, accessories, supports and connections in
accordance with the Specifications

A 25mm Diameter pipes 27 m

B 32mm Diameter pipes 14 m

C 40mm Diameter pipes 24 m

D 50mm Diameter pipes 22 m

E 65mm Diameter pipes 7 m

F 100mm Diameter pipes 41 m

Zone control valve assembly; including OS&Y valve, check valve,


flow switch, pressure gauge, alarm test, sight glass and test valve,
interconnecting pipework and all necessary accessories and
ancillaries ; all in accordance with the Specification

G Fixed to 150 mm diameter pipe 1 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 8 8.5/8
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 8 - GF EAST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION (CONT*D)

Sprinkler Installations (CONT*D)

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification

A Pendent type sprinkler heads 16 nr

B Upright type sprinkler heads 16 nr

Fire hose reel and department valve assembly; comprising of fire


department landing valve, rack with hose, nozzle, 25mm diameter
pressure reducing valve, swing hose reel, fire extinguishers,
pipework inside cabinet, all necessary accessories and
connections ; all in accordance with the Specification

C Fire hose reel cabinet 1 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 8 8.5/9
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 8 - GF EAST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS

39 Electrical services

Fire Detection & Voice Evacuation System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

A Intelligent optical Smoke Detector with standard base 5 nr

B Ceiling void Intelligent optical Smoke Detector with LED remote 5 nr


Indicator

C Manual Call Point 1 nr

D Flasher 2 nr

E Response Indicator 4 nr

F PAVA/BGM Ceiling Speaker 3 nr

Terminal equipment and fittings

Supply and installation of fire alarm devices, all in accordance with


the Specification

G Intelligent optical Smoke Detector with standard base 5 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 8 8.5/10
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 8 - GF EAST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Fire Detection & Voice Evacuation System (CONT*D)

Supply and installation of fire alarm devices, all in accordance with


the Specification (CONT*D)
A Ceiling void Intelligent optical Smoke Detector with LED remote 5 nr
Indicator

B Manual Call Point 1 nr

C Flasher 2 nr

D Response Indicator 4 nr

E PAVA/BGM Ceiling Speaker 3 nr

IT System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

F Dual Data Outlet 1 nr

G WIFI Ceiling 1 nr

Terminal equipment and fittings

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 8 8.5/11
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 8 - GF EAST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

IT System (CONT*D)

Supply and installation of IT devices, all in accordance with the


Specification

A Dual Data Outlet 1 nr

B 65" TV 1 nr

C WIFI Ceiling 1 nr

Security System

CCTV

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

D Dome Camera 2 nr

Terminal equipment and fittings

Supply and installation of CCTV devices, all in accordance with


the Specification

E Dome Camera 2 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 8 8.5/12
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 8 - GF EAST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

BUILDER'S WORK IN CONNECTION WITH SERVICES

41 Builder's work in connection with mechanical, electrical


and transportation installations

A Builder's work in connection with services 1 Item

B Allow for integrating the new MEP services to the existing services 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 8 8.5/13
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 8 - GF EAST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 8.5/1

Page : 8.5/2

Page : 8.5/3

Page : 8.5/4

Page : 8.5/5

Page : 8.5/6

Page : 8.5/7

Page : 8.5/8

Page : 8.5/9

Page : 8.5/10

Page : 8.5/11

Page : 8.5/12

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 8 D/Add/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 8 - GF EAST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS
Any items that may not be covered elsewhere in the Bills of
Quantities which the tenderer deemed to be necessary in order to
carry out the works in full compliance with the Drawings,
Specifications and any other items necessary to form a complete
Installations, must be itemised and priced below. The tenderer
may provide additional sheets for this purpose if necessary. All
items under this section must be summarised under a separate
cover.

A Item

B Item

C Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 8 D/Add/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 8 - GF EAST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : D/Add/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 8 D/Add/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 8 - GF EAST CIRCULATION 01

Item Description Quantity Unit Rate AED Amount AED

BILL 8 - GF East Circulation 01

BILL SUMMARY

Total Brought Forward from Page No.

Facilitating works 8.1/2

Superstructure 8.2/3

Internal Finishes 8.3/4

Fittings and Furnishing 8.4/2

Services 8.5/13

ADDITIONAL ITEMS D/Add/2

Carried To General Summary Page AED 0


Issued on: 15/11/2022
The Armed Forces Officers Club and Hotel

Erth Guest Experience

Fit-out Works

BILL 9

GF EAST CIRCULATION 02

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 9 9.1/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 9 - GF EAST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS

DEMOLITION WORKS

3 Demolitions

Demolish and off site disposal of existing ceilings and MEP


services as per drawings and specification

A Demolition of existing ceiling finishes 164 m2

B Demolition of existing MEP services 164 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 9 9.1/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 9 - GF EAST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 9.1/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 9 9.2/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 9 - GF EAST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE

INTERNAL DOORS

24 Doors, shutters and hatches

Doors (size, type and material to be confirmed); including


ironmongery and all necessary fixing accessories; all in
accordance with the Drawings and Specifications

A Double leaf door including ironmongery 1 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 9 9.2/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 9 - GF EAST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 9.2/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 9 9.3/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 9 - GF EAST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES

WALL FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to walls and columns

Texture paint; including all accessories and works required; all in


accordance with the Specifications

A Type W203 170 m2

Mirror wall cladding; including all accessories and works required;


all in accordance with the Specifications

B Type W501 80 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 9 9.3/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 9 - GF EAST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

FLOOR FINISHES

28 Floor, wall, ceiling and roof finishings

Screeds

Backgrounds; self levelling compound; to receive floor finishes; all


in accordance with the Specifications

A To floors 166 m2

Finish to floors

Woven Vinyl Carpet; laid on self levelling compound (measured


separately) including preparation and all works required; all in
accordance with the Specifications

B Type F-101B 166 m2

Brushed brass metal skirting; including preparation and all works


required; all in accordance with the Specifications

C Brushed brass metal 78 m

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 9 9.3/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 9 - GF EAST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

CEILING FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to ceilings

Ceiling paint; including all accessories and works required; all in


accordance with the Specifications

A Type C-200 77 m2

B Type C-202 89 m2

Suspended Ceilings

Suspended Gypsum Board; including; fastenings and all


accessories and works required; all in accordance with the
Specifications

C For Type C-200 & C-202 166 m2

Acoustic insulation; including fastenings and all accessories and


works required; all in accordance with the Specifications

D For Type C-200 & C-202 166 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 9 9.3/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 9 - GF EAST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 9.3/1

Page : 9.3/2

Page : 9.3/3

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 9 9.4/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 9 - GF EAST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING

32 Furniture, fittings and equipment

Signage

Identity Signs, as per Specifications

A Type ID01 1 nr

Directional Signs, as per Specifications

B Type DS01 1 nr

Fire and Life Safety Signs, as per Specifications

C Allow for fire and life safety signs 1 Item

Artwork

D Allow for provision of artwork 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 9 9.4/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 9 - GF EAST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 9.4/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 9 9.5/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 9 - GF EAST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

SERVICES

SPACE HEATING AND AIR CONDITIONING

38 Mechanical services

Ductwork

Galvanised steel sheet rectangular ductwork and fittings, including


insulation, supports, manufactured and fitted in accordance with
the relevant standards, complete as shown on drawings and
Specifications

A Supply/Return air ductwork 20 m2

Duct ancillaries

Flexible duct with damper, including insulation complete all in


accordance with the Specifications

B 200 mm Diameter 21 nr

Linear slot diffuser, complete all in accordance with the


Specifications

C 1000mm 4 slot supply air linear diffuser 9 nr

D 1000mm 4 slot Return air linear diffuser 6 nr

E 500mm 4 slot supply air linear diffuser 3 nr

F 500mm 4 slot Return air linear diffuser 2 nr

Bell mouth with wire mesh

G 750x800 Bell mouth with Stainless Steel wire mesh 1 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 9 9.5/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 9 - GF EAST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATIONS

39 Electrical services

Small Power Installation

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

Socket outlets

A 13A Switch Socket Outlet 2 nr

B 13A Switch Socket Outlet Twin 1 nr

Terminal equipment and fittings

Devices complete as described, all in accordance with the


Specification

Socket outlets

C 13A Switch Socket Outlet 2 nr

D 13A Switch Socket Outlet Twin 1 nr

Lighting Installation

Final circuits

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 9 9.5/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 9 - GF EAST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATIONS (CONT*D)

Lighting Installation

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

A Lighting points 16 nr

B Linear lighting points; for Lighting type C(1) 1 Item

Terminal equipment and fittings

Light fittings including fixings, lamps and connections complete in


accordance with the Specifications

C Lighting type C (1) 78 m

D Lighting type D (4) 16 nr

Lighting Control Installation

Lighting control system including but not limited to panels, wiring,


containment, as shown on drawings all in accordance with the
Specification

E Lighting control installation 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 9 9.5/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 9 - GF EAST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATIONS (CONT*D)

Emergency Lighting
Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

A Emergency lighting points 5 nr

B Emergency exit sign points 2 nr

Terminal equipment and fittings

Emergency light fittings including fixings, lamps and connections


complete in accordance with the Specifications

C Emergency Light; LED T5; self contained led emergency lights, 5 nr


non maintained,surface mounted type with 3 hrs. battery backup
(IP-65)

D Emergency Exit Sign; self contained led exit lights, maintained, 2 nr


single sided 3 hrs. battery backup (IP-20)

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 9 9.5/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 9 - GF EAST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION

38 Mechanical services

Sprinkler Installations

Pipework

Above ground galvanized steel pipes; including fittings, all


necessary fixings, accessories, supports and connections in
accordance with the Specifications

A 25mm Diameter pipes 18 m

B 32mm Diameter pipes 12 m

C 40mm Diameter pipes 48 m

D 50mm Diameter pipes 17 m

E 80mm Diameter pipes 3 m

Pipe ancillaries

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification

F Pendent type sprinkler heads 14 nr

G Upright type sprinkler heads 14 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 9 9.5/6
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 9 - GF EAST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS

39 Electrical services

Fire Detection & Voice Evacuation System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

A Intelligent optical Smoke Detector with standard base 5 nr

B Ceiling void Intelligent optical Smoke Detector with LED remote 5 nr


Indicator

C Manual Call Point 1 nr

D Flasher 2 nr

E Response Indicator 4 nr

F PAVA/BGM Ceiling Speaker 3 nr

Terminal equipment and fittings

Supply and installation of fire alarm devices, all in accordance with


the Specification

G Intelligent optical Smoke Detector with standard base 5 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 9 9.5/7
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 9 - GF EAST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Fire Detection & Voice Evacuation System (CONT*D)

Supply and installation of fire alarm devices, all in accordance with


the Specification (CONT*D)
A Ceiling void Intelligent optical Smoke Detector with LED remote 5 nr
Indicator

B Manual Call Point 1 nr

C Flasher 2 nr

D Response Indicator 4 nr

E PAVA/BGM Ceiling Speaker 3 nr

IT System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

F Dual Data Outlet 1 nr

G WIFI Ceiling 1 nr

Terminal equipment and fittings

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 9 9.5/8
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 9 - GF EAST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

IT System (CONT*D)

Supply and installation of IT devices, all in accordance with the


Specification

A Dual Data Outlet 1 nr

B 65" TV 1 nr

C WIFI Ceiling 1 nr

Security System

CCTV

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

D Dome Camera 2 nr

E Box Camera 1 nr

Terminal equipment and fittings

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 9 9.5/9
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 9 - GF EAST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Security System (CONT*D)

Supply and installation of CCTV devices, all in accordance with


the Specification
A Dome Camera 2 nr

B Box Camera 1 nr

Access Control

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

C Door with card reader, Electric lock, BGU and exit Push button 1 nr

Terminal equipment and fittings

Supply and installation of Access control devices, all in


accordance with the Specification

D Door with card reader, Electric lock, BGU and exit Push button 1 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 9 9.5/10
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 9 - GF EAST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

BUILDER'S WORK IN CONNECTION WITH SERVICES

41 Builder's work in connection with mechanical, electrical


and transportation installations

A Builder's work in connection with services 1 Item

B Allow for integrating the new MEP services to the existing services 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 9 9.5/11
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 9 - GF EAST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 9.5/1

Page : 9.5/2

Page : 9.5/3

Page : 9.5/4

Page : 9.5/5

Page : 9.5/6

Page : 9.5/7

Page : 9.5/8

Page : 9.5/9

Page : 9.5/10

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 9 D/Add/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 9 - GF EAST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS
Any items that may not be covered elsewhere in the Bills of
Quantities which the tenderer deemed to be necessary in order to
carry out the works in full compliance with the Drawings,
Specifications and any other items necessary to form a complete
Installations, must be itemised and priced below. The tenderer
may provide additional sheets for this purpose if necessary. All
items under this section must be summarised under a separate
cover.

A Item

B Item

C Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 9 D/Add/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 9 - GF EAST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : D/Add/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 9 D/Add/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 9 - GF EAST CIRCULATION 02

Item Description Quantity Unit Rate AED Amount AED

BILL 9 - GF East Circulation 02

BILL SUMMARY

Total Brought Forward from Page No.

Facilitating works 9.1/2

Superstructure 9.2/2

Internal Finishes 9.3/4

Fittings and Furnishing 9.4/2

Services 9.5/11

ADDITIONAL ITEMS D/Add/2

Carried To General Summary Page AED 0


Issued on: 15/11/2022
The Armed Forces Officers Club and Hotel

Erth Guest Experience

Fit-out Works

BILL 10

GF EAST CIRCULATION 03

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 10 10.1/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 10 - GF EAST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS

DEMOLITION WORKS

3 Demolitions

Demolish and off site disposal of existing ceilings and MEP


services as per drawings and specification

A Demolition of existing ceiling finishes 170 m2

B Demolition of existing MEP services 170 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 10 10.1/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 10 - GF EAST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 10.1/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 10 10.2/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 10 - GF EAST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE

INTERNAL WALLS AND PARTITIONS

20 Proprietary linings and partitions

Curtain wall mullion painting; all in accordance with the Drawings


and Specifications

A Allow for painting of mullion 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 10 10.2/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 10 - GF EAST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

INTERNAL DOORS

24 Doors, shutters and hatches

Doors (size, type and material to be confirmed); including


ironmongery and all necessary fixing accessories; all in
accordance with the Drawings and Specifications

A Single leaf door including ironmongery 1 nr

B Double lead door including ironmongery 1 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 10 10.2/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 10 - GF EAST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 10.2/1

Page : 10.2/2

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 10 10.3/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 10 - GF EAST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES

WALL FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to walls and columns

Texture paint; including all accessories and works required; all in


accordance with the Specifications

A Type W203 116 m2

B Type W206 7 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 10 10.3/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 10 - GF EAST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

FLOOR FINISHES

28 Floor, wall, ceiling and roof finishings

Screeds

Backgrounds; self levelling compound; to receive floor finishes; all


in accordance with the Specifications

A To floors 127 m2

Finish to floors

Woven Vinyl Carpet; laid on self levelling compound (measured


separately) including preparation and all works required; all in
accordance with the Specifications

B Type F-101B 127 m2

Brushed brass metal skirting; including preparation and all works


required; all in accordance with the Specifications

C Brushed brass metal 40 m

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 10 10.3/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 10 - GF EAST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

CEILING FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to ceilings

Ceiling paint; including all accessories and works required; all in


accordance with the Specifications

A Type C-202 161 m2

Bronze metal insert; including all accessories and works required;


all in accordance with the Specifications

B Type J-900 49 m

Textured paint; including all accessories and works required; all in


accordance with the Specifications

C Type C-800 8 m2

Suspended Ceilings

Suspended Gypsum Board; including; fastenings and all


accessories and works required; all in accordance with the
Specifications

D For Type C-202 161 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 10 10.3/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 10 - GF EAST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

CEILING FINISHES (CONT*D)

28 Floor, wall, ceiling and roof finishings (CONT*D)


Acoustic insulation; including fastenings and all accessories and
works required; all in accordance with the Specifications

A For Type C-202 161 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 10 10.3/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 10 - GF EAST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 10.3/1

Page : 10.3/2

Page : 10.3/3

Page : 10.3/4

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 10 10.4/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 10 - GF EAST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING

32 Furniture, fittings and equipment

Signage

Fire and Life Safety Signs, as per Specifications

A Allow for fire and life safety signs 1 Item

Furnitures

B Armchair; Ref. S04 6 nr

Artwork

C Allow for provision of artwork 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 10 10.4/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 10 - GF EAST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 10.4/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 10 10.5/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 10 - GF EAST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

SERVICES

DISPOSAL INSTALLATION

38 Mechanical services

Pipe ancillaries

Supply and installation of the following with fittings, fixings,


supports and all required accessories complete; in accordance
with drawings and specifications.

Planter drain

A 50mm diameter 3 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 10 10.5/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 10 - GF EAST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

SPACE HEATING AND AIR CONDITIONING

38 Mechanical services

Ductwork

Galvanised steel sheet rectangular ductwork and fittings, including


insulation, supports, manufactured and fitted in accordance with
the relevant standards, complete as shown on drawings and
Specifications

A Supply/Return air ductwork 131 m2

Duct ancillaries

Flexible duct with damper, including insulation complete all in


accordance with the Specifications

B 200 mm Diameter 48 nr

Linear slot diffuser, complete all in accordance with the


Specifications

C 1000mm 4 slot supply air linear diffuser 24 nr

4 way square diffuser, complete all in accordance with the


Specifications

D 225x225mm 2 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 10 10.5/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 10 - GF EAST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

SPACE HEATING AND AIR CONDITIONING (CONT*D)

38 Mechanical services (CONT*D)

Variable air volume boxes; including all necessary insulation,


accessories and connections; complete all in accordance with the
Specifications

A Ref. VAV-GE-G-6/3-01 1 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 10 10.5/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 10 - GF EAST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION

39 Electrical services

Panel boards

Primary equipment

Distribution panel board complete with all necessary


accessories all in accordance with the Specification

A DB 1 nr

Small Power Installation

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

Socket outlets

B 13A Switch Socket Outlet 4 nr

Terminal equipment and fittings

Devices complete as described, all in accordance with the


Specification

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 10 10.5/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 10 - GF EAST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Small Power Installation (CONT*D)

Socket outlets

A 13A Switch Socket Outlet 4 nr

Lighting Installation

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

B Lighting points 52 nr

C Linear lighting points; for Lighting type C(1) 1 Item

Terminal equipment and fittings

Light fittings including fixings, lamps and connections complete in


accordance with the Specifications

D Lighting type A (2) 8 nr

E Lighting type B (1) 13 nr

F Lighting type C (1) 27 m

G Lighting type C (2) 9 m

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 10 10.5/6
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 10 - GF EAST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Lighting Installation (CONT*D)

Light fittings including fixings, lamps and connections complete in


accordance with the Specifications (CONT*D)

A Lighting type D (1) 18 nr

B Lighting type D (2) 9 nr

C Lighting type D (3) 4 nr

Lighting Control Installation

Lighting control system including but not limited to panels, wiring,


containment, as shown on drawings all in accordance with the
Specification

D Lighting control installation 1 Item

Emergency Lighting

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

E Emergency lighting points 4 nr

F Emergency exit sign points 1 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 10 10.5/7
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 10 - GF EAST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Emergency Lighting (CONT*D)

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification
(CONT*D)

Terminal equipment and fittings

Emergency light fittings including fixings, lamps and connections


complete in accordance with the Specifications

A Emergency Light; LED T5; self contained led emergency lights, 4 nr


non maintained,surface mounted type with 3 hrs. battery backup
(IP-65)

B Emergency Exit Sign; self contained led exit lights, maintained, 1 nr


single sided 3 hrs. battery backup (IP-20)

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 10 10.5/8
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 10 - GF EAST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION

38 Mechanical services

Sprinkler Installations

Pipework

Above ground galvanized steel pipes; including fittings, all


necessary fixings, accessories, supports and connections in
accordance with the Specifications

A 25mm Diameter pipes 12 m

B 32mm Diameter pipes 4 m

C 40mm Diameter pipes 7 m

D 50mm Diameter pipes 4 m

E 80mm Diameter pipes 30 m

Pipe ancillaries

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification

F Pendent type sprinkler heads 15 nr

G Upright type sprinkler heads 15 nr

H Side wall type sprinkler heads 3 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 10 10.5/9
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 10 - GF EAST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION (CONT*D)

Sprinkler Installations (CONT*D)

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification
(CONT*D)

Fire hose reel and department valve assembly; comprising of fire


department landing valve, rack with hose, nozzle, 25mm diameter
pressure reducing valve, swing hose reel, fire extinguishers,
pipework inside cabinet, all necessary accessories and
connections ; all in accordance with the Specification

A Fire hose reel cabinet 1 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 10 10.5/10
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 10 - GF EAST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS

39 Electrical services

Fire Detection & Voice Evacuation System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

A Intelligent optical Smoke Detector with standard base 4 nr

B Ceiling void Intelligent optical Smoke Detector with LED remote 4 nr


Indicator

C Manual Call Point 2 nr

D Flasher 1 nr

E PAVA/BGM Ceiling Speaker 2 nr

F BGM Volume Controller & Source selector 1 nr

Terminal equipment and fittings

Supply and installation of fire alarm devices, all in accordance with


the Specification

G Intelligent optical Smoke Detector with standard base 4 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 10 10.5/11
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 10 - GF EAST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Fire Detection & Voice Evacuation System (CONT*D)

Supply and installation of fire alarm devices, all in accordance with


the Specification (CONT*D)
A Ceiling void Intelligent optical Smoke Detector with LED remote 4 nr
Indicator

B Manual Call Point 2 nr

C Flasher 1 nr

D PAVA/BGM Ceiling Speaker 2 nr

E BGM Volume Controller & Source selector 1 nr

IT System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

F WIFI Ceiling 1 nr

Terminal equipment and fittings

Supply and installation of IT devices, all in accordance with the


Specification

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 10 10.5/12
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 10 - GF EAST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

IT System (CONT*D)

Supply and installation of IT devices, all in accordance with the


Specification
A WIFI Ceiling 1 nr

Security System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

B Dome Camera 1 nr

Terminal equipment and fittings

Supply and installation of CCTV devices, all in accordance with


the Specification

C Dome Camera 1 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 10 10.5/13
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 10 - GF EAST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

BUILDER'S WORK IN CONNECTION WITH SERVICES

41 Builder's work in connection with mechanical, electrical


and transportation installations

A Builder's work in connection with services 1 Item

B Allow for integrating the new MEP services to the existing services 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 10 10.5/14
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 10 - GF EAST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 10.5/1

Page : 10.5/2

Page : 10.5/3

Page : 10.5/4

Page : 10.5/5

Page : 10.5/6

Page : 10.5/7

Page : 10.5/8

Page : 10.5/9

Page : 10.5/10

Page : 10.5/11

Page : 10.5/12

Page : 10.5/13

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 10 10.6/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 10 - GF EAST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

EXTERNAL WORKS

35 Site works

Hardscape

Supply and install gravel including binding course asphalt,


compacted sub-base, joints, fixing, accessories, all necessary
associated works, complete in accordance with the Drawings and
Specifications.

A Gravel; 15-25mm dia, 50mm depth, Light beige/ grey color natural 24 m2
finish

Softscape

Supply and Install; shrubs succulents, perennials ground covers


and the like planted in prepared ground as detailed, including
compost and fertilizers, compaction, with all necessary associated
works, complete in accordance with the Drawings and
Specifications.

Shrubs

B Asparagus sprengeri 46 nr

C Allow for drainage to the planting area 1 Item

D Allow for irrigation to the planting area 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 10 10.6/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 10 - GF EAST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

EXTERNAL WORKS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 10.6/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 10 D/Add/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 10 - GF EAST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS
Any items that may not be covered elsewhere in the Bills of
Quantities which the tenderer deemed to be necessary in order to
carry out the works in full compliance with the Drawings,
Specifications and any other items necessary to form a complete
Installations, must be itemised and priced below. The tenderer
may provide additional sheets for this purpose if necessary. All
items under this section must be summarised under a separate
cover.

A Item

B Item

C Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 10 D/Add/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 10 - GF EAST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : D/Add/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 10 D/Add/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 10 - GF EAST CIRCULATION 03

Item Description Quantity Unit Rate AED Amount AED

BILL 10 - GF East Circulation 03

BILL SUMMARY

Total Brought Forward from Page No.

Facilitating works 10.1/2

Superstructure 10.2/3

Internal Finishes 10.3/5

Fittings and Furnishing 10.4/2

Services 10.5/14

External works 10.6/2

ADDITIONAL ITEMS D/Add/2

Carried To General Summary Page AED 0


Issued on: 15/11/2022
The Armed Forces Officers Club and Hotel

Erth Guest Experience

Fit-out Works

BILL 11

GF RECREATION LOBBY

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 11 11.1/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 11 - GF RECREATION LOBBY

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS

DEMOLITION WORKS

3 Demolitions

Demolish and off site disposal of existing ceilings and MEP


services as per drawings and specification

A Demolition of existing ceiling finishes 685 m2

B Demolition of existing MEP services 685 m2

C Allowance for removing / transplanting of existing plant material 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 11 11.1/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 11 - GF RECREATION LOBBY

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 11.1/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 11 11.2/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 11 - GF RECREATION LOBBY

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE

INTERNAL DOORS

24 Doors, shutters and hatches

Doors (size, type and material to be confirmed); including


ironmongery and all necessary fixing accessories; all in
accordance with the Drawings and Specifications

A Single leaf door including ironmongery 4 nr

B Double leaf door including ironmongery 2 nr

C Single leaf glazed door including ironmongery; to stair 1 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 11 11.2/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 11 - GF RECREATION LOBBY

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 11.2/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 11 11.3/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 11 - GF RECREATION LOBBY

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES

WALL FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to walls and columns

Texture paint; including all accessories and works required; all in


accordance with the Specifications

A Type W203 407 m2

B Type W206 29 m2

Mirror wall cladding; including all accessories and works required;


all in accordance with the Specifications

C Type W501 52 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 11 11.3/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 11 - GF RECREATION LOBBY

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

FLOOR FINISHES

28 Floor, wall, ceiling and roof finishings

Screeds

Backgrounds; self levelling compound; to receive floor finishes; all


in accordance with the Specifications

A To floors 586 m2

Finish to floors

Porcelain Floor tile; Matt finish, colour: sand, size:


1200mmx2400mm, laid on self levelling compound (measured
separately) including preparation and all works required; all in
accordance with the Specifications

B Type F-300B 586 m2

Brushed brass metal skirting; including preparation and all works


required; all in accordance with the Specifications

C Brushed brass metal 153 m

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 11 11.3/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 11 - GF RECREATION LOBBY

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

CEILING FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to ceilings

Ceiling paint; including all accessories and works required; all in


accordance with the Specifications

A Type C-202 477 m2

Textured paint; including all accessories and works required; all in


accordance with the Specifications

B Type C-800 10 m2

Suspended Ceilings

Suspended Gypsum Board; including; fastenings and all


accessories and works required; all in accordance with the
Specifications

C For Type C202 487 m2

Ceiling bulkhead; including; fastenings and all accessories and


works required; all in accordance with the Specifications

D For Type C202 14 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 11 11.3/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 11 - GF RECREATION LOBBY

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

CEILING FINISHES (CONT*D)

28 Floor, wall, ceiling and roof finishings (CONT*D)


Acoustic insulation; including fastenings and all accessories and
works required; all in accordance with the Specifications

A For Type C202 487 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 11 11.3/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 11 - GF RECREATION LOBBY

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 11.3/1

Page : 11.3/2

Page : 11.3/3

Page : 11.3/4

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 11 11.4/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 11 - GF RECREATION LOBBY

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING

32 Furniture, fittings and equipment

Signage

Identity Signs, as per Specifications

A Type ID01 3 nr

B Type ID03 1 nr

Directional Signs, as per Specifications

C Type DS01 1 nr

Fire and Life Safety Signs, as per Specifications

D Allow for fire and life safety signs 1 Item

Furnitures

E Chair; Ref. CH01_RL 14 nr

F Armchair; Ref. S05_RL 4 nr

G Armchair; Ref. S26_RL 6 nr

H High table; Ref. T06_RL 2 nr

J High table; Ref. T07_RL 2 nr

K Dining table; Ref. T10_RL 5 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 11 11.4/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 11 - GF RECREATION LOBBY

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING (CONT*D)

Artwork

A Allow for provision of artwork 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 11 11.4/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 11 - GF RECREATION LOBBY

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 11.4/1

Page : 11.4/2

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 11 11.5/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 11 - GF RECREATION LOBBY

Item Description Quantity Unit Rate AED Amount AED

SERVICES

DISPOSAL INSTALLATION

38 Mechanical services

Pipework

Supply and installation of drainage pipes including insulation,


fittings, supports, hangers and all required accessories in
accordance with drawings and specifications.

A 50mm diameter 37 m

Pipe ancillaries

Supply and installation of the following with fittings, fixings,


supports and all required accessories complete; in accordance
with drawings and specifications.

Clean out

B 50mm diameter 4 nr

Planter drain

C 50mm diameter 1 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 11 11.5/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 11 - GF RECREATION LOBBY

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

SPACE HEATING AND AIR CONDITIONING

38 Mechanical services

Ductwork

Galvanised steel sheet rectangular ductwork and fittings, including


insulation, supports, manufactured and fitted in accordance with
the relevant standards, complete as shown on drawings and
Specifications

A Supply/Return air ductwork 289 m2

Duct ancillaries

Flexible duct with damper, including insulation complete all in


accordance with the Specifications

B 200 mm Diameter 82 nr

Linear slot diffuser, complete all in accordance with the


Specifications

C 1000mm 4 slot supply air linear diffuser 41 nr

Variable air volume boxes; including all necessary insulation,


accessories and connections; complete all in accordance with the
Specifications

D Ref. VAV-GE-G-5/1-S01 & VAV-GE-G-2/3-02 2 nr

E Ref. VAV-GE-G-2/3-02 & VAV-GE-G-5/1-S02 2 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 11 11.5/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 11 - GF RECREATION LOBBY

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION

39 Electrical services

Panel boards

Primary equipment

Distribution panel board complete with all necessary


accessories all in accordance with the Specification

A DB 1 nr

Small Power Installation

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

Socket outlets

B 13A Switch Socket Outlet 8 nr

C 13A Switch Socket Outlet Twin 4 nr

D Floor Box 3 nr

Terminal equipment and fittings

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 11 11.5/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 11 - GF RECREATION LOBBY

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Small Power Installation (CONT*D)

Devices complete as described, all in accordance with the


Specification

Socket outlets

A 13A Switch Socket Outlet 8 nr

B 13A Switch Socket Outlet Twin 4 nr

C Floor Box 3 nr

Lighting Installation

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

D Lighting points 88 nr

E Linear lighting points; for Lighting type C (1) 1 Item

Terminal equipment and fittings

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 11 11.5/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 11 - GF RECREATION LOBBY

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Lighting Installation (CONT*D)

Light fittings including fixings, lamps and connections complete in


accordance with the Specifications

A Lighting type A (1) 18 nr

B Lighting type A (2) 20 nr

C Lighting type B (1) 6 nr

D Lighting type C (1) 119 m

E Lighting type C (2) 19 m

F Lighting type D (2) 15 nr

G Lighting type D (3) 7 nr

H Lighting type F (1) 5 nr

J Lighting type F (2) 8 nr

K Lighting type G (1) 3 nr

L Lighting type H (1) 6 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 11 11.5/6
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 11 - GF RECREATION LOBBY

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Lighting Control Installation


Lighting control system including but not limited to panels, wiring,
containment, as shown on drawings all in accordance with the
Specification

A Lighting control installation 1 Item

Emergency Lighting

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

B Emergency lighting points 10 nr

Terminal equipment and fittings

Emergency light fittings including fixings, lamps and connections


complete in accordance with the Specifications

C Emergency Light; LED T5; self contained led emergency lights, 10 nr


non maintained,surface mounted type with 3 hrs. battery backup
(IP-65)

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 11 11.5/7
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 11 - GF RECREATION LOBBY

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION

38 Mechanical services

Sprinkler Installations

Pipework

Above ground galvanized steel pipes; including fittings, all


necessary fixings, accessories, supports and connections in
accordance with the Specifications

A 25mm Diameter pipes 73 m

B 32mm Diameter pipes 23 m

C 40mm Diameter pipes 76 m

D 50mm Diameter pipes 49 m

E 100mm Diameter pipes 64 m

Pipe ancillaries

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification

F Pendent type sprinkler heads 45 nr

G Upright type sprinkler heads 45 nr

H Side wall type sprinkler heads 5 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 11 11.5/8
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 11 - GF RECREATION LOBBY

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION (CONT*D)

Sprinkler Installations (CONT*D)

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification
(CONT*D)

Fire hose reel and department valve assembly; comprising of fire


department landing valve, rack with hose, nozzle, 25mm diameter
pressure reducing valve, swing hose reel, fire extinguishers,
pipework inside cabinet, all necessary accessories and
connections ; all in accordance with the Specification

A Fire hose reel cabinet 1 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 11 11.5/9
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 11 - GF RECREATION LOBBY

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS

39 Electrical services

Fire Detection & Voice Evacuation System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

A Intelligent optical Smoke Detector with standard base 10 nr

B Ceiling void Intelligent optical Smoke Detector with LED remote 10 nr


Indicator

C Manual Call Point 2 nr

D Flasher 3 nr

E PAVA/BGM Ceiling Speaker 6 nr

F BGM Volume Controller & Source selector 1 nr

Terminal equipment and fittings

Supply and installation of fire alarm devices, all in accordance with


the Specification

G Intelligent optical Smoke Detector with standard base 10 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 11 11.5/10
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 11 - GF RECREATION LOBBY

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Fire Detection & Voice Evacuation System (CONT*D)

Supply and installation of fire alarm devices, all in accordance with


the Specification (CONT*D)
A Ceiling void Intelligent optical Smoke Detector with LED remote 10 nr
Indicator

B Manual Call Point 2 nr

C Flasher 3 nr

D PAVA/BGM Ceiling Speaker 6 nr

E BGM Volume Controller & Source selector 1 nr

IT System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

F Dual Data Outlet 3 nr

G WIFI Ceiling 1 nr

Terminal equipment and fittings

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 11 11.5/11
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 11 - GF RECREATION LOBBY

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

IT System (CONT*D)

Supply and installation of IT devices, all in accordance with the


Specification

A Dual Data Outlet 3 nr

B 65" TV 1 nr

C WIFI Ceiling 1 nr

Security System

CCTV

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

D Dome Camera 7 nr

Terminal equipment and fittings

Supply and installation of CCTV devices, all in accordance with


the Specification

E Dome Camera 7 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 11 11.5/12
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 11 - GF RECREATION LOBBY

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Security System (CONT*D)

Access Control

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

A Door with card reader, Electric lock, BGU and exit Push button 2 nr

Terminal equipment and fittings

Supply and installation of Access control devices, all in


accordance with the Specification

B Door with card reader, Electric lock, BGU and exit Push button 2 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 11 11.5/13
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 11 - GF RECREATION LOBBY

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

BUILDER'S WORK IN CONNECTION WITH SERVICES

41 Builder's work in connection with mechanical, electrical


and transportation installations

A Builder's work in connection with services 1 Item

B Allow for integrating the new MEP services to the existing services 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 11 11.5/14
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 11 - GF RECREATION LOBBY

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 11.5/1

Page : 11.5/2

Page : 11.5/3

Page : 11.5/4

Page : 11.5/5

Page : 11.5/6

Page : 11.5/7

Page : 11.5/8

Page : 11.5/9

Page : 11.5/10

Page : 11.5/11

Page : 11.5/12

Page : 11.5/13

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 11 11.6/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 11 - GF RECREATION LOBBY

Item Description Quantity Unit Rate AED Amount AED

EXTERNAL WORKS

35 Site works

Hardscape

Supply and install gravel including binding course asphalt,


compacted sub-base, joints, fixing, accessories, all necessary
associated works, complete in accordance with the Drawings and
Specifications.

