Correlation Status

Clash Check(Visual)
Isometric Number: TDL Status
Super
Identifying Factors Designer Checker
Cheker

Tittle Block:

Line Number specified (Y/N)


Isometric Number specified. (Y/N)
Rev specified. (Y/N)
IF Yes, Rev cloud mark up (Y/N)
Area Code Specified (Y/N)
PID Number Specified. (Y/N)
Insulation and Heat Tracing Specified. (Y/N)
Fluid code, Design pressure & Temperature's are verified with fluid list (Y/N)

Drawing factors:

Co-ordinate System Note Specified. (Y/N)


Special notes Specified. (Y/N)
Note in p&id if any properly specified. (Y/N)
Eqp Approval status & detailed (Y/N)
If no, Equipment vendor drawing not available (Y/N)
Eqp name and nozzle no. along with nozzle size and rating specified. (Y/N)
Slope requirements if any are specified. (Y/N)
Spec break if any properly specified. (Y/N)
All components properly dimensioned. (Y/N)
Flow arrow marked. (Y/N)
All Components available. (Y/N)
If no, Hold mark-up for the component (Y/N)
 Instrument Tags specified. (Y/N)
Control Valves tags Specified. (Y/N)

Stress factors:

Stress validation (yes / No) , Sys name:


if yes, Supports are marked as per analysis

MTO factors:

Component Description properly included (Y/N)


Commodity Code properly included. (Y/N)
Valve Option Code / Tag no., Checked (Y/N)
Non piping MTO not included.(EX:Shop/Other then Shop) (Y/N)
Instrument, Special Items, Typical Assemblies Tags included. (Y/N)
IF B61/C61, Flange to be ensured (Fix flange & Lap joint) (Y/N)
Pipe supports MTO included (Y/N)

ProcessFlow Factors:

High point vents and low point drains included. (Y/N)


PID Mark-up requirement (Y/N)

1 of 103/09/2023 Self Check : Checked By: