Site Id FE
8.9593 38.705
1 142010 mitiku &kassa 9-Feb-23
2 142011 mitiku &kassa 10-Feb-23 8.9706593 38.705863
3 142012 mitiku &kassa
4 142024 mitiku &kassa 10-Feb-23 8.9714809 38.7166885
5 142032 mitiku &kassa 10-Feb-23 8.9792217 38.7224827
6 142035 mitiku &kassa 10-Feb-23 8.9716 38.722
7 142041 mitiku &kassa 9-Feb-23 8.9671 38.714
8 142043 mitiku &kassa 11-Feb-23 8.9874 38.721
9 142046 mitiku &kassa 10-Feb-23 8.95289 38.6941233333
10 142062 mitiku &kassa 3-Feb-23 8.9595 38.722
11 142075 mitiku &kassa 9-Feb-23 8.957 38.699
12 143004 mitiku &kassa 11-Feb-23 8.9934 38.709
13 143008 mitiku &kassa 9-Feb-23 8.9841 38.707
14 143011 mitiku &kassa 10-Feb-23 8.958345 38.689718
15 143015 mitiku &kassa 8-Feb-23 8.9869033333333 38.676518333333
16 143016 mitiku &kassa 10-Feb-23 8.9959 38.126
17 143023 mitiku &kassa 8-Feb-23 8.973478 38.6754269
18 143030 mitiku &kassa 11-Feb-23 9.0045 38.697
19 143044 mitiku &kassa 7-Feb-23 8.9699 38.666
20 143049 mitiku &kassa 5-Feb-23 9.0091 38.695
21 143052 mitiku &kassa 11-Feb 8.9907 38.715
22 143054 mitiku &kassa 8-Feb-23 9.00255999999999 38.69362
23 143062 mitiku &kassa 6-Feb-23 9.0095 38.681
24 143014 mitiku &kassa 10-Feb-23 8.99 38.686
25 143035 mitiku &kassa 10-Feb-23 8.97992117 38.6801
26 143047 mitiku &kassa 10-Feb-23
27 143059 mitiku &kassa 10-Feb-23 8.9868 38.697
28 143012 mitiku &kassa
29 143031 mitiku &kassa
Site Type Own
HO
RTT/RTP/GB Secuirty power solution
Date
T(Colo/FTK) Guard Guard Guard Mobile
Name Number
OK
nok UBT and RRH grounding not connected to bus bar
AC Single
EEU Meter type(Post/Pre
Supplier(EEU/O Phase/Three CB capacity
paid)
wner) Phase
enetek 6 4
entek 4 4
vertive 4 4
vertive 3 4
enetek 4 5
enetek 4 5
vertive 3 4
enetek 4 5
enetek 4 5
vertiv 3 4
vertiv 4 4
entek 4 4
vertive 3 4
vertiv 3 4
entek 4 5
vertiv 3 4
enetek 4 4
vertiv 3 4
vertiv 3 4
entek 4 5
roof top access denied roof top access denied roof top access denied
vertiv 3 4
entek 14 14
vertiv 3 4
vertiv 4 4
LVD /BLVD physical connection
ok
ok
ok
ok
ok
ok
ok
ok
ok
ok
ok
ok
ok
ok
ok
ok
ok
ok
ok
ok
roof top access denied
ok
ok
ok
ok
Priorty & Non priorty MCB count LVD-1
P(2*32A+2*16A+2*10A) NP(2*125A+2*63A) 43
P(2*32+2*16+2*10)NP(2*125+2*63) -47
P(6*6)NP(2*125+50+32+2*6) -47
P(32+5*6)NP(2*125+50+32+2*6) -47
P(1*32A+2*16A+2*10A) PR(1*63+3*125A) 43
P(3*10A+1*32A) NP(1*32A+2863A+2*125A) 43
P(32+5*6)NP(2*125+50+32+6) -47
P(1*10A+2*16A+2*32A) NP(2*63A+2*125A) 43
P(2*32A+4*50A) NP(1*50A+2*63A+3*125A)
P(5*6A+1*32A) NP(2*6A+1*32A+1*50A2*125A) 47
P(1*32A+5*6A) NP(2*6A+1*32A+1*50A+2*125A) 47
P(2*32+2*16+2*16)NP(2*125+2*63) 43
P(32+5*6)NP(2*125+50A+32A+2*6) -47
P(5*6A+1*32A) NP(2*6A+1*32A+1*50A+2*125A) 47
P(2*32+4*16+2*10)NP(2*125+2*63) -47
P(5*6A+1*32A) NP(2*6A+1*32A+1*50A+2*125A) 47
P(3*16A+2*32A+1*10A) NP(2*63A+2*125A) 43
P(5*6A+32A) +NP(2*6A+1*50A+3*125A) 47
P(4*6A+2*32A) NP(3*6A+1*50A+2*125A) 47
P(63+32+2*16+2*10)NP(2*125+32+63) -47
roof top access denied roof top access denied
P(5*6A+1*32A) NP(2*6A+1*32A+1*50A+2*125A) 47
P(10*32+6*16+6*10+8*50)NP(6*125+5*32+6*63+7*50) -47
47
P(6*6A) NP(1*6A+2*32A+1*50A+2*125A) 47
Re-Connect LVD -2 Re-Connect
44 47 48
-48 -43 -44
44 47 48
44 47 48
48 -43 -44
44 47 48
43 44 47
48 43 44