A Gravel; 15-25mm dia, 50mm depth, Light beige/ grey color natural 16 m2
finish

Boulders to planting area

B Riyadh Limestone - Natural boulder; size: 450mm x 300mm x 2 nr


300mm, Medium brown color, natural finish; BOU-1

C Riyadh Limestone - Natural boulder; size: 600mm x 300mm x 2 nr


450mm, Medium brown color, natural finish; BOU-2

Softscape

Supply and Install; shrubs succulents, perennials ground covers


and the like planted in prepared ground as detailed, including
compost and fertilizers, compaction, with all necessary associated
works, complete in accordance with the Drawings and
Specifications.

Shrubs

D Asparagus sprengeri 26 nr

E Allow for drainage to the planting area 1 Item

F Allow for irrigation to the planting area 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 11 11.6/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 11 - GF RECREATION LOBBY

Item Description Quantity Unit Rate AED Amount AED

EXTERNAL WORKS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 11.6/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 11 D/Add/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 11 - GF RECREATION LOBBY

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS
Any items that may not be covered elsewhere in the Bills of
Quantities which the tenderer deemed to be necessary in order to
carry out the works in full compliance with the Drawings,
Specifications and any other items necessary to form a complete
Installations, must be itemised and priced below. The tenderer
may provide additional sheets for this purpose if necessary. All
items under this section must be summarised under a separate
cover.

A Item

B Item

C Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 11 D/Add/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 11 - GF RECREATION LOBBY

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : D/Add/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 11 D/Add/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 11 - GF RECREATION LOBBY

Item Description Quantity Unit Rate AED Amount AED

BILL 11 - GF Recreation Lobby

BILL SUMMARY

Total Brought Forward from Page No.

Facilitating works 11.1/2

Superstructure 11.2/2

Internal Finishes 11.3/5

Fittings and Furnishing 11.4/3

Services 11.5/14

External works 11.6/2

ADDITIONAL ITEMS D/Add/2

Carried To General Summary Page AED 0


Issued on: 15/11/2022
The Armed Forces Officers Club and Hotel

Erth Guest Experience

Fit-out Works

BILL 12

GF RECREATION RECEPTION

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 12 12.1/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 12 - GF RECREATION RECEPTION

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS

DEMOLITION WORKS

3 Demolitions

Demolish and off site disposal of existing ceilings and MEP


services as per drawings and specification

A Demolition of existing ceiling finishes 20 m2

B Demolition of existing MEP services 20 m2

C Allowance for removing / transplanting of existing plant material 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 12 12.1/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 12 - GF RECREATION RECEPTION

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 12.1/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 12 12.2/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 12 - GF RECREATION RECEPTION

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING

32 Furniture, fittings and equipment

Signage

Fire and Life Safety Signs, as per Specifications

A Allow for fire and life safety signs 1 Item

B Allow for reception counter 1 Item

Artwork

C Allow for provision of artwork 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 12 12.2/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 12 - GF RECREATION RECEPTION

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 12.2/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 12 12.3/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 12 - GF RECREATION RECEPTION

Item Description Quantity Unit Rate AED Amount AED

SERVICES

ELECTRICAL INSTALLATION

39 Electrical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Small Power Installation

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

Socket outlets

A Switch Socket Outlets 1 Item

B Floor Box 1 Item

Terminal equipment and fittings

Devices complete as described, all in accordance with the


Specification

Socket outlets

C Switch Socket Outlets 1 Item

D Floor Box 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 12 12.3/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 12 - GF RECREATION RECEPTION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Lighting Installation

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

A Lighting points 1 Item

Terminal equipment and fittings

Light fittings including fixings, lamps and connections complete in


accordance with the Specifications

B Lighting type TBC 1 Item

Lighting Control Installation

Lighting control system including but not limited to panels, wiring,


containment, as shown on drawings all in accordance with the
Specification

C Lighting control installation 1 Item

Emergency Lighting

Final circuits

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 12 12.3/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 12 - GF RECREATION RECEPTION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Emergency Lighting

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

A Emergency lighting points 1 Item

B Emergency exit sign points 1 Item

Terminal equipment and fittings

Emergency light fittings including fixings, lamps and connections


complete in accordance with the Specifications

C Emergency Light 1 Item

D Emergency Exit Sign 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 12 12.3/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 12 - GF RECREATION RECEPTION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS

39 Electrical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Fire Detection & Voice Evacuation System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

A Intelligent optical Smoke Detector with standard base 1 Item

B Ceiling void Intelligent optical Smoke Detector with LED remote 1 Item
Indicator

C Manual Call Point 1 Item

D Flasher 1 Item

E Response Indicator 1 Item

F PAVA/BGM Ceiling Speaker 1 Item

Terminal equipment and fittings

Supply and installation of fire alarm devices, all in accordance with


the Specification

G Intelligent optical Smoke Detector with standard base 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 12 12.3/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 12 - GF RECREATION RECEPTION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Fire Detection & Voice Evacuation System (CONT*D)

Supply and installation of fire alarm devices, all in accordance with


the Specification (CONT*D)

A Ceiling void Intelligent optical Smoke Detector with LED remote 1 Item
Indicator

B Manual Call Point 1 Item

C Flasher 1 Item

D Response Indicator 1 Item

E PAVA/BGM Ceiling Speaker 1 Item

IT System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

F WIFI Ceiling 1 Item

Terminal equipment and fittings

Supply and installation of IT devices, all in accordance with the


Specification

G WIFI Ceiling 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 12 12.3/6
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 12 - GF RECREATION RECEPTION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Security System

CCTV

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

A Dome Camera 1 Item

Terminal equipment and fittings

Supply and installation of CCTV devices, all in accordance with


the Specification

B Dome Camera 1 Item

Access Control

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

C Door with card reader, Electric lock, BGU and exit Push button 1 Item

Terminal equipment and fittings

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 12 12.3/7
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 12 - GF RECREATION RECEPTION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Security System (CONT*D)

Supply and installation of Access control devices, all in


accordance with the Specification

A Door with card reader, Electric lock, BGU and exit Push button 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 12 12.3/8
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 12 - GF RECREATION RECEPTION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

BUILDER'S WORK IN CONNECTION WITH SERVICES

41 Builder's work in connection with mechanical, electrical


and transportation installations

A Builder's work in connection with services 1 Item

B Allow for integrating the new MEP services to the existing services 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 12 12.3/9
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 12 - GF RECREATION RECEPTION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 12.3/1

Page : 12.3/2

Page : 12.3/3

Page : 12.3/4

Page : 12.3/5

Page : 12.3/6

Page : 12.3/7

Page : 12.3/8

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 12 D/Add/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 12 - GF RECREATION RECEPTION

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS
Any items that may not be covered elsewhere in the Bills of
Quantities which the tenderer deemed to be necessary in order to
carry out the works in full compliance with the Drawings,
Specifications and any other items necessary to form a complete
Installations, must be itemised and priced below. The tenderer
may provide additional sheets for this purpose if necessary. All
items under this section must be summarised under a separate
cover.

A Item

B Item

C Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 12 D/Add/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 12 - GF RECREATION RECEPTION

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : D/Add/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 12 D/Add/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 12 - GF RECREATION RECEPTION

Item Description Quantity Unit Rate AED Amount AED

BILL 12 - GF Recreation Reception

BILL SUMMARY

Total Brought Forward from Page No.

Facilitating works 12.1/2

Fittings and Furnishing 12.2/2

Services 12.3/9

ADDITIONAL ITEMS D/Add/2

Carried To General Summary Page AED 0


Issued on: 15/11/2022
The Armed Forces Officers Club and Hotel

Erth Guest Experience

Fit-out Works

BILL 13

GF AL ROUDHA OASIS

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 13 13.1/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 13 - GF AL ROUDHA OASIS

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS

DEMOLITION WORKS

3 Demolitions

Demolish and off site disposal of existing ceilings and MEP


services as per drawings and specification

A Demolition of existing ceiling finishes 45 m2

B Demolition of existing MEP services 45 m2

C Allowance for removing / transplanting of existing plant material 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 13 13.1/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 13 - GF AL ROUDHA OASIS

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 13.1/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 13 13.2/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 13 - GF AL ROUDHA OASIS

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE

INTERNAL WALLS AND PARTITIONS

20 Proprietary linings and partitions

Closing of existing niche using proprietary wall partition; all in


accordance with the Drawings and Specifications

A Allow for closing the existing niche 1 Item

Curtain wall mullion painting; all in accordance with the Drawings


and Specifications

B Allow for painting of mullion 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 13 13.2/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 13 - GF AL ROUDHA OASIS

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

INTERNAL DOORS

24 Doors, shutters and hatches

Doors (size, type and material to be confirmed); including


ironmongery and all necessary fixing accessories; all in
accordance with the Drawings and Specifications

A Single leaf door including ironmongery 1 nr

B Double leaf door including ironmongery 3 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 13 13.2/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 13 - GF AL ROUDHA OASIS

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 13.2/1

Page : 13.2/2

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 13 13.3/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 13 - GF AL ROUDHA OASIS

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES

WALL FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to walls and columns

Texture paint; including all accessories and works required; all in


accordance with the Specifications

A Type W203; edges to landscape area 136 m

B Type W206 12 m2

Powder coated paint; including all accessories and works


required; all in accordance with the Specifications

C Type W210 32 m2

D Type W212 32 m2

E Type W213 32 m2

Cementitious finish; including all accessories and works required;


all in accordance with the Specifications

F Type W302 564 m2

G Type W302; edges to landscape area 20 m

H Type W303 82 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 13 13.3/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 13 - GF AL ROUDHA OASIS

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

WALL FINISHES (CONT*D)

28 Floor, wall, ceiling and roof finishings (CONT*D)

Cementitious finish; including all accessories and works required;


all in accordance with the Specifications (CONT*D)

A Type W304 82 m2

B Type W305 114 m2

C Type W305; edges to landscape area 8 m

D Type W306 82 m2

E Type W306; edges to landscape area 5 m

F Type W308; edges to landscape area 15 m

G Type W309; edges to landscape area 8 m

H Type W311; edges to landscape area 11 m

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 13 13.3/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 13 - GF AL ROUDHA OASIS

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

FLOOR FINISHES

28 Floor, wall, ceiling and roof finishings

Screeds

Backgrounds; self levelling compound; to receive floor finishes; all


in accordance with the Specifications

A To floors 1,024 m2

Finish to floors

Cementitious finish to water features; Moisture resistant


Decorative paint, Matt finish, laid on self levelling compound
(measured separately) including preparation and all works
required; all in accordance with the Specifications

B Type F-312 207 m2

Concrete brick effect flooring; laid on self levelling compound


(measured separately) including preparation and all works
required; all in accordance with the Specifications

C Type F-308 27 m2

Concrete ribbed effect flooring; laid on self levelling compound


(measured separately) including preparation and all works
required; all in accordance with the Specifications

D Type F-311 25 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 13 13.3/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 13 - GF AL ROUDHA OASIS

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

FLOOR FINISHES (CONT*D)

28 Floor, wall, ceiling and roof finishings (CONT*D)


Concrete horizontal effect flooring; laid on self levelling compound
(measured separately) including preparation and all works
required; all in accordance with the Specifications

A Type F-309 21 m2

Porcelain Floor tile; Matt finish, colour: sand, size:


1200mmx2400mm, laid on self levelling compound (measured
separately) including preparation and all works required; all in
accordance with the Specifications

B Type F-300B 510 m2

Cementitious finish; laid on self levelling compound (measured


separately) including preparation and all works required; all in
accordance with the Specifications

C Type F-302 22 m2

D Type F-303 28 m2

E Type F-304 31 m2

F Type F-306 46 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 13 13.3/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 13 - GF AL ROUDHA OASIS

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

FLOOR FINISHES (CONT*D)

28 Floor, wall, ceiling and roof finishings (CONT*D)

Woven Vinyl Carpet; laid on self levelling compound (measured


separately) including preparation and all works required; all in
accordance with the Specifications
A Type F-101B 107 m2

Metal strips; all accessories and works required; all in accordance


with the Specifications

B Type J-900 96 m

Brushed brass metal skirting; including preparation and all works


required; all in accordance with the Specifications

C Brushed brass metal 153 m

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 13 13.3/6
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 13 - GF AL ROUDHA OASIS

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

CEILING FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to ceilings

Ceiling paint; including all accessories and works required; all in


accordance with the Specifications

A Type C-202 45 m2

Suspended Ceilings

Suspended Gypsum Board; including; fastenings and all


accessories and works required; all in accordance with the
Specifications

B For Type C202 45 m2

Acoustic insulation; including fastenings and all accessories and


works required; all in accordance with the Specifications

C For Type C202 45 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 13 13.3/7
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 13 - GF AL ROUDHA OASIS

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 13.3/1

Page : 13.3/2

Page : 13.3/3

Page : 13.3/4

Page : 13.3/5

Page : 13.3/6

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 13 13.4/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 13 - GF AL ROUDHA OASIS

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING

32 Furniture, fittings and equipment

Signage

Identity Signs, as per Specifications

A Type ID01 2 nr

Directional Signs, as per Specifications

B Type DS02 2 nr

Fire and Life Safety Signs, as per Specifications

C Allow for fire and life safety signs 1 Item

Furnitures

D Ref. A12A 1 nr

E Ref. A12B 1 nr

F Ref. A12C 1 nr

G Pots; Ref. A13 3 nr

H Ref. A14 1 nr

J Chair; Ref. CH02 4 nr

K Chair; Ref. CH03 6 nr

L Chair; Ref. CH04 13 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 13 13.4/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 13 - GF AL ROUDHA OASIS

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING (CONT*D)

Furnitures (CONT*D)

A Chair; Ref. CH05 8 nr

B Chair; Ref. CH06 9 nr

C Floor lamp; Ref. LT01A 1 nr

D Table lamp; Ref. LT01B 4 nr

E Floor lamp; Ref. LT01C 1 nr

F Pouf; Ref. S02 1 nr

G Pouf; Ref. S13 3 nr

H Bench seating; Ref. S19 2 nr

J Bench seating; Ref. S19A 2 nr

K Bench seating; Ref. S20 2 nr

L Sofa; Ref. S21 1 nr

M Armchair; Ref. S22 9 nr

N Armchair; Ref. S23 2 nr

P Armchair; Ref. S24 2 nr

Q Pouf; Ref. S25 1 nr

R Chair; Ref. T01 2 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 13 13.4/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 13 - GF AL ROUDHA OASIS

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING (CONT*D)

Furnitures (CONT*D)

A Coffee table; Ref. T03 2 nr

B Side table; Ref. T04 1 nr

C High table; Ref. T05 4 nr

D High table; Ref. T06 1 nr

E High table; Ref. T07 1 nr

F Dining table; Ref. T10 0 nr

G Table; Ref. T11 20 nr

H Round dining table; Ref. T13 3 nr

J Display table; Ref. T14-A 1 nr

K Display table; Ref. T14-B 1 nr

L Display table; Ref. T14-C 1 nr

M Movable coffee cart; Ref. T15 1 nr

Artwork

N Allow for provision of artwork 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 13 13.4/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 13 - GF AL ROUDHA OASIS

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 13.4/1

Page : 13.4/2

Page : 13.4/3

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 13 13.5/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 13 - GF AL ROUDHA OASIS

Item Description Quantity Unit Rate AED Amount AED

SERVICES

DISPOSAL INSTALLATION

38 Mechanical services

Pipework

Supply and installation of drainage pipes including insulation,


fittings, supports, hangers and all required accessories in
accordance with drawings and specifications.

Drain Pipe (UPVC)

A 50mm diameter 13 m

B 75mm diameter 49 m

C 100mm diameter 37 m

Pipe ancillaries

Supply and installation of the following with fittings, fixings,


supports and all required accessories complete; in accordance
with drawings and specifications.

End cap

D 50mm diameter 2 nr

E 100mm diameter 2 nr

Floor Drain

F 50mm diameter 12 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 13 13.5/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 13 - GF AL ROUDHA OASIS

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

WATER INSTALLATIONS

38 Mechanical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Pipework

Supply and installation of water supply pipes including insulation,


fittings, supports, hangers and all required accessories in
accordance with drawings and specifications.

Water Supply Pipe (PEX)

A 15mm diameter 1 Item

B 22mm diameter 1 Item

Pipe ancillaries

Supply and installation of the following with fittings, fixings,


supports and all required accessories complete; in accordance
with drawings and specifications.

Isolation Valves

C 15mm diameter 1 Item

D 22mm diameter 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 13 13.5/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 13 - GF AL ROUDHA OASIS

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

SPACE HEATING AND AIR CONDITIONING

38 Mechanical services

Ductwork

Galvanised steel sheet rectangular ductwork and fittings, including


insulation, supports, manufactured and fitted in accordance with
the relevant standards, complete as shown on drawings and
Specifications

A Supply/Return air ductwork 39 m2

Duct ancillaries

Flexible duct with damper, including insulation complete all in


accordance with the Specifications

B 200 mm Diameter 24 nr

Linear slot diffuser, complete all in accordance with the


Specifications

C 1000mm 4 slot supply air linear diffuser 12 nr

Variable air volume boxes; including all necessary insulation,


accessories and connections; complete all in accordance with the
Specifications

D Ref. VAV-GE-G-6/3-02 1 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 13 13.5/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 13 - GF AL ROUDHA OASIS

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

SPACE HEATING AND AIR CONDITIONING (CONT*D)

38 Mechanical services (CONT*D)

Supply air outlet; including all necessary insulation, accessories


and connections; complete all in accordance with the
Specifications

A Supply Air Outlets 3 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 13 13.5/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 13 - GF AL ROUDHA OASIS

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION

39 Electrical services

Panel boards

Primary equipment

Distribution panel board complete with all necessary


accessories all in accordance with the Specification

A DB 1 nr

Lighting Installation

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

B Lighting points 295 nr

C Linear lighting points; for Lighting type C(7) 1 Item

Terminal equipment and fittings

Light fittings including fixings, lamps and connections complete in


accordance with the Specifications

D Lighting type B (1) 11 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 13 13.5/6
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 13 - GF AL ROUDHA OASIS

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Lighting Installation (CONT*D)

Light fittings including fixings, lamps and connections complete in


accordance with the Specifications (CONT*D)

A Lighting type B (3) 3 nr

B Lighting type B (4) 26 nr

C Lighting type C (6) 63 nr

D Lighting type C (7) 34 m

E Lighting type F (5) 11 nr

F Lighting type L (1) 24 nr

G Lighting type L (2) 10 nr

H Lighting type M (1) 19 nr

J Lighting type N (1) 126 nr

K Lighting type P (1) 2 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 13 13.5/7
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 13 - GF AL ROUDHA OASIS

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Lighting Control Installation

Lighting control system including but not limited to panels, wiring,


containment, as shown on drawings all in accordance with the
Specification

A Lighting control installation 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 13 13.5/8
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 13 - GF AL ROUDHA OASIS

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION

38 Mechanical services

Sprinkler Installations

Pipework

Above ground galvanized steel pipes; including fittings, all


necessary fixings, accessories, supports and connections in
accordance with the Specifications

A 25mm Diameter pipes 7 m

B 65mm Diameter pipes 10 m

Pipe ancillaries

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification

C Pendent type sprinkler heads 5 nr

D Upright type sprinkler heads 5 nr

E Side wall type sprinkler heads 3 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 13 13.5/9
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 13 - GF AL ROUDHA OASIS

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)
COMMUNICATION, SECURITY AND CONTROL SYSTEMS

39 Electrical services

Fire Detection & Voice Evacuation System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

A Intelligent optical Smoke Detector with standard base 2 nr

B Ceiling void Intelligent optical Smoke Detector with LED remote 2 nr


Indicator

C PAVA/BGM Ceiling Speaker 11 nr

Terminal equipment and fittings

Supply and installation of fire alarm devices, all in accordance with


the Specification

D Intelligent optical Smoke Detector with standard base 2 nr

E Ceiling void Intelligent optical Smoke Detector with LED remote 2 nr


Indicator

F PAVA/BGM Ceiling Speaker 11 nr

IT System

Final circuits

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 13 13.5/10
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 13 - GF AL ROUDHA OASIS

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

IT System

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

A WIFI Wall 4 nr

B WIFI Ceiling 1 nr

Terminal equipment and fittings

Supply and installation of IT devices, all in accordance with the


Specification

C WIFI Wall 4 nr

D WIFI Ceiling 1 nr

Security System

CCTV

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

E Dome Camera 8 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 13 13.5/11
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 13 - GF AL ROUDHA OASIS

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Security System (CONT*D)

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification
(CONT*D)

A Box Camera 2 nr

Terminal equipment and fittings

Supply and installation of CCTV devices, all in accordance with


the Specification

B Dome Camera 8 nr

C Box Camera 2 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 13 13.5/12
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 13 - GF AL ROUDHA OASIS

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

BUILDER'S WORK IN CONNECTION WITH SERVICES

41 Builder's work in connection with mechanical, electrical


and transportation installations

A Builder's work in connection with services 1 Item

B Allow for integrating the new MEP services to the existing services 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 13 13.5/13
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 13 - GF AL ROUDHA OASIS

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 13.5/1

Page : 13.5/2

Page : 13.5/3

Page : 13.5/4

Page : 13.5/5

Page : 13.5/6

Page : 13.5/7

Page : 13.5/8

Page : 13.5/9

Page : 13.5/10

Page : 13.5/11

Page : 13.5/12

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 13 13.6/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 13 - GF AL ROUDHA OASIS

Item Description Quantity Unit Rate AED Amount AED

EXTERNAL WORKS

35 Site works

Hardscape

Supply and install gravel including binding course asphalt,


compacted sub-base, joints, fixing, accessories, all necessary
associated works, complete in accordance with the Drawings and
Specifications.

A Gravel; 15-25mm dia, 50mm depth, Light beige/ grey color natural 497 m2
finish

Boulders to planting area

B Riyadh Limestone - Natural boulder; size: 450mm x 300mm x 81 nr


300mm, Medium brown color, natural finish; BOU-1

C Riyadh Limestone - Natural boulder; size: 600mm x 300mm x 45 nr


450mm, Medium brown color, natural finish; BOU-2

D Sculptures 4 nr

E Water bodies 49 m2

Softscape

Supply and Install; shrubs succulents, perennials ground covers


and the like planted in prepared ground as detailed, including
compost and fertilizers, compaction, with all necessary associated
works, complete in accordance with the Drawings and
Specifications.

Shrubs

F Lawsonia-inermis 201 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 13 13.6/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 13 - GF AL ROUDHA OASIS

Item Description Quantity Unit Rate AED Amount AED

EXTERNAL WORKS (CONT*D)

Shrubs (CONT*D)

A Aerva javanica 48 nr

B Leptadenia pyrotechnica 172 nr

Grass

C Pennisetum setaceum 285 nr

Ground cover

D Zygophyllum coccineum 128 nr

Trees

E Salvadora persica 10 nr

F Allow for irrigation to the planting area 1 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 13 13.6/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 13 - GF AL ROUDHA OASIS

Item Description Quantity Unit Rate AED Amount AED

EXTERNAL WORKS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 13.6/1

Page : 13.6/2

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 13 D/Add/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 13 - GF AL ROUDHA OASIS

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS
Any items that may not be covered elsewhere in the Bills of
Quantities which the tenderer deemed to be necessary in order to
carry out the works in full compliance with the Drawings,
Specifications and any other items necessary to form a complete
Installations, must be itemised and priced below. The tenderer
may provide additional sheets for this purpose if necessary. All
items under this section must be summarised under a separate
cover.

A Item

B Item

C Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 13 D/Add/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 13 - GF AL ROUDHA OASIS

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : D/Add/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 13 D/Add/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 13 - GF AL ROUDHA OASIS

Item Description Quantity Unit Rate AED Amount AED

BILL 13 - GF Al Roudha Oasis

BILL SUMMARY

Total Brought Forward from Page No.

Facilitating works 13.1/2

Superstructure 13.2/3

Internal Finishes 13.3/7

Fittings and Furnishing 13.4/4

Services 13.5/13

External works 13.6/3

ADDITIONAL ITEMS D/Add/2

Carried To General Summary Page AED


Issued on: 15/11/2022
The Armed Forces Officers Club and Hotel

Erth Guest Experience

Fit-out Works

BILL 14

GF PUBLIC BATHROOM

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 14 14.1/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 14 - GF PUBLIC BATHROOM

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS

DEMOLITION WORKS

3 Demolitions

Demolish and off site disposal of existing walls, floor finishes, wall
finishes, ceilings and MEP services as per drawings and
specification

A Demolition of existing floor finishes 53 m2

B Demolition of existing internal walls including finishes 135 m2

C Demolition of existing wall finishes 97 m2

D Demolition of existing ceiling finishes 53 m2

E Demolition of existing doors 5 nr

F Demolition of existing MEP services 53 m2

G Demolition of existing concrete ground floor slab for new drainage 67 m2


pipe network

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 14 14.1/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 14 - GF PUBLIC BATHROOM

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 14.1/1

Carried To Bill Summary Page AED


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 14 14.2/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 14 - GF PUBLIC BATHROOM

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE

INTERNAL WALLS AND PARTITIONS

20 Proprietary linings and partitions

Block work; including reinforcement and all necessary fixing


accessories; all in accordance with the Drawings and
Specifications

A Toilet partition; assume block walls; 200mm thick 158 m2

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 14 14.2/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 14 - GF PUBLIC BATHROOM

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

INTERNAL DOORS

24 Doors, shutters and hatches

Doors (size, type and material to be confirmed); including


ironmongery and all necessary fixing accessories; all in
accordance with the Drawings and Specifications

A Single leaf door including ironmongery 14 nr

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 14 14.2/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 14 - GF PUBLIC BATHROOM

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 14.2/1

Page : 14.2/2

Carried To Bill Summary Page AED


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 14 14.3/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 14 - GF PUBLIC BATHROOM

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES

WALL FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to walls and columns

Plastering to internal masonry / concrete backing; including all


accessories and works required; all in accordance with the
Specifications

A To receive tile 266 m2

B To receive paint 35 m2

Texture paint; including all accessories and works required; all in


accordance with the Specifications

C Type W203 35 m2

Silver travertine unfilled Stone; Finish: Unfilled, continuously


matched horizontal veins; including all accessories and works
required; all in accordance with the Specifications

D Type ST004 208 m2

Mosaic Wall tile; including all accessories and works required; all
in accordance with the Specifications

E Type MOS-001 58 m2

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 14 14.3/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 14 - GF PUBLIC BATHROOM

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)


FLOOR FINISHES

28 Floor, wall, ceiling and roof finishings

Screeds

Backgrounds; self levelling compound; to receive floor finishes; all


in accordance with the Specifications

A To floors 62 m2

Finish to floors

Porcelain Floor tile; Matt finish, colour : sand, size : 120x240, laid
on self levelling compound (measured separately) including
preparation and all works required; all in accordance with the
Specifications

B Type F-300B 10 m2

Porcelain tile; bedded on self levelling compound (measured


separately); including all accessories and works required; all in
accordance with the Specifications

C Type F-003 52 m2

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 14 14.3/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 14 - GF PUBLIC BATHROOM

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

CEILING FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to ceilings

Ceiling paint; including all accessories and works required; all in


accordance with the Specifications

A Type C-202 62 m2

Suspended Ceilings

Moisture Resistant Suspended Gypsum Board; including;


fastenings and all accessories and works required; all in
accordance with the Specifications

B For Type C202 62 m2

Ceiling bulkhead; including fastenings and all accessories and


works required; all in accordance with the Specifications

C 250mm high 11 m

Acoustic insulation; including fastenings and all accessories and


works required; all in accordance with the Specifications

D For Type C202 62 m2

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 14 14.3/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 14 - GF PUBLIC BATHROOM

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 14.3/1

Page : 14.3/2

Page : 14.3/3

Carried To Bill Summary Page AED


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 14 14.4/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 14 - GF PUBLIC BATHROOM

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING

32 Furniture, fittings and equipment

Signage

A Signages 2 nr

Countertop

B Countertop, 600mm x 3750mm 2 nr

C Countertop, 600mm x 2400mm 1 nr

Artwork

D Allow for provision of artwork 1 Item

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 14 14.4/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 14 - GF PUBLIC BATHROOM

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 14.4/1

Carried To Bill Summary Page AED


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 14 14.5/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 14 - GF PUBLIC BATHROOM

Item Description Quantity Unit Rate AED Amount AED

SERVICES

SANITARY INSTALLATIONS

38 Mechanical services

Sanitary appliances; including all necessary fixing and


accessories; as shown on drawings; all in accordance with the
Specifications

A Water Closet 9 nr

B Wash Basin with mixer 10 nr

Sanitary fittings; including all necessary fixing and accessories; as


shown on drawings; all in accordance with the Specifications

C Grab Bars for Disabled toilet 2 nr

D Trash bin 9 nr

E Tissue holder 9 nr

F Health Spray 9 nr

G Wall Mounted Towel Dispenser/Waste Bin 3 nr

H Mirror 10 nr

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 14 14.5/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 14 - GF PUBLIC BATHROOM

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

DISPOSAL INSTALLATION

38 Mechanical services

Pipework

Supply and installation of drainage pipes including insulation,


fittings, supports, hangers and all required accessories in
accordance with drawings and specifications.

Waste Pipe (UPVC)

A 32mm diameter 8 m

B 50mm diameter 12 m

C 75mm diameter 23 m

D 110mm diameter 26 m

Pipe ancillaries

Supply and installation of the following with fittings, fixings,


supports and all required accessories complete; in accordance
with drawings and specifications.

Clean out

E 75mm diameter 2 nr

F 110mm diameter 2 nr

Floor Trap

G 75mm diameter 13 nr

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 14 14.5/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 14 - GF PUBLIC BATHROOM

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

DISPOSAL INSTALLATION (CONT*D)

38 Mechanical services (CONT*D)

Valve

A 75mm diameter 1 nr

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 14 14.5/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 14 - GF PUBLIC BATHROOM

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

WATER INSTALLATION

38 Mechanical services

Pipework

Supply and installation of water supply pipes including insulation,


fittings, supports, hangers and all required accessories in
accordance with drawings and specifications.

Water Supply Pipe (PEX)

A 15mm diameter 32 m

B 22mm diameter 46 m

Pipe ancillaries

Supply and installation of the following with fittings, fixings,


supports and all required accessories complete; in accordance
with drawings and specifications.

Isolation Valves

C 15mm diameter 2 nr

D 22mm diameter 6 nr

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 14 14.5/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 14 - GF PUBLIC BATHROOM

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

SPACE HEATING AND AIR CONDITIONING

38 Mechanical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Ductwork

Galvanised steel sheet rectangular ductwork and fittings, including


insulation, supports, manufactured and fitted in accordance with
the relevant standards, complete as shown on drawings and
Specifications

A Supply/Return air ductwork 1 Item

Duct ancillaries

Flexible duct, including insulation complete all in accordance with


the Specifications

B Flexible duct 1 Item

Linear slot diffuser, complete all in accordance with the


Specifications

C Supply air linear diffuser 1 Item

Variable air volume boxes; including all necessary insulation,


accessories and connections; complete all in accordance with the
Specifications

D VAVs 1 Item

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 14 14.5/6
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 14 - GF PUBLIC BATHROOM

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION

39 Electrical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Small Power Installation

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

Socket outlets

A Switch Socket Outlets 1 Item

Terminal equipment and fittings

Devices complete as described, all in accordance with the


Specification

Socket outlets

B Switch Socket Outlets 1 Item

Lighting Installation

Final circuits

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 14 14.5/7
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 14 - GF PUBLIC BATHROOM

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Lighting Installation

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

A Lighting points 1 Item

Terminal equipment and fittings

Light fittings including fixings, lamps and connections complete in


accordance with the Specifications

B Lighting type TBC 1 Item

Lighting Control Installation

Lighting control system including but not limited to panels, wiring,


containment, as shown on drawings all in accordance with the
Specification

C Lighting control installation 1 Item

Emergency Lighting

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

D Emergency lighting points 1 Item

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 14 14.5/8
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 14 - GF PUBLIC BATHROOM

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Emergency Lighting (CONT*D)

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification
(CONT*D)

A Emergency exit sign points 1 Item

Terminal equipment and fittings

Emergency light fittings including fixings, lamps and connections


complete in accordance with the Specifications

B Emergency Light 1 Item

C Emergency Exit Sign 1 Item

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 14 14.5/9
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 14 - GF PUBLIC BATHROOM

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION

38 Mechanical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Sprinkler Installations

Pipework

Above ground galvanized steel pipes; including fittings, all


necessary fixings, accessories, supports and connections in
accordance with the Specifications

A 25mm Diameter pipes 1 Item

B 32mm Diameter pipes 1 Item

C 40mm Diameter pipes 1 Item

D 50mm Diameter pipes 1 Item

E 65mm Diameter pipes 1 Item

Pipe ancillaries

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification

F Pendent type sprinkler heads 1 Item

G Upright type sprinkler heads 1 Item

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 14 14.5/10
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 14 - GF PUBLIC BATHROOM

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION (CONT*D)

Sprinkler Installations (CONT*D)

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification
(CONT*D)

A Side wall type sprinkler heads 1 Item

Fire hose reel and department valve assembly; comprising of fire


department landing valve, rack with hose, nozzle, 25mm diameter
pressure reducing valve, swing hose reel, fire extinguishers,
pipework inside cabinet, all necessary accessories and
connections ; all in accordance with the Specification

B Fire hose reel cabinet 1 Item

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 14 14.5/11
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 14 - GF PUBLIC BATHROOM

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS

39 Electrical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Fire Detection & Voice Evacuation System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

A Intelligent optical Smoke Detector with standard base 1 Item

B Ceiling void Intelligent optical Smoke Detector with LED remote 1 Item
Indicator

C Manual Call Point 1 Item

D Flasher 1 Item

E Response Indicator 1 Item

F PAVA/BGM Ceiling Speaker 1 Item

Terminal equipment and fittings

Supply and installation of fire alarm devices, all in accordance with


the Specification

G Intelligent optical Smoke Detector with standard base 1 Item

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 14 14.5/12
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 14 - GF PUBLIC BATHROOM

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Fire Detection & Voice Evacuation System (CONT*D)

Supply and installation of fire alarm devices, all in accordance with


the Specification (CONT*D)

A Ceiling void Intelligent optical Smoke Detector with LED remote 1 Item
Indicator

B Manual Call Point 1 Item

C Flasher 1 Item

D Response Indicator 1 Item

E PAVA/BGM Ceiling Speaker 1 Item

IT System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

F WIFI Ceiling 1 Item

Terminal equipment and fittings

Supply and installation of IT devices, all in accordance with the


Specification

G WIFI Ceiling 1 Item

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 14 14.5/13
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 14 - GF PUBLIC BATHROOM

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Security System

CCTV

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

A Dome Camera 1 Item

Terminal equipment and fittings

Supply and installation of CCTV devices, all in accordance with


the Specification

B Dome Camera 1 Item

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 14 14.5/14
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 14 - GF PUBLIC BATHROOM

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

BUILDER'S WORK IN CONNECTION WITH SERVICES

41 Builder's work in connection with mechanical, electrical


and transportation installations

A Builder's work in connection with services 1 Item

B Allow for integrating the new MEP services to the existing services 1 Item

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 14 14.5/15
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 14 - GF PUBLIC BATHROOM

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 14.5/1

Page : 14.5/2

Page : 14.5/3

Page : 14.5/4

Page : 14.5/5

Page : 14.5/6

Page : 14.5/7

Page : 14.5/8

Page : 14.5/9

Page : 14.5/10

Page : 14.5/11

Page : 14.5/12

Page : 14.5/13

Page : 14.5/14

Carried To Bill Summary Page AED


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 14 D/Add/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 14 - GF PUBLIC BATHROOM

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS
Any items that may not be covered elsewhere in the Bills of
Quantities which the tenderer deemed to be necessary in order to
carry out the works in full compliance with the Drawings,
Specifications and any other items necessary to form a complete
Installations, must be itemised and priced below. The tenderer
may provide additional sheets for this purpose if necessary. All
items under this section must be summarised under a separate
cover.

