This inspection and test plan outlines 11 steps for casting a new demin pump base. It specifies visual and dimensional documentation checks at various steps, as well as supplier and client hold point inspections involving testing, witnessing, or surveillance. Sign-off is required from the contractor, client QA, client engineer, and client project manager to approve the quality control process.
This inspection and test plan outlines 11 steps for casting a new demin pump base. It specifies visual and dimensional documentation checks at various steps, as well as supplier and client hold point inspections involving testing, witnessing, or surveillance. Sign-off is required from the contractor, client QA, client engineer, and client project manager to approve the quality control process.
This inspection and test plan outlines 11 steps for casting a new demin pump base. It specifies visual and dimensional documentation checks at various steps, as well as supplier and client hold point inspections involving testing, witnessing, or surveillance. Sign-off is required from the contractor, client QA, client engineer, and client project manager to approve the quality control process.
Quality Control - Product / Process Inspection and Test Plan
No. ITP 020
SHONISANI RAMBAU CONSTRUCTION (PTY) LTD Rev. 0
Page 1 of 1
Order No: Project Description: CIVIL MAINTENANCE CONTRACT (LIMITED TO REFURBISHMENTS)
Item / Process Description: Casting of Demin pump base Section / Unit: Water treatment plant
Visual Supplier’s Hold (H) Client Hold (H) Remarks,
Instruction Dimensional Inspection (I), Inspection (I), Deficiency or Operational / Activity Procedure Documentation Test (T), Witness (W) Test (T), Witness (W) Non-conformance Number and Drawing or Hold Points or or Surveillance (S) or Surveillance (S) Report numbers Description Specification Non-Destructive Points Points Reference Examination Activities Vis. Dim. Doc. Hold ND Signature Date Signature Date point E 1 Breaking and removal of SABS 1200LC x x I I existing base 2 Breaking of slab concrete SABS 1200LC x x X I I to the specified depth of 300,0 mm 3 Removal of concrete SABS 1200LC x I I aggregates on the floor 4 Formworking for new slab SABS 1200LC x X X I I 5 Reinforcement steel fixing SABS 1200LC x x X I I 6 Placing of new studs in SABS 1200LC x x x position 7 Casting of concrete of SABS 1200LC x x X 35mpa strength 8 Housekeeping SABS 1200LC x 9 Inspection by engineer SABS 1200LC x x I I 10 Formwork removal after 3 days 11 Curing time of 7 days SABS 1200LC X X I I Approved by Contractor Approved by Client QA Approved by Client Engineer Approved by Client Project Manager
Signature Signature Signature Signature
Name RN Magidi Name Name Kash Sohawan Name Designation Site Manager Designation Designation Engineer Designation Date 13/01/2023 Date Date 13/01/2023 Date