PREP EQUIPMENT

PR 44
A.J. Antunes & Co.

A.J. Antunes & Co. Rapid Toaster Models VCT-200 and VCT-250
Rapid Toaster
Models VCT-200 and VCT-250

Model VCT-250 shown


Daily maintenance tasks
PR 44 D1 Clean release sheet
and belt wraps

Weekly maintenance tasks


PR 44 W1 Check unit and
bun temperatures

Monthly maintenance tasks


PR 44 M1 Calibrate bun
buffer landing
zone
PR 44 M2 Measure conveyor
belt chains and
roller

Quarterly maintenance tasks


PR 44 Q1 Replace belt wraps

Annual maintenance tasks


PR 44 A1 Lubricate drive
chain and idler
sprocket bearing
and clean inside of
electrical housing

A.VCT-250 Toaster, B. Optional Bun Buffer Landing Zone

Hazards
These icons alert you to a possible risk of personal injury.

Equipment alerts
Look for this icon to find information about how to avoid damaging the
equipment while doing a procedure.
PR 44

Tips
P/N 1011147 Rev. C 06/12 Look for this icon to find helpful tips about how to do a procedure.

©McDonald’s Corporation · Planned Maintenance Manual · Revised January 2008


Clean release sheet and belt wraps Daily PR 44 D1

A.J. Antunes & Co. Rapid Toaster Models VCT-200 and VCT-250
Why To prevent buns from sticking and burning in the toaster

Time required 30 minute to prepare 5 minutes to complete

Time of day After close For 24-hour restaurants: during breakfast menu

Hazard icons

Tools and supplies

Bucket, clean and Bucket, soiled towels EXCEED Glass & Multi- Gloves, neoprene KAYQUAT II Sani-
sanitized towels Surface Cleaner tizer solution

Procedure

1 Disconnect toaster. 4 Clean and sanitize release


Turn the toaster’s power sheet.
switch to the off position. Put the release sheet on a
Unplug the power cord from clean, dry, flat surface. Spray
the outlet. Allow the toaster to EXCEED Glass & Multi-
cool for at least 30 minutes. Surface Cleaner on a clean,
sanitized towel. Wipe one
entire side of the release sheet
firmly with the towel. Then
wipe the same side with a
clean, sanitized towel soaked
Toaster surfaces are hot. with KAYQUAT II Sanitizer
solution.
2 Remove bun feeder.
Using the neoprene gloves, Allow the sheet to air dry.
remove the bun feeder by
lifting it straight up from the Turn the release sheet over.
toaster. Then set the bun Spray EXCEED cleaner on a
feeder aside. clean, sanitized towel. Wipe
the other entire side of the
release sheet firmly with the
towel. Then wipe the same
side with a clean, sanitized
3 Inspect release sheet. towel dampened with
Remove the release sheet
from the toaster by lifting it KAYQUAT II solution.
Daily

out. Look carefully at both


sides of the release sheet. If Allow the sheet to air dry.
the release sheet is worn,
creased, or torn, then replace
it with a new release sheet. EXCEED Glass & Multi-
Surface Cleaner, KAYQUAT
II Sanitizer solution
PR 44 D1

©McDonald’s Corporation · Planned Maintenance Manual · Revised January 2008 Page 1 of 2


Clean release sheet and belt wraps (continued)

5 Clean and sanitize front belt 9 Clean and sanitize rear belt

A.J. Antunes & Co. Rapid Toaster Models VCT-200 and VCT-250
wrap. wrap again.
Open the front conveyor cov- Repeat the process shown in
er. Then spray EXCEED step 6 for cleaning and sani-
cleaner on a clean, sanitized tizing the rear belt wrap.
towel and wipe the surface of
the front belt wrap firmly
from side to side. Next, wipe
the belt wrap from top to bot-
tom.
10 Fold release sheet.
Then wipe the belt wrap with When the release sheet has air
a clean, sanitized towel dried, fold it in half. Then use
soaked with KAYQUAT II your fingers to crease the
Sanitizer solution. Close the fold.
conveyor cover.

6 Clean and sanitize rear belt Do not use metal, wood, or


wrap. plastic objects to crease the
Open the rear conveyor cover. release sheet. They will dam-
Then spray EXCEED cleaner age the sheet.
on a clean, sanitized towel
and wipe the surface of the
rear belt wrap firmly from 11 Reinstall release sheet.
side to side. Next, wipe the Hang the release sheet over
belt wrap from top to bottom. the platen. Make sure the
sheet is in the correct position
Then wipe the belt wrap with and that it will not catch any
a clean, sanitized towel moving parts.
soaked with KAYQUAT II
Sanitizer solution.
Flip the release sheet from
7 Warm up toaster. one side to the other each day
Plug the toaster’s power cord to extend its life.
into an outlet. Turn the
toaster’s power switch to the 12 Reinstall bun feeder.
on position. Wait 17 seconds. Reinstall the bun feeder on
Then turn the power switch to the toaster.
the off position and unplug
the power cord.
The bun feeder holds the
release sheet in place.
8 Clean and sanitize front belt
wrap again.
Repeat the process shown in
step 5 for cleaning and sani- 13 Reconnect toaster.
Plug the power cord into the
Daily

tizing the front belt wrap.


outlet. Turn the power switch
to the on position.
PR 44 D1

©McDonald’s Corporation · Planned Maintenance Manual · Revised January 2008 Page 2 of 2


Check unit and bun temperatures Weekly PR 44 W1

A.J. Antunes & Co. Rapid Toaster Models VCT-200 and VCT-250
Why To ensure buns are toasted properly

Time required 5 minutes to prepare 10 minutes to complete

Time of day After close For 24-hour restaurants: during breakfast menu

Hazard icons

Tools and supplies

Pyrometer with UHC


probe

Procedure

1 Gather supplies. 4 Test the regular crown.


Gather regular crown, Big Take the temperature of the
Mac crown, regular heel, and regular crown within 5 se-
pyrometer with UHC probe. conds of toasting. Insert the
probe into the toasted side of
the bun at a 45 degree angle.

2 Check setpoint temperatures.


Turn the toaster on and ob-
5 Lift bun with the probe.
serve the front display. Lift the bun with the probe so
During startup, the unit dis- the bun hangs as shown.
plays the setpoint
temperatures. The temperature should be no
lower than 160°F (70°C).
The unit should display 560°F Repeat test if bun temperature
(293°C) and 400°F (204°C). is too low. Refer to owner’s
Turn the toaster on and off to manual for troubleshooting.
view these settings. If these
settings are incorrect, refer to
owner’s manual. 6 Repeat with Big Mac crown
and regular heel.
Repeat steps 3, 4, and 5 with
the Big Mac crown and regu-
lar heel.
Weekly

3 Toast the regular crown.


PR 44 W1

©McDonald’s Corporation · Planned Maintenance Manual · Revised January 2008 Page 1 of 1


Measure temperature of bun landing area Monthly PR 44 M1
BBLZ

A.J. Antunes & Co. Rapid Toaster Models VCT-200 and VCT-250
Why To confirm that the temperature in the bun landing area is correct

Time required 1 minute to prepare 5 minutes to complete

Time of day After close For 24-hour restaurants: during breakfast menu

Hazard icons

Tools and supplies

Pyrometer with grill


surface probe

Procedure

1 Confirm toaster is ready to 3 Measure temperature.


use. Use the pyrometer with grill
Wait 30 minutes after startup surface probe to measure the
to ensure proper temperature. temperature of the toaster at
If the front display shows the center of the bun landing
“USE”, move to the next step. area. This area is directly in
front of the bun chute.
If the display does not say
“USE”, make sure the toaster If the pyrometer’s tempera-
is plugged in and the power ture reading is at least 130°F
switch is in the on position. (54°C), the temperature is
Once the display shows acceptable. No action is need-
“USE”, then move to the next ed.
step.
If the pyrometer’s tempera-
ture reading is less than 130°F
(54°C), call your authorized
Toaster surfaces are hot.
service agency to request ser-
vice for the toaster.
2 Remove BBLZ.
Remove the BBLZ and set it
aside.
4 Replace BBLZ.

Monthly
PR 44 M1

©McDonald’s Corporation · Planned Maintenance Manual · Revised January 2008 Page 1 of 1


Measure conveyor belt chains and roller
Monthly PR 44 M2
tensioner

A.J. Antunes & Co. Rapid Toaster Models VCT-200 and VCT-250
Why To avoid problems with loose belt chains or roller tensioners, which can cause buns to stick or jam
in the toaster
Time required 30 minute to prepare 15 minutes to complete

Time of day After close For 24-hour restaurants: during breakfast menu

Hazard icons

Tools and supplies

Coins, U.S. : 5-cent, Gap tool Gloves, neoprene Links for conveyor Pliers, needlenose
10-cent, 25-cent chain, ½ -in., ¾-in.

Procedure

1 Disconnect toaster. 4 Remove front and rear belt


Turn the toaster’s power wraps.
switch to the off position. If the toaster has front and
Unplug the power cord from rear belt wraps, remove them
the outlet. Allow toaster to by removing the hinge pin
cool for at least 30 minutes. from each belt. Then remove
the wraps.

Toaster surfaces are hot.

2 Remove bun feeder, bun


chute, and bun buffer landing
zone.
Put on neoprene gloves.
Remove the bun feeder and
the bun chute. Set them aside.
If the toaster has a bun buffer
landing zone (BBLZ), remove
it, and set it aside.

3 Set thickness compression


knobs.
Monthly

Open both the front and rear


conveyor covers on the toast-
er. Set the bun thickness
compression knobs to the “6”
and “F” settings.
PR 44 M2

©McDonald’s Corporation · Planned Maintenance Manual · Revised January 2008 Page 1 of 4


Measure conveyor belt chains and roller tensioner (continued)

5 Measure gap between 6 Shorten chain, if required.

A.J. Antunes & Co. Rapid Toaster Models VCT-200 and VCT-250
conveyor belt chain and If the gap between the two is
toaster frame in front of more than one and one-half
toaster. times the width of the coin or
Face the front (heel or club) the tool (that is, the gap is
side of the toaster. Find the more than 1 ½ in or 3.75 cm),
approximate center point of shorten the chain by removing
the conveyor belt chain. Pull a ½-in link.
the conveyor belt chain firmly
away from the edge of the To remove a link, disconnect
toaster. the conveyor belt chain by
squeezing two links together
Insert the largest portion of and unhooking both ends of
the gap tool between the con- one link. Needlenose pliers
veyor belt chain and the may be needed to unhook the
frame of the toaster. A U.S. link. Remove one ½-in (1.27
25-cent coin can be used cm) link. Reconnect the chain
instead of the gap tool. A 25- by hooking together both ends
cent coin is approximately of the chain.
15
/16 in (2.5 cm) wide.
If the chain is too short to be
The gap tool (or coin) should reassembled, remove a second
fit securely between the con- ½-in (1.27 cm) link and re-
veyor belt chain and the place the second link with a
toaster frame. If the gap ¾-in (1.90 cm) link. Then
between the conveyor belt reconnect the chain by hook-
chain and the toaster frame is ing together both ends of the
more than one and one-half chain.
times the width of the tool or
the coin (that is, the gap is Measure the gap between the
more than 1 ½ in or 3.75 cm), conveyor belt chain and the
move to the next step. toaster frame again, using the
gap tool or a 25-cent coin.
If the gap tool (or coin) fits
securely between the convey- If the tool (or coin) does not
or belt chain and the toaster fit securely between the con-
frame, skip the next step. veyor belt chain and the
toaster frame now, refer to the
maintenance section of the
Owner’s Manual for the
toaster.