A Item

B Item

C Item

To Collection AED
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 14 D/Add/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 14 - GF PUBLIC BATHROOM

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : D/Add/1

Carried To Bill Summary Page AED


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 14 D/Add/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 14 - GF PUBLIC BATHROOM

Item Description Quantity Unit Rate AED Amount AED

BILL 14 - GF Public Bathroom

BILL SUMMARY

Total Brought Forward from Page No.

Facilitating works 14.1/2

Superstructure 14.2/3

Internal Finishes 14.3/4

Fittings and Furnishing 14.4/2

Services 14.5/15

ADDITIONAL ITEMS D/Add/2

Carried To General Summary Page AED 0


Issued on: 15/11/2022
The Armed Forces Officers Club and Hotel

Erth Guest Experience

Fit-out Works

BILL 15

GF STAIRS

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 15 15.1/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 15 - GF STAIRS

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES

WALL FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to walls and columns

Texture paint; including all accessories and works required; all in


accordance with the Specifications

A Type W203; to walls 391 m2

B Type W203; to planters 121 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 15 15.1/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 15 - GF STAIRS

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

FLOOR FINISHES

28 Floor, wall, ceiling and roof finishings

Screeds

Backgrounds; self levelling compound; to receive floor finishes; all


in accordance with the Specifications

A To floors 297 m2

Cast Stone, laid on cement and sand screed (measured


separately) including preparation and all works required; all in
accordance with the Specifications

B Type F-300; to circular stair threads 485 m

C Type F-300; to triangular stair threads 200 m

D Type F-300; to circular stair landing 44 m2

E Type F-300; to triangular stair landing 47 m2

Omani Beige marble Split face, laid on cement and sand screed
(measured separately) including preparation and all works
required; all in accordance with the Specifications

F Type F-301; to circular stair riser 485 m

G Type F-301; to triangular stair riser 200 m

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 15 15.1/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 15 - GF STAIRS

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 15.1/1

Page : 15.1/2

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 15 15.2/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 15 - GF STAIRS

Item Description Quantity Unit Rate AED Amount AED

EXTERNAL WORKS

35 Site works

Hardscape

Supply and install gravel including binding course asphalt,


compacted sub-base, joints, fixing, accessories, all necessary
associated works, complete in accordance with the Drawings and
Specifications.

A Gravel; 15-25mm dia, 50mm depth, Light beige/ grey color natural 14 m2
finish

Softscape

Supply and Install; shrubs succulents, perennials ground covers


and the like planted in prepared ground as detailed, including
compost and fertilizers, compaction, with all necessary associated
works, complete in accordance with the Drawings and
Specifications.

Shrubs

B Asparagus sprengeri 52 nr

C Allow for drainage to the planting area 1 Item

D Allow for irrigation to the planting area 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 15 15.2/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 15 - GF STAIRS

Item Description Quantity Unit Rate AED Amount AED

EXTERNAL WORKS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 15.2/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 15 D/Add/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 15 - GF STAIRS

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS
Any items that may not be covered elsewhere in the Bills of
Quantities which the tenderer deemed to be necessary in order to
carry out the works in full compliance with the Drawings,
Specifications and any other items necessary to form a complete
Installations, must be itemised and priced below. The tenderer
may provide additional sheets for this purpose if necessary. All
items under this section must be summarised under a separate
cover.

A Item

B Item

C Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 15 D/Add/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 15 - GF STAIRS

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : D/Add/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 15 D/Add/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 15 - GF STAIRS

Item Description Quantity Unit Rate AED Amount AED

BILL 15 - GF Stairs

BILL SUMMARY

Total Brought Forward from Page No.

Internal Finishes 15.1/3

External works 15.2/2

ADDITIONAL ITEMS D/Add/2

Carried To General Summary Page AED 0


Issued on: 15/11/2022
The Armed Forces Officers Club and Hotel

Erth Guest Experience

Fit-out Works

BILL 16

FF VIP ENTRANCE + MAIN CIRCULATION

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 16 16.1/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 16 - FF VIP ENTRANCE + MAIN CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS

DEMOLITION WORKS

3 Demolitions

Demolish and off site disposal of existing beams, slabs, columns,


walls, floor finishes, wall finishes, ceilings, doors and MEP
services as per drawings and specification

Minor Demolition Works

A Demolition of existing ceiling finishes 532 m2

B Demolition of existing MEP services 532 m2

Major Demolition Works

Second floor level demolition

C Site survey and marking 1 Item

D Demolition of existing slab 54 m3

E Demolition of existing beams 49 m3

F Demolition of existing columns 32 m3

G Allow for scaffolding propping 373 m2

H Allow for making good and treatment of cut concrete surfaces 1 Item

J Allow for protection of existing 1 Item

K Allow for disposal of debris materials 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 16 16.1/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 16 - FF VIP ENTRANCE + MAIN CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS (CONT*D)

DEMOLITION WORKS (CONT*D)

3 Demolitions (CONT*D)

Second floor level demolition (CONT*D)

A Allow for final cleaning 1 Item

First Floor level demolition

B Site survey and marking 1 Item

C Demolition of existing columns 32 m3

D Demolition of upstand 23 m3

E Demolition of cap beam 12 m3

F Allow for scaffolding propping 379 m2

G Allow for making good and treatment of cut concrete surfaces 1 Item

H Allow for protection of existing 1 Item

J Allow for disposal of debris materials 1 Item

K Allow for final cleaning 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 16 16.1/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 16 - FF VIP ENTRANCE + MAIN CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 16.1/1

Page : 16.1/2

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 16 16.2/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 16 - FF VIP ENTRANCE + MAIN CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE

UPPER FLOORS

First Floor level new infill slab

15 Structural metalwork

A Supply and installation of lightweight floor construction; metal 168 m2


decking

B Structural steel support 15 tonne

C Allow for anchor bolt drilling and installation to existing columns 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 16 16.2/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 16 - FF VIP ENTRANCE + MAIN CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

INTERNAL DOORS

24 Doors, shutters and hatches

Glass doors (size and type to be confirmed); including


ironmongery and all necessary fixing accessories; all in
accordance with the Drawings and Specifications

A Single leaf door including ironmongery 7 nr

B Double leaf door including ironmongery 6 nr

Revolving doors; including ironmongery and all necessary fixing


accessories; all in accordance with the Drawings and
Specifications

C Allow for replacement of revolving door 1 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 16 16.2/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 16 - FF VIP ENTRANCE + MAIN CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 16.2/1

Page : 16.2/2

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 16 16.3/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 16 - FF VIP ENTRANCE + MAIN CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES

WALL FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to walls and columns

Texture paint; including all accessories and works required; all in


accordance with the Specifications

A Type W200 531 m2

B Type W201 14 m2

C Type W203 196 m2

D Type W206 75 m2

Wall paint; including all accessories and works required; all in


accordance with the Specifications

E Type W202 27 m2

Mullion paint; including all accessories and works required; all in


accordance with the Specifications

F Type W207 528 m

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 16 16.3/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 16 - FF VIP ENTRANCE + MAIN CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

WALL FINISHES (CONT*D)

28 Floor, wall, ceiling and roof finishings (CONT*D)

Marble cladding; Colour: Bianco Venatino Marble, including all


accessories and works required; all in accordance with the
Specifications

A Type W301 22 m2

Solid timber and matching Veneer; including all accessories and


works required; all in accordance with the Specifications

B Type J400 25 m2

Mirror wall cladding; including all accessories and works required;


all in accordance with the Specifications

C Type W501 18 m2

Glass Handrail; including all accessories and works required; all in


accordance with the Specifications

D Type W500 41 m

Textured paint; including all accessories and works required; all in


accordance with the Specifications

E Type W900 14 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 16 16.3/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 16 - FF VIP ENTRANCE + MAIN CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

FLOOR FINISHES

28 Floor, wall, ceiling and roof finishings

Screeds

Backgrounds; self levelling compound; to receive floor finishes; all


in accordance with the Specifications

A To floors 1,416 m2

Finish to floors

Porcelain Floor tile; Matt finish, colour : sand, size : 120x240, laid
on self levelling compound (measured separately) including
preparation and all works required; all in accordance with the
Specifications

B Type F-300 150 m2

C Type F-300B 806 m2

Woven Vinyl Carpet; laid on self levelling compound (measured


separately) including preparation and all works required; all in
accordance with the Specifications

D Type F-101 15 m2

E Type F-101B 293 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 16 16.3/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 16 - FF VIP ENTRANCE + MAIN CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

FLOOR FINISHES (CONT*D)

28 Floor, wall, ceiling and roof finishings (CONT*D)


Entrance mat; laid on self levelling compound (measured
separately) including preparation and all works required; all in
accordance with the Specifications

A Type F-102 14 m2

Customized Carpet Inset; laid on self levelling compound


(measured separately) including preparation and all works
required; all in accordance with the Specifications

B Type F-103 138 m2

Metal insert including all accessories and works required; all in


accordance with the Specifications

C Type J-900 21 m

Brushed brass metal skirting; including preparation and all works


required; all in accordance with the Specifications

D Brushed brass metal 207 m

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 16 16.3/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 16 - FF VIP ENTRANCE + MAIN CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

CEILING FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to ceilings

Ceiling paint; including all accessories and works required; all in


accordance with the Specifications

A Type C-202 586 m2

Suspended Ceilings

Suspended Gypsum Board; including; fastenings and all


accessories and works required; all in accordance with the
Specifications

B For Type C-202 532 m2

Ceiling bulkhead; including; fastenings and all accessories and


works required; all in accordance with the Specifications

C For Type C-202; 200mm high 270 m

Acoustic insulation; including fastenings and all accessories and


works required; all in accordance with the Specifications

D For Type C-202 532 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 16 16.3/6
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 16 - FF VIP ENTRANCE + MAIN CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 16.3/1

Page : 16.3/2

Page : 16.3/3

Page : 16.3/4

Page : 16.3/5

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 16 16.4/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 16 - FF VIP ENTRANCE + MAIN CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING

32 Furniture, fittings and equipment

Signage

Door Signs, as per Specifications

A Type ST01 2 nr

Identity Signs, as per Specifications

B Type ID01 2 nr

Directional Signs, as per Specifications

C Type DS01 1 nr

D Type DS02 1 nr

Directory Signs, as per Specifications

E Type LD01 1 nr

F Type LD02 1 nr

Digital Signs, as per Specifications

G Type ES01 2 nr

H Type ES02 1 nr

Fire and Life Safety Signs, as per Specifications

J Allow for fire and life safety signs 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 16 16.4/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 16 - FF VIP ENTRANCE + MAIN CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING (CONT*D)

Furnitures

A Vase; Ref. A01 11 nr

B Accessories - customized; Ref. A04 3 nr

C Custom rugs; Ref. A06 2 nr

D Vase; Ref. A09 6 nr

E Floor Lamp - custom made; Ref. LT02 2 nr

F Armchair; Ref. S01 17 nr

G Pouf; Ref. S02 6 nr

H Sofa; Ref. S03 6 nr

J Armchair; Ref. S04 5 nr

K Armchair; Ref. S05 7 nr

L Round sofa; Ref. S06 2 nr

M Sofa; Ref. S07 2 nr

N Sofa; Ref. S08 1 nr

P Sofa; Ref. S09 2 nr

Q Sofa; Ref. S10 1 nr

R Sofa; Ref. S11 2 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 16 16.4/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 16 - FF VIP ENTRANCE + MAIN CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING (CONT*D)

Furnitures (CONT*D)

A Sofa; Ref. S12 4 nr

B Pouf; Ref. S13 4 nr

C Pouf; Ref. S14 15 nr

D Sofa; Ref. S15 4 nr

E Armchair; Ref. S16 6 nr

F Chair; Ref. T01 19 nr

G Coffee table; Ref. T02 5 nr

H Coffee table; Ref. T03 6 nr

J Side table; Ref. T04 4 nr

K High table; Ref. T06 6 nr

L High table; Ref. T07 6 nr

M Banquette Table; Ref. T08 10 nr

N Table; Ref. T11 1 nr

P Side table; Ref. T16 10 nr

Artwork

Q Allow for provision of artwork 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 16 16.4/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 16 - FF VIP ENTRANCE + MAIN CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 16.4/1

Page : 16.4/2

Page : 16.4/3

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 16 16.5/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 16 - FF VIP ENTRANCE + MAIN CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SERVICES

SPACE HEATING AND AIR CONDITIONING

38 Mechanical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Ductwork

Galvanised steel sheet rectangular ductwork and fittings, including


insulation, supports, manufactured and fitted in accordance with
the relevant standards, complete as shown on drawings and
Specifications

A Supply/Return air ductwork 1 Item

Duct ancillaries

Flexible duct, including insulation complete all in accordance with


the Specifications

B Flexible duct 1 Item

Linear slot diffuser, complete all in accordance with the


Specifications

C Supply air linear diffuser 1 Item

Variable air volume boxes; including all necessary insulation,


accessories and connections; complete all in accordance with the
Specifications

D VAVs 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 16 16.5/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 16 - FF VIP ENTRANCE + MAIN CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION

39 Electrical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Small Power Installation

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

Socket outlets

A Switch Socket Outlets 1 Item

B Floor Box 1 Item

Terminal equipment and fittings

Devices complete as described, all in accordance with the


Specification

Socket outlets

C Switch Socket Outlets 1 Item

D Floor Box 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 16 16.5/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 16 - FF VIP ENTRANCE + MAIN CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Lighting Installation

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

A Lighting points 74 nr

B Linear lighting points 1 Item

Terminal equipment and fittings

Light fittings including fixings, lamps and connections complete in


accordance with the Specifications

C Lighting type A (1) 4 nr

D Lighting type A (2) 16 nr

E Lighting type C (1) 73 m

F Lighting type C (2) 194 m

G Lighting type F (4) 34 nr

H Lighting type J (1) 20 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 16 16.5/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 16 - FF VIP ENTRANCE + MAIN CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)


Lighting Control Installation

Lighting control system including but not limited to panels, wiring,


containment, as shown on drawings all in accordance with the
Specification

A Lighting control installation 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 16 16.5/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 16 - FF VIP ENTRANCE + MAIN CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION

38 Mechanical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Sprinkler Installations

Pipework

Above ground galvanized steel pipes; including fittings, all


necessary fixings, accessories, supports and connections in
accordance with the Specifications

A 25mm Diameter pipes 1 Item

B 32mm Diameter pipes 1 Item

C 40mm Diameter pipes 1 Item

D 50mm Diameter pipes 1 Item

E 65mm Diameter pipes 1 Item

Pipe ancillaries

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification

F Pendent type sprinkler heads 1 Item

G Upright type sprinkler heads 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 16 16.5/6
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 16 - FF VIP ENTRANCE + MAIN CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION (CONT*D)

Sprinkler Installations (CONT*D)

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification
(CONT*D)

A Side wall type sprinkler heads 1 Item

Fire hose reel and department valve assembly; comprising of fire


department landing valve, rack with hose, nozzle, 25mm diameter
pressure reducing valve, swing hose reel, fire extinguishers,
pipework inside cabinet, all necessary accessories and
connections ; all in accordance with the Specification

B Fire hose reel cabinet 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 16 16.5/7
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 16 - FF VIP ENTRANCE + MAIN CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS

39 Electrical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Fire Detection & Voice Evacuation System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

A Intelligent optical Smoke Detector with standard base 1 Item

B Ceiling void Intelligent optical Smoke Detector with LED remote 1 Item
Indicator

C Manual Call Point 1 Item

D Flasher 1 Item

E Response Indicator 1 Item

F PAVA/BGM Ceiling Speaker 1 Item

Terminal equipment and fittings

Supply and installation of fire alarm devices, all in accordance with


the Specification

G Intelligent optical Smoke Detector with standard base 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 16 16.5/8
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 16 - FF VIP ENTRANCE + MAIN CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Fire Detection & Voice Evacuation System (CONT*D)

Supply and installation of fire alarm devices, all in accordance with


the Specification (CONT*D)

A Ceiling void Intelligent optical Smoke Detector with LED remote 1 Item
Indicator

B Manual Call Point 1 Item

C Flasher 1 Item

D Response Indicator 1 Item

E PAVA/BGM Ceiling Speaker 1 Item

IT System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

F WIFI Ceiling 1 Item

Terminal equipment and fittings

Supply and installation of IT devices, all in accordance with the


Specification

G WIFI Ceiling 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 16 16.5/9
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 16 - FF VIP ENTRANCE + MAIN CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Security System

CCTV

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

A Dome Camera 1 Item

Terminal equipment and fittings

Supply and installation of CCTV devices, all in accordance with


the Specification

B Dome Camera 1 Item

Access Control

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

C Door with card reader, Electric lock, BGU and exit Push button 1 Item

Terminal equipment and fittings

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 16 16.5/10
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 16 - FF VIP ENTRANCE + MAIN CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Security System (CONT*D)

Supply and installation of Access control devices, all in


accordance with the Specification

A Door with card reader, Electric lock, BGU and exit Push button 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 16 16.5/11
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 16 - FF VIP ENTRANCE + MAIN CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

BUILDER'S WORK IN CONNECTION WITH SERVICES

41 Builder's work in connection with mechanical, electrical


and transportation installations

A Builder's work in connection with services 1 Item

B Allow for integrating the new MEP services to the existing services 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 16 16.5/12
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 16 - FF VIP ENTRANCE + MAIN CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 16.5/1

Page : 16.5/2

Page : 16.5/3

Page : 16.5/4

Page : 16.5/5

Page : 16.5/6

Page : 16.5/7

Page : 16.5/8

Page : 16.5/9

Page : 16.5/10

Page : 16.5/11

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 16 D/Add/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 16 - FF VIP ENTRANCE + MAIN CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS
Any items that may not be covered elsewhere in the Bills of
Quantities which the tenderer deemed to be necessary in order to
carry out the works in full compliance with the Drawings,
Specifications and any other items necessary to form a complete
Installations, must be itemised and priced below. The tenderer
may provide additional sheets for this purpose if necessary. All
items under this section must be summarised under a separate
cover.

A Item

B Item

C Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 16 D/Add/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 16 - FF VIP ENTRANCE + MAIN CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : D/Add/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 16 D/Add/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 16 - FF VIP ENTRANCE + MAIN CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

BILL 16 - FF VIP Entrance + Main Circulation

BILL SUMMARY

Total Brought Forward from Page No.

Facilitating works 16.1/3

Superstructure 16.2/3

Internal Finishes 16.3/6

Fittings and Furnishing 16.4/4

Services 16.5/12

ADDITIONAL ITEMS D/Add/2

Carried To General Summary Page AED 0


Issued on: 15/11/2022
The Armed Forces Officers Club and Hotel

Erth Guest Experience

Fit-out Works

BILL 17

FF AL MIS'HAB HALL (ABU MOUSA HALL)

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 17 17.1/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 17 - FF AL MIS'HAB HALL (ABU MOUSA HALL)

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS

DEMOLITION WORKS

3 Demolitions

Demolish and off site disposal of existing ceilings and MEP


services as per drawings and specification

A Demolition of existing ceiling finishes 1,200 m2

B Demolition of existing MEP services 1,200 m2

C Allowance for removing / transplanting of existing plant material 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 17 17.1/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 17 - FF AL MIS'HAB HALL (ABU MOUSA HALL)

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 17.1/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 17 17.2/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 17 - FF AL MIS'HAB HALL (ABU MOUSA HALL)

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE

INTERNAL DOORS

24 Doors, shutters and hatches

Doors (size, type and material to be confirmed); including


ironmongery and all necessary fixing accessories; all in
accordance with the Drawings and Specifications

A Single leaf door including ironmongery 6 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 17 17.2/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 17 - FF AL MIS'HAB HALL (ABU MOUSA HALL)

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 17.2/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 17 17.3/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 17 - FF AL MIS'HAB HALL (ABU MOUSA HALL)

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES

WALL FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to walls and columns

Texture paint; including all accessories and works required; all in


accordance with the Specifications

A Type W203; to walls 774 m2

B Type W206; to circular columns 149 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 17 17.3/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 17 - FF AL MIS'HAB HALL (ABU MOUSA HALL)

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

FLOOR FINISHES

28 Floor, wall, ceiling and roof finishings

Screeds

Backgrounds; self levelling compound; to receive floor finishes; all


in accordance with the Specifications

A To floors 1,842 m2

Woven Vinyl Carpet; laid on self levelling compound (measured


separately) including preparation and all works required; all in
accordance with the Specifications

B Type F-101B 1,842 m2

Brushed brass metal skirting; including preparation and all works


required; all in accordance with the Specifications

C Brushed brass metal 339 m

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 17 17.3/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 17 - FF AL MIS'HAB HALL (ABU MOUSA HALL)

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

CEILING FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to ceilings

Ceiling Textured paint; including all accessories and works


required; all in accordance with the Specifications

A Type C-205 621 m2

Ceiling paint; including all accessories and works required; all in


accordance with the Specifications

B Type C-202 604 m2

Bronze metal insert; including all accessories and works required;


all in accordance with the Specifications

C Type J-900 22 m

Suspended Ceilings

Suspended Gypsum Board; including; fastenings and all


accessories and works required; all in accordance with the
Specifications

D For Type C-202 & C-205 1,225 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 17 17.3/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 17 - FF AL MIS'HAB HALL (ABU MOUSA HALL)

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

CEILING FINISHES (CONT*D)

28 Floor, wall, ceiling and roof finishings (CONT*D)


Acoustic insulation; including fastenings and all accessories and
works required; all in accordance with the Specifications

A For Type C-202 & C-205 1,225 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 17 17.3/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 17 - FF AL MIS'HAB HALL (ABU MOUSA HALL)

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 17.3/1

Page : 17.3/2

Page : 17.3/3

Page : 17.3/4

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 17 17.4/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 17 - FF AL MIS'HAB HALL (ABU MOUSA HALL)

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING

32 Furniture, fittings and equipment

Signage

Fire and Life Safety Signs, as per Specifications

A Allow for fire and life safety signs 1 Item

Artwork

B Allow for provision of artwork 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 17 17.4/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 17 - FF AL MIS'HAB HALL (ABU MOUSA HALL)

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 17.4/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 17 17.5/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 17 - FF AL MIS'HAB HALL (ABU MOUSA HALL)

Item Description Quantity Unit Rate AED Amount AED

SERVICES

SPACE HEATING AND AIR CONDITIONING

38 Mechanical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Ductwork

Galvanised steel sheet rectangular ductwork and fittings, including


insulation, supports, manufactured and fitted in accordance with
the relevant standards, complete as shown on drawings and
Specifications

A Supply/Return air ductwork 1 Item

Duct ancillaries

Flexible duct, including insulation complete all in accordance with


the Specifications

B Flexible duct 1 Item

Linear slot diffuser, complete all in accordance with the


Specifications

C Supply air linear diffuser 1 Item

Variable air volume boxes; including all necessary insulation,


accessories and connections; complete all in accordance with the
Specifications

D VAVs 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 17 17.5/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 17 - FF AL MIS'HAB HALL (ABU MOUSA HALL)

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION

39 Electrical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Small Power Installation

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

Socket outlets

A Switch Socket Outlets 1 Item

B Floor Box 1 Item

Terminal equipment and fittings

Devices complete as described, all in accordance with the


Specification

Socket outlets

C Switch Socket Outlets 1 Item

D Floor Box 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 17 17.5/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 17 - FF AL MIS'HAB HALL (ABU MOUSA HALL)

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Lighting Installation
Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

A Lighting points 394 nr

B Linear lighting points 1 Item

Terminal equipment and fittings

Light fittings including fixings, lamps and connections complete in


accordance with the Specifications

C Lighting type A (1) 37 nr

D Lighting type C (3) 359 m

E Lighting type K (1) 247 nr

F Lighting type K (2) 110 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 17 17.5/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 17 - FF AL MIS'HAB HALL (ABU MOUSA HALL)

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Lighting Control Installation

Lighting control system including but not limited to panels, wiring,


containment, as shown on drawings all in accordance with the
Specification

A Lighting control installation 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 17 17.5/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 17 - FF AL MIS'HAB HALL (ABU MOUSA HALL)

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION

38 Mechanical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Sprinkler Installations

Pipework

Above ground galvanized steel pipes; including fittings, all


necessary fixings, accessories, supports and connections in
accordance with the Specifications

A 25mm Diameter pipes 1 Item

B 32mm Diameter pipes 1 Item

C 40mm Diameter pipes 1 Item

D 50mm Diameter pipes 1 Item

E 65mm Diameter pipes 1 Item

Terminal equipment and fittings

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification

F Pendent type sprinkler heads 1 Item

G Upright type sprinkler heads 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 17 17.5/6
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 17 - FF AL MIS'HAB HALL (ABU MOUSA HALL)

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION (CONT*D)

Sprinkler Installations (CONT*D)

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification
(CONT*D)

A Side wall type sprinkler heads 1 Item

Fire hose reel and department valve assembly; comprising of fire


department landing valve, rack with hose, nozzle, 25mm diameter
pressure reducing valve, swing hose reel, fire extinguishers,
pipework inside cabinet, all necessary accessories and
connections ; all in accordance with the Specification

B Fire hose reel cabinet 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 17 17.5/7
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 17 - FF AL MIS'HAB HALL (ABU MOUSA HALL)

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS

39 Electrical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Fire Detection & Voice Evacuation System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

A Intelligent optical Smoke Detector with standard base 1 Item

B Ceiling void Intelligent optical Smoke Detector with LED remote 1 Item
Indicator

C Manual Call Point 1 Item

D Flasher 1 Item

E Response Indicator 1 Item

F PAVA/BGM Ceiling Speaker 1 Item

Terminal equipment and fittings

Supply and installation of fire alarm devices, all in accordance with


the Specification

G Intelligent optical Smoke Detector with standard base 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 17 17.5/8
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 17 - FF AL MIS'HAB HALL (ABU MOUSA HALL)

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Fire Detection & Voice Evacuation System (CONT*D)

Supply and installation of fire alarm devices, all in accordance with


the Specification (CONT*D)

A Ceiling void Intelligent optical Smoke Detector with LED remote 1 Item
Indicator

B Manual Call Point 1 Item

C Flasher 1 Item

D Response Indicator 1 Item

E PAVA/BGM Ceiling Speaker 1 Item

IT System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

F WIFI Ceiling 1 Item

Terminal equipment and fittings

Supply and installation of IT devices, all in accordance with the


Specification

G WIFI Ceiling 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 17 17.5/9
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 17 - FF AL MIS'HAB HALL (ABU MOUSA HALL)

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Security System

CCTV

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

A Dome Camera 1 Item

Terminal equipment and fittings

Supply and installation CCTV devices, all in accordance with the


Specification

B Dome Camera 1 Item

Access Control

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

C Door with card reader, Electric lock, BGU and exit Push button 1 Item

Terminal equipment and fittings

Supply and installation of Access control devices, all in


accordance with the Specification

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 17 17.5/10
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 17 - FF AL MIS'HAB HALL (ABU MOUSA HALL)

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Security System (CONT*D)

Supply and installation of Access control devices, all in


accordance with the Specification

A Door with card reader, Electric lock, BGU and exit Push button 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 17 17.5/11
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 17 - FF AL MIS'HAB HALL (ABU MOUSA HALL)

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

BUILDER'S WORK IN CONNECTION WITH SERVICES

41 Builder's work in connection with mechanical, electrical


and transportation installations

A Builder's work in connection with services 1 Item

B Allow for integrating the new MEP services to the existing services 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 17 17.5/12
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 17 - FF AL MIS'HAB HALL (ABU MOUSA HALL)

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 17.5/1

Page : 17.5/2

Page : 17.5/3

Page : 17.5/4

Page : 17.5/5

Page : 17.5/6

Page : 17.5/7

Page : 17.5/8

Page : 17.5/9

Page : 17.5/10

Page : 17.5/11

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 17 17.6/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 17 - FF AL MIS'HAB HALL (ABU MOUSA HALL)

Item Description Quantity Unit Rate AED Amount AED

EXTERNAL WORKS

35 Site works

Hardscape

Supply and install gravel including binding course asphalt,


compacted sub-base, joints, fixing, accessories, all necessary
associated works, complete in accordance with the Drawings and
Specifications.

A Gravel; 15-25mm dia, 50mm depth, Light beige/ grey color natural 61 m2
finish

Boulders to planting area

B Riyadh Limestone - Natural boulder; size: 450mm x 300mm x 4 nr


300mm, Medium brown color, natural finish; BOU-1

C Riyadh Limestone - Natural boulder; size: 600mm x 300mm x 14 nr


450mm, Medium brown color, natural finish; BOU-2

Softscape

Supply and Install; shrubs succulents, perennials ground covers


and the like planted in prepared ground as detailed, including
compost and fertilizers, compaction, with all necessary associated
works, complete in accordance with the Drawings and
Specifications.

Shrubs

D Lawsonia-inermis 60 nr

E Leptadenia pyrotechnica 30 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 17 17.6/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 17 - FF AL MIS'HAB HALL (ABU MOUSA HALL)

Item Description Quantity Unit Rate AED Amount AED

EXTERNAL WORKS (CONT*D)

Softscape (CONT*D)

Grass

A Pennisetum setaceum 56 nr

B Allow for drainage to the planting area 1 Item

C Allow for irrigation to the planting area 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 17 17.6/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 17 - FF AL MIS'HAB HALL (ABU MOUSA HALL)

Item Description Quantity Unit Rate AED Amount AED

EXTERNAL WORKS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 17.6/1

Page : 17.6/2

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 17 D/Add/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 17 - FF AL MIS'HAB HALL (ABU MOUSA HALL)

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS
Any items that may not be covered elsewhere in the Bills of
Quantities which the tenderer deemed to be necessary in order to
carry out the works in full compliance with the Drawings,
Specifications and any other items necessary to form a complete
Installations, must be itemised and priced below. The tenderer
may provide additional sheets for this purpose if necessary. All
items under this section must be summarised under a separate
cover.

A Item

B Item

C Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 17 D/Add/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 17 - FF AL MIS'HAB HALL (ABU MOUSA HALL)

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : D/Add/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 17 D/Add/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 17 - FF AL MIS'HAB HALL (ABU MOUSA HALL)

Item Description Quantity Unit Rate AED Amount AED

BILL 17 - FF Al Mis'hab Hall (Abu Mousa Hall)

BILL SUMMARY

Total Brought Forward from Page No.