48 43 44
44 47 48
-48 -43 -44
48 43 44
-48 -43 -44
48 43 44
44 47 48
48 43 44
48 43 44
-48 -43 -44
roof top access denied roof top access denied roof top access denied
48 43 44
-48 -43 -44
48 43 44
48 43 44
Battery Charging
Input/Output current limit
Coefficient
25% 54A
25% 15
0.25 8
25% 15
20% 24A
25% 54A
25% 8
25% 54A
48 23A
0.25 8A
0.25 15A
25% 30
25% 8
0.25 8A
25% 54A
0.25 15A
25% 24A
0.25 15A
0.25 8A
25% 24
roof top access denied roof top access denied
0.25 6A
25% 54
0.25 15a
0.2 8A
DG
working NA NO
working NO available Ascot
working avaliable NA
working avaliable NA
working NO available Blacksmiz
working avaliable NA
working avaliable teksan
not working proprly NA NA
working NA NA
working Available NO
not working NO available NO
working NA NA
Working Available Teksan
working NA Ascot
working avaliable NA
blacksmith is installed but not
working NA connected
working NA NA
working Available NA
roof top access denied roof top access denied NA
Working NA NA
Working Available cummins
Working NA NA
Working NA CGM
DG working mode
Capacity of Generator(KVA) DG running hour
(auto/cyclic/247)
NO NO NO
20kva auto 305Hrs
NA NA NA
NA NA NA
15kva auto 75Hrs
NA NA NA
30kva auto 84.6hrs
NA NA NA
NA NA NA
NO NO NO
NO NO NO
NA NA NA
30kva auto 1632hrs
20kva auto 261hrs
NA NA NA
12kw
NA NA NA
NA NO NO
NA NA NA
NA NA NA
30kva auto 0
NA NA NA
auto 151hrs
TX
Router
Fuel level Router Position
type
NO 7250IXR-ec FCOB
600Ltr 7250IXR-ec fcob cabinet
28 no
(30/29) N0
(29/26)
(29/28) NO
(23/20) no
(25/30) no
(27/24) no
(27/29)
(32/30) no
(31/31) no
(27/27) no
32/28) no
(28/27) no
(27/25) yes
(34/27) no
(25/26) no
(26/28) no
(28/20) no
(28/26) no
(28/29) no
(27/27) no
(26/33) yes
roof top access denied no
(29/27) no
(37/28) no
(37/28) no
(25/31)
(26/28)
BTS
1&ok 9 installed
1 AND OK 6 Installed
1 AND OK 6 NO
1&ok 6 Installed
1&ok 9 installed
1&ok 9 installed
1&ok 9 installed
1&ok 6 NO installed
1&ok 9 installed
1&ok 9 installed
1&ok 6 NA
1&ok 6 installed
1&ok 6 installed
1&ok 6 installed
1&ok 6 installed
1&ok 6 installed
1&ok 6 NA
1&ok 6 NA
1&ok 9 installed
1&ok 6 installed
1&ok 9 installed
roof top access denied roof top access denied
1&ok 6 installed
1&ok 6 installed
1&ok 9 installed
Number of
Cable Tray cover
FPFH & Position
pending 2 on pole
Fuiiy 1 and pole
NO 1 AND POLE
fully 1on pole
ok 2
ok 2 on tower
OK 2 on tower
no 1on pole
ok 2 on pole
ok 2 on tower
NA 1on pole
ok 1 on pole
fully
fully 1 on tower
ok 1 on tower
pending 1 on tower
NA 1on pole
NA 1 on pole
ok 2 on pole
ok 1 on pole
fully 2 onFCOB
ok 1on tower
fully 1on tower
ok on pole& on fcob
Access
ok
Night accses security issue
no issues
OK OK
access till 22:00 PM
Portable DG
EHS issue
allowed
OK OK
Bad smell not allowed
ok allowed
ok not allowed
nok/ allowed
allowed
ok
ok allowed
allowed
OK not allowed
OK allowed
allowed
OK allowed
the ladder has no hand rail
allowed
allowed
OK not allowed
ok
OK
Commerical bulding
comercial bulding
OK
with ET permission
three phase cables are cascaded in the single phase meter MCB
the site has 5 battries but only 4 battries are charged
OK
three phase cables are cascaded in the single phase meter MCB
the site has DWDM
colo sit
colo sit
Active PM