Monthly
PR 44 M2

©McDonald’s Corporation · Planned Maintenance Manual · Revised January 2008 Page 2 of 4


Measure conveyor belt chains and roller tensioner (continued)

7 Measure gap between 8 Shorten chain, if required.

A.J. Antunes & Co. Rapid Toaster Models VCT-200 and VCT-250
conveyor belt chain and If the gap between the two is
toaster frame in rear of toaster. more than one and one-half
Face the rear side of the times the width of the tool or
toaster. Find the approximate the coin (that is, the gap is
center point of the conveyor more than 1 in or 2.7 cm)
belt chain. Pull the conveyor shorten the chain by removing
belt chain firmly away from a ½-inch link.
the edge of the toaster.
To remove a link, disconnect
Insert the smallest portion of the conveyor belt chain by
a gap tool between the con- squeezing two links together
veyor belt chain and the and unhooking both ends of
frame of the toaster. A U.S. one link. Needlenose pliers
10-cent coin can be used may be needed to unhook the
instead of the gap tool. A 10- link. Remove one ½-in (1.27
cent coin is approximately cm) link. Reconnect the chain
11
/16 in (1.7 cm) wide. by hooking together both ends
of the chain.
The gap tool (or coin) should
fit securely between the con- If the chain is too short to be
veyor belt chain and the reassembled, remove a second
toaster frame. If the gap be- ½-in (1.27 cm) link and re-
tween the conveyor belt chain place the second link with a
and the toaster frame is more ¾-in (1.9-cm) link. Then re-
than one and one-half times connect the chain by hooking
the width of the tool or the together both ends of the
coin (that is, the gap is more chain.
than 1 1/32 in or 2.6 cm), move
to the next step. Measure the gap between the
conveyor belt chain and the
If the tool (or coin) fits toaster frame again, using the
securely between the convey- gap tool or a 10-cent coin.
or belt chain and the toaster
frame, skip the next step. If the tool (or coin) does not
fit securely between the con-
veyor belt chain and the
toaster frame, refer to the
maintenance section of the
Owner’s Manual for the
toaster.

Monthly
PR 44 M2

©McDonald’s Corporation · Planned Maintenance Manual · Revised January 2008 Page 3 of 4


Measure conveyor belt chains and roller tensioner (continued)

9 Measure gap between roller 12 Reinstall bun feeder, bun

A.J. Antunes & Co. Rapid Toaster Models VCT-200 and VCT-250
tensioner and inner conveyor chute, and BBLZ.
cover. Reinstall the bun feeder and
Insert the middle portion of a the bun chute on the toaster.
gap tool between the roller If the toaster has a BBLZ,
tensioner and the inner con- reinstall it.
veyor cover. A U.S. 5-cent
coin can be used instead of
the gap tool. A 5-cent coin is
approximately 13/16 in (2.1
cm) wide. 13 Reset thickness compression
knobs.
The gap tool (or coin) should Close the conveyor covers.
fit securely between the roller Set the bun thickness com-
tensioner and the inner con- pression knobs to the correct
veyor cover. If the gap setting, based on the manu-
between the tensioner and the facturing number of the
conveyor cover is more than toaster. Use the following
one and one-half times the settings.
width of the tool or the coin
(that is, the gap is more than For manufacturing number
1¼ in or 3.1 cm), move to the 9210606, use “B” and “3.”
next step.
For manufacturing number
If the coin (or tool) fit secure- 9210616, use “E” and “4.”
ly between the roller tensioner
and the inner conveyor cover, For manufacturing numbers
skip the next step. 9200512, 9210607, 9210608,
9210610, 9210624, 9210626,
and any toaster with a yellow
10 Bend roller tensioner arm, if label, use “D” and “5.”
required.
If the gap between the two is
more than one and one-half 14 Plug the toaster in and set the
times the width of the tool or power switch to the on posi-
the coin (that is, the gap is tion.
more than 1¼ in or 3.1 cm),
carefully bend the roller ten-
sioner arm until the gap is less
than 1¼ in (3.1 cm).

11 Reinstall belt wraps.


Reinstall the belt wraps in the
correct location. Replace the
hinge pin for each belt.
Monthly

Insert belt wraps under


yellow rods. Align edges
of the belt wraps when
reinstalling.
PR 44 M2

©McDonald’s Corporation · Planned Maintenance Manual · Revised January 2008 Page 4 of 4


Replace belt wraps Quarterly PR 44 Q1

A.J. Antunes & Co. Rapid Toaster Models VCT-200 and VCT-250
Why To prevent buns from sticking or burning in the toaster

Time required 30 minute to prepare 15 minutes to complete

Time of day After close For 24-hour restaurants: during breakfast menu

Hazard icons

Tools and supplies

Bucket, clean and Bucket, soiled towels Gloves, neoprene KAYQUAT II McD All Purpose
sanitized towels Sanitizer solution Super Concentrate
(APSC)

Procedure

1 Disconnect toaster. 4 Remove rear belt wrap.


Turn the toaster’s power Open the rear (crown side)
switch to the off position. conveyor cover. Rotate the
Unplug the power cord from belt wrap so its flap is in the
the outlet. Allow the toaster to middle (looking top to
cool for at least 30 minutes. bottom) of the conveyor. Pull
the hinge pin out of the belt
wrap. Remove the belt wrap.
Discard the wrap and the pin.

Toaster surfaces are hot.

2 Remove bun feeder, bun


chute, and bun buffer landing
zone.
Put on neoprene gloves.
Remove the bun feeder and
the bun chute. Set them aside.
If the toaster has a bun buffer
landing zone (BBLZ), remove
it, and set it aside.

3 Remove front belt wrap.


Quarterly

Open the front (heel or club


side) conveyor cover. Rotate
the belt wrap so its flap is in
the middle (looking top to
bottom) of the conveyor. Pull
the hinge pin out of the belt
wrap. Remove the belt wrap.
Discard the wrap and the pin.
PR 44 Q1

©McDonald’s Corporation · Planned Maintenance Manual · Revised Juanuary 2008 Page 1 of 3


Replace belt wraps (continued)

5 Clean and sanitize front 8 Clean and sanitize front

A.J. Antunes & Co. Rapid Toaster Models VCT-200 and VCT-250
conveyor belt chain. conveyor belt chain again.
Spray McD APSC solution on Repeat the process shown in
a clean, sanitized towel. Wipe step 5 for cleaning and
the links of the front conveyor sanitizing the front conveyor
belt chain firmly with the belt chain.
towel. Wipe first from side to
side, and then from top to
bottom. Then wipe the links
with a clean, sanitized towel
soaked with KAYQUAT II 9 Clean and sanitize rear
Sanitizer solution. Close the conveyor belt chain again.
conveyor cover. Repeat the process shown in
step 6 for cleaning and
sanitizing the rear conveyor
McD APSC, KAYQUAT II belt chain.
Sanitizer solution

Do not spray toaster with 10 Sanitize new belt wraps.


water or cleaning sprays. This Wipe both sides of the new
can damage electrical belt wraps with a clean,
components. sanitized towel dampened
with KAYQUAT II Sanitizer
6 Clean and sanitize rear solution. Allow the belt wraps
conveyor belt chain. to air dry.
Spray McD APSC solution on
a clean, sanitized towel. Wipe
the links of the rear conveyor
belt chain firmly with the 11 Install new belt wrap for front
towel. Wipe first from side to conveyor belt chain.
side, and then from top to When the new belt wraps
bottom. Then wipe the links have air dried, install a new
with a clean, sanitized towel wrap on the front conveyor
soaked with KAYQUAT II belt chain. Install the wrap
Sanitizer solution. Close the inside the upper and lower
conveyor cover. yellow rods, with the flap of
the belt wrap facing out and
hanging down.
Do not spray toaster with
water or cleaning sprays. This 12 Install new belt wrap for rear
can damage electrical conveyor belt chain.
components. When the new belt wraps
have air dried, install a new
wrap on the rear conveyor
7 Warm up toaster. belt chain. Install the wrap
Quarterly

Plug the toaster’s power cord


inside the upper and lower
into an outlet. Turn the
yellow rods, with the flap of
toaster’s power switch to the
the belt wrap facing out and
on position. Wait 17 seconds.
hanging down.
Then turn the power switch to
the off position and unplug
the power cord.
PR 44 Q1

©McDonald’s Corporation · Planned Maintenance Manual · Revised January 2008 Page 2 of 3


Replace belt wraps (continued)

13 Attach ends of front belt wrap.

A.J. Antunes & Co. Rapid Toaster Models VCT-200 and VCT-250
Attach the ends of the wrap
for the front conveyor belt
chain together. Align the teeth
on both sides of the belt wrap
evenly. Feed the hinge pin
carefully between the two
ends of the conveyor belt
chain. The pin should not
stick out on either side. Close
the front conveyor cover.