Facilitating works 17.1/2

Superstructure 17.2/2

Internal Finishes 17.3/5

Fittings and Furnishing 17.4/2

Services 17.5/12

External works 17.6/3

ADDITIONAL ITEMS D/Add/2

Carried To General Summary Page AED 0


Issued on: 15/11/2022
The Armed Forces Officers Club and Hotel

Erth Guest Experience

Fit-out Works

BILL 18

FF PRE FUNCTION

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 18 18.1/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 18 - FF PRE FUNCTION

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS

DEMOLITION WORKS

3 Demolitions

Demolish and off site disposal of existing ceilings and MEP


services as per drawings and specification

A Demolition of existing ceiling finishes 365 m2

B Demolition of existing MEP services 365 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 18 18.1/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 18 - FF PRE FUNCTION

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 18.1/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 18 18.2/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 18 - FF PRE FUNCTION

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE

INTERNAL WALLS AND PARTITIONS

20 Proprietary linings and partitions

Glazed partition; including all necessary fixing accessories; all in


accordance with the Drawings and Specifications

A Glazed partition to retail zones; Type W400 14 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 18 18.2/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 18 - FF PRE FUNCTION

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

INTERNAL DOORS

24 Doors, shutters and hatches

Doors (size, type and material to be confirmed); including


ironmongery and all necessary fixing accessories; all in
accordance with the Drawings and Specifications

A Single leaf door including ironmongery 2 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 18 18.2/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 18 - FF PRE FUNCTION

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 18.2/1

Page : 18.2/2

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 18 18.3/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 18 - FF PRE FUNCTION

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES

WALL FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to walls and columns

Texture paint; including all accessories and works required; all in


accordance with the Specifications

A Type W203 266 m2

B Type W206 20 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 18 18.3/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 18 - FF PRE FUNCTION

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

FLOOR FINISHES

28 Floor, wall, ceiling and roof finishings

Screeds

Backgrounds; self levelling compound; to receive floor finishes; all


in accordance with the Specifications

A To floors 422 m2

Finish to floors

Porcelain Floor tile; Matt finish, colour : sand, size : 120x240, laid
on self levelling compound (measured separately) including
preparation and all works required; all in accordance with the
Specifications

B Type F-300B 370 m2

Customized Carpet Inset; laid on self levelling compound


(measured separately) including preparation and all works
required; all in accordance with the Specifications

C Type F-103 52 m2

Metal insert including all accessories and works required; all in


accordance with the Specifications

D Type J-900 33 m

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 18 18.3/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 18 - FF PRE FUNCTION

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

FLOOR FINISHES (CONT*D)

28 Floor, wall, ceiling and roof finishings (CONT*D)


Brushed brass metal skirting; including preparation and all works
required; all in accordance with the Specifications

A Brushed brass metal 61 m

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 18 18.3/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 18 - FF PRE FUNCTION

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

CEILING FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to ceilings

Ceiling paint; including all accessories and works required; all in


accordance with the Specifications

A Type C-202 16 m2

Textured paint; including all accessories and works required; all in


accordance with the Specifications

B Type C-900 349 m2

Suspended Ceilings

Suspended Gypsum Board; including; fastenings and all


accessories and works required; all in accordance with the
Specifications

C For Type C-202 & C-900 365 m2

Acoustic insulation; including fastenings and all accessories and


works required; all in accordance with the Specifications

D For Type C-202 & C-900 365 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 18 18.3/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 18 - FF PRE FUNCTION

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 18.3/1

Page : 18.3/2

Page : 18.3/3

Page : 18.3/4

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 18 18.4/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 18 - FF PRE FUNCTION

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING

32 Furniture, fittings and equipment

Signage

Fire and Life Safety Signs, as per Specifications

A Allow for fire and life safety signs 1 Item

Furnitures

B Armchair; Ref. S01 4 nr

C Armchair; Ref. S04 2 nr

D Armchair; Ref. S05 2 nr

E Sofa; Ref. S07 2 nr

F Sofa; Ref. S12 4 nr

G Pouf; Ref. S13 13 nr

H Side table; Ref. T16 2 nr

Artwork

J Allow for provision of artwork 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 18 18.4/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 18 - FF PRE FUNCTION

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 18.4/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 18 18.5/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 18 - FF PRE FUNCTION

Item Description Quantity Unit Rate AED Amount AED

SERVICES

SPACE HEATING AND AIR CONDITIONING

38 Mechanical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Ductwork

Galvanised steel sheet rectangular ductwork and fittings, including


insulation, supports, manufactured and fitted in accordance with
the relevant standards, complete as shown on drawings and
Specifications

A Supply/Return air ductwork 1 Item

Duct ancillaries

Flexible duct, including insulation complete all in accordance with


the Specifications

B Flexible duct 1 Item

Linear slot diffuser, complete all in accordance with the


Specifications

C Supply air linear diffuser 1 Item

Variable air volume boxes; including all necessary insulation,


accessories and connections; complete all in accordance with the
Specifications

D VAVs 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 18 18.5/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 18 - FF PRE FUNCTION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION

39 Electrical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Small Power Installation

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

Socket outlets

A Switch Socket Outlets 1 Item

B Floor Box 1 Item

Terminal equipment and fittings

Devices complete as described, all in accordance with the


Specification

Socket outlets

C Switch Socket Outlets 1 Item

D Floor Box 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 18 18.5/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 18 - FF PRE FUNCTION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Lighting Installation
Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

A Lighting points 12 nr

B Linear lighting points 1 Item

Terminal equipment and fittings

Light fittings including fixings, lamps and connections complete in


accordance with the Specifications

C Lighting type A (2) 12 nr

D Lighting type C (1) 87 m

Lighting Control Installation

Lighting control system including but not limited to panels, wiring,


containment, as shown on drawings all in accordance with the
Specification

E Lighting control installation 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 18 18.5/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 18 - FF PRE FUNCTION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION

38 Mechanical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Sprinkler Installations

Pipework

Above ground galvanized steel pipes; including fittings, all


necessary fixings, accessories, supports and connections in
accordance with the Specifications

A 25mm Diameter pipes 1 Item

B 32mm Diameter pipes 1 Item

C 40mm Diameter pipes 1 Item

D 50mm Diameter pipes 1 Item

E 65mm Diameter pipes 1 Item

Pipe ancillaries

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification

F Pendent type sprinkler heads 1 Item

G Upright type sprinkler heads 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 18 18.5/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 18 - FF PRE FUNCTION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION (CONT*D)

Sprinkler Installations (CONT*D)

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification
(CONT*D)

A Side wall type sprinkler heads 1 Item

Fire hose reel and department valve assembly; comprising of fire


department landing valve, rack with hose, nozzle, 25mm diameter
pressure reducing valve, swing hose reel, fire extinguishers,
pipework inside cabinet, all necessary accessories and
connections ; all in accordance with the Specification

B Fire hose reel cabinet 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 18 18.5/6
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 18 - FF PRE FUNCTION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS

39 Electrical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Fire Detection & Voice Evacuation System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

A Intelligent optical Smoke Detector with standard base 1 Item

B Ceiling void Intelligent optical Smoke Detector with LED remote 1 Item
Indicator

C Manual Call Point 1 Item

D Flasher 1 Item

E Response Indicator 1 Item

F PAVA/BGM Ceiling Speaker 1 Item

Terminal equipment and fittings

Supply and installation of fire alarm devices, all in accordance with


the Specification

G Intelligent optical Smoke Detector with standard base 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 18 18.5/7
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 18 - FF PRE FUNCTION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Fire Detection & Voice Evacuation System (CONT*D)

Supply and installation of fire alarm devices, all in accordance with


the Specification (CONT*D)

A Ceiling void Intelligent optical Smoke Detector with LED remote 1 Item
Indicator

B Manual Call Point 1 Item

C Flasher 1 Item

D Response Indicator 1 Item

E PAVA/BGM Ceiling Speaker 1 Item

IT System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

F WIFI Ceiling 1 Item

Terminal equipment and fittings

Supply and installation of IT devices, all in accordance with the


Specification

G WIFI Ceiling 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 18 18.5/8
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 18 - FF PRE FUNCTION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Security System

CCTV

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

A Dome Camera 1 Item

Terminal equipment and fittings

Supply and installation of CCTV devices, all in accordance with


the Specification

B Dome Camera 1 Item

Access Control

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

C Door with card reader, Electric lock, BGU and exit Push button 1 Item

Terminal equipment and fittings

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 18 18.5/9
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 18 - FF PRE FUNCTION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Security System (CONT*D)

Supply and installation of Access control devices, all in


accordance with the Specification

A Door with card reader, Electric lock, BGU and exit Push button 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 18 18.5/10
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 18 - FF PRE FUNCTION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

BUILDER'S WORK IN CONNECTION WITH SERVICES

41 Builder's work in connection with mechanical, electrical


and transportation installations

A Builder's work in connection with services 1 Item

B Allow for integrating the new MEP services to the existing services 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 18 18.5/11
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 18 - FF PRE FUNCTION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 18.5/1

Page : 18.5/2

Page : 18.5/3

Page : 18.5/4

Page : 18.5/5

Page : 18.5/6

Page : 18.5/7

Page : 18.5/8

Page : 18.5/9

Page : 18.5/10

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 18 18.6/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 18 - FF PRE FUNCTION

Item Description Quantity Unit Rate AED Amount AED

EXTERNAL WORKS

35 Site works

Hardscape

Supply and install gravel including binding course asphalt,


compacted sub-base, joints, fixing, accessories, all necessary
associated works, complete in accordance with the Drawings and
Specifications.

A Gravel; 15-25mm dia, 50mm depth, Light beige/ grey color natural 14 m2
finish

Boulders to planting area

B Riyadh Limestone - Natural boulder; size: 450mm x 300mm x 11 nr


300mm, Medium brown color, natural finish; BOU-1

C Riyadh Limestone - Natural boulder; size: 600mm x 300mm x 4 nr


450mm, Medium brown color, natural finish; BOU-1

Softscape

Supply and Install; shrubs succulents, perennials ground covers


and the like planted in prepared ground as detailed, including
compost and fertilizers, compaction, with all necessary associated
works, complete in accordance with the Drawings and
Specifications.

Shrubs

D Lawsonia-inermis 29 nr

E Allow for drainage to the planting area 1 Item

F Allow for irrigation to the planting area 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 18 18.6/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 18 - FF PRE FUNCTION

Item Description Quantity Unit Rate AED Amount AED

EXTERNAL WORKS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 18.6/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 18 D/Add/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 18 - FF PRE FUNCTION

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS
Any items that may not be covered elsewhere in the Bills of
Quantities which the tenderer deemed to be necessary in order to
carry out the works in full compliance with the Drawings,
Specifications and any other items necessary to form a complete
Installations, must be itemised and priced below. The tenderer
may provide additional sheets for this purpose if necessary. All
items under this section must be summarised under a separate
cover.

A Item

B Item

C Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 18 D/Add/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 18 - FF PRE FUNCTION

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : D/Add/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 18 D/Add/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 18 - FF PRE FUNCTION

Item Description Quantity Unit Rate AED Amount AED

BILL 18 - FF Pre Function

BILL SUMMARY

Total Brought Forward from Page No.

Facilitating works 18.1/2

Superstructure 18.2/3

Internal Finishes 18.3/5

Fittings and Furnishing 18.4/2

Services 18.5/11

External works 18.6/2

ADDITIONAL ITEMS D/Add/2

Carried To General Summary Page AED 0


Issued on: 15/11/2022
The Armed Forces Officers Club and Hotel

Erth Guest Experience

Fit-out Works

BILL 19

FF WEST CIRCULATION

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 19 19.1/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 19 - FF WEST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS

DEMOLITION WORKS

3 Demolitions

Demolish and off site disposal of existing ceilings and MEP


services as per drawings and specification

A Demolition of existing ceiling finishes 658 m2

B Demolition of existing MEP services 658 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 19 19.1/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 19 - FF WEST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 19.1/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 19 19.2/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 19 - FF WEST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE

INTERNAL WALLS AND PARTITIONS

20 Proprietary linings and partitions

Glazed partition; including all necessary fixing accessories; all in


accordance with the Drawings and Specifications

A Glazed partition to retail zones 7, 8, 9, 10, 11 and 12; Type W400 267 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 19 19.2/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 19 - FF WEST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

INTERNAL DOORS

24 Doors, shutters and hatches

Glass doors (size and type to be confirmed); including


ironmongery and all necessary fixing accessories; all in
accordance with the Drawings and Specifications

A Single leaf door including ironmongery 4 nr

B Extra over for glazed doors to retail zones; double leaf 7 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 19 19.2/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 19 - FF WEST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 19.2/1

Page : 19.2/2

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 19 19.3/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 19 - FF WEST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES

WALL FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to walls and columns

Texture paint; including all accessories and works required; all in


accordance with the Specifications

A Type W203 325 m2

B Type W206 94 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 19 19.3/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 19 - FF WEST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)


FLOOR FINISHES

28 Floor, wall, ceiling and roof finishings

Screeds

Backgrounds; self levelling compound; to receive floor finishes; all


in accordance with the Specifications

A To floors 651 m2

Finish to floors

Porcelain Floor tile; Matt finish, colour : sand, size : 120x240, laid
on self levelling compound (measured separately) including
preparation and all works required; all in accordance with the
Specifications

B Type F-300B 361 m2

Woven Vinyl Carpet; laid on self levelling compound (measured


separately) including preparation and all works required; all in
accordance with the Specifications

C Type F-101B 290 m2

Metal insert: including all accessories and works required; all in


accordance with the Specifications

D J-900 54 m

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 19 19.3/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 19 - FF WEST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

FLOOR FINISHES (CONT*D)

28 Floor, wall, ceiling and roof finishings (CONT*D)

Brushed brass metal skirting; including preparation and all works


required; all in accordance with the Specifications

A Brushed brass metal 143 m

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 19 19.3/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 19 - FF WEST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

CEILING FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to ceilings

Ceiling paint; including all accessories and works required; all in


accordance with the Specifications

A Type C-202 13 m2

Textured paint; including all accessories and works required; all in


accordance with the Specifications

B Type C-800 25 m2

C Type C-900 620 m2

Suspended Ceilings

Suspended Gypsum Board; including; fastenings and all


accessories and works required; all in accordance with the
Specifications

D For Type C-202, C-800 & C-900 658 m2

Acoustic insulation; including fastenings and all accessories and


works required; all in accordance with the Specifications

E For Type C-202, C-800 & C-900 658 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 19 19.3/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 19 - FF WEST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 19.3/1

Page : 19.3/2

Page : 19.3/3

Page : 19.3/4

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 19 19.4/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 19 - FF WEST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING

32 Furniture, fittings and equipment

Signage

Identity Signs, as per Specifications

A Type ID03 2 nr

Directional Signs, as per Specifications

B Type DS01 1 nr

Directory Signs, as per Specifications

C Type LD03 1 nr

D Type LD04 1 nr

Digital Signs, as per Specifications

E Type ES02 1 nr

Fire and Life Safety Signs, as per Specifications

F Allow for fire and life safety signs 1 Item

Artwork

G Allow for provision of artwork 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 19 19.4/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 19 - FF WEST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 19.4/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 19 19.5/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 19 - FF WEST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SERVICES

SPACE HEATING AND AIR CONDITIONING

38 Mechanical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Ductwork

Galvanised steel sheet rectangular ductwork and fittings, including


insulation, supports, manufactured and fitted in accordance with
the relevant standards, complete as shown on drawings and
Specifications

A Supply/Return air ductwork 1 Item

Duct ancillaries

Flexible duct, including insulation complete all in accordance with


the Specifications

B Flexible duct 1 Item

Linear slot diffuser, complete all in accordance with the


Specifications

C Supply air linear diffuser 1 Item

Variable air volume boxes; including all necessary insulation,


accessories and connections; complete all in accordance with the
Specifications

D VAVs 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 19 19.5/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 19 - FF WEST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION

39 Electrical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Small Power Installation

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

Socket outlets

A Switch Socket Outlets 1 Item

B Floor Box 1 Item

Terminal equipment and fittings

Devices complete as described, all in accordance with the


Specification

Socket outlets

C Switch Socket Outlets 1 Item

D Floor Box 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 19 19.5/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 19 - FF WEST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Lighting Installation
Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

A Lighting points 92 nr

B Linear lighting points 1 Item

Terminal equipment and fittings

Light fittings including fixings, lamps and connections complete in


accordance with the Specifications

C Lighting type A (1) 24 nr

D Lighting type A (2) 12 nr

E Lighting type B (1) 17 nr

F Lighting type C (1) 49 m

G Lighting type C (2) 15 m

H Lighting type D (3) 13 nr

J Lighting type D (5) 26 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 19 19.5/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 19 - FF WEST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Lighting Installation (CONT*D)

Light fittings including fixings, lamps and connections complete in


accordance with the Specifications (CONT*D)

Lighting Control Installation

Lighting control system including but not limited to panels, wiring,


containment, as shown on drawings all in accordance with the
Specification

A Lighting control installation 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 19 19.5/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 19 - FF WEST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION

38 Mechanical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Sprinkler Installations

Pipework

Above ground galvanized steel pipes; including fittings, all


necessary fixings, accessories, supports and connections in
accordance with the Specifications

A 25mm Diameter pipes 1 Item

B 32mm Diameter pipes 1 Item

C 40mm Diameter pipes 1 Item

D 50mm Diameter pipes 1 Item

E 65mm Diameter pipes 1 Item

Pipe ancillaries

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification

F Pendent type sprinkler heads 1 Item

G Upright type sprinkler heads 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 19 19.5/6
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 19 - FF WEST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION (CONT*D)

Sprinkler Installations (CONT*D)

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification
(CONT*D)

A Side wall type sprinkler heads 1 Item

Fire hose reel and department valve assembly; comprising of fire


department landing valve, rack with hose, nozzle, 25mm diameter
pressure reducing valve, swing hose reel, fire extinguishers,
pipework inside cabinet, all necessary accessories and
connections ; all in accordance with the Specification

B Fire hose reel cabinet 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 19 19.5/7
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 19 - FF WEST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS

39 Electrical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Fire Detection & Voice Evacuation System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

A Intelligent optical Smoke Detector with standard base 1 Item

B Ceiling void Intelligent optical Smoke Detector with LED remote 1 Item
Indicator

C Manual Call Point 1 Item

D Flasher 1 Item

E Response Indicator 1 Item

F PAVA/BGM Ceiling Speaker 1 Item

Terminal equipment and fittings

Supply and installation of fire alarm devices, all in accordance with


the Specification

G Intelligent optical Smoke Detector with standard base 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 19 19.5/8
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 19 - FF WEST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Fire Detection & Voice Evacuation System (CONT*D)

Supply and installation of fire alarm devices, all in accordance with


the Specification (CONT*D)

A Ceiling void Intelligent optical Smoke Detector with LED remote 1 Item
Indicator

B Manual Call Point 1 Item

C Flasher 1 Item

D Response Indicator 1 Item

E PAVA/BGM Ceiling Speaker 1 Item

IT System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

F WIFI Ceiling 1 Item

Terminal equipment and fittings

Supply and installation of IT devices, all in accordance with the


Specification

G WIFI Ceiling 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 19 19.5/9
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 19 - FF WEST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Security System

CCTV

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

A Dome Camera 1 Item

Terminal equipment and fittings

Supply and installation of CCTV devices, all in accordance with


the Specification

B Dome Camera 1 Item

Access Control

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

C Door with card reader, Electric lock, BGU and exit Push button 1 Item

Terminal equipment and fittings

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 19 19.5/10
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 19 - FF WEST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Security System (CONT*D)

Supply and installation of Access control devices, all in


accordance with the Specification

A Door with card reader, Electric lock, BGU and exit Push button 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 19 19.5/11
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 19 - FF WEST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

BUILDER'S WORK IN CONNECTION WITH SERVICES

41 Builder's work in connection with mechanical, electrical


and transportation installations

A Builder's work in connection with services 1 Item

B Allow for integrating the new MEP services to the existing services 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 19 19.5/12
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 19 - FF WEST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 19.5/1

Page : 19.5/2

Page : 19.5/3

Page : 19.5/4

Page : 19.5/5

Page : 19.5/6

Page : 19.5/7

Page : 19.5/8

Page : 19.5/9

Page : 19.5/10

Page : 19.5/11

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 19 D/Add/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 19 - FF WEST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS
Any items that may not be covered elsewhere in the Bills of
Quantities which the tenderer deemed to be necessary in order to
carry out the works in full compliance with the Drawings,
Specifications and any other items necessary to form a complete
Installations, must be itemised and priced below. The tenderer
may provide additional sheets for this purpose if necessary. All
items under this section must be summarised under a separate
cover.

A Item

B Item

C Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 19 D/Add/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 19 - FF WEST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : D/Add/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 19 D/Add/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 19 - FF WEST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

BILL 19 - FF West Circulation

BILL SUMMARY

Total Brought Forward from Page No.

Facilitating works 19.1/2

Superstructure 19.2/3

Internal Finishes 19.3/5

Fittings and Furnishing 19.4/2

Services 19.5/12

ADDITIONAL ITEMS D/Add/2

Carried To General Summary Page AED 0


Issued on: 15/11/2022
The Armed Forces Officers Club and Hotel

Erth Guest Experience

Fit-out Works

BILL 20

FF EAST CIRCULATION

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 20 20.1/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 20 - FF EAST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS

DEMOLITION WORKS

3 Demolitions

Demolish and off site disposal of existing ceilings and MEP


services as per drawings and specification

A Demolition of existing ceiling finishes 898 m2

B Demolition of existing MEP services 898 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 20 20.1/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 20 - FF EAST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 20.1/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 20 20.2/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 20 - FF EAST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE

INTERNAL WALLS AND PARTITIONS

20 Proprietary linings and partitions

Glazed partition; including all necessary fixing accessories; all in


accordance with the Drawings and Specifications

A Glazed partition to retail zone 13, 14 and 15; Type W400 91 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 20 20.2/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 20 - FF EAST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

INTERNAL DOORS

24 Doors, shutters and hatches

Glass doors (size and type to be confirmed); including


ironmongery and all necessary fixing accessories; all in
accordance with the Drawings and Specifications

A Single leaf door including ironmongery 2 nr

B Extra over for glazed doors to retail zones; double leaf 3 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 20 20.2/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 20 - FF EAST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 20.2/1

Page : 20.2/2

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 20 20.3/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 20 - FF EAST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES

WALL FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to walls and columns

Texture paint; including all accessories and works required; all in


accordance with the Specifications

A Type W203 311 m2

B Type W206 100 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 20 20.3/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 20 - FF EAST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

FLOOR FINISHES

28 Floor, wall, ceiling and roof finishings

Screeds

Backgrounds; self levelling compound; to receive floor finishes; all


in accordance with the Specifications

A To floors 928 m2

Porcelain Floor tile; Matt finish, colour : sand, size : 120x240, laid
on self levelling compound (measured separately) including
preparation and all works required; all in accordance with the
Specifications

B Type F-300B 830 m2

Woven Vinyl Carpet; laid on self levelling compound (measured


separately) including preparation and all works required; all in
accordance with the Specifications

C Type F-101B 98 m2

Metal insert; including all accessories and works required; all in


accordance with the Specifications

D J-900 73 m

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 20 20.3/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 20 - FF EAST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

FLOOR FINISHES (CONT*D)

28 Floor, wall, ceiling and roof finishings (CONT*D)

Brushed brass metal skirting; including preparation and all works


required; all in accordance with the Specifications

A Brushed brass metal 83 m

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 20 20.3/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 20 - FF EAST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

CEILING FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to ceilings

Ceiling paint; including all accessories and works required; all in


accordance with the Specifications

A Type C-202 875 m2

Textured paint; including all accessories and works required; all in


accordance with the Specifications

B Type C-800 23 m2

Suspended Ceilings

Suspended Gypsum Board; including; fastenings and all


accessories and works required; all in accordance with the
Specifications

C For Type C-202 & C-800 898 m2

Acoustic insulation; including fastenings and all accessories and


works required; all in accordance with the Specifications

D For Type C-202 & C-800 898 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 20 20.3/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 20 - FF EAST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 20.3/1

Page : 20.3/2

Page : 20.3/3

Page : 20.3/4

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 20 20.4/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 20 - FF EAST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING

32 Furniture, fittings and equipment

Signage

Identity Signs, as per Specifications

A Type ID03 1 nr

Directional Signs, as per Specifications

B Type DS02 1 nr

Directory Signs, as per Specifications

C Type LD05 1 nr

D Type LD06 1 nr

Digital Signs, as per Specifications

E Type ES01 2 nr

Fire and Life Safety Signs, as per Specifications

F Allow for fire and life safety signs 1 Item

Artwork

G Allow for provision of artwork 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 20 20.4/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 20 - FF EAST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 20.4/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 20 20.5/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 20 - FF EAST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SERVICES

SPACE HEATING AND AIR CONDITIONING

38 Mechanical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Ductwork

Galvanised steel sheet rectangular ductwork and fittings, including


insulation, supports, manufactured and fitted in accordance with
the relevant standards, complete as shown on drawings and
Specifications

A Supply/Return air ductwork 1 Item

Duct ancillaries

Flexible duct, including insulation complete all in accordance with


the Specifications

B Flexible duct 1 Item

Linear slot diffuser, complete all in accordance with the


Specifications

C Supply air linear diffuser 1 Item

Variable air volume boxes; including all necessary insulation,


accessories and connections; complete all in accordance with the
Specifications

D VAVs 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 20 20.5/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 20 - FF EAST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION

39 Electrical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Small Power Installation

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

Socket outlets

A Switch Socket Outlets 1 Item

B Floor Box 1 Item

Terminal equipment and fittings

Devices complete as described, all in accordance with the


Specification

Socket outlets

C Switch Socket Outlets 1 Item

D Floor Box 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 20 20.5/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 20 - FF EAST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Lighting Installation

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

A Lighting points 1 Item

Terminal equipment and fittings

Light fittings including fixings, lamps and connections complete in


accordance with the Specifications

B Lighting type TBC 1 Item

Lighting Control Installation

Lighting control system including but not limited to panels, wiring,


containment, as shown on drawings all in accordance with the
Specification

C Lighting control installation 1 Item

Emergency Lighting

Final circuits

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 20 20.5/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 20 - FF EAST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Emergency Lighting

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

A Emergency lighting points 1 Item

B Emergency exit sign points 1 Item

Terminal equipment and fittings

Emergency light fittings including fixings, lamps and connections


complete in accordance with the Specifications

C Emergency Light 1 Item

D Emergency Exit Sign 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 20 20.5/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 20 - FF EAST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION

38 Mechanical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Sprinkler Installations

Pipework

Above ground galvanized steel pipes; including fittings, all


necessary fixings, accessories, supports and connections in
accordance with the Specifications

A 25mm Diameter pipes 1 Item

B 32mm Diameter pipes 1 Item

C 40mm Diameter pipes 1 Item

D 50mm Diameter pipes 1 Item

E 65mm Diameter pipes 1 Item

Pipe ancillaries

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification

F Pendent type sprinkler heads 1 Item

G Upright type sprinkler heads 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 20 20.5/6
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 20 - FF EAST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION (CONT*D)

Sprinkler Installations (CONT*D)

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification
(CONT*D)

A Side wall type sprinkler heads 1 Item

Fire hose reel and department valve assembly; comprising of fire


department landing valve, rack with hose, nozzle, 25mm diameter
pressure reducing valve, swing hose reel, fire extinguishers,
pipework inside cabinet, all necessary accessories and
connections ; all in accordance with the Specification

B Fire hose reel cabinet 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 20 20.5/7
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 20 - FF EAST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS

39 Electrical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Fire Detection & Voice Evacuation System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

A Intelligent optical Smoke Detector with standard base 1 Item

B Ceiling void Intelligent optical Smoke Detector with LED remote 1 Item
Indicator

C Manual Call Point 1 Item

D Flasher 1 Item

E Response Indicator 1 Item

F PAVA/BGM Ceiling Speaker 1 Item

Terminal equipment and fittings

Supply and installation of fire alarm devices, all in accordance with


the Specification

G Intelligent optical Smoke Detector with standard base 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 20 20.5/8
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 20 - FF EAST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Fire Detection & Voice Evacuation System (CONT*D)

Supply and installation of fire alarm devices, all in accordance with


the Specification (CONT*D)

A Ceiling void Intelligent optical Smoke Detector with LED remote 1 Item
Indicator

B Manual Call Point 1 Item

C Flasher 1 Item

D Response Indicator 1 Item

E PAVA/BGM Ceiling Speaker 1 Item

IT System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

F WIFI Ceiling 1 Item

Terminal equipment and fittings

Supply and installation of IT devices, all in accordance with the


Specification

G WIFI Ceiling 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 20 20.5/9
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 20 - FF EAST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Security System

CCTV

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

A Dome Camera 1 Item

Terminal equipment and fittings

Supply and installation of CCTV devices, all in accordance with


the Specification

B Dome Camera 1 Item

Access Control

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

C Door with card reader, Electric lock, BGU and exit Push button 1 Item

Terminal equipment and fittings

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 20 20.5/10
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 20 - FF EAST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Security System (CONT*D)

Supply and installation of Access control devices, all in


accordance with the Specification

A Door with card reader, Electric lock, BGU and exit Push button 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 20 20.5/11
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 20 - FF EAST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

BUILDER'S WORK IN CONNECTION WITH SERVICES

41 Builder's work in connection with mechanical, electrical


and transportation installations

A Builder's work in connection with services 1 Item

B Allow for integrating the new MEP services to the existing services 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 20 20.5/12
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 20 - FF EAST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 20.5/1

Page : 20.5/2

Page : 20.5/3

Page : 20.5/4

Page : 20.5/5

Page : 20.5/6

Page : 20.5/7

Page : 20.5/8

Page : 20.5/9

Page : 20.5/10

Page : 20.5/11

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 20 D/Add/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 20 - FF EAST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS
Any items that may not be covered elsewhere in the Bills of
Quantities which the tenderer deemed to be necessary in order to
carry out the works in full compliance with the Drawings,
Specifications and any other items necessary to form a complete
Installations, must be itemised and priced below. The tenderer
may provide additional sheets for this purpose if necessary. All
items under this section must be summarised under a separate
cover.

A Item

B Item

C Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 20 D/Add/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 20 - FF EAST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : D/Add/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 20 D/Add/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 20 - FF EAST CIRCULATION

Item Description Quantity Unit Rate AED Amount AED

BILL 20 - FF East Circulation

BILL SUMMARY

Total Brought Forward from Page No.

Facilitating works 20.1/2

Superstructure 20.2/3

Internal Finishes 20.3/5

Fittings and Furnishing 20.4/2

Services 20.5/12

ADDITIONAL ITEMS D/Add/2

Carried To General Summary Page AED 0


Issued on: 15/11/2022
The Armed Forces Officers Club and Hotel

Erth Guest Experience

Fit-out Works

BILL 21

FF CONNECTION TO EAST WING

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 21 21.1/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 21 - FF CONNECTION TO EAST WING

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS

DEMOLITION WORKS

3 Demolitions

Demolish and off site disposal of existing ceilings and MEP


services as per drawings and specification

A Demolition of existing ceiling finishes 396 m2

B Demolition of existing MEP services 396 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 21 21.1/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 21 - FF CONNECTION TO EAST WING

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 21.1/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 21 21.2/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 21 - FF CONNECTION TO EAST WING

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE

INTERNAL DOORS

24 Doors, shutters and hatches

Glass doors (size and type to be confirmed); including


ironmongery and all necessary fixing accessories; all in
accordance with the Drawings and Specifications

A Single leaf door including ironmongery 1 nr

B Double leaf door including ironmongery 2 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 21 21.2/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 21 - FF CONNECTION TO EAST WING

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 21.2/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 21 21.3/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 21 - FF CONNECTION TO EAST WING

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES

WALL FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to walls and columns

Texture paint; including all accessories and works required; all in


accordance with the Specifications

A Type W203 236 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 21 21.3/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 21 - FF CONNECTION TO EAST WING

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

FLOOR FINISHES

28 Floor, wall, ceiling and roof finishings

Screeds

Backgrounds; self levelling compound; to receive floor finishes; all


in accordance with the Specifications

A To floors 374 m2

Finish to floors

Porcelain Floor tile; Matt finish, colour : sand, size : 120x240, laid
on self levelling compound (measured separately) including
preparation and all works required; all in accordance with the
Specifications

B Type F-300B 330 m2

Carpet; laid on self levelling compound (measured separately)


including preparation and all works required; all in accordance with
the Specifications

C Type F-101 44 m2

Brushed brass metal skirting; including preparation and all works


required; all in accordance with the Specifications

D Brushed brass metal 195 m

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 21 21.3/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 21 - FF CONNECTION TO EAST WING

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

CEILING FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to ceilings

Ceiling paint; including all accessories and works required; all in


accordance with the Specifications

A Type C-202 396 m2

Suspended Ceilings

Suspended Gypsum Board; including; fastenings and all


accessories and works required; all in accordance with the
Specifications

B For Type C-202 396 m2

Acoustic insulation; including fastenings and all accessories and


works required; all in accordance with the Specifications

C For Type C-202 396 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 21 21.3/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 21 - FF CONNECTION TO EAST WING

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 21.3/1

Page : 21.3/2

Page : 21.3/3

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 21 21.4/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 21 - FF CONNECTION TO EAST WING

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING

32 Furniture, fittings and equipment

Signage

Fire and Life Safety Signs, as per Specifications

A Allow for fire and life safety signs 1 Item

Artwork

B Allow for provision of artwork 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 21 21.4/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 21 - FF CONNECTION TO EAST WING

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 21.4/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 21 21.5/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 21 - FF CONNECTION TO EAST WING

Item Description Quantity Unit Rate AED Amount AED

SERVICES
SPACE HEATING AND AIR CONDITIONING

38 Mechanical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Ductwork

Galvanised steel sheet rectangular ductwork and fittings, including


insulation, supports, manufactured and fitted in accordance with
the relevant standards, complete as shown on drawings and
Specifications

A Supply/Return air ductwork 1 Item

Duct ancillaries

Flexible duct, including insulation complete all in accordance with


the Specifications

B Flexible duct 1 Item

Linear slot diffuser, complete all in accordance with the


Specifications

C Supply air linear diffuser 1 Item

Variable air volume boxes; including all necessary insulation,


accessories and connections; complete all in accordance with the
Specifications

D VAVs 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 21 21.5/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 21 - FF CONNECTION TO EAST WING

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION

39 Electrical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Small Power Installation

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

Socket outlets

A Switch Socket Outlets 1 Item

B Floor Box 1 Item

Terminal equipment and fittings

Devices complete as described, all in accordance with the


Specification

Socket outlets

C Switch Socket Outlets 1 Item

D Floor Box 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 21 21.5/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 21 - FF CONNECTION TO EAST WING

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Lighting Installation
Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

A Lighting points 47 nr

B Linear lighting points; 1 Item

Terminal equipment and fittings

Light fittings including fixings, lamps and connections complete in


accordance with the Specifications

C Lighting type C (1) 83 m

D Lighting type D (2) 36 nr

E Lighting type D (3) 11 nr

Lighting Control Installation

Lighting control system including but not limited to panels, wiring,


containment, as shown on drawings all in accordance with the
Specification

F Lighting control installation 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 21 21.5/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 21 - FF CONNECTION TO EAST WING

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION

38 Mechanical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Sprinkler Installations

Pipework

Above ground galvanized steel pipes; including fittings, all


necessary fixings, accessories, supports and connections in
accordance with the Specifications

A 25mm Diameter pipes 1 Item

B 32mm Diameter pipes 1 Item

C 40mm Diameter pipes 1 Item

D 50mm Diameter pipes 1 Item

E 65mm Diameter pipes 1 Item

Pipe ancillaries

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification

F Pendent type sprinkler heads 1 Item

G Upright type sprinkler heads 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 21 21.5/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 21 - FF CONNECTION TO EAST WING

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION (CONT*D)

Sprinkler Installations (CONT*D)

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification
(CONT*D)

A Side wall type sprinkler heads 1 Item

Fire hose reel and department valve assembly; comprising of fire


department landing valve, rack with hose, nozzle, 25mm diameter
pressure reducing valve, swing hose reel, fire extinguishers,
pipework inside cabinet, all necessary accessories and
connections ; all in accordance with the Specification

B Fire hose reel cabinet 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 21 21.5/6
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 21 - FF CONNECTION TO EAST WING

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS

39 Electrical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Fire Detection & Voice Evacuation System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

A Intelligent optical Smoke Detector with standard base 1 Item

B Ceiling void Intelligent optical Smoke Detector with LED remote 1 Item
Indicator

C Manual Call Point 1 Item

D Flasher 1 Item

E Response Indicator 1 Item

F PAVA/BGM Ceiling Speaker 1 Item

Terminal equipment and fittings

Supply and installation of fire alarm devices, all in accordance with


the Specification

G Intelligent optical Smoke Detector with standard base 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 21 21.5/7
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 21 - FF CONNECTION TO EAST WING

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Fire Detection & Voice Evacuation System (CONT*D)

Supply and installation of fire alarm devices, all in accordance with


the Specification (CONT*D)

A Ceiling void Intelligent optical Smoke Detector with LED remote 1 Item
Indicator

B Manual Call Point 1 Item

C Flasher 1 Item

D Response Indicator 1 Item

E PAVA/BGM Ceiling Speaker 1 Item

IT System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

F WIFI Ceiling 1 Item

Terminal equipment and fittings

Supply and installation of IT devices, all in accordance with the


Specification

G WIFI Ceiling 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 21 21.5/8
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 21 - FF CONNECTION TO EAST WING

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Security System

CCTV

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

A Dome Camera 1 Item

Terminal equipment and fittings

Supply and installation of CCTV devices, all in accordance with


the Specification

B Dome Camera 1 Item

Access Control

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

C Door with card reader, Electric lock, BGU and exit Push button 1 Item

Terminal equipment and fittings

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 21 21.5/9
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 21 - FF CONNECTION TO EAST WING

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Security System (CONT*D)

Supply and installation of Access control devices, all in


accordance with the Specification

A Door with card reader, Electric lock, BGU and exit Push button 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 21 21.5/10
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 21 - FF CONNECTION TO EAST WING

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

BUILDER'S WORK IN CONNECTION WITH SERVICES

41 Builder's work in connection with mechanical, electrical


and transportation installations

A Builder's work in connection with services 1 Item

B Allow for integrating the new MEP services to the existing services 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 21 21.5/11
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 21 - FF CONNECTION TO EAST WING

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 21.5/1

Page : 21.5/2

Page : 21.5/3

Page : 21.5/4

Page : 21.5/5

Page : 21.5/6

Page : 21.5/7

Page : 21.5/8

Page : 21.5/9

Page : 21.5/10

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 21 D/Add/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 21 - FF CONNECTION TO EAST WING

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS
Any items that may not be covered elsewhere in the Bills of
Quantities which the tenderer deemed to be necessary in order to
carry out the works in full compliance with the Drawings,
Specifications and any other items necessary to form a complete
Installations, must be itemised and priced below. The tenderer
may provide additional sheets for this purpose if necessary. All
items under this section must be summarised under a separate
cover.

A Item

B Item

C Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 21 D/Add/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 21 - FF CONNECTION TO EAST WING

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : D/Add/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 21 D/Add/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 21 - FF CONNECTION TO EAST WING

Item Description Quantity Unit Rate AED Amount AED

BILL 21 - FF Connection to East Wing

BILL SUMMARY

Total Brought Forward from Page No.

Facilitating works 21.1/2

Superstructure 21.2/2

Internal Finishes 21.3/4

Fittings and Furnishing 21.4/2

Services 21.5/11

ADDITIONAL ITEMS D/Add/2

Carried To General Summary Page AED 0


Issued on: 15/11/2022
The Armed Forces Officers Club and Hotel

Erth Guest Experience

Fit-out Works

BILL 22

FF PUBLIC BATHROOM 1

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 22 22.1/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 22 - FF PUBLIC BATHROOM 1

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS

DEMOLITION WORKS

3 Demolitions

Demolish and off site disposal of existing walls, floor finishes, wall
finishes, ceilings, doors and MEP services as per drawings and
specification

A Demolition of existing floor finishes 87 m2

B Demolition of existing internal walls including finishes 236 m2

C Demolition of existing wall finishes 174 m2

D Demolition of existing ceiling finishes 87 m2

E Demolition of existing doors 8 nr

F Demolition of existing MEP services 87 m2

G Demolish and remove existing toilet sanitary fittings and 1 Item


accessories

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 22 22.1/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 22 - FF PUBLIC BATHROOM 1

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 22.1/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 22 22.2/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 22 - FF PUBLIC BATHROOM 1

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE

INTERNAL WALLS AND PARTITIONS

20 Proprietary linings and partitions

Block work; including reinforcement and all necessary fixing


accessories; all in accordance with the Drawings and
Specifications

A Toilet partition; assume 200mm thick block walls 202 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 22 22.2/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 22 - FF PUBLIC BATHROOM 1

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

INTERNAL DOORS

24 Doors, shutters and hatches

Doors (size, type and material to be confirmed); including


ironmongery and all necessary fixing accessories; all in
accordance with the Drawings and Specifications

A Single leaf door including ironmongery 10 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 22 22.2/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 22 - FF PUBLIC BATHROOM 1

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 22.2/1

Page : 22.2/2

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 22 22.3/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 22 - FF PUBLIC BATHROOM 1

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES

WALL FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to walls and columns

Plastering to internal masonry / concrete backing; including all


accessories and works required; all in accordance with the
Specifications

A To receive stone 201 m2

B To receive paint 170 m2

Texture paint; including all accessories and works required; all in


accordance with the Specifications

C Type W203; to toilet lobby 170 m2

Mosaic Wall tile; including all accessories and works required; all
in accordance with the Specifications

D Type MOS-001 48 m2

Silver travertine unfilled Stone; Finish: Unfilled, continuously


matched horizontal veins; including all accessories and works
required; all in accordance with the Specifications

E Type ST-004 153 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 22 22.3/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 22 - FF PUBLIC BATHROOM 1

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

WALL FINISHES (CONT*D)

28 Floor, wall, ceiling and roof finishings (CONT*D)


Stone to toilet ledge; including all accessories and works required;
all in accordance with the Specifications

A Stone cladding to toilet WC tank 7 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 22 22.3/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 22 - FF PUBLIC BATHROOM 1

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

FLOOR FINISHES

28 Floor, wall, ceiling and roof finishings

Screeds

Backgrounds; self levelling compound; to receive floor finishes; all


in accordance with the Specifications

A To floors 62 m2

Finish to floors

Porcelain Floor tile; Matt finish, colour : sand, size : 120x240, laid
on self levelling compound (measured separately) including
preparation and all works required; all in accordance with the
Specifications

B Type F-300B; to toilet lobby 18 m2

Porcelain Floor tile; Colour: Concrete grey, Matt finish; bedded on


self levelling compound (measured separately); including all
accessories and works required; all in accordance with the
Specifications

C Type F-003 44 m2

Waterproofing; including all accessories and works required; all in


accordance with the Specifications

D To toilet floors 44 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 22 22.3/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 22 - FF PUBLIC BATHROOM 1

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

CEILING FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to ceilings

Ceiling paint; including all accessories and works required; all in


accordance with the Specifications

A Type C-202 61 m2

Suspended Ceilings

Moisture Resistant Suspended Gypsum Board; including;


fastenings and all accessories and works required; all in
accordance with the Specifications

B For Type C-202 61 m2

Ceiling Bulkhead; including; fastenings and all accessories and


works required; all in accordance with the Specifications

C 250mm thick high 30 m

Acoustic insulation; including fastenings and all accessories and


works required; all in accordance with the Specifications

D For Type C-202 61 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 22 22.3/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 22 - FF PUBLIC BATHROOM 1

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 22.3/1

Page : 22.3/2

Page : 22.3/3

Page : 22.3/4

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 22 22.4/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 22 - FF PUBLIC BATHROOM 1

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING

32 Furniture, fittings and equipment

Signages

A Toilet sign 2 nr

Countertop

B Countertop, 600mm x 3750mm 2 nr

Artwork

C Allow for provision of artwork 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 22 22.4/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 22 - FF PUBLIC BATHROOM 1

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 22.4/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 22 22.5/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 22 - FF PUBLIC BATHROOM 1

Item Description Quantity Unit Rate AED Amount AED

SERVICES

SANITARY INSTALLATIONS

38 Mechanical services

Sanitary appliances; including all necessary fixing and


accessories; as shown on drawings; all in accordance with the
Specifications

A Water Closet 7 nr

B Wash Basin with mixer 7 nr

C Urinals 2 nr

Sanitary fittings; including all necessary fixing and accessories; as


shown on drawings; all in accordance with the Specifications

D Grab Bars for Disabled toilet 2 nr

E Trash bin 7 nr

F Tissue holder 7 nr

G Health Spray 7 nr

H Urinal partition 2 nr

J Wall Mounted Towel Dispenser/Waste Bin 1 nr

K Mirror 2 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 22 22.5/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 22 - FF PUBLIC BATHROOM 1

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

DISPOSAL INSTALLATION

38 Mechanical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Pipework

Supply and installation of drainage pipes including insulation,


fittings, supports, hangers and all required accessories in
accordance with drawings and specifications.

Waste Pipe (UPVC)

A 32mm diameter 1 Item

B 50mm diameter 1 Item

C 75mm diameter 1 Item

D 110mm diameter 1 Item

Pipe ancillaries

Supply and installation of the following with fittings, fixings,


supports and all required accessories complete; in accordance
with drawings and specifications.

Clean out

E 75mm diameter 1 Item

F 110mm diameter 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 22 22.5/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 22 - FF PUBLIC BATHROOM 1

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

DISPOSAL INSTALLATION (CONT*D)

38 Mechanical services (CONT*D)

Floor Trap

A 75mm diameter 1 Item

Valve

B 75mm diameter 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 22 22.5/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 22 - FF PUBLIC BATHROOM 1

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

WATER INSTALLATION

38 Mechanical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Pipework

Supply and installation of water supply pipes including insulation,


fittings, supports, hangers and all required accessories in
accordance with drawings and specifications.

Water Supply Pipe (PEX)

A 15mm diameter 1 Item

B 22mm diameter 1 Item

Pipe ancillaries

Supply and installation of the following with fittings, fixings,


supports and all required accessories complete; in accordance
with drawings and specifications.

Isolation Valves

C 15mm diameter 1 Item

D 22mm diameter 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 22 22.5/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 22 - FF PUBLIC BATHROOM 1

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

SPACE HEATING AND AIR CONDITIONING

38 Mechanical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Ductwork

Galvanised steel sheet rectangular ductwork and fittings, including


insulation, supports, manufactured and fitted in accordance with
the relevant standards, complete as shown on drawings and
Specifications

A Supply/Return air ductwork 1 Item

Duct ancillaries

Flexible duct, including insulation complete all in accordance with


the Specifications

B Flexible duct 1 Item

Linear slot diffuser, complete all in accordance with the


Specifications

C Supply air linear diffuser 1 Item

Variable air volume boxes; including all necessary insulation,


accessories and connections; complete all in accordance with the
Specifications

D VAVs 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 22 22.5/6
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 22 - FF PUBLIC BATHROOM 1

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION

39 Electrical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Small Power Installation

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

Socket outlets

A Switch Socket Outlets 1 Item

Terminal equipment and fittings

Devices complete as described, all in accordance with the


Specification

Socket outlets

B Switch Socket Outlets 1 Item

Lighting Installation

Final circuits

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 22 22.5/7
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 22 - FF PUBLIC BATHROOM 1

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Lighting Installation

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

A Lighting points 53 nr

B Linear lighting points; for Lighting type C(1) 1 Item

Terminal equipment and fittings

Light fittings including fixings, lamps and connections complete in


accordance with the Specifications

C Lighting type A (2) 4 nr

D Lighting type A (3) 3 nr

E Lighting type A (5) 8 nr

F Lighting type A (6) 38 nr

G Lighting type C (1) 4 m

H Lighting type C (5) 12 m

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 22 22.5/8
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 22 - FF PUBLIC BATHROOM 1

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Lighting Control Installation


Lighting control system including but not limited to panels, wiring,
containment, as shown on drawings all in accordance with the
Specification

A Lighting control installation 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 22 22.5/9
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 22 - FF PUBLIC BATHROOM 1

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION

38 Mechanical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Sprinkler Installations

Pipework

Above ground galvanized steel pipes; including fittings, all


necessary fixings, accessories, supports and connections in
accordance with the Specifications

A 25mm Diameter pipes 1 Item

B 32mm Diameter pipes 1 Item

C 40mm Diameter pipes 1 Item

D 50mm Diameter pipes 1 Item

E 65mm Diameter pipes 1 Item

Pipe ancillaries

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification

F Pendent type sprinkler heads 1 Item

G Upright type sprinkler heads 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 22 22.5/10
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 22 - FF PUBLIC BATHROOM 1

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION (CONT*D)

Sprinkler Installations (CONT*D)

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification
(CONT*D)

A Side wall type sprinkler heads 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 22 22.5/11
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 22 - FF PUBLIC BATHROOM 1

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS

39 Electrical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Fire Detection & Voice Evacuation System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

A Intelligent optical Smoke Detector with standard base 1 Item

B Ceiling void Intelligent optical Smoke Detector with LED remote 1 Item
Indicator

C Manual Call Point 1 Item

D Flasher 1 Item

E Response Indicator 1 Item

F PAVA/BGM Ceiling Speaker 1 Item

Terminal equipment and fittings

Supply and installation of fire alarm devices, all in accordance with


the Specification

G Intelligent optical Smoke Detector with standard base 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 22 22.5/12
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 22 - FF PUBLIC BATHROOM 1

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Fire Detection & Voice Evacuation System (CONT*D)

Supply and installation of fire alarm devices, all in accordance with


the Specification (CONT*D)

A Ceiling void Intelligent optical Smoke Detector with LED remote 1 Item
Indicator

B Manual Call Point 1 Item

C Flasher 1 Item

D Response Indicator 1 Item

E PAVA/BGM Ceiling Speaker 1 Item

IT System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

F WIFI Ceiling 1 Item

Terminal equipment and fittings

Supply and installation of IT devices, all in accordance with the


Specification

G WIFI Ceiling 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 22 22.5/13
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 22 - FF PUBLIC BATHROOM 1

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Security System

CCTV

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

A Dome Camera 1 Item

Terminal equipment and fittings

Supply and installation of CCTV devices, all in accordance with


the Specification

B Dome Camera 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 22 22.5/14
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 22 - FF PUBLIC BATHROOM 1

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

BUILDER'S WORK IN CONNECTION WITH SERVICES

41 Builder's work in connection with mechanical, electrical


and transportation installations

A Builder's work in connection with services 1 Item

B Allow for integrating the new MEP services to the existing services 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 22 22.5/15
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 22 - FF PUBLIC BATHROOM 1

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 22.5/1

Page : 22.5/2

Page : 22.5/3

Page : 22.5/4

Page : 22.5/5

Page : 22.5/6

Page : 22.5/7

Page : 22.5/8

Page : 22.5/9

Page : 22.5/10

Page : 22.5/11

Page : 22.5/12

Page : 22.5/13

Page : 22.5/14

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 22 D/Add/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 22 - FF PUBLIC BATHROOM 1

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS
Any items that may not be covered elsewhere in the Bills of
Quantities which the tenderer deemed to be necessary in order to
carry out the works in full compliance with the Drawings,
Specifications and any other items necessary to form a complete
Installations, must be itemised and priced below. The tenderer
may provide additional sheets for this purpose if necessary. All
items under this section must be summarised under a separate
cover.

A Item

B Item

C Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 22 D/Add/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 22 - FF PUBLIC BATHROOM 1

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : D/Add/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 22 D/Add/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 22 - FF PUBLIC BATHROOM 1

Item Description Quantity Unit Rate AED Amount AED

BILL 22 - FF Public Bathroom 1

BILL SUMMARY

Total Brought Forward from Page No.

Facilitating works 22.1/2

Superstructure 22.2/3

Internal Finishes 22.3/5

Fittings and Furnishing 22.4/2

Services 22.5/15

ADDITIONAL ITEMS D/Add/2

Carried To General Summary Page AED 0


Issued on: 15/11/2022
The Armed Forces Officers Club and Hotel

Erth Guest Experience

Fit-out Works

BILL 23

FF PUBLIC BATHROOM 2

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 23 23.1/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 23 - FF PUBLIC BATHROOM 2

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS

DEMOLITION WORKS

3 Demolitions

Demolish and off site disposal of existing walls, floor finishes, wall
finishes, ceilings, doors and MEP services as per drawings and
specification

A Demolition of existing floor finishes 103 m2

B Demolition of existing internal walls including finishes 188 m2

C Demolition of existing wall finishes 179 m2

D Demolition of existing ceiling finishes 103 m2

E Demolition of existing doors 6 nr

F Demolition of existing MEP services 103 m2

G Demolish and remove existing toilet sanitary fittings and 1 Item


accessories

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 23 23.1/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 23 - FF PUBLIC BATHROOM 2

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 23.1/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 23 23.2/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 23 - FF PUBLIC BATHROOM 2

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE

INTERNAL WALLS AND PARTITIONS

20 Proprietary linings and partitions

Block work; including reinforcement and all necessary fixing


accessories; all in accordance with the Drawings and
Specifications

A Toilet partition; assume 200mm thick block walls 197 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 23 23.2/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 23 - FF PUBLIC BATHROOM 2

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

INTERNAL DOORS

24 Doors, shutters and hatches

Doors (size, type and material to be confirmed); including


ironmongery and all necessary fixing accessories; all in
accordance with the Drawings and Specifications

A Single leaf door including ironmongery 9 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 23 23.2/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 23 - FF PUBLIC BATHROOM 2

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 23.2/1

Page : 23.2/2

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 23 23.3/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 23 - FF PUBLIC BATHROOM 2

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES

WALL FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to walls and columns

Plastering to internal masonry / concrete backing; including all


accessories and works required; all in accordance with the
Specifications

A To receive tile 194 m2

B To receive paint 25 m2

Texture paint; including all accessories and works required; all in


accordance with the Specifications

C Type W203; to toilet lobby 25 m2

Mosaic Wall tile; including all accessories and works required; all
in accordance with the Specifications

D Type MOS-001 78 m2

Silver travertine unfilled Stone; Finish: Unfilled, continuously


matched horizontal veins; including all accessories and works
required; all in accordance with the Specifications

E Type ST-004 116 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 23 23.3/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 23 - FF PUBLIC BATHROOM 2

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

WALL FINISHES (CONT*D)

28 Floor, wall, ceiling and roof finishings (CONT*D)


Marble to toilet ledge; including all accessories and works
required; all in accordance with the Specifications

A Marble cladding to toilet WC tank 7 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 23 23.3/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 23 - FF PUBLIC BATHROOM 2

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

FLOOR FINISHES

28 Floor, wall, ceiling and roof finishings

Screeds

Backgrounds; self levelling compound; to receive floor finishes; all


in accordance with the Specifications

A To floors 47 m2

Finish to floors

Woven Vinyl Carpet; laid on self levelling compound (measured


separately) including preparation and all works required; all in
accordance with the Specifications

B Type F-101B; to toilet lobby 8 m2

Porcelain Floor tile; Colour: Concrete grey, Matt finish; bedded on


self levelling compound (measured separately); including all
accessories and works required; all in accordance with the
Specifications

C Type F-003 39 m2

Waterproofing; including all accessories and works required; all in


accordance with the Specifications

D To toilet floors 39 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 23 23.3/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 23 - FF PUBLIC BATHROOM 2

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

CEILING FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to ceilings

Ceiling paint; including all accessories and works required; all in


accordance with the Specifications

A Type C-202 45 m2

Moisture Resistant Suspended Gypsum Board; including;


fastenings and all accessories and works required; all in
accordance with the Specifications

B For Type C-202 45 m2

Ceiling Bulkhead; including; fastenings and all accessories and


works required; all in accordance with the Specifications

C 250mm thick high 24 m

Acoustic insulation; including fastenings and all accessories and


works required; all in accordance with the Specifications

D For Type C-202 45 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 23 23.3/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 23 - FF PUBLIC BATHROOM 2

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 23.3/1

Page : 23.3/2

Page : 23.3/3

Page : 23.3/4

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 23 23.4/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 23 - FF PUBLIC BATHROOM 2

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING

32 Furniture, fittings and equipment

Signages

A Toilet sign 2 nr

Countertop

B Countertop, 600mm x 3750mm 2 nr

Artwork

C Allow for provision of artwork 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 23 23.4/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 23 - FF PUBLIC BATHROOM 2

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 23.4/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 23 23.5/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 23 - FF PUBLIC BATHROOM 2

Item Description Quantity Unit Rate AED Amount AED

SERVICES

SANITARY INSTALLATIONS

38 Mechanical services

Sanitary appliances; including all necessary fixing and


accessories; as shown on drawings; all in accordance with the
Specifications

A Water Closet 7 nr

B Wash Basin with mixer 7 nr

C Urinals 2 nr

Sanitary fittings; including all necessary fixing and accessories; as


shown on drawings; all in accordance with the Specifications

D Grab Bars for Disabled toilet 2 nr

E Trash bin 7 nr

F Tissue holder 7 nr

G Health Spray 7 nr

H Urinal partition 2 nr

J Wall Mounted Towel Dispenser/Waste Bin 1 nr

K Mirror 2 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 23 23.5/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 23 - FF PUBLIC BATHROOM 2

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

DISPOSAL INSTALLATION

38 Mechanical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Pipework

Supply and installation of drainage pipes including insulation,


fittings, supports, hangers and all required accessories in
accordance with drawings and specifications.

Waste Pipe (UPVC)

A 32mm diameter 1 Item

B 50mm diameter 1 Item

C 75mm diameter 1 Item

D 110mm diameter 1 Item

Pipe ancillaries

Supply and installation of the following with fittings, fixings,


supports and all required accessories complete; in accordance
with drawings and specifications.

Clean out

E 75mm diameter 1 Item

F 110mm diameter 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 23 23.5/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 23 - FF PUBLIC BATHROOM 2

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

DISPOSAL INSTALLATION (CONT*D)

38 Mechanical services (CONT*D)

Floor Trap

A 75mm diameter 1 Item

Valve

B 75mm diameter 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 23 23.5/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 23 - FF PUBLIC BATHROOM 2

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

WATER INSTALLATION

38 Mechanical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Pipework

Supply and installation of water supply pipes including insulation,


fittings, supports, hangers and all required accessories in
accordance with drawings and specifications.

Water Supply Pipe (PEX)

A 15mm diameter 1 Item

B 22mm diameter 1 Item

Pipe ancillaries

Supply and installation of the following with fittings, fixings,


supports and all required accessories complete; in accordance
with drawings and specifications.

Isolation Valves

C 15mm diameter 1 Item

D 22mm diameter 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 23 23.5/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 23 - FF PUBLIC BATHROOM 2

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

SPACE HEATING AND AIR CONDITIONING

38 Mechanical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Ductwork

Galvanised steel sheet rectangular ductwork and fittings, including


insulation, supports, manufactured and fitted in accordance with
the relevant standards, complete as shown on drawings and
Specifications

A Supply/Return air ductwork 1 Item

Duct ancillaries

Flexible duct, including insulation complete all in accordance with


the Specifications

B Flexible duct 1 Item

Linear slot diffuser, complete all in accordance with the


Specifications

C Supply air linear diffuser 1 Item

Variable air volume boxes; including all necessary insulation,


accessories and connections; complete all in accordance with the
Specifications

D VAVs 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 23 23.5/6
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 23 - FF PUBLIC BATHROOM 2

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION

39 Electrical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Small Power Installation

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

Socket outlets

A Switch Socket Outlets 1 Item

Terminal equipment and fittings

Devices complete as described, all in accordance with the


Specification

Socket outlets

B Switch Socket Outlets 1 Item

Lighting Installation

Final circuits

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 23 23.5/7
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 23 - FF PUBLIC BATHROOM 2

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Lighting Installation

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

A Lighting points 53 nr

B Linear lighting points; for Lighting type C(1) 1 Item

Terminal equipment and fittings

Light fittings including fixings, lamps and connections complete in


accordance with the Specifications

C Lighting type A (2) 4 nr

D Lighting type A (3) 3 nr

E Lighting type A (5) 8 nr

F Lighting type A (6) 38 nr

G Lighting type C (1) 4 m

H Lighting type C (5) 12 m

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 23 23.5/8
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 23 - FF PUBLIC BATHROOM 2

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Lighting Control Installation


Lighting control system including but not limited to panels, wiring,
containment, as shown on drawings all in accordance with the
Specification

A Lighting control installation 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 23 23.5/9
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 23 - FF PUBLIC BATHROOM 2

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION

38 Mechanical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Sprinkler Installations

Pipework

Above ground galvanized steel pipes; including fittings, all


necessary fixings, accessories, supports and connections in
accordance with the Specifications

A 25mm Diameter pipes 1 Item

B 32mm Diameter pipes 1 Item

C 40mm Diameter pipes 1 Item

D 50mm Diameter pipes 1 Item

E 65mm Diameter pipes 1 Item

Pipe ancillaries

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification

F Pendent type sprinkler heads 1 Item

G Upright type sprinkler heads 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 23 23.5/10
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 23 - FF PUBLIC BATHROOM 2

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION (CONT*D)

Sprinkler Installations (CONT*D)

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification
(CONT*D)

A Side wall type sprinkler heads 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 23 23.5/11
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 23 - FF PUBLIC BATHROOM 2

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS

39 Electrical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Fire Detection & Voice Evacuation System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

A Intelligent optical Smoke Detector with standard base 1 Item

B Ceiling void Intelligent optical Smoke Detector with LED remote 1 Item
Indicator

C Manual Call Point 1 Item

D Flasher 1 Item

E Response Indicator 1 Item

F PAVA/BGM Ceiling Speaker 1 Item

Terminal equipment and fittings

Supply and installation of fire alarm devices, all in accordance with


the Specification

G Intelligent optical Smoke Detector with standard base 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 23 23.5/12
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 23 - FF PUBLIC BATHROOM 2

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Fire Detection & Voice Evacuation System (CONT*D)

Supply and installation of fire alarm devices, all in accordance with


the Specification (CONT*D)

A Ceiling void Intelligent optical Smoke Detector with LED remote 1 Item
Indicator

B Manual Call Point 1 Item

C Flasher 1 Item

D Response Indicator 1 Item

E PAVA/BGM Ceiling Speaker 1 Item

IT System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

F WIFI Ceiling 1 Item

Terminal equipment and fittings

Supply and installation of IT devices, all in accordance with the


Specification

G WIFI Ceiling 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 23 23.5/13
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 23 - FF PUBLIC BATHROOM 2

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Security System

CCTV

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

A Dome Camera 1 Item

Terminal equipment and fittings

Supply and installation of CCTV devices, all in accordance with


the Specification

B Dome Camera 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 23 23.5/14
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 23 - FF PUBLIC BATHROOM 2

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

BUILDER'S WORK IN CONNECTION WITH SERVICES

41 Builder's work in connection with mechanical, electrical


and transportation installations

A Builder's work in connection with services 1 Item

B Allow for integrating the new MEP services to the existing services 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 23 23.5/15
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 23 - FF PUBLIC BATHROOM 2

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 23.5/1

Page : 23.5/2

Page : 23.5/3

Page : 23.5/4

Page : 23.5/5

Page : 23.5/6

Page : 23.5/7

Page : 23.5/8

Page : 23.5/9

Page : 23.5/10

Page : 23.5/11

Page : 23.5/12

Page : 23.5/13

Page : 23.5/14

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 23 D/Add/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 23 - FF PUBLIC BATHROOM 2

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS
Any items that may not be covered elsewhere in the Bills of
Quantities which the tenderer deemed to be necessary in order to
carry out the works in full compliance with the Drawings,
Specifications and any other items necessary to form a complete
Installations, must be itemised and priced below. The tenderer
may provide additional sheets for this purpose if necessary. All
items under this section must be summarised under a separate
cover.

A Item

B Item

C Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 23 D/Add/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 23 - FF PUBLIC BATHROOM 2

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : D/Add/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 23 D/Add/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 23 - FF PUBLIC BATHROOM 2

Item Description Quantity Unit Rate AED Amount AED

BILL 23 - FF Public Bathroom 2

BILL SUMMARY

Total Brought Forward from Page No.

Facilitating works 23.1/2

Superstructure 23.2/3

Internal Finishes 23.3/5

Fittings and Furnishing 23.4/2

Services 23.5/15

ADDITIONAL ITEMS D/Add/2

Carried To General Summary Page AED 0


Issued on: 15/11/2022
The Armed Forces Officers Club and Hotel

Erth Guest Experience

Fit-out Works

BILL 24

FF PUBLIC BATHROOM 3

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 24 24.1/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 24 - FF PUBLIC BATHROOM 3

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS
DEMOLITION WORKS

3 Demolitions

Demolish and off site disposal of existing walls, floor finishes, wall
finishes, ceilings, doors and MEP services as per drawings and
specification

A Demolition of existing floor finishes 103 m2

B Demolition of existing internal walls including finishes 188 m2

C Demolition of existing wall finishes 179 m2

D Demolition of existing ceiling finishes 103 m2

E Demolition of existing doors 6 nr

F Demolition of existing MEP services 103 m2

G Demolish and remove existing toilet sanitary fittings and 1 Item


accessories

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 24 24.1/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 24 - FF PUBLIC BATHROOM 3

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 24.1/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 24 24.2/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 24 - FF PUBLIC BATHROOM 3

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE

INTERNAL WALLS AND PARTITIONS

20 Proprietary linings and partitions

Block work; including reinforcement and all necessary fixing


accessories; all in accordance with the Drawings and
Specifications

A Toilet partition; assume 200mm thick block walls 195 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 24 24.2/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 24 - FF PUBLIC BATHROOM 3

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

INTERNAL DOORS

24 Doors, shutters and hatches

Doors (size, type and material to be confirmed); including


ironmongery and all necessary fixing accessories; all in
accordance with the Drawings and Specifications

A Single leaf door including ironmongery 9 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 24 24.2/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 24 - FF PUBLIC BATHROOM 3

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 24.2/1

Page : 24.2/2

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 24 24.3/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 24 - FF PUBLIC BATHROOM 3

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES

WALL FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to walls and columns

Plastering to internal masonry / concrete backing; including all


accessories and works required; all in accordance with the
Specifications

A To receive tile 199 m2

B To receive paint 25 m2

Texture paint; including all accessories and works required; all in


accordance with the Specifications

C Type W203; to toilet lobby 25 m2

Mosaic Wall tile; including all accessories and works required; all
in accordance with the Specifications

D Type MOS-001 81 m2

Silver travertine unfilled Stone; Finish: Unfilled, continuously


matched horizontal veins; including all accessories and works
required; all in accordance with the Specifications

E Type ST-004 118 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 24 24.3/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 24 - FF PUBLIC BATHROOM 3

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

WALL FINISHES (CONT*D)

28 Floor, wall, ceiling and roof finishings (CONT*D)


Stone to toilet ledge; including all accessories and works required;
all in accordance with the Specifications

A Stone cladding to toilet WC tank 7 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 24 24.3/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 24 - FF PUBLIC BATHROOM 3

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

FLOOR FINISHES

28 Floor, wall, ceiling and roof finishings

Screeds

Backgrounds; self levelling compound; to receive floor finishes; all


in accordance with the Specifications

A To floors 47 m2

Finish to floors

Woven Vinyl Carpet; laid on self levelling compound (measured


separately) including preparation and all works required; all in
accordance with the Specifications

B Type F-101B; to toilet lobby 7 m2

Porcelain Floor tile; Colour: Concrete grey, Matt finish; bedded on


self levelling compound (measured separately); including all
accessories and works required; all in accordance with the
Specifications

C Type F-003 40 m2

Waterproofing; including all accessories and works required; all in


accordance with the Specifications

D To toilet floors 40 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 24 24.3/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 24 - FF PUBLIC BATHROOM 3

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

CEILING FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to ceilings

Ceiling paint; including all accessories and works required; all in


accordance with the Specifications

A Type C-202 46 m2

Suspended Ceilings

Moisture Resistant Suspended Gypsum Board; including;


fastenings and all accessories and works required; all in
accordance with the Specifications

B For Type C-202 46 m2

Ceiling Bulkhead; including; fastenings and all accessories and


works required; all in accordance with the Specifications

C 250mm thick high 24 m

Acoustic insulation; including fastenings and all accessories and


works required; all in accordance with the Specifications

D For Type C-202 46 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 24 24.3/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 24 - FF PUBLIC BATHROOM 3

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 24.3/1

Page : 24.3/2

Page : 24.3/3

Page : 24.3/4

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 24 24.4/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 24 - FF PUBLIC BATHROOM 3

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING

32 Furniture, fittings and equipment

Signage

Door Signs

A Type ST02 3 nr

Countertop

B Countertop, 600mm x 3750mm 2 nr

Artwork

C Allow for provision of artwork 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 24 24.4/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 24 - FF PUBLIC BATHROOM 3

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 24.4/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 24 24.5/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 24 - FF PUBLIC BATHROOM 3

Item Description Quantity Unit Rate AED Amount AED

SERVICES

SANITARY INSTALLATIONS

38 Mechanical services

Sanitary appliances; including all necessary fixing and


accessories; as shown on drawings; all in accordance with the
Specifications

A Water Closet 7 nr

B Wash Basin with mixer 7 nr

C Urinals 2 nr

Sanitary fittings; including all necessary fixing and accessories; as


shown on drawings; all in accordance with the Specifications

D Grab Bars for Disabled toilet 2 nr

E Trash bin 7 nr

F Tissue holder 7 nr

G Health Spray 7 nr

H Urinal partition 2 nr

J Wall Mounted Towel Dispenser/Waste Bin 1 nr

K Mirror 2 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 24 24.5/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 24 - FF PUBLIC BATHROOM 3

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

DISPOSAL INSTALLATION

38 Mechanical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Pipework

Supply and installation of drainage pipes including insulation,


fittings, supports, hangers and all required accessories in
accordance with drawings and specifications.

Waste Pipe (UPVC)

A 32mm diameter 1 Item

B 50mm diameter 1 Item

C 75mm diameter 1 Item

D 110mm diameter 1 Item

Pipe ancillaries

Supply and installation of the following with fittings, fixings,


supports and all required accessories complete; in accordance
with drawings and specifications.

Clean out

E 75mm diameter 1 Item

F 110mm diameter 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 24 24.5/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 24 - FF PUBLIC BATHROOM 3

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

DISPOSAL INSTALLATION (CONT*D)

38 Mechanical services (CONT*D)

Floor Trap

A 75mm diameter 1 Item

Valve

B 75mm diameter 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 24 24.5/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 24 - FF PUBLIC BATHROOM 3

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

WATER INSTALLATION

38 Mechanical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Pipework

Supply and installation of water supply pipes including insulation,


fittings, supports, hangers and all required accessories in
accordance with drawings and specifications.

Water Supply Pipe (PEX)

A 15mm diameter 1 Item

B 22mm diameter 1 Item

Pipe ancillaries

Supply and installation of the following with fittings, fixings,


supports and all required accessories complete; in accordance
with drawings and specifications.