Attach the ends of the wrap


carefully to avoid bending the
hinge pin.

14 Attach ends of rear belt wrap.


Attach the ends of the wrap
for the rear conveyor belt
chain together. Align the teeth
on both sides of the belt wrap
evenly. Feed the hinge pin
carefully between the two
ends of the conveyor belt
chain. The pin should not
stick out on either side. Close
the rear conveyor cover.

Attach the ends of the wrap


carefully to avoid bending the
hinge pin.

15 Reinstall bun feeder, bun


chute, and BBLZ.
Reinstall the bun feeder and
the bun chute on the toaster.
If the toaster has a BBLZ,
reinstall it.

16 Plug the toaster in and turn


the power switch to the on
Quarterly

position.
PR 44 Q1

©McDonald’s Corporation · Planned Maintenance Manual · Revised January 2008 Page 3 of 3


Lubricate drive chain and idler sprocket
Annual PR 44 A1
bearing & clean inside of electrical housing

A.J. Antunes & Co. Rapid Toaster Models VCT-200 and VCT-250
Why To maintain proper operation of toaster

Time required 30 minute to prepare 20 minutes to complete

Time of day After close For 24-hour restaurants: during breakfast menu

Hazard icons

Tools and supplies

Gloves, neoprene Lubit-8 Screwdriver, flathead

Procedure

1 Disconnect toaster. 3 Lubricate first section of drive


Turn the toaster’s power chain.
switch to the off position. Squeeze the bottom of the
Unplug the power cord from tube of Lubit-8 gently to push
the outlet. Allow the toaster to lubricant out of the tube. Use
cool for at least 30 minutes. the applicator to spread a light
film of Lubit-8 on all of the
visible links of the drive
chain.

Toaster surfaces are hot.


Lubit-8

2 Remove control housing


cover.
Use a flathead screwdriver to
open the front and rear con- 4 Warm toaster up.
veyor covers. Put on neoprene Put the control housing cover
gloves. Remove the control back in place. Close both
housing cover, which is conveyor covers. Plug the
located on the right-hand side toaster’s power cord into the
when facing the unit. outlet. Turn the power switch
to the on position. Wait 25
seconds. Then turn the power
switch to the off position.
Unplug the power cord.
Annual
PR 44 A1

©McDonald’s Corporation · Planned Maintenance Manual · Revised January 2008 Page 1 of 2


Lubricate drive chain and idler sprocket bearing and clean inside of
electrical housing (continued)
5 Lubricate remaining sections

A.J. Antunes & Co. Rapid Toaster Models VCT-200 and VCT-250
of drive chain.
Repeat steps 2, 3, and 4 to
lubricate additional sections
of the drive chain. Continue
until the entire drive chain has
been lubricated.

6 Lubricate idler bearing and


sprocket.
Squeeze the bottom of the
tube of Lubit-8 gently to push
lubricant out of the tube. Use
the applicator to spread a light
film of Lubit-8 on the idler
bearing and sprocket. The
idler bearing and sprocket are
the uppermost bearing and
sprocket in the toaster.

7 Clean inside of control


housing .
Clean any grease, lint, and
debris from the electrical
connections and surfaces
from the inside of the electri-
cal housing.

8 Reinstall control housing


cover.
Reinstall the control housing
cover. Close the conveyor
covers.

9 Reconnect toaster.
Plug the power cord into the
outlet. Turn the power switch
to the on position. Annual
PR 44 A1

©McDonald’s Corporation · Planned Maintenance Manual · Revised January 2008 Page 2 of 2