Isolation Valves

C 15mm diameter 1 Item

D 22mm diameter 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 24 24.5/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 24 - FF PUBLIC BATHROOM 3

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

SPACE HEATING AND AIR CONDITIONING

38 Mechanical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Ductwork

Galvanised steel sheet rectangular ductwork and fittings, including


insulation, supports, manufactured and fitted in accordance with
the relevant standards, complete as shown on drawings and
Specifications

A Supply/Return air ductwork 1 Item

Duct ancillaries

Flexible duct, including insulation complete all in accordance with


the Specifications

B Flexible duct 1 Item

Linear slot diffuser, complete all in accordance with the


Specifications

C Supply air linear diffuser 1 Item

Variable air volume boxes; including all necessary insulation,


accessories and connections; complete all in accordance with the
Specifications

D VAVs 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 24 24.5/6
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 24 - FF PUBLIC BATHROOM 3

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION

39 Electrical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Small Power Installation

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

Socket outlets

A Switch Socket Outlets 1 Item

Terminal equipment and fittings

Devices complete as described, all in accordance with the


Specification

Socket outlets

B Switch Socket Outlets 1 Item

Lighting Installation

Final circuits

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 24 24.5/7
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 24 - FF PUBLIC BATHROOM 3

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Lighting Installation

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

A Lighting points 53 nr

B Linear lighting points 1 Item

Terminal equipment and fittings

Light fittings including fixings, lamps and connections complete in


accordance with the Specifications

C Lighting type A (2) 4 nr

D Lighting type A (5) 38 nr

E Lighting type A (6) 11 nr

F Lighting type C (1) 26 m

Lighting Control Installation

Lighting control system including but not limited to panels, wiring,


containment, as shown on drawings all in accordance with the
Specification

G Lighting control installation 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 24 24.5/8
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 24 - FF PUBLIC BATHROOM 3

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION

38 Mechanical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Sprinkler Installations

Pipework

Above ground galvanized steel pipes; including fittings, all


necessary fixings, accessories, supports and connections in
accordance with the Specifications

A 25mm Diameter pipes 1 Item

B 32mm Diameter pipes 1 Item

C 40mm Diameter pipes 1 Item

D 50mm Diameter pipes 1 Item

E 65mm Diameter pipes 1 Item

Pipe ancillaries

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification

F Pendent type sprinkler heads 1 Item

G Upright type sprinkler heads 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 24 24.5/9
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 24 - FF PUBLIC BATHROOM 3

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION (CONT*D)

Sprinkler Installations (CONT*D)

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification
(CONT*D)

A Side wall type sprinkler heads 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 24 24.5/10
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 24 - FF PUBLIC BATHROOM 3

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS

39 Electrical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Fire Detection & Voice Evacuation System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

A Intelligent optical Smoke Detector with standard base 1 Item

B Ceiling void Intelligent optical Smoke Detector with LED remote 1 Item
Indicator

C Manual Call Point 1 Item

D Flasher 1 Item

E Response Indicator 1 Item

F PAVA/BGM Ceiling Speaker 1 Item

Terminal equipment and fittings

Supply and installation of fire alarm devices, all in accordance with


the Specification

G Intelligent optical Smoke Detector with standard base 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 24 24.5/11
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 24 - FF PUBLIC BATHROOM 3

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Fire Detection & Voice Evacuation System (CONT*D)

Supply and installation of fire alarm devices, all in accordance with


the Specification (CONT*D)

A Ceiling void Intelligent optical Smoke Detector with LED remote 1 Item
Indicator

B Manual Call Point 1 Item

C Flasher 1 Item

D Response Indicator 1 Item

E PAVA/BGM Ceiling Speaker 1 Item

IT System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

F WIFI Ceiling 1 Item

Terminal equipment and fittings

Supply and installation of IT devices, all in accordance with the


Specification

G WIFI Ceiling 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 24 24.5/12
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 24 - FF PUBLIC BATHROOM 3

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Security System

CCTV

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

A Dome Camera 1 Item

Terminal equipment and fittings

Supply and installation of CCTV devices, all in accordance with


the Specification

B Dome Camera 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 24 24.5/13
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 24 - FF PUBLIC BATHROOM 3

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

BUILDER'S WORK IN CONNECTION WITH SERVICES

41 Builder's work in connection with mechanical, electrical


and transportation installations

A Builder's work in connection with services 1 Item

B Allow for integrating the new MEP services to the existing services 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 24 24.5/14
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 24 - FF PUBLIC BATHROOM 3

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 24.5/1

Page : 24.5/2

Page : 24.5/3

Page : 24.5/4

Page : 24.5/5

Page : 24.5/6

Page : 24.5/7

Page : 24.5/8

Page : 24.5/9

Page : 24.5/10

Page : 24.5/11

Page : 24.5/12

Page : 24.5/13

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 24 D/Add/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 24 - FF PUBLIC BATHROOM 3

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS
Any items that may not be covered elsewhere in the Bills of
Quantities which the tenderer deemed to be necessary in order to
carry out the works in full compliance with the Drawings,
Specifications and any other items necessary to form a complete
Installations, must be itemised and priced below. The tenderer
may provide additional sheets for this purpose if necessary. All
items under this section must be summarised under a separate
cover.

A Item

B Item

C Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 24 D/Add/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 24 - FF PUBLIC BATHROOM 3

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : D/Add/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 24 D/Add/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 24 - FF PUBLIC BATHROOM 3

Item Description Quantity Unit Rate AED Amount AED

BILL 24 - FF Public Bathroom 3

BILL SUMMARY

Total Brought Forward from Page No.

Facilitating works 24.1/2

Superstructure 24.2/3

Internal Finishes 24.3/5

Fittings and Furnishing 24.4/2

Services 24.5/14

ADDITIONAL ITEMS D/Add/2

Carried To General Summary Page AED 0


Issued on: 15/11/2022
The Armed Forces Officers Club and Hotel

Erth Guest Experience

Fit-out Works

BILL 25

FF PUBLIC BATHROOM 4

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 25 25.1/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 25 - FF PUBLIC BATHROOM 4

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS

DEMOLITION WORKS

3 Demolitions

Demolish and off site disposal of existing walls, floor finishes, wall
finishes, ceilings, doors and MEP services as per drawings and
specification

A Demolition of existing floor finishes 35 m2

B Demolition of existing internal walls including finishes 60 m2

C Demolition of existing wall finishes 110 m2

D Demolition of existing ceiling finishes 35 m2

E Demolition of existing doors 5 nr

F Demolition of existing MEP services 35 m2

G Demolish and remove existing toilet sanitary fittings and 1 Item


accessories

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 25 25.1/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 25 - FF PUBLIC BATHROOM 4

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 25.1/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 25 25.2/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 25 - FF PUBLIC BATHROOM 4

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE

INTERNAL WALLS AND PARTITIONS

20 Proprietary linings and partitions

Block work; including reinforcement and all necessary fixing


accessories; all in accordance with the Drawings and
Specifications

A Toilet partition; assume 200mm thick block walls 100 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 25 25.2/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 25 - FF PUBLIC BATHROOM 4

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

INTERNAL DOORS

24 Doors, shutters and hatches

Doors (size, type and material to be confirmed); including


ironmongery and all necessary fixing accessories; all in
accordance with the Drawings and Specifications

A Single leaf door including ironmongery 5 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 25 25.2/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 25 - FF PUBLIC BATHROOM 4

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 25.2/1

Page : 25.2/2

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 25 25.3/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 25 - FF PUBLIC BATHROOM 4

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES

WALL FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to walls and columns

Plastering to internal masonry / concrete backing; including all


accessories and works required; all in accordance with the
Specifications

A To receive tile 148 m2

Mosaic Wall tile; including all accessories and works required; all
in accordance with the Specifications

B Type MOS-001 26 m2

Silver travertine unfilled Stone; Finish: Unfilled, continuously


matched horizontal veins; including all accessories and works
required; all in accordance with the Specifications

C Type ST-004 122 m2

Stone to toilet ledge; including all accessories and works required;


all in accordance with the Specifications

D Stone cladding to toilet WC tank 4 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 25 25.3/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 25 - FF PUBLIC BATHROOM 4

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

FLOOR FINISHES

28 Floor, wall, ceiling and roof finishings

Screeds

Backgrounds; self levelling compound; to receive floor finishes; all


in accordance with the Specifications

A To floors 34 m2

Finish to floors

Porcelain Floor tile; Colour: Concrete grey, Matt finish; bedded on


self levelling compound (measured separately); including all
accessories and works required; all in accordance with the
Specifications

B Type F-003 34 m2

Waterproofing; including all accessories and works required; all in


accordance with the Specifications

C To toilet floors 34 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 25 25.3/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 25 - FF PUBLIC BATHROOM 4

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

CEILING FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to ceilings

Ceiling paint; including all accessories and works required; all in


accordance with the Specifications

A Type C-202 45 m2

Suspended Ceilings

Moisture Resistant Suspended Gypsum Board; including;


fastenings and all accessories and works required; all in
accordance with the Specifications

B For Type C-202 45 m2

Ceiling Bulkhead; including; fastenings and all accessories and


works required; all in accordance with the Specifications

C 250mm thick high 19 m

Acoustic insulation; including fastenings and all accessories and


works required; all in accordance with the Specifications

D For Type C-202 45 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 25 25.3/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 25 - FF PUBLIC BATHROOM 4

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 25.3/1

Page : 25.3/2

Page : 25.3/3

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 25 25.4/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 25 - FF PUBLIC BATHROOM 4

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING

32 Furniture, fittings and equipment

Signages

A Toilet sign 1 nr

Countertop

B Countertop, 600mm x 2870mm 1 nr

Artwork

C Allow for provision of artwork 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 25 25.4/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 25 - FF PUBLIC BATHROOM 4

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 25.4/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 25 25.5/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 25 - FF PUBLIC BATHROOM 4

Item Description Quantity Unit Rate AED Amount AED

SERVICES

SANITARY INSTALLATIONS

38 Mechanical services

Sanitary appliances; including all necessary fixing and


accessories; as shown on drawings; all in accordance with the
Specifications

A Water Closet 4 nr

B Wash Basin with mixer 3 nr

Sanitary fittings; including all necessary fixing and accessories; as


shown on drawings; all in accordance with the Specifications

C Trash bin 4 nr

D Tissue holder 4 nr

E Health Spray 4 nr

F Wall Mounted Towel Dispenser/Waste Bin 1 nr

G Mirror 1 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 25 25.5/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 25 - FF PUBLIC BATHROOM 4

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

DISPOSAL INSTALLATION

38 Mechanical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Pipework

Supply and installation of drainage pipes including insulation,


fittings, supports, hangers and all required accessories in
accordance with drawings and specifications.

Waste Pipe (UPVC)

A 32mm diameter 1 Item

B 50mm diameter 1 Item

C 75mm diameter 1 Item

D 110mm diameter 1 Item

Pipe ancillaries

Supply and installation of the following with fittings, fixings,


supports and all required accessories complete; in accordance
with drawings and specifications.

Clean out

E 75mm diameter 1 Item

F 110mm diameter 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 25 25.5/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 25 - FF PUBLIC BATHROOM 4

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

DISPOSAL INSTALLATION (CONT*D)

38 Mechanical services (CONT*D)

Floor Trap

A 75mm diameter 1 Item

Valve

B 75mm diameter 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 25 25.5/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 25 - FF PUBLIC BATHROOM 4

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

WATER INSTALLATION

38 Mechanical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Pipework

Supply and installation of water supply pipes including insulation,


fittings, supports, hangers and all required accessories in
accordance with drawings and specifications.

Water Supply Pipe (PEX)

A 15mm diameter 1 Item

B 22mm diameter 1 Item

Pipe ancillaries

Supply and installation of the following with fittings, fixings,


supports and all required accessories complete; in accordance
with drawings and specifications.

Isolation Valves

C 15mm diameter 1 Item

D 22mm diameter 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 25 25.5/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 25 - FF PUBLIC BATHROOM 4

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

SPACE HEATING AND AIR CONDITIONING

38 Mechanical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Ductwork

Galvanised steel sheet rectangular ductwork and fittings, including


insulation, supports, manufactured and fitted in accordance with
the relevant standards, complete as shown on drawings and
Specifications

A Supply/Return air ductwork 1 Item

Duct ancillaries

Flexible duct, including insulation complete all in accordance with


the Specifications

B Flexible duct 1 Item

Linear slot diffuser, complete all in accordance with the


Specifications

C Supply air linear diffuser 1 Item

Variable air volume boxes; including all necessary insulation,


accessories and connections; complete all in accordance with the
Specifications

D VAVs 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 25 25.5/6
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 25 - FF PUBLIC BATHROOM 4

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION

39 Electrical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Small Power Installation

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

Socket outlets

A Switch Socket Outlets 1 Item

Terminal equipment and fittings

Devices complete as described, all in accordance with the


Specification

Socket outlets

B Switch Socket Outlets 1 Item

Lighting Installation

Final circuits

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 25 25.5/7
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 25 - FF PUBLIC BATHROOM 4

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Lighting Installation

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

A Lighting points 15 nr

B Linear lighting points 1 Item

Terminal equipment and fittings

Light fittings including fixings, lamps and connections complete in


accordance with the Specifications

C Lighting type A (2) 4 nr

D Lighting type A (5) 8 nr

E Lighting type A (6) 3 nr

F Lighting type C (1) 12 m

Lighting Control Installation

Lighting control system including but not limited to panels, wiring,


containment, as shown on drawings all in accordance with the
Specification

G Lighting control installation 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 25 25.5/8
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 25 - FF PUBLIC BATHROOM 4

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

38 Mechanical services

Sprinkler Installations

Pipework

Above ground galvanized steel pipes; including fittings, all


necessary fixings, accessories, supports and connections in
accordance with the Specifications

A 25mm Diameter pipes 1 Item

B 32mm Diameter pipes 1 Item

C 40mm Diameter pipes 1 Item

D 50mm Diameter pipes 1 Item

E 65mm Diameter pipes 1 Item

Pipe ancillaries

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification

F Pendent type sprinkler heads 1 Item

G Upright type sprinkler heads 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 25 25.5/9
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 25 - FF PUBLIC BATHROOM 4

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION (CONT*D)

Sprinkler Installations (CONT*D)

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification
(CONT*D)

A Side wall type sprinkler heads 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 25 25.5/10
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 25 - FF PUBLIC BATHROOM 4

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

39 Electrical services

Fire Detection & Voice Evacuation System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

A Intelligent optical Smoke Detector with standard base 1 Item

B Ceiling void Intelligent optical Smoke Detector with LED remote 1 Item
Indicator

C Manual Call Point 1 Item

D Flasher 1 Item

E Response Indicator 1 Item

F PAVA/BGM Ceiling Speaker 1 Item

Terminal equipment and fittings

Supply and installation of fire alarm devices, all in accordance with


the Specification

G Intelligent optical Smoke Detector with standard base 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 25 25.5/11
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 25 - FF PUBLIC BATHROOM 4

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Fire Detection & Voice Evacuation System (CONT*D)

Supply and installation of fire alarm devices, all in accordance with


the Specification (CONT*D)

A Ceiling void Intelligent optical Smoke Detector with LED remote 1 Item
Indicator

B Manual Call Point 1 Item

C Flasher 1 Item

D Response Indicator 1 Item

E PAVA/BGM Ceiling Speaker 1 Item

IT System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

F WIFI Ceiling 1 Item

Terminal equipment and fittings

Supply and installation of IT devices, all in accordance with the


Specification

G WIFI Ceiling 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 25 25.5/12
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 25 - FF PUBLIC BATHROOM 4

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Security System

CCTV

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

A Dome Camera 1 Item

Terminal equipment and fittings

Supply and installation of CCTV devices, all in accordance with


the Specification

B Dome Camera 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 25 25.5/13
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 25 - FF PUBLIC BATHROOM 4

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

BUILDER'S WORK IN CONNECTION WITH SERVICES

41 Builder's work in connection with mechanical, electrical


and transportation installations

A Builder's work in connection with services 1 Item

B Allow for integrating the new MEP services to the existing services 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 25 25.5/14
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 25 - FF PUBLIC BATHROOM 4

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 25.5/1

Page : 25.5/2

Page : 25.5/3

Page : 25.5/4

Page : 25.5/5

Page : 25.5/6

Page : 25.5/7

Page : 25.5/8

Page : 25.5/9

Page : 25.5/10

Page : 25.5/11

Page : 25.5/12

Page : 25.5/13

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 25 D/Add/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 25 - FF PUBLIC BATHROOM 4

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS
Any items that may not be covered elsewhere in the Bills of
Quantities which the tenderer deemed to be necessary in order to
carry out the works in full compliance with the Drawings,
Specifications and any other items necessary to form a complete
Installations, must be itemised and priced below. The tenderer
may provide additional sheets for this purpose if necessary. All
items under this section must be summarised under a separate
cover.

A Item

B Item

C Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 25 D/Add/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 25 - FF PUBLIC BATHROOM 4

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : D/Add/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 25 D/Add/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 25 - FF PUBLIC BATHROOM 4

Item Description Quantity Unit Rate AED Amount AED

BILL 25 - FF Public Bathroom 4

BILL SUMMARY

Total Brought Forward from Page No.

Facilitating works 25.1/2

Superstructure 25.2/3

Internal Finishes 25.3/4

Fittings and Furnishing 25.4/2

Services 25.5/14

ADDITIONAL ITEMS D/Add/2

Carried To General Summary Page AED 0


Issued on: 15/11/2022
The Armed Forces Officers Club and Hotel

Erth Guest Experience

Fit-out Works

BILL 26

FF PUBLIC BATHROOM 5

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 26 26.1/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 26 - FF PUBLIC BATHROOM 5

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS

DEMOLITION WORKS

3 Demolitions

Demolish and off site disposal of existing walls, floor finishes, wall
finishes, ceilings, doors and MEP services as per drawings and
specification

A Demolition of existing floor finishes 36 m2

B Demolition of existing internal walls including finishes 59 m2

C Demolition of existing wall finishes 112 m2

D Demolition of existing ceiling finishes 36 m2

E Demolition of existing doors 5 nr

F Demolition of existing MEP services 36 m2

G Demolish and remove existing toilet sanitary fittings and 1 Item


accessories

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 26 26.1/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 26 - FF PUBLIC BATHROOM 5

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 26.1/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 26 26.2/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 26 - FF PUBLIC BATHROOM 5

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE

INTERNAL WALLS AND PARTITIONS

20 Proprietary linings and partitions

Block work; including reinforcement and all necessary fixing


accessories; all in accordance with the Drawings and
Specifications

A Toilet partition; assume 200mm thick block walls 93 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 26 26.2/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 26 - FF PUBLIC BATHROOM 5

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

INTERNAL DOORS

24 Doors, shutters and hatches

Doors (size, type and material to be confirmed); including


ironmongery and all necessary fixing accessories; all in
accordance with the Drawings and Specifications

A Single leaf door including ironmongery 5 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 26 26.2/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 26 - FF PUBLIC BATHROOM 5

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 26.2/1

Page : 26.2/2

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 26 26.3/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 26 - FF PUBLIC BATHROOM 5

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES

WALL FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to walls and columns

Plastering to internal masonry / concrete backing; including all


accessories and works required; all in accordance with the
Specifications

A To receive tile 156 m2

Mosaic Wall tile; including all accessories and works required; all
in accordance with the Specifications

B Type MOS-001 26 m2

Silver travertine unfilled Stone; Finish: Unfilled, continuously


matched horizontal veins; including all accessories and works
required; all in accordance with the Specifications

C Type ST-004 130 m2

Stone to toilet ledge; including all accessories and works required;


all in accordance with the Specifications

D Stone cladding to toilet WC tank 4 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 26 26.3/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 26 - FF PUBLIC BATHROOM 5

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

FLOOR FINISHES

28 Floor, wall, ceiling and roof finishings

Screeds

Backgrounds; self levelling compound; to receive floor finishes; all


in accordance with the Specifications

A To floors 35 m2

Finish to floors

Porcelain Floor tile; Colour: Concrete grey, Matt finish; bedded on


self levelling compound (measured separately); including all
accessories and works required; all in accordance with the
Specifications

B Type F-003 35 m2

Waterproofing; including all accessories and works required; all in


accordance with the Specifications

C To toilet floors 35 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 26 26.3/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 26 - FF PUBLIC BATHROOM 5

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

CEILING FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to ceilings

Ceiling paint; including all accessories and works required; all in


accordance with the Specifications

A Type C-202 50 m2

Suspended Ceilings

Moisture Resistant Suspended Gypsum Board; including


fastenings and all accessories and works required; all in
accordance with the Specifications

B For Type C-202 50 m2

Ceiling bulk head; including fastenings and all accessories and


works required; all in accordance with the Specifications

C 250mm high 20 m

Acoustic insulation; including fastenings and all accessories and


works required; all in accordance with the Specifications

D For Type C-202 50 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 26 26.3/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 26 - FF PUBLIC BATHROOM 5

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 26.3/1

Page : 26.3/2

Page : 26.3/3

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 26 26.4/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 26 - FF PUBLIC BATHROOM 5

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING

32 Furniture, fittings and equipment

Signages

A Toilet sign 1 nr

Countertop

B Countertop, 600mm x 2870mm 1 nr

Artwork

C Allow for provision of artwork 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 26 26.4/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 26 - FF PUBLIC BATHROOM 5

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 26.4/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 26 26.5/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 26 - FF PUBLIC BATHROOM 5

Item Description Quantity Unit Rate AED Amount AED

SERVICES

SANITARY INSTALLATIONS

38 Mechanical services

Sanitary appliances; including all necessary fixing and


accessories; as shown on drawings; all in accordance with the
Specifications

A Water Closet 4 nr

B Wash Basin with mixer 3 nr

Sanitary fittings; including all necessary fixing and accessories; as


shown on drawings; all in accordance with the Specifications

C Trash bin 4 nr

D Tissue holder 4 nr

E Health Spray 4 nr

F Wall Mounted Towel Dispenser/Waste Bin 1 nr

G Mirror 1 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 26 26.5/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 26 - FF PUBLIC BATHROOM 5

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

DISPOSAL INSTALLATION

38 Mechanical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Pipework

Supply and installation of drainage pipes including insulation,


fittings, supports, hangers and all required accessories in
accordance with drawings and specifications.

Waste Pipe (UPVC)

A 32mm diameter 1 Item

B 50mm diameter 1 Item

C 75mm diameter 1 Item

D 110mm diameter 1 Item

Pipe ancillaries

Supply and installation of the following with fittings, fixings,


supports and all required accessories complete; in accordance
with drawings and specifications.

Clean out

E 75mm diameter 1 Item

F 110mm diameter 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 26 26.5/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 26 - FF PUBLIC BATHROOM 5

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

DISPOSAL INSTALLATION (CONT*D)

38 Mechanical services (CONT*D)

Floor Trap

A 75mm diameter 1 Item

Valve

B 75mm diameter 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 26 26.5/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 26 - FF PUBLIC BATHROOM 5

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

WATER INSTALLATION

38 Mechanical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Pipework

Supply and installation of water supply pipes including insulation,


fittings, supports, hangers and all required accessories in
accordance with drawings and specifications.

Water Supply Pipe (PEX)

A 15mm diameter 1 Item

B 22mm diameter 1 Item

Pipe ancillaries

Supply and installation of the following with fittings, fixings,


supports and all required accessories complete; in accordance
with drawings and specifications.

Isolation Valves

C 15mm diameter 1 Item

D 22mm diameter 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 26 26.5/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 26 - FF PUBLIC BATHROOM 5

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

SPACE HEATING AND AIR CONDITIONING

38 Mechanical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Ductwork

Galvanised steel sheet rectangular ductwork and fittings, including


insulation, supports, manufactured and fitted in accordance with
the relevant standards, complete as shown on drawings and
Specifications

A Supply/Return air ductwork 1 Item

Duct ancillaries

Flexible duct, including insulation complete all in accordance with


the Specifications

B Flexible duct 1 Item

Linear slot diffuser, complete all in accordance with the


Specifications

C Supply air linear diffuser 1 Item

Variable air volume boxes; including all necessary insulation,


accessories and connections; complete all in accordance with the
Specifications

D VAVs 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 26 26.5/6
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 26 - FF PUBLIC BATHROOM 5

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION

39 Electrical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Small Power Installation

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

Socket outlets

A Switch Socket Outlets 1 Item

Terminal equipment and fittings

Devices complete as described, all in accordance with the


Specification

Socket outlets

B Switch Socket Outlets 1 Item

Lighting Installation

Final circuits

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 26 26.5/7
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 26 - FF PUBLIC BATHROOM 5

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Lighting Installation

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

A Lighting points 1 Item

B Linear lighting points 1 Item

Terminal equipment and fittings

Light fittings including fixings, lamps and connections complete in


accordance with the Specifications

C Lighting type A (2) 1 Item

D Lighting type A (5) 1 Item

E Lighting type A (6) 1 Item

F Lighting type C (1) 1 Item

Lighting Control Installation

Lighting control system including but not limited to panels, wiring,


containment, as shown on drawings all in accordance with the
Specification

G Lighting control installation 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 26 26.5/8
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 26 - FF PUBLIC BATHROOM 5

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION

38 Mechanical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Sprinkler Installations

Pipework

Above ground galvanized steel pipes; including fittings, all


necessary fixings, accessories, supports and connections in
accordance with the Specifications

A 25mm Diameter pipes 1 Item

B 32mm Diameter pipes 1 Item

C 40mm Diameter pipes 1 Item

D 50mm Diameter pipes 1 Item

E 65mm Diameter pipes 1 Item

Pipe ancillaries

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification

F Pendent type sprinkler heads 1 Item

G Upright type sprinkler heads 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 26 26.5/9
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 26 - FF PUBLIC BATHROOM 5

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION (CONT*D)

Sprinkler Installations (CONT*D)

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification
(CONT*D)

A Side wall type sprinkler heads 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 26 26.5/10
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 26 - FF PUBLIC BATHROOM 5

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS

39 Electrical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Fire Detection & Voice Evacuation System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

A Intelligent optical Smoke Detector with standard base 1 Item

B Ceiling void Intelligent optical Smoke Detector with LED remote 1 Item
Indicator

C Manual Call Point 1 Item

D Flasher 1 Item

E Response Indicator 1 Item

F PAVA/BGM Ceiling Speaker 1 Item

Terminal equipment and fittings

Supply and installation of fire alarm devices, all in accordance with


the Specification

G Intelligent optical Smoke Detector with standard base 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 26 26.5/11
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 26 - FF PUBLIC BATHROOM 5

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Fire Detection & Voice Evacuation System (CONT*D)

Supply and installation of fire alarm devices, all in accordance with


the Specification (CONT*D)

A Ceiling void Intelligent optical Smoke Detector with LED remote 1 Item
Indicator

B Manual Call Point 1 Item

C Flasher 1 Item

D Response Indicator 1 Item

E PAVA/BGM Ceiling Speaker 1 Item

IT System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

F WIFI Ceiling 1 Item

Terminal equipment and fittings

Supply and installation of IT devices, all in accordance with the


Specification

G WIFI Ceiling 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 26 26.5/12
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 26 - FF PUBLIC BATHROOM 5

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Security System

CCTV

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

A Dome Camera 1 Item

Terminal equipment and fittings

Supply and installation of CCTV devices, all in accordance with


the Specification

B Dome Camera 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 26 26.5/13
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 26 - FF PUBLIC BATHROOM 5

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

BUILDER'S WORK IN CONNECTION WITH SERVICES

41 Builder's work in connection with mechanical, electrical


and transportation installations

A Builder's work in connection with services 1 Item

B Allow for integrating the new MEP services to the existing services 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 26 26.5/14
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 26 - FF PUBLIC BATHROOM 5

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 26.5/1

Page : 26.5/2

Page : 26.5/3

Page : 26.5/4

Page : 26.5/5

Page : 26.5/6

Page : 26.5/7

Page : 26.5/8

Page : 26.5/9

Page : 26.5/10

Page : 26.5/11

Page : 26.5/12

Page : 26.5/13

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 26 D/Add/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 26 - FF PUBLIC BATHROOM 5

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS
Any items that may not be covered elsewhere in the Bills of
Quantities which the tenderer deemed to be necessary in order to
carry out the works in full compliance with the Drawings,
Specifications and any other items necessary to form a complete
Installations, must be itemised and priced below. The tenderer
may provide additional sheets for this purpose if necessary. All
items under this section must be summarised under a separate
cover.

A Item

B Item

C Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 26 D/Add/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 26 - FF PUBLIC BATHROOM 5

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : D/Add/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 26 D/Add/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 26 - FF PUBLIC BATHROOM 5

Item Description Quantity Unit Rate AED Amount AED

BILL 26 - FF Public Bathroom 5

BILL SUMMARY

Total Brought Forward from Page No.

Facilitating works 26.1/2

Superstructure 26.2/3

Internal Finishes 26.3/4

Fittings and Furnishing 26.4/2

Services 26.5/14

ADDITIONAL ITEMS D/Add/2

Carried To General Summary Page AED 0


Issued on: 15/11/2022
The Armed Forces Officers Club and Hotel

Erth Guest Experience

Fit-out Works

BILL 27

FF PUBLIC BATHROOM 6

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 27 27.1/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 27 - FF PUBLIC BATHROOM 6

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS

DEMOLITION WORKS

3 Demolitions

Demolish and off site disposal of existing walls, floor finishes, wall
finishes, ceilings, doors and MEP services as per drawings and
specification

A Demolition of existing floor finishes 81 m2

B Demolition of existing internal walls including finishes 204 m2

C Demolition of existing wall finishes 172 m2

D Demolition of existing ceiling finishes 81 m2

E Demolition of existing doors 7 nr

F Demolition of existing MEP services 81 m2

G Demolish and remove existing toilet sanitary fittings and 1 Item


accessories

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 27 27.1/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 27 - FF PUBLIC BATHROOM 6

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 27.1/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 27 27.2/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 27 - FF PUBLIC BATHROOM 6

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE

INTERNAL WALLS AND PARTITIONS

20 Proprietary linings and partitions

Block work; including reinforcement and all necessary fixing


accessories; all in accordance with the Drawings and
Specifications

A Toilet partition; assume 200mm thick block walls 209 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 27 27.2/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 27 - FF PUBLIC BATHROOM 6

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

INTERNAL DOORS

24 Doors, shutters and hatches

Doors (size, type and material to be confirmed); including


ironmongery and all necessary fixing accessories; all in
accordance with the Drawings and Specifications

A Single leaf door including ironmongery 9 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 27 27.2/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 27 - FF PUBLIC BATHROOM 6

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 27.2/1

Page : 27.2/2

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 27 27.3/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 27 - FF PUBLIC BATHROOM 6

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES

WALL FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to walls and columns

Plastering to internal masonry / concrete backing; including all


accessories and works required; all in accordance with the
Specifications

A To receive tile 195 m2

B To receive paint 136 m2

Mosaic Wall tile; including all accessories and works required; all
in accordance with the Specifications

C Type MOS-001 48 m2

Silver travertine unfilled Stone; Finish: Unfilled, continuously


matched horizontal veins; including all accessories and works
required; all in accordance with the Specifications

D Type ST-004 147 m2

Texture paint; including all accessories and works required; all in


accordance with the Specifications

E Type W203; to toilet lobby 136 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 27 27.3/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 27 - FF PUBLIC BATHROOM 6

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

WALL FINISHES (CONT*D)

28 Floor, wall, ceiling and roof finishings (CONT*D)

Stone to toilet ledge; including all accessories and works required;


all in accordance with the Specifications

A Stone cladding to toilet WC tank 7 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 27 27.3/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 27 - FF PUBLIC BATHROOM 6

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

FLOOR FINISHES

28 Floor, wall, ceiling and roof finishings

Screeds

Backgrounds; self levelling compound; to receive floor finishes; all


in accordance with the Specifications

A To floors 66 m2

Finish to floors

Woven Vinyl Carpet; laid on self levelling compound (measured


separately) including preparation and all works required; all in
accordance with the Specifications

B Type F-101B; to toilet lobby 20 m2

Porcelain Floor tile; Colour: Concrete grey, Matt finish; bedded on


self levelling compound (measured separately); including all
accessories and works required; all in accordance with the
Specifications

C Type F-003 46 m2

Waterproofing; including all accessories and works required; all in


accordance with the Specifications

D To toilet floors 46 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 27 27.3/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 27 - FF PUBLIC BATHROOM 6

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

CEILING FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to ceilings

Ceiling paint; including all accessories and works required; all in


accordance with the Specifications

A Type C-202 62 m2

Suspended Ceilings

Moisture Resistant Suspended Gypsum Board; including;


fastenings and all accessories and works required; all in
accordance with the Specifications

B For Type C-202 62 m2

Ceiling bulkhead; including; fastenings and all accessories and


works required; all in accordance with the Specifications

C 250mm high 30 m

Acoustic insulation; including fastenings and all accessories and


works required; all in accordance with the Specifications

D For Type C-202 62 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 27 27.3/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 27 - FF PUBLIC BATHROOM 6

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 27.3/1

Page : 27.3/2

Page : 27.3/3

Page : 27.3/4

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 27 27.4/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 27 - FF PUBLIC BATHROOM 6

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING

32 Furniture, fittings and equipment

Signages

A Toilet sign 2 nr

Countertop

B Countertop, 600mm x 3750mm 2 nr

Artwork

C Allow for provision of artwork 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 27 27.4/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 27 - FF PUBLIC BATHROOM 6

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 27.4/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 27 27.5/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 27 - FF PUBLIC BATHROOM 6

Item Description Quantity Unit Rate AED Amount AED

SERVICES

SANITARY INSTALLATIONS

38 Mechanical services

Sanitary appliances; including all necessary fixing and


accessories; as shown on drawings; all in accordance with the
Specifications

A Water Closet 7 nr

B Wash Basin with mixer 8 nr

C Urinals 2 nr

Sanitary fittings; including all necessary fixing and accessories; as


shown on drawings; all in accordance with the Specifications

D Grab Bars for Disabled toilet 2 nr

E Trash bin 7 nr

F Tissue holder 7 nr

G Health Spray 7 nr

H Urinal partition 2 nr

J Wall Mounted Towel Dispenser/Waste Bin 1 nr

K Mirror 2 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 27 27.5/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 27 - FF PUBLIC BATHROOM 6

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

DISPOSAL INSTALLATION

38 Mechanical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Pipework

Supply and installation of drainage pipes including insulation,


fittings, supports, hangers and all required accessories in
accordance with drawings and specifications.

Waste Pipe (UPVC)

A 32mm diameter 1 Item

B 50mm diameter 1 Item

C 75mm diameter 1 Item

D 110mm diameter 1 Item

Pipe ancillaries

Supply and installation of the following with fittings, fixings,


supports and all required accessories complete; in accordance
with drawings and specifications.

Clean out

E 75mm diameter 1 Item

F 110mm diameter 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 27 27.5/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 27 - FF PUBLIC BATHROOM 6

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

DISPOSAL INSTALLATION (CONT*D)

38 Mechanical services (CONT*D)

Floor Trap

A 75mm diameter 1 Item

Valve

B 75mm diameter 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 27 27.5/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 27 - FF PUBLIC BATHROOM 6

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

WATER INSTALLATION

38 Mechanical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Pipework

Supply and installation of water supply pipes including insulation,


fittings, supports, hangers and all required accessories in
accordance with drawings and specifications.

Water Supply Pipe (PEX)

A 15mm diameter 1 Item

B 22mm diameter 1 Item

Pipe ancillaries

Supply and installation of the following with fittings, fixings,


supports and all required accessories complete; in accordance
with drawings and specifications.

Isolation Valves

C 15mm diameter 1 Item

D 22mm diameter 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 27 27.5/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 27 - FF PUBLIC BATHROOM 6

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

SPACE HEATING AND AIR CONDITIONING

38 Mechanical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Ductwork

Galvanised steel sheet rectangular ductwork and fittings, including


insulation, supports, manufactured and fitted in accordance with
the relevant standards, complete as shown on drawings and
Specifications

A Supply/Return air ductwork 1 Item

Duct ancillaries

Flexible duct, including insulation complete all in accordance with


the Specifications

B Flexible duct 1 Item

Linear slot diffuser, complete all in accordance with the


Specifications

C Supply air linear diffuser 1 Item

Variable air volume boxes; including all necessary insulation,


accessories and connections; complete all in accordance with the
Specifications

D VAVs 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 27 27.5/6
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 27 - FF PUBLIC BATHROOM 6

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION

39 Electrical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Small Power Installation

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

Socket outlets

A Switch Socket Outlets 1 Item

Terminal equipment and fittings

Devices complete as described, all in accordance with the


Specification

Socket outlets

B Switch Socket Outlets 1 Item

Lighting Installation

Final circuits

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 27 27.5/7
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 27 - FF PUBLIC BATHROOM 6

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Lighting Installation

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

A Lighting points 53 nr

B Linear lighting points 1 Item

Terminal equipment and fittings

Light fittings including fixings, lamps and connections complete in


accordance with the Specifications

C Lighting type A (2) 4 nr

D Lighting type A (5) 38 nr

E Lighting type A (6) 11 nr

F Lighting type C (1) 26 m

Lighting Control Installation

Lighting control system including but not limited to panels, wiring,


containment, as shown on drawings all in accordance with the
Specification

G Lighting control installation 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 27 27.5/8
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 27 - FF PUBLIC BATHROOM 6

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION

38 Mechanical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Sprinkler Installations

Pipework

Above ground galvanized steel pipes; including fittings, all


necessary fixings, accessories, supports and connections in
accordance with the Specifications

A 25mm Diameter pipes 1 Item

B 32mm Diameter pipes 1 Item

C 40mm Diameter pipes 1 Item

D 50mm Diameter pipes 1 Item

E 65mm Diameter pipes 1 Item

Pipe ancillaries

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification

F Pendent type sprinkler heads 1 Item

G Upright type sprinkler heads 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 27 27.5/9
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 27 - FF PUBLIC BATHROOM 6

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION (CONT*D)

Sprinkler Installations (CONT*D)

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification
(CONT*D)

A Side wall type sprinkler heads 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 27 27.5/10
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 27 - FF PUBLIC BATHROOM 6

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS

39 Electrical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Fire Detection & Voice Evacuation System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

A Intelligent optical Smoke Detector with standard base 1 Item

B Ceiling void Intelligent optical Smoke Detector with LED remote 1 Item
Indicator

C Manual Call Point 1 Item

D Flasher 1 Item

E Response Indicator 1 Item

F PAVA/BGM Ceiling Speaker 1 Item

Terminal equipment and fittings

Supply and installation of fire alarm devices, all in accordance with


the Specification

G Intelligent optical Smoke Detector with standard base 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 27 27.5/11
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 27 - FF PUBLIC BATHROOM 6

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Fire Detection & Voice Evacuation System (CONT*D)

Supply and installation of fire alarm devices, all in accordance with


the Specification (CONT*D)

A Ceiling void Intelligent optical Smoke Detector with LED remote 1 Item
Indicator

B Manual Call Point 1 Item

C Flasher 1 Item

D Response Indicator 1 Item

E PAVA/BGM Ceiling Speaker 1 Item

IT System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

F WIFI Ceiling 1 Item

Terminal equipment and fittings

Supply and installation of IT devices, all in accordance with the


Specification

G WIFI Ceiling 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 27 27.5/12
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 27 - FF PUBLIC BATHROOM 6

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Security System

CCTV

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

A Dome Camera 1 Item

Terminal equipment and fittings

Supply and installation of CCTV devices, all in accordance with


the Specification

B Dome Camera 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 27 27.5/13
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 27 - FF PUBLIC BATHROOM 6

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

BUILDER'S WORK IN CONNECTION WITH SERVICES

41 Builder's work in connection with mechanical, electrical


and transportation installations

A Builder's work in connection with services 1 Item

B Allow for integrating the new MEP services to the existing services 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 27 27.5/14
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 27 - FF PUBLIC BATHROOM 6

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 27.5/1

Page : 27.5/2

Page : 27.5/3

Page : 27.5/4

Page : 27.5/5

Page : 27.5/6

Page : 27.5/7

Page : 27.5/8

Page : 27.5/9

Page : 27.5/10

Page : 27.5/11

Page : 27.5/12

Page : 27.5/13

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 27 D/Add/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 27 - FF PUBLIC BATHROOM 6

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS
Any items that may not be covered elsewhere in the Bills of
Quantities which the tenderer deemed to be necessary in order to
carry out the works in full compliance with the Drawings,
Specifications and any other items necessary to form a complete
Installations, must be itemised and priced below. The tenderer
may provide additional sheets for this purpose if necessary. All
items under this section must be summarised under a separate
cover.

A Item

B Item

C Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 27 D/Add/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 27 - FF PUBLIC BATHROOM 6

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : D/Add/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 27 D/Add/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 27 - FF PUBLIC BATHROOM 6

Item Description Quantity Unit Rate AED Amount AED

BILL 27 - FF Public Bathroom 6

BILL SUMMARY

Total Brought Forward from Page No.

Facilitating works 27.1/2

Superstructure 27.2/3

Internal Finishes 27.3/5

Fittings and Furnishing 27.4/2

Services 27.5/14

ADDITIONAL ITEMS D/Add/2

Carried To General Summary Page AED 0


Issued on: 15/11/2022
The Armed Forces Officers Club and Hotel

Erth Guest Experience

Fit-out Works

BILL 28

FF THEATER LOBBY

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 28 28.1/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 28 - FF THEATER LOBBY

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS

DEMOLITION WORKS

3 Demolitions

Demolish and off site disposal of existing ceilings and MEP


services as per drawings and specification

A Demolition of existing ceiling finishes 395 m2

B Demolition of existing MEP services 395 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 28 28.1/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 28 - FF THEATER LOBBY

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 28.1/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 28 28.2/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 28 - FF THEATER LOBBY

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE

INTERNAL DOORS

24 Doors, shutters and hatches

Doors (size, type and material to be confirmed); including


ironmongery and all necessary fixing accessories; all in
accordance with the Drawings and Specifications

A Single leaf door including ironmongery 3 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 28 28.2/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 28 - FF THEATER LOBBY

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 28.2/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 28 28.3/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 28 - FF THEATER LOBBY

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES

WALL FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to walls and columns

Texture paint; including all accessories and works required; all in


accordance with the Specifications

A Type W203 594 m2

B Type W206 41 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 28 28.3/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 28 - FF THEATER LOBBY

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

FLOOR FINISHES

28 Floor, wall, ceiling and roof finishings

Screeds

Backgrounds; self levelling compound; to receive floor finishes; all


in accordance with the Specifications

A To floors 395 m2

Finish to floors

Woven Vinyl Carpet; laid on self levelling compound (measured


separately) including preparation and all works required; all in
accordance with the Specifications

B Type F-101B 395 m2

Brushed brass metal skirting; including preparation and all works


required; all in accordance with the Specifications

C Brushed brass metal 141 m

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 28 28.3/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 28 - FF THEATER LOBBY

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

CEILING FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to ceilings

Ceiling Textured paint; including all accessories and works


required; all in accordance with the Specifications

A Type C-205 260 m2

Ceiling paint; including all accessories and works required; all in


accordance with the Specifications

B Type C-202 133 m2

Bronze metal insert; including all accessories and works required;


all in accordance with the Specifications

C Type J-900 41 m

Suspended Ceilings

Suspended Gypsum Board; including; fastenings and all


accessories and works required; all in accordance with the
Specifications

D For Type C-205 & C-202 393 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 28 28.3/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 28 - FF THEATER LOBBY

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

CEILING FINISHES (CONT*D)

28 Floor, wall, ceiling and roof finishings (CONT*D)


Acoustic insulation; including fastenings and all accessories and
works required; all in accordance with the Specifications

A For Type C-205 & C-202 393 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 28 28.3/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 28 - FF THEATER LOBBY

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 28.3/1

Page : 28.3/2

Page : 28.3/3

Page : 28.3/4

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 28 28.4/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 28 - FF THEATER LOBBY

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING

32 Furniture, fittings and equipment

Signage

Fire and Life Safety Signs, as per Specifications

A Allow for fire and life safety signs 1 Item

Artwork

B Allow for provision of artwork 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 28 28.4/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 28 - FF THEATER LOBBY

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 28.4/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 28 28.5/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 28 - FF THEATER LOBBY

Item Description Quantity Unit Rate AED Amount AED

SERVICES
SPACE HEATING AND AIR CONDITIONING

38 Mechanical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Ductwork

Galvanised steel sheet rectangular ductwork and fittings, including


insulation, supports, manufactured and fitted in accordance with
the relevant standards, complete as shown on drawings and
Specifications

A Supply/Return air ductwork 1 Item

Duct ancillaries

Flexible duct, including insulation complete all in accordance with


the Specifications

B Flexible duct 1 Item

Linear slot diffuser, complete all in accordance with the


Specifications

C Supply air linear diffuser 1 Item

Variable air volume boxes; including all necessary insulation,


accessories and connections; complete all in accordance with the
Specifications

D VAVs 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 28 28.5/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 28 - FF THEATER LOBBY

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION

39 Electrical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Small Power Installation

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

Socket outlets

A Switch Socket Outlets 1 Item

B Floor Box 1 Item

Terminal equipment and fittings

Devices complete as described, all in accordance with the


Specification

Socket outlets

C Switch Socket Outlets 1 Item

D Floor Box 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 28 28.5/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 28 - FF THEATER LOBBY

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Lighting Installation
Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

A Lighting points 44 nr

B Linear lighting points; 1 Item

Terminal equipment and fittings

Light fittings including fixings, lamps and connections complete in


accordance with the Specifications

C Lighting type A (2) 44 nr

D Lighting type C (3) 111 m

Lighting Control Installation

Lighting control system including but not limited to panels, wiring,


containment, as shown on drawings all in accordance with the
Specification

E Lighting control installation 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 28 28.5/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 28 - FF THEATER LOBBY

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION

38 Mechanical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Sprinkler Installations

Pipework

Above ground galvanized steel pipes; including fittings, all


necessary fixings, accessories, supports and connections in
accordance with the Specifications

A 25mm Diameter pipes 1 Item

B 32mm Diameter pipes 1 Item

C 40mm Diameter pipes 1 Item

D 50mm Diameter pipes 1 Item

E 65mm Diameter pipes 1 Item

Pipe ancillaries

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification

F Pendent type sprinkler heads 1 Item

G Upright type sprinkler heads 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 28 28.5/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 28 - FF THEATER LOBBY

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION (CONT*D)

Sprinkler Installations (CONT*D)

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification
(CONT*D)

A Side wall type sprinkler heads 1 Item

Fire hose reel and department valve assembly; comprising of fire


department landing valve, rack with hose, nozzle, 25mm diameter
pressure reducing valve, swing hose reel, fire extinguishers,
pipework inside cabinet, all necessary accessories and
connections ; all in accordance with the Specification

B Fire hose reel cabinet 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 28 28.5/6
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 28 - FF THEATER LOBBY

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS

39 Electrical services

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

Fire Detection & Voice Evacuation System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

A Intelligent optical Smoke Detector with standard base 1 Item

B Ceiling void Intelligent optical Smoke Detector with LED remote 1 Item
Indicator

C Manual Call Point 1 Item

D Flasher 1 Item

E Response Indicator 1 Item

F PAVA/BGM Ceiling Speaker 1 Item

Terminal equipment and fittings

Supply and installation of fire alarm devices, all in accordance with


the Specification

G Intelligent optical Smoke Detector with standard base 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 28 28.5/7
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 28 - FF THEATER LOBBY

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Fire Detection & Voice Evacuation System (CONT*D)

Supply and installation of fire alarm devices, all in accordance with


the Specification (CONT*D)

A Ceiling void Intelligent optical Smoke Detector with LED remote 1 Item
Indicator

B Manual Call Point 1 Item

C Flasher 1 Item

D Response Indicator 1 Item

E PAVA/BGM Ceiling Speaker 1 Item

IT System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

F WIFI Ceiling 1 Item

Terminal equipment and fittings

Supply and installation of IT devices, all in accordance with the


Specification

G WIFI Ceiling 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 28 28.5/8
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 28 - FF THEATER LOBBY

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Security System

CCTV

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

A Dome Camera 1 Item

Terminal equipment and fittings

Supply and installation of CCTV devices, all in accordance with


the Specification

B Dome Camera 1 Item

Access Control

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

C Door with card reader, Electric lock, BGU and exit Push button 1 Item

Terminal equipment and fittings

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 28 28.5/9
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 28 - FF THEATER LOBBY

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Security System (CONT*D)

Supply and installation of Access control devices, all in


accordance with the Specification

A Door with card reader, Electric lock, BGU and exit Push button 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 28 28.5/10
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 28 - FF THEATER LOBBY

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

BUILDER'S WORK IN CONNECTION WITH SERVICES

41 Builder's work in connection with mechanical, electrical


and transportation installations

A Builder's work in connection with services 1 Item

B Allow for integrating the new MEP services to the existing services 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 28 28.5/11
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 28 - FF THEATER LOBBY

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 28.5/1

Page : 28.5/2

Page : 28.5/3

Page : 28.5/4

Page : 28.5/5

Page : 28.5/6

Page : 28.5/7

Page : 28.5/8

Page : 28.5/9

Page : 28.5/10

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 28 D/Add/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 28 - FF THEATER LOBBY

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS
Any items that may not be covered elsewhere in the Bills of
Quantities which the tenderer deemed to be necessary in order to
carry out the works in full compliance with the Drawings,
Specifications and any other items necessary to form a complete
Installations, must be itemised and priced below. The tenderer
may provide additional sheets for this purpose if necessary. All
items under this section must be summarised under a separate
cover.

A Item

B Item

C Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 28 D/Add/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 28 - FF THEATER LOBBY

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : D/Add/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 28 D/Add/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 28 - FF THEATER LOBBY

Item Description Quantity Unit Rate AED Amount AED

BILL 28 - FF Theater Lobby

BILL SUMMARY

Total Brought Forward from Page No.

Facilitating works 28.1/2

Superstructure 28.2/2

Internal Finishes 28.3/5

Fittings and Furnishing 28.4/2

Services 28.5/11

ADDITIONAL ITEMS D/Add/2

Carried To General Summary Page AED 0


Issued on: 15/11/2022
The Armed Forces Officers Club and Hotel

Erth Guest Experience

Fit-out Works

BILL 29

FF GREATER TUNB HALL

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 29 29.1/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 29 - FF GREATER TUNB HALL

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS

DEMOLITION WORKS

3 Demolitions

Demolish and off site disposal of existing ceilings and MEP


services as per drawings and specification

A Demolition of existing ceiling finishes 810 m2

B Demolition of existing MEP services 810 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 29 29.1/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 29 - FF GREATER TUNB HALL

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 29.1/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 29 29.2/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 29 - FF GREATER TUNB HALL

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE

INTERNAL DOORS

24 Doors, shutters and hatches

Doors (size, type and material to be confirmed); including


ironmongery and all necessary fixing accessories; all in
accordance with the Drawings and Specifications

A Single leaf door including ironmongery 4 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 29 29.2/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 29 - FF GREATER TUNB HALL

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 29.2/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 29 29.3/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 29 - FF GREATER TUNB HALL

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES

WALL FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to walls and columns

Texture paint; including all accessories and works required; all in


accordance with the Specifications

A Type W203 478 m2

B Type W206 126 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 29 29.3/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 29 - FF GREATER TUNB HALL

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

FLOOR FINISHES

28 Floor, wall, ceiling and roof finishings

Screeds

Backgrounds; self levelling compound; to receive floor finishes; all


in accordance with the Specifications

A To floors 810 m2

Finish to floors

Woven Vinyl Carpet; laid on self levelling compound (measured


separately) including preparation and all works required; all in
accordance with the Specifications

B Type F-101B 810 m2

Brushed brass metal skirting; including preparation and all works


required; all in accordance with the Specifications

C Brushed brass metal 136 m

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 29 29.3/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 29 - FF GREATER TUNB HALL

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

CEILING FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to ceilings

Ceiling Textured paint; including all accessories and works


required; all in accordance with the Specifications

A Type C-205 508 m2

Ceiling paint; including all accessories and works required; all in


accordance with the Specifications

B Type C-202 328 m2

Bronze metal insert; including all accessories and works required;


all in accordance with the Specifications

C Type J-900 78 m

Suspended Ceilings

Suspended Gypsum Board; including; fastenings and all


accessories and works required; all in accordance with the
Specifications

D For Type C-202 and C205 836 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 29 29.3/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 29 - FF GREATER TUNB HALL

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

CEILING FINISHES (CONT*D)

28 Floor, wall, ceiling and roof finishings (CONT*D)


Acoustic insulation; including fastenings and all accessories and
works required; all in accordance with the Specifications

A For Type C-202 and C205 836 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 29 29.3/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 29 - FF GREATER TUNB HALL

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 29.3/1

Page : 29.3/2

Page : 29.3/3

Page : 29.3/4

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 29 29.4/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 29 - FF GREATER TUNB HALL

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING


32 Furniture, fittings and equipment

Signage

Fire and Life Safety Signs, as per Specifications

A Allowance for fire and life safety signs 1 Item

Artwork

B Allow for provision of artwork 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 29 29.4/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 29 - FF GREATER TUNB HALL

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 29.4/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 29 29.5/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 29 - FF GREATER TUNB HALL

Item Description Quantity Unit Rate AED Amount AED

SERVICES

SPACE HEATING AND AIR CONDITIONING

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

38 Mechanical services

Ductwork

Galvanised steel sheet rectangular ductwork and fittings, including


insulation, supports, manufactured and fitted in accordance with
the relevant standards, complete as shown on drawings and
Specifications

A Supply/Return air ductwork 1 Item

Duct ancillaries

Flexible duct, including insulation complete all in accordance with


the Specifications

B Flexible duct 1 Item

Linear slot diffuser, complete all in accordance with the


Specifications

C Supply air linear diffuser 1 Item

Variable air volume boxes; including all necessary insulation,


accessories and connections; complete all in accordance with the
Specifications

D VAVs 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 29 29.5/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 29 - FF GREATER TUNB HALL

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

39 Electrical services

Small Power Installation

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

Socket outlets

A Switch Socket Outlets 1 Item

B Floor Box 1 Item

Terminal equipment and fittings

Devices complete as described, all in accordance with the


Specification

Socket outlets

C Switch Socket Outlets 1 Item

D Floor Box 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 29 29.5/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 29 - FF GREATER TUNB HALL

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Lighting Installation

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

A Lighting points 1 Item

B Linear lighting points 1 Item

Terminal equipment and fittings

Light fittings including fixings, lamps and connections complete in


accordance with the Specifications

C Lighting type A (1) 1 Item

D Lighting type C (3) 1 Item

E Lighting type K (1) 1 Item

F Lighting type K (2) 1 Item

Lighting Control Installation

Lighting control system including but not limited to panels, wiring,


containment, as shown on drawings all in accordance with the
Specification

G Lighting control installation 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 29 29.5/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 29 - FF GREATER TUNB HALL

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

38 Mechanical services

Sprinkler Installations

Pipework

Above ground galvanized steel pipes; including fittings, all


necessary fixings, accessories, supports and connections in
accordance with the Specifications

A 25mm Diameter pipes 1 Item

B 32mm Diameter pipes 1 Item

C 40mm Diameter pipes 1 Item

D 50mm Diameter pipes 1 Item

E 65mm Diameter pipes 1 Item

Pipe ancillaries

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification

F Pendent type sprinkler heads 1 Item

G Upright type sprinkler heads 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 29 29.5/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 29 - FF GREATER TUNB HALL

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION (CONT*D)

Sprinkler Installations (CONT*D)

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification
(CONT*D)

A Side wall type sprinkler heads 1 Item

Fire hose reel and department valve assembly; comprising of fire


department landing valve, rack with hose, nozzle, 25mm diameter
pressure reducing valve, swing hose reel, fire extinguishers,
pipework inside cabinet, all necessary accessories and
connections ; all in accordance with the Specification

B Fire hose reel cabinet 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 29 29.5/6
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 29 - FF GREATER TUNB HALL

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

39 Electrical services

Fire Detection & Voice Evacuation System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

A Intelligent optical Smoke Detector with standard base 1 Item

B Ceiling void Intelligent optical Smoke Detector with LED remote 1 Item
Indicator

C Manual Call Point 1 Item

D Flasher 1 Item

E Response Indicator 1 Item

F PAVA/BGM Ceiling Speaker 1 Item

Terminal equipment and fittings

Supply and installation of fire alarm devices, all in accordance with


the Specification

G Intelligent optical Smoke Detector with standard base 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 29 29.5/7
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 29 - FF GREATER TUNB HALL

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Fire Detection & Voice Evacuation System (CONT*D)

Supply and installation of fire alarm devices, all in accordance with


the Specification (CONT*D)

A Ceiling void Intelligent optical Smoke Detector with LED remote 1 Item
Indicator

B Manual Call Point 1 Item

C Flasher 1 Item

D Response Indicator 1 Item

E PAVA/BGM Ceiling Speaker 1 Item

IT System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

F WIFI Ceiling 1 Item

Terminal equipment and fittings

Supply and installation of IT devices, all in accordance with the


Specification

G WIFI Ceiling 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 29 29.5/8
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 29 - FF GREATER TUNB HALL

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Security System

CCTV

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

A Dome Camera 1 Item

Terminal equipment and fittings

Supply and installation of CCTV devices, all in accordance with


the Specification

B Dome Camera 1 Item

Access Control

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

C Door with card reader, Electric lock, BGU and exit Push button 1 Item

Terminal equipment and fittings

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 29 29.5/9
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 29 - FF GREATER TUNB HALL

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Security System (CONT*D)

Supply and installation of Access control devices, all in


accordance with the Specification

A Door with card reader, Electric lock, BGU and exit Push button 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 29 29.5/10
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 29 - FF GREATER TUNB HALL

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

BUILDER'S WORK IN CONNECTION WITH SERVICES

41 Builder's work in connection with mechanical, electrical


and transportation installations

A Builder's work in connection with services 1 Item

B Allow for integrating the new MEP services to the existing services 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 29 29.5/11
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 29 - FF GREATER TUNB HALL

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 29.5/1

Page : 29.5/2

Page : 29.5/3

Page : 29.5/4

Page : 29.5/5

Page : 29.5/6

Page : 29.5/7

Page : 29.5/8

Page : 29.5/9

Page : 29.5/10

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 29 D/Add/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 29 - FF GREATER TUNB HALL

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS
Any items that may not be covered elsewhere in the Bills of
Quantities which the tenderer deemed to be necessary in order to
carry out the works in full compliance with the Drawings,
Specifications and any other items necessary to form a complete
Installations, must be itemised and priced below. The tenderer
may provide additional sheets for this purpose if necessary. All
items under this section must be summarised under a separate
cover.

A Item

B Item

C Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 29 D/Add/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 29 - FF GREATER TUNB HALL

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : D/Add/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 29 D/Add/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 29 - FF GREATER TUNB HALL

Item Description Quantity Unit Rate AED Amount AED

BILL 29 - FF Greater Tunb Hall

BILL SUMMARY

Total Brought Forward from Page No.

Facilitating works 29.1/2

Superstructure 29.2/2

Internal Finishes 29.3/5

Fittings and Furnishing 29.4/2

Services 29.5/11

ADDITIONAL ITEMS D/Add/2

Carried To General Summary Page AED 0


Issued on: 15/11/2022
The Armed Forces Officers Club and Hotel

Erth Guest Experience

Fit-out Works

BILL 30

FF AL HISN FOYER

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 30 30.1/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 30 - FF AL HISN FOYER

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS

DEMOLITION WORKS

3 Demolitions

Demolish and off site disposal of existing ceilings and MEP


services as per drawings and specification

A Demolition of existing ceiling finishes 80 m2

B Demolition of existing MEP services 80 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 30 30.1/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 30 - FF AL HISN FOYER

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 30.1/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 30 30.2/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 30 - FF AL HISN FOYER

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE

INTERNAL DOORS

24 Doors, shutters and hatches

Doors (size, type and material to be confirmed); including


ironmongery and all necessary fixing accessories; all in
accordance with the Drawings and Specifications

A Single leaf door including ironmongery 10 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 30 30.2/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 30 - FF AL HISN FOYER

Item Description Quantity Unit Rate AED Amount AED

SUPERSTRUCTURE (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 30.2/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 30 30.3/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 30 - FF AL HISN FOYER

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES

WALL FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to walls and columns

Texture paint; including all accessories and works required; all in


accordance with the Specifications

A Type W203 209 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 30 30.3/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 30 - FF AL HISN FOYER

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

FLOOR FINISHES

28 Floor, wall, ceiling and roof finishings

Screeds

Backgrounds; self levelling compound; to receive floor finishes; all


in accordance with the Specifications

A To floors 80 m2

Finish to floors

Woven Vinyl Carpet; laid on self levelling compound (measured


separately) including preparation and all works required; all in
accordance with the Specifications

B Type F-101B 80 m2

Brushed brass metal skirting; including preparation and all works


required; all in accordance with the Specifications

C Brushed brass metal 51 m

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 30 30.3/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 30 - FF AL HISN FOYER

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

CEILING FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to ceilings

Ceiling Textured paint; including all accessories and works


required; all in accordance with the Specifications

A Type C-205 52 m2

Ceiling paint; including all accessories and works required; all in


accordance with the Specifications

B Type C-202 20 m2

Bronze metal insert; including all accessories and works required;


all in accordance with the Specifications

C Type J-900 10 m

Suspended Ceilings

Suspended Gypsum Board; including; fastenings and all


accessories and works required; all in accordance with the
Specifications

D For Type C-202 72 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 30 30.3/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 30 - FF AL HISN FOYER

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

CEILING FINISHES (CONT*D)

28 Floor, wall, ceiling and roof finishings (CONT*D)


Acoustic insulation; including fastenings and all accessories and
works required; all in accordance with the Specifications

A For Type C-202 72 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 30 30.3/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 30 - FF AL HISN FOYER

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 30.3/1

Page : 30.3/2

Page : 30.3/3

Page : 30.3/4

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 30 30.4/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 30 - FF AL HISN FOYER

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING

32 Furniture, fittings and equipment

Signage

Fire and Life Safety Signs, as per Specifications

A Allow for fire and life safety signs 1 Item

Artwork

B Allow for provision of artwork 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 30 30.4/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 30 - FF AL HISN FOYER

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 30.4/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 30 30.5/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 30 - FF AL HISN FOYER

Item Description Quantity Unit Rate AED Amount AED

SERVICES
SPACE HEATING AND AIR CONDITIONING

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

38 Mechanical services

Ductwork

Galvanised steel sheet rectangular ductwork and fittings, including


insulation, supports, manufactured and fitted in accordance with
the relevant standards, complete as shown on drawings and
Specifications

A Supply/Return air ductwork 1 Item

Duct ancillaries

Flexible duct, including insulation complete all in accordance with


the Specifications

B Flexible duct 1 Item

Linear slot diffuser, complete all in accordance with the


Specifications

C Supply air linear diffuser 1 Item

Variable air volume boxes; including all necessary insulation,


accessories and connections; complete all in accordance with the
Specifications

D VAVs 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 30 30.5/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 30 - FF AL HISN FOYER

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

39 Electrical services

Small Power Installation

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

Socket outlets

A Switch Socket Outlets 1 Item

B Floor Box 1 Item

Terminal equipment and fittings

Devices complete as described, all in accordance with the


Specification

Socket outlets

C Switch Socket Outlets 1 Item

D Floor Box 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 30 30.5/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 30 - FF AL HISN FOYER

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Lighting Installation

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

A Lighting points 1 Item

Terminal equipment and fittings

Light fittings including fixings, lamps and connections complete in


accordance with the Specifications

B Lighting type TBC 1 Item

Lighting Control Installation

Lighting control system including but not limited to panels, wiring,


containment, as shown on drawings all in accordance with the
Specification

C Lighting control installation 1 Item

Emergency Lighting

Final circuits

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 30 30.5/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 30 - FF AL HISN FOYER

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Emergency Lighting

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

A Emergency lighting points 1 Item

B Emergency exit sign points 1 Item

Terminal equipment and fittings

Emergency light fittings including fixings, lamps and connections


complete in accordance with the Specifications

C Emergency Light 1 Item

D Emergency Exit Sign 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 30 30.5/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 30 - FF AL HISN FOYER

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

38 Mechanical services

Sprinkler Installations

Pipework

Above ground galvanized steel pipes; including fittings, all


necessary fixings, accessories, supports and connections in
accordance with the Specifications

A 25mm Diameter pipes 1 Item

B 32mm Diameter pipes 1 Item

C 40mm Diameter pipes 1 Item

D 50mm Diameter pipes 1 Item

E 65mm Diameter pipes 1 Item

Pipe ancillaries

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification

F Pendent type sprinkler heads 1 Item

G Upright type sprinkler heads 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 30 30.5/6
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 30 - FF AL HISN FOYER

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION (CONT*D)

Sprinkler Installations (CONT*D)

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification
(CONT*D)

A Side wall type sprinkler heads 1 Item

Fire hose reel and department valve assembly; comprising of fire


department landing valve, rack with hose, nozzle, 25mm diameter
pressure reducing valve, swing hose reel, fire extinguishers,
pipework inside cabinet, all necessary accessories and
connections ; all in accordance with the Specification

B Fire hose reel cabinet 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 30 30.5/7
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 30 - FF AL HISN FOYER

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

39 Electrical services

Fire Detection & Voice Evacuation System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

A Intelligent optical Smoke Detector with standard base 1 Item

B Ceiling void Intelligent optical Smoke Detector with LED remote 1 Item
Indicator

C Manual Call Point 1 Item

D Flasher 1 Item

E Response Indicator 1 Item

F PAVA/BGM Ceiling Speaker 1 Item

Terminal equipment and fittings

Supply and installation of fire alarm devices, all in accordance with


the Specification

G Intelligent optical Smoke Detector with standard base 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 30 30.5/8
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 30 - FF AL HISN FOYER

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Fire Detection & Voice Evacuation System (CONT*D)

Supply and installation of fire alarm devices, all in accordance with


the Specification (CONT*D)

A Ceiling void Intelligent optical Smoke Detector with LED remote 1 Item
Indicator

B Manual Call Point 1 Item

C Flasher 1 Item

D Response Indicator 1 Item

E PAVA/BGM Ceiling Speaker 1 Item

IT System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

F WIFI Ceiling 1 Item

Terminal equipment and fittings

Supply and installation of IT devices, all in accordance with the


Specification

G WIFI Ceiling 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 30 30.5/9
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 30 - FF AL HISN FOYER

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Security System

CCTV

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

A Dome Camera 1 Item

Terminal equipment and fittings

Supply and installation of CCTV devices, all in accordance with


the Specification

B Dome Camera 1 Item

Access Control

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

C Door with card reader, Electric lock, BGU and exit Push button 1 Item

Terminal equipment and fittings

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 30 30.5/10
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 30 - FF AL HISN FOYER

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Security System (CONT*D)

Supply and installation of Access control devices, all in


accordance with the Specification

A Door with card reader, Electric lock, BGU and exit Push button 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 30 30.5/11
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 30 - FF AL HISN FOYER

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

BUILDER'S WORK IN CONNECTION WITH SERVICES

41 Builder's work in connection with mechanical, electrical


and transportation installations

A Builder's work in connection with services 1 Item

B Allow for integrating the new MEP services to the existing services 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 30 30.5/12
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 30 - FF AL HISN FOYER

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 30.5/1

Page : 30.5/2

Page : 30.5/3

Page : 30.5/4

Page : 30.5/5

Page : 30.5/6

Page : 30.5/7

Page : 30.5/8

Page : 30.5/9

Page : 30.5/10

Page : 30.5/11

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 30 D/Add/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 30 - FF AL HISN FOYER

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS
Any items that may not be covered elsewhere in the Bills of
Quantities which the tenderer deemed to be necessary in order to
carry out the works in full compliance with the Drawings,
Specifications and any other items necessary to form a complete
Installations, must be itemised and priced below. The tenderer
may provide additional sheets for this purpose if necessary. All
items under this section must be summarised under a separate
cover.

A Item

B Item

C Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 30 D/Add/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 30 - FF AL HISN FOYER

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : D/Add/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 30 D/Add/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 30 - FF AL HISN FOYER

Item Description Quantity Unit Rate AED Amount AED

BILL 30 - FF Al Hisn Foyer

BILL SUMMARY

Total Brought Forward from Page No.

Facilitating works 30.1/2

Superstructure 30.2/2

Internal Finishes 30.3/5

Fittings and Furnishing 30.4/2

Services 30.5/12

ADDITIONAL ITEMS D/Add/2

Carried To General Summary Page AED 0


Issued on: 15/11/2022
The Armed Forces Officers Club and Hotel

Erth Guest Experience

Fit-out Works

BILL 31

FF BANQUET STORE AND EXECUTIVE CAFE

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 31 31.1/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 31 - FF BANQUET STORE AND EXECUTIVE CAFE

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS

DEMOLITION WORKS

3 Demolitions

Demolish and off site disposal of existing ceilings and MEP


services as per drawings and specification

A Demolition of existing ceiling finishes 262 m2

B Demolition of existing MEP services 262 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 31 31.1/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 31 - FF BANQUET STORE AND EXECUTIVE CAFE

Item Description Quantity Unit Rate AED Amount AED

FACILITATING WORKS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 31.1/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 31 31.2/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 31 - FF BANQUET STORE AND EXECUTIVE CAFE

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES

WALL FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to walls and columns

Texture paint; including all accessories and works required; all in


accordance with the Specifications

A Type W203 95 m2

B Type W206 55 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 31 31.2/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 31 - FF BANQUET STORE AND EXECUTIVE CAFE

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

FLOOR FINISHES

28 Floor, wall, ceiling and roof finishings

Screeds

Backgrounds; self levelling compound; to receive floor finishes; all


in accordance with the Specifications

A To floors 262 m2

Finish to floors

Porcelain Floor tile; Matt finish, colour : sand, size : 120x240, laid
on cement and sand screed (measured separately) including
preparation and all works required; all in accordance with the
Specifications

B Type F-300B 183 m2

Customized Carpet Inset; laid on cement and sand screed


(measured separately) including preparation and all works
required; all in accordance with the Specifications

C Type F-103 79 m2

Metal insert including all accessories and works required; all in


accordance with the Specifications

D Type J-900 101 m

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 31 31.2/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 31 - FF BANQUET STORE AND EXECUTIVE CAFE

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

CEILING FINISHES

28 Floor, wall, ceiling and roof finishings

Finish to ceilings

Ceiling paint; including all accessories and works required; all in


accordance with the Specifications

A Type C-202 289 m2

Suspended Ceilings

Suspended Gypsum Board; including; fastenings and all


accessories and works required; all in accordance with the
Specifications

B For Type C-202 289 m2

Acoustic insulation; including fastenings and all accessories and


works required; all in accordance with the Specifications

C For Type C-202 289 m2

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 31 31.2/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 31 - FF BANQUET STORE AND EXECUTIVE CAFE

Item Description Quantity Unit Rate AED Amount AED

INTERNAL FINISHES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 31.2/1

Page : 31.2/2

Page : 31.2/3

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 31 31.3/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 31 - FF BANQUET STORE AND EXECUTIVE CAFE

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING


32 Furniture, fittings and equipment

Signage

Fire and Life Safety Signs, as per Specifications

A Allow for fire and life safety signs 1 Item

Artwork

B Allow for provision of Artwork 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 31 31.3/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 31 - FF BANQUET STORE AND EXECUTIVE CAFE

Item Description Quantity Unit Rate AED Amount AED

FITTINGS AND FURNISHING (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 31.3/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 31 31.4/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 31 - FF BANQUET STORE AND EXECUTIVE CAFE

Item Description Quantity Unit Rate AED Amount AED

SERVICES
SPACE HEATING AND AIR CONDITIONING

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

38 Mechanical services

Ductwork

Galvanised steel sheet rectangular ductwork and fittings, including


insulation, supports, manufactured and fitted in accordance with
the relevant standards, complete as shown on drawings and
Specifications

A Supply/Return air ductwork 1 Item

Duct ancillaries

Flexible duct, including insulation complete all in accordance with


the Specifications

B Flexible duct 1 Item

Linear slot diffuser, complete all in accordance with the


Specifications

C Supply air linear diffuser 1 Item

Variable air volume boxes; including all necessary insulation,


accessories and connections; complete all in accordance with the
Specifications

D VAVs 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 31 31.4/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 31 - FF BANQUET STORE AND EXECUTIVE CAFE

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

39 Electrical services

Small Power Installation

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

Socket outlets

A Switch Socket Outlets 1 Item

B Floor Box 1 Item

Terminal equipment and fittings

Devices complete as described, all in accordance with the


Specification

Socket outlets

C Switch Socket Outlets 1 Item

D Floor Box 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 31 31.4/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 31 - FF BANQUET STORE AND EXECUTIVE CAFE

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Lighting Installation

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

A Lighting points 1 Item

Terminal equipment and fittings

Light fittings including fixings, lamps and connections complete in


accordance with the Specifications

B Lighting type TBC 1 Item

Lighting Control Installation

Lighting control system including but not limited to panels, wiring,


containment, as shown on drawings all in accordance with the
Specification

C Lighting control installation 1 Item

Emergency Lighting

Final circuits

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 31 31.4/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 31 - FF BANQUET STORE AND EXECUTIVE CAFE

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATION (CONT*D)

Emergency Lighting

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets , all in accordance with the Specification

A Emergency lighting points 1 Item

B Emergency exit sign points 1 Item

Terminal equipment and fittings

Emergency light fittings including fixings, lamps and connections


complete in accordance with the Specifications

C Emergency Light 1 Item

D Emergency Exit Sign 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 31 31.4/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 31 - FF BANQUET STORE AND EXECUTIVE CAFE

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

38 Mechanical services

Sprinkler Installations

Pipework

Above ground galvanized steel pipes; including fittings, all


necessary fixings, accessories, supports and connections in
accordance with the Specifications

A 25mm Diameter pipes 1 Item

B 32mm Diameter pipes 1 Item

C 40mm Diameter pipes 1 Item

D 50mm Diameter pipes 1 Item

E 65mm Diameter pipes 1 Item

Pipe ancillaries

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification

F Pendent type sprinkler heads 1 Item

G Upright type sprinkler heads 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 31 31.4/6
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 31 - FF BANQUET STORE AND EXECUTIVE CAFE

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION (CONT*D)

Sprinkler Installations (CONT*D)

Sprinkler heads; including all necessary accessories and


connections; complete in accordance with the Specification
(CONT*D)

A Side wall type sprinkler heads 1 Item

Fire hose reel and department valve assembly; comprising of fire


department landing valve, rack with hose, nozzle, 25mm diameter
pressure reducing valve, swing hose reel, fire extinguishers,
pipework inside cabinet, all necessary accessories and
connections ; all in accordance with the Specification

B Fire hose reel cabinet 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 31 31.4/7
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 31 - FF BANQUET STORE AND EXECUTIVE CAFE

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS

Note: The descriptions provided below are indicative and the


Contractor is required to verify and make allowance to the
proposed design.

39 Electrical services

Fire Detection & Voice Evacuation System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

A Intelligent optical Smoke Detector with standard base 1 Item

B Ceiling void Intelligent optical Smoke Detector with LED remote 1 Item
Indicator

C Manual Call Point 1 Item

D Flasher 1 Item

E Response Indicator 1 Item

F PAVA/BGM Ceiling Speaker 1 Item

Terminal equipment and fittings

Supply and installation of fire alarm devices, all in accordance with


the Specification

G Intelligent optical Smoke Detector with standard base 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 31 31.4/8
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 31 - FF BANQUET STORE AND EXECUTIVE CAFE

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Fire Detection & Voice Evacuation System (CONT*D)

Supply and installation of fire alarm devices, all in accordance with


the Specification (CONT*D)

A Ceiling void Intelligent optical Smoke Detector with LED remote 1 Item
Indicator

B Manual Call Point 1 Item

C Flasher 1 Item

D Response Indicator 1 Item

E PAVA/BGM Ceiling Speaker 1 Item

IT System

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

F WIFI Ceiling 1 Item

Terminal equipment and fittings

Supply and installation of IT devices, all in accordance with the


Specification

G WIFI Ceiling 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 31 31.4/9
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 31 - FF BANQUET STORE AND EXECUTIVE CAFE

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Security System

CCTV

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

A Dome Camera 1 Item

Terminal equipment and fittings

Supply and installation of CCTV devices, all in accordance with


the Specification

B Dome Camera 1 Item

Access Control

Final circuits

Wiring in approved cables, drawing into and including conduit, and


cable tray/trunking where required, complete with boxes, fittings
and supporting brackets, all in accordance with the Specification

C Door with card reader, Electric lock, BGU and exit Push button 1 Item

Terminal equipment and fittings

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 31 31.4/10
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 31 - FF BANQUET STORE AND EXECUTIVE CAFE

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COMMUNICATION, SECURITY AND CONTROL SYSTEMS


(CONT*D)

Security System (CONT*D)

Supply and installation of Access control devices, all in


accordance with the Specification

A Door with card reader, Electric lock, BGU and exit Push button 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 31 31.4/11
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 31 - FF BANQUET STORE AND EXECUTIVE CAFE

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

BUILDER'S WORK IN CONNECTION WITH SERVICES

41 Builder's work in connection with mechanical, electrical


and transportation installations

A Builder's work in connection with services 1 Item

B Allow for integrating the new MEP services to the existing services 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 31 31.4/12
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 31 - FF BANQUET STORE AND EXECUTIVE CAFE

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 31.4/1

Page : 31.4/2

Page : 31.4/3

Page : 31.4/4

Page : 31.4/5

Page : 31.4/6

Page : 31.4/7

Page : 31.4/8

Page : 31.4/9

Page : 31.4/10

Page : 31.4/11

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 31 D/Add/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 31 - FF BANQUET STORE AND EXECUTIVE CAFE

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS
Any items that may not be covered elsewhere in the Bills of
Quantities which the tenderer deemed to be necessary in order to
carry out the works in full compliance with the Drawings,
Specifications and any other items necessary to form a complete
Installations, must be itemised and priced below. The tenderer
may provide additional sheets for this purpose if necessary. All
items under this section must be summarised under a separate
cover.

A Item

B Item

C Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 31 D/Add/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 31 - FF BANQUET STORE AND EXECUTIVE CAFE

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : D/Add/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 31 D/Add/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 31 - FF BANQUET STORE AND EXECUTIVE CAFE

Item Description Quantity Unit Rate AED Amount AED

BILL 31 - FF Banquet Store and Executive Cafe

BILL SUMMARY

Total Brought Forward from Page No.

Facilitating works 31.1/2

Internal Finishes 31.2/4

Fittings and Furnishing 31.3/2

Services 31.4/12

ADDITIONAL ITEMS D/Add/2

Carried To General Summary Page AED 0


Issued on: 15/11/2022
The Armed Forces Officers Club and Hotel

Erth Guest Experience

Fit-out Works

BILL 32

MODIFICATION OF MEP PLANT & EQUIPMENT

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 32 32.1/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 32 - MODIFICATION OF MEP PLANT & EQUIPMENT

Item Description Quantity Unit Rate AED Amount AED

SERVICES
SPACE HEATING AND AIR CONDITIONING

38 Mechanical services

Replacement of Existing AHU Units (14No)

A Allow for decommissioning and complete removal of existing AHU 14 nr


units

B Allow for supply and installation of new AHU units including supply 14 nr
air fan, return air fan, coils, eliminators, panel / bag filters,
manometers, duct connections, motorized dampers / actuators,
mixing boxes, floor mounted all in accordance with the drawings
and specification

C Allow for modification of ductwork including provision of VAVs 1 Item

D Allow for modification of AHU breakers, containments and cables 1 Item

Replacement of Kitchen Extract Fans with ecology units:

E Allow for replacement of kitchen extract fans with ecology units 1 Item

Basement Chilled Water Pipes and Valves

Above ground galvanized steel pipes; including fittings, all


necessary fixings, accessories, supports and connections in
accordance with the Specifications

F 150mm Diameter pipes 77 m

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 32 32.1/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 32 - MODIFICATION OF MEP PLANT & EQUIPMENT

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

SPACE HEATING AND AIR CONDITIONING (CONT*D)

Basement Chilled Water Pipes and Valves (CONT*D)

Isolation valve; with interconnecting pipework and all necessary


accessories and ancillaries ; all in accordance with the
Specification

A Fixed to 150 mm diameter pipe 28 nr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 32 32.1/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 32 - MODIFICATION OF MEP PLANT & EQUIPMENT

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

FIRE AND LIGHTNING PROTECTION

38 Mechanical services

Smoke management system

A Allow for provision of smoke management system 1 Item

Fire Alarm Workstation

B Allow for provision of workstation for the existing fire alarm system 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 32 32.1/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 32 - MODIFICATION OF MEP PLANT & EQUIPMENT

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 32.1/1

Page : 32.1/2

Page : 32.1/3

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 32 D/Add/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 32 - MODIFICATION OF MEP PLANT & EQUIPMENT

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS
Any items that may not be covered elsewhere in the Bills of
Quantities which the tenderer deemed to be necessary in order to
carry out the works in full compliance with the Drawings,
Specifications and any other items necessary to form a complete
Installations, must be itemised and priced below. The tenderer
may provide additional sheets for this purpose if necessary. All
items under this section must be summarised under a separate
cover.

A Item

B Item

C Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 32 D/Add/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 32 - MODIFICATION OF MEP PLANT & EQUIPMENT

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : D/Add/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 32 D/Add/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 32 - MODIFICATION OF MEP PLANT & EQUIPMENT

Item Description Quantity Unit Rate AED Amount AED

BILL 32 - Modification of MEP Plant & Equipment

BILL SUMMARY

Total Brought Forward from Page No.

Services 32.1/4

ADDITIONAL ITEMS D/Add/2

Carried To General Summary Page AED 0


Issued on: 15/11/2022
The Armed Forces Officers Club and Hotel

Erth Guest Experience

Fit-out Works

BILL 33

PROVISION OF POWER AND DATA TO RETAIL SHOP

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 33 33.1/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 33 - PROVISION OF POWER AND DATA TO RETAIL SHOP

Item Description Quantity Unit Rate AED Amount AED

SERVICES

ELECTRICAL INSTALLATIONS

39 Electrical services

Contractor to allow for provision of power installation to


retail shops

A Shop 1 Vacant; 79.1m2 1 Item

B Shop 2 Vacant; 211.9m2 1 Item

C Shop 3 Vacant; 34.3m2 1 Item

D Shop 4 Vacant Former Bank Space; 30.4m2 1 Item

E Shop 5 Relocation Seasons Café; 35.2m2 1 Item

F Shop 6 & 7 Male Grooming; 244.4m2 1 Item

G Shop 8 Adventure Parx; 456.6m2 1 Item

H Shop 9 Vacant; 92.2m2 1 Item

J Shop 10 & 11 Future Spa; 433m2 1 Item

K Shop 12 Ergon Foods/Organic Restaurant; 143m2 1 Item

L Shop 13 Pool & Beach Merchandise;21m2 1 Item

M Shop 14 Sports Hub Retail; 39m2 1 Item

N Shop 15, 16, 17 ATM Nook 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 33 33.1/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 33 - PROVISION OF POWER AND DATA TO RETAIL SHOP

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

ELECTRICAL INSTALLATIONS (CONT*D)

Contractor to allow for provision of data outlet to retail shops

A Shop 1 Vacant; 79.1m2 1 Item

B Shop 2 Vacant; 211.9m2 1 Item

C Shop 3 Vacant; 34.3m2 1 Item

D Shop 4 Vacant Former Bank Space; 30.4m2 1 Item

E Shop 5 Relocation Seasons Café; 35.2m2 1 Item

F Shop 6 & 7 Male Grooming; 244.4m2 1 Item

G Shop 8 Adventure Parx; 456.6m2 1 Item

H Shop 9 Vacant; 92.2m2 1 Item

J Shop 10 & 11 Future Spa; 433m2 1 Item

K Shop 12 Ergon Foods/Organic Restaurant; 143m2 1 Item

L Shop 13 Pool & Beach Merchandise;21m2 1 Item

M Shop 14 Sports Hub Retail; 39m2 1 Item

N Shop 15, 16, 17 ATM Nook 1 Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 33 33.1/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 33 - PROVISION OF POWER AND DATA TO RETAIL SHOP

Item Description Quantity Unit Rate AED Amount AED

SERVICES (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : 33.1/1

Page : 33.1/2

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 33 D/Add/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 33 - PROVISION OF POWER AND DATA TO RETAIL SHOP

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS
Any items that may not be covered elsewhere in the Bills of
Quantities which the tenderer deemed to be necessary in order to
carry out the works in full compliance with the Drawings,
Specifications and any other items necessary to form a complete
Installations, must be itemised and priced below. The tenderer
may provide additional sheets for this purpose if necessary. All
items under this section must be summarised under a separate
cover.

A Item

B Item

C Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 33 D/Add/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 33 - PROVISION OF POWER AND DATA TO RETAIL SHOP

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : D/Add/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 33 D/Add/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 33 - PROVISION OF POWER AND DATA TO RETAIL SHOP

Item Description Quantity Unit Rate AED Amount AED

BILL 33 - Provision of power and data to Retail Shop

BILL SUMMARY

Total Brought Forward from Page No.

Services 33.1/3

ADDITIONAL ITEMS D/Add/2

Carried To General Summary Page AED 0


Issued on: 15/11/2022
The Armed Forces Officers Club and Hotel

Erth Guest Experience

Fit-out Works

BILL 34

DAYWORKS

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 34 DW/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 34 - DAYWORKS

Item Description Quantity Unit Rate AED Amount AED

DAYWORKS

GENERAL NOTES

Dayworks will be administered strictly in accordance with


Conditions of Contract

The Contractor will be paid for Dayworks carried out during the
course of the Works, while other operations are in progress, at the
rates set out in this Schedule. Profit and Overheads are not to be
included in the actual rates but stated as a percentage addition at
the Item provided for same at the end of the Labour, Materials and
Plant sections of the Dayworks Schedule.

The basic unit rates to be inserted in the Dayworks Schedule shall


be the rates which the Contractor has used in determining his unit
rates inserted elsewhere in this Tender Document.

Time engaged on the actual works only will be allowed. In the


event of Labour or Plant having to be brought to the Site
specifically for the item of Daywork, then a reasonable allowance
for travelling time shall be considered, any such allowance to be
agreed before the Daywork Item is executed.

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 34 DW/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 34 - DAYWORKS

Item Description Quantity Unit Rate AED Amount AED

DAYWORKS (CONT*D)

GENERAL NOTES ON RATES FOR LABOUR

The Daywork rates quoted for Labour are to be the inclusive net
amounts payable, including wages, bonuses and all allowances
paid to operatives directly engaged on dayworks (including those
operating mechanical plant and equipment).

The Daywork rates shall include for use of hand tools and
consumables, ordinary non-mechanical plant, staging, scaffolding,
tarpaulin, use of electric power, light and water for the works, etc.,
and all special inducements for working in Al Ula.

The rates shall also be deemed to include for the extra cost of
public holidays, other holidays with pay, medical costs, bonuses,
sick leave, termination indemnity pay and the like.

Unless specifically authorised in writing by the Project Manager,


non-productive overtime or special rates for overtime will not be
admissible.

The cost of all supervisory and administrative staff, including


Engineers, Foremen, Clerks, Storemen, Secretaries, Assistants
and the like, is to be included in the percentage addition for profit
and overheads.

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 34 DW/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 34 - DAYWORKS

Item Description Quantity Unit Rate AED Amount AED

DAYWORKS (CONT*D)

GENERAL NOTES ON RATES FOR MATERIALS

Materials used on Daywork shall be as specified elsewhere for the


Works. The rates are to be the net invoice price including delivery
to the Site. Should materials be required for use on Dayworks
which are not included in the Schedule, the lowest current net
market prices shall apply, plus a reasonable allowance for
collecting, loading, off-loading and transporting to the Site.

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 34 DW/4
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 34 - DAYWORKS

Item Description Quantity Unit Rate AED Amount AED

DAYWORKS (CONT*D)

GENERAL NOTES ON RATES FOR PLANT

Plant hire rates shall include for the cost of maintaining in proper
working order, repairs, maintenance, insurance, attendance in
starting up and shutting down, fuel, re-fuelling, power, oils, grease,
cleaning materials, replacement and / or sharpening of tools,
provision of tools and all other ancillary items, including
consumables.

Idle time in waiting or maintenance or travelling to the Site will not


be considered.

Drivers and Attendants shall be charged for, at the rates set out in
the Schedule of Rates for Labour.

The reasonable cost of hiring plant and equipment shall be paid,


for any items not listed in the Schedule. These costs shall be
based upon the Contractors Invoices. Competitive Quotations
must be obtained for all Plant hire. In the case of plant and
equipment owned by the Contractor being used, a fair value,
based upon market hire rates applicable at the time, will be used.

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 34 DW/5
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 34 - DAYWORKS

Item Description Quantity Unit Rate AED Amount AED

DAYWORKS (CONT*D)

GENERAL NOTES ON PERCENTAGE ADDITION

The percentage inserted at the Item provided at the end of each


section shall, in addition to any items referred previously, include
for the following ; profit and overheads, supervisory and
administrative staff, establishment, all costs related to the
employment of labour, costs related to the storage of materials
(including handling and waste in storage), costs associated with
the Contractor's administrative arrangements, constructional plant
(except plant employed exclusively on Dayworks), Contractor's
facilities, equipment, temporary works and all other sundry items

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 34 DW/6
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 34 - DAYWORKS

Item Description Quantity Unit Rate AED Amount AED

DAYWORKS (CONT*D)

SCHEDULE OF RATES FOR LABOUR

Generally

A Labourer (unskilled) 1 Hr

B Labourer (skilled) 1 Hr

C Steel fixer 1 Hr

D Bar bender 1 Hr

E Welder; uncoded 1 Hr

F Welder; coded 1 Hr

G Transport driver 1 Hr

H Plant operator 1 Hr

J Mason/Brick/Block layer 1 Hr

K Carpenter/Joiner 1 Hr

L Plumber/Pipe Fitter 1 Hr

M Plasterer/Tile Fixer 1 Hr

N Painter 1 Hr

P Fitter/Mechanic 1 Hr

Q Charge hand Electrician 1 Hr

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 34 DW/7
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 34 - DAYWORKS

Item Description Quantity Unit Rate AED Amount AED

DAYWORKS (CONT*D)

SCHEDULE OF RATES FOR LABOUR (CONT*D)

Generally (CONT*D)

A Electrician 1 Hr

B Electrician's Mate 1 Hr

C Cable Jointer 1 Hr

D Charge hand Ductwork Erector 1 Hr

E Thermal Insulator Erector 1 Hr

F Ductwork Fabricator 1 Hr

G Ductwork Erector 1 Hr

H Air-conditioning Fitter 1 Hr

Percentage Addition

J Allow for all other costs and charges %

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 34 DW/8
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 34 - DAYWORKS

Item Description Quantity Unit Rate AED Amount AED

DAYWORKS (CONT*D)

SCHEDULE OF RATES FOR MATERIALS

A Ordinary Portland cement (or equivalent) 1 Tonne

B Sulphate resisting cement (or equivalent) 1 Tonne

C Coarse aggregate (dry) 1 Tonne

D Fine aggregate (dry) 1 Tonne

E Ready mix concrete (Grade 40) delivered to site 1 m3

F Reinforcement bars (high yield, deformed) 1 Tonne

G Emulsion paint 10 ltr

H Enamel paint 10 ltr

J Intumescent Fireproofing Paint (1 hr rating) 1 m2

K Intumescent Fireproofing Paint (2 hr rating) 1 m2

L Cementitious Fireproofing Application (1 hr rating) 1 m2

M Cementitious Fireproofing Application (2 hr rating) 1 m2

Percentage Addition

N Allow for all other costs and charges %

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 34 DW/9
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 34 - DAYWORKS

Item Description Quantity Unit Rate AED Amount AED

DAYWORKS (CONT*D)

SCHEDULE OF RATES FOR PLANTS

A Concrete mixer, 7 / 5 1 Hr

B Dump truck, minimum 20 tonnes 1 Hr

C Dump truck, minimum 10 tonnes 1 Hr

D Pneumatic tool, hoses and fittings 1 Hr

E Concrete vibrator 1 Hr

F Generator, 200 KVA 1 Hr

G Mobile crane, 25 tonnes 1 Hr

H Welding Machine 1 Hr

J Drilling Machine 1 Hr

K Concrete pump 1 Hr

L Air compressor (250 cubic feet) any type of drive including power, 1 Hr
fuel, water, all consumable stores, spares, hoses and tools

M Air compressor (180 cubic feet) any type of drive including power, 1 Hr
fuel, water, all consumable stores, spares, hoses and tools

N Concrete mixer, closed drum with hopper any type of drive fuel 1 Hr
and consumable stores and spares capacity 10/7

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 34 DW/10
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 34 - DAYWORKS

Item Description Quantity Unit Rate AED Amount AED

DAYWORKS (CONT*D)

SCHEDULE OF RATES FOR PLANTS (CONT*D)

A Dumper, fuel, all consumable stores and spares, capacity 1/2 1 Hr


cubic yard

B Motor lorry, including fuel, all consumable stores and spares, 1 Hr


capacity 5 ton tipper

Percentage Addition

C Allow for all other costs and charges %

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 34 DW/11
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 34 - DAYWORKS

Item Description Quantity Unit Rate AED Amount AED

DAYWORKS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : DW/1

Page : DW/2

Page : DW/3

Page : DW/4

Page : DW/5

Page : DW/6

Page : DW/7

Page : DW/8

Page : DW/9

Page : DW/10

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 34 DW/Add/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 34 - DAYWORKS

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS

Any items that may not be covered elsewhere in the Bills of


Quantities which the tenderer deemed to be necessary in order to
carry out the works in full compliance with the Drawings,
Specifications and any other items necessary to form a complete
Installations, must be itemised and priced below. The tenderer
may provide additional sheets for this purpose if necessary. All
items under this section must be summarised under a separate
cover.

A Item

B Item

C Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 34 DW/Add/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 34 - DAYWORKS

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : DW/Add/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 34 DW/Add/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 34 - DAYWORKS

Item Description Quantity Unit Rate AED Amount AED

BILL 34 - DAYWORKS

BILL SUMMARY

Total Brought Forward from Page No.

DAYWORKS DW/11

ADDITIONAL ITEMS DW/Add/2

Carried To General Summary Page AED 0


Issued on: 15/11/2022
The Armed Forces Officers Club and Hotel

Erth Guest Experience

Fit-out Works

BILL 35

PROVISIONAL SUMS

Issued on: 15/11/2022


CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 35 PS/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 35 - PROVISIONAL SUMS

Item Description Quantity Unit Rate AED Amount AED

PROVISIONAL SUMS

Note: The Provisional Sums given in the Bill of Quantities may be


used in whole or in part, or not at all, on the instruction of the
Engineer

Percentage of adjustment for provisional sums as provided in the


conditions of contract shall not be applicable to any work carried
out by other contractors or service authorities employed directly by
the employer. Payments to such contractors and service
authorities shall be made directly by the employer. If the contractor
is required to pay the service authorities on behalf of the
employer, the contractor shall be eligible for Over Head costs
only.

The contractor shall co-ordinate with the service authorities and


provide all necessary facilities as may be required and as
foreseeable by an experienced contractor. The cost of such co-
ordination and facilities is deemed to be included in the respective
item given in General Items Bills Of Quantities.

Provisional Sum

A TBC item

B Contractor's General and Special attendance on above %

C Contractor's Overhead & Profit on Provisional Sum %

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 35 PS/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 35 - PROVISIONAL SUMS

Item Description Quantity Unit Rate AED Amount AED

PROVISIONAL SUMS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : PS/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 35 D/Add/1
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 35 - PROVISIONAL SUMS

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS
Any items that may not be covered elsewhere in the Bills of
Quantities which the tenderer deemed to be necessary in order to
carry out the works in full compliance with the Drawings,
Specifications and any other items necessary to form a complete
Installations, must be itemised and priced below. The tenderer
may provide additional sheets for this purpose if necessary. All
items under this section must be summarised under a separate
cover.

A Item

B Item

C Item

To Collection AED 0
Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 35 D/Add/2
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 35 - PROVISIONAL SUMS

Item Description Quantity Unit Rate AED Amount AED

ADDITIONAL ITEMS (CONT*D)

COLLECTION

Total Brought Forward from Page No.

Page : D/Add/1

Carried To Bill Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works BILL 35 D/Add/3
BILL OF QUANTITIES - 50% DETAILED DESIGN
BILL 35 - PROVISIONAL SUMS

Item Description Quantity Unit Rate AED Amount AED

BILL 35 - PROVISIONAL SUMS

BILL SUMMARY

Total Brought Forward from Page No.

Provisional Sums PS/2

ADDITIONAL ITEMS D/Add/2

Carried To General Summary Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works GS/S
BILL OF QUANTITIES - 50% DETAILED DESIGN
GENERAL SUMMARY

Item Description Page No. Amount AED

GENERAL SUMMARY

Total Brought Forward from Page No.

BILL 2 - PRELIMINARIES & GENERAL CONDITIONS PR/1 To PR/7

BILL 3 - GF Guest Entrance + Cafe + ATM Nooks 3.1/1 To D/Add/1

BILL 4 - GF Central Corridor 4.1/1 To D/Add/1

BILL 5 - GF West Circulation 01 5.1/1 To D/Add/1

BILL 6 - GF West Circulation 02 6.1/1 To D/Add/1

BILL 7 - GF West Circulation 03 7.1/1 To D/Add/1

BILL 8 - GF East Circulation 01 8.1/1 To D/Add/1

BILL 9 - GF East Circulation 02 9.1/1 To D/Add/1

BILL 10 - GF East Circulation 03 10.1/1 To D/Add/1

BILL 11 - GF Recreation Lobby 11.1/1 To D/Add/1

BILL 12 - GF Recreation Reception 12.1/1 To D/Add/1

BILL 13 - GF Al Roudha Oasis 13.1/1 To D/Add/1

BILL 14 - GF Public Bathroom 14.1/1 To D/Add/1

BILL 15 - GF Stairs 15.1/1 To D/Add/1

BILL 16 - FF VIP Entrance + Main Circulation 16.1/1 To D/Add/1

BILL 17 - FF Al Mis'hab Hall (Abu Mousa Hall) 17.1/1 To D/Add/1

Carried To Next Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works GS/S
BILL OF QUANTITIES - 50% DETAILED DESIGN
GENERAL SUMMARY

Item Description Page No. Amount AED

GENERAL SUMMARY

Total Brought Forward from Page No. (CONT*D)

BILL 18 - FF Pre Function 18.1/1 To D/Add/1

BILL 19 - FF West Circulation 19.1/1 To D/Add/1

BILL 20 - FF East Circulation 20.1/1 To D/Add/1

BILL 21 - FF Connection to East Wing 21.1/1 To D/Add/1

BILL 22 - FF Public Bathroom 1 22.1/1 To D/Add/1

BILL 23 - FF Public Bathroom 2 23.1/1 To D/Add/1

BILL 24 - FF Public Bathroom 3 24.1/1 To D/Add/1

BILL 25 - FF Public Bathroom 4 25.1/1 To D/Add/1

BILL 26 - FF Public Bathroom 5 26.1/1 To D/Add/1

BILL 27 - FF Public Bathroom 6 27.1/1 To D/Add/1

BILL 28 - FF Theater Lobby 28.1/1 To D/Add/1

BILL 29 - FF Greater Tunb Hall 29.1/1 To D/Add/1

BILL 30 - FF Al Hisn Foyer 30.1/1 To D/Add/1

BILL 31 - FF Banquet Store and Executive Cafe 31.1/1 To D/Add/1

BILL 32 - Modification of MEP Plant & Equipment 32.1/1 To D/Add/1

BILL 33 - Provision of power and data to Retail Shop 33.1/1 To D/Add/1

Carried To Next Page AED 0


Issued on: 15/11/2022
CLIENT The Armed Forces Officers Club and Hotel
PROJECT Erth Guest Experience
PACKAGE Fit-out Works GS/S
BILL OF QUANTITIES - 50% DETAILED DESIGN
GENERAL SUMMARY

Item Description Page No. Amount AED

GENERAL SUMMARY

Total Brought Forward from Page No. (CONT*D)

BILL 34 - DAYWORKS DW/1 To DW/Add/1

BILL 35 - PROVISIONAL SUMS PS/1 To D/Add/1

Carried to Form of Tender AED 0


Issued on: 15/11/2022
Classification: Internal
Erth Hotel Guest Arrival Experience, Refurbishment Works
Invitation to Tender
22 November 2022

Appendix H
Site Restrictions

Page 28 of 28
AFOCH
– Erth
Hotel
Outline Site Restrictions
November 2022
General Requirements

Working Hours Operative Access & Egress Hours


The Contractor working hours are to be: Operatives are to be transported to site in well presented buses and all operatives to be
appropriately dressed with their company name/logo displayed.
• Working hours, 24 hours, As per United Arab Emirates Labor Law and Existing Main Building
Works restriction The Contractor is to ensure that all operative movements within the site establishment are to
• May be subject to operational stoppages occur only after sign-in at the designated security point.
• Building will be fully operational throughout the works.
Transportation for Engineers to undertake site inspections.

Noisy Works Hours


Delivery
The contractor's noisy works hours are restricted to:
Abnormal Loads:
• Monday to Friday Night only. 6pm – 8am
• Saturday – Sunday Full Day Should these Works require the delivery of factory pre-fabricated structures (by others), it is the
• May be subject to operational stoppages responsibility of the Contractor to work with Specialist Sub-Contractor to liaise with authorities
on behalf of Erth in order to ensure that all necessary permits and clearances are obtained from
local authorities.
Delivery Access Hours Delivery access during night shift and to comply to ERTH security department. (Subject to
Contractor’s methodology)
The Contractor delivery hours are to be:

• Delivery Access Hours, night shift and to comply to ERTH security department. (Subject to
Contractor’s methodology)

Removal of Waste Hours


The Contractor working hours for the removal of waste from the site are to be:

• Removal of waste during nnight shift and to comply to ERTH security department. (Subject to
Contractor’s methodology)
General Requirements

Statutory Authority Approvals Guest Complaints Procedure


The Contractor shall be responsible to obtain all statutory authority permits (as The Hotel Operator will manage all guest complaints via the front desk and internal
required) for its works. Completed permit for Design & Construction management procedure. Should the complaint be raised to the level of SVP / Chief
Officer then the Employer’s Representative may be contacted to suspend the Works.

The Employer / Employers Representative will be the only authorized person to


Work Permits suspend the Works on behalf of the Employer.

Work permits, As per UAE safety code and EHS requirements such as but not limited
to method statement, risk assessment, required certificates for staff.

▪ Completed Permit Form


▪ Emirates ID (for all staff)
▪ Risk Assessments and Method Statements (project specific activities)
AFOCH / Erth work permit to be completed
General Requirements

Further Contractor Requirements ▪ Client will support where possible to provide sufficient power and water to
undertake the works. (The Contractor is to verify their power requirements)
▪ All the Contractor’s work areas need to be protected and managed from any guests
entering the space, by use of hoarding. Hoarding to be standard and will require ▪ The Contractor will ensure that the site is managed properly & kept in a clean
gypsum boarding and graphics. Design to come from marketing/branding Erth manner at all times.
Management. ▪ The Contractor will be responsible to provide wild air to their working zones /
areas. Sufficient ventilated area.
▪ The Contractor will need to provide Health, Safety & Environment (HSE) plans to
the Erth, to be signed off, inclusive but not limited to: Lay-down area / Offices
• First Aid ▪ The Contractor will be provided a designated laying down area (offsite).
• Toolbox talks ▪ Lay down are within the site will need to be established throughout, will change
• General site welfare
• Lockout procedures ▪ The Contractor will be provided a site office space. Operational offices will be at the
• Working at heights expense of the contractor.
• Working in confined spaces
• Inductions, etc. ▪ The Contractor is to provide security at site for its materials laydown area.

▪ The Contractor is to fully comply with Abu Dhabi code of Construction Safety ▪ Roads to be kept open at all times by the Contractor.
Practice.

▪ The Contractor will be able to utilise the bathrooms provided by Erth hotel.
Material delivery / labour access and egress

▪ The Contractor will deliver materials through a designated route provided by Erth
management.