00-SAIP-90 Maintenance Quality Requirements For High Voltage Electrical Assets
00-SAIP-90 Maintenance Quality Requirements For High Voltage Electrical Assets
00-SAIP-90 Maintenance Quality Requirements For High Voltage Electrical Assets
Contents
1 Scope .......................................................................... 2
2 Purpose....................................................................... 2
3 Conflicts and Deviations.............................................. 3
4 References.................................................................. 3
5 Definitions and Acronyms ........................................... 5
6 Instructions.................................................................. 6
7 Inspection Strategy ..................................................... 7
8 Responsibilities ......................................................... 12
Appendix A – PM, Repair and Maintenance Process
Checklists.................................................................. 17
Appendix B - Equipment, Facilities & Assets Inspection
Checklists.................................................................. 18
Appendix C – Inspection Intervals .................................... 30
Appendix D – Unapproved Notification Escalation............ 31
Appendix E - HV Electrical Equipment Maintenance
Inspection and Test Plan List .................................... 34
Appendix F - Electrical Inspection Roles and
Responsibilities ......................................................... 34
1 Scope
1.2 The scope covers assets and activities relevant to Saudi Aramco
operating facilities, communities and operations support facilities i n
line with GI-0002.706.
2.5 Adequate resources are provided for the HV electrical assets quality
program.
Page 2 of 34
Document Responsibility: Inspection Engineering Standards Committee 00-SAIP-90
Issue Date: 24 April 2022
Next Planned Update: 24 April 2027 Maintenance Quality Requirements for High Voltage Electrical Assets
3.1 Conflicts
4 References
Page 3 of 34
Document Responsibility: Inspection Engineering Standards Committee 00-SAIP-90
Issue Date: 24 April 2022
Next Planned Update: 24 April 2027 Maintenance Quality Requirements for High Voltage Electrical Assets
Page 4 of 34
Document Responsibility: Inspection Engineering Standards Committee 00-SAIP-90
Issue Date: 24 April 2022
Next Planned Update: 24 April 2027 Maintenance Quality Requirements for High Voltage Electrical Assets
Page 5 of 34
Document Responsibility: Inspection Engineering Standards Committee 00-SAIP-90
Issue Date: 24 April 2022
Next Planned Update: 24 April 2027 Maintenance Quality Requirements for High Voltage Electrical Assets
Acronyms
6 Instructions
6.1 Safety
6.1.1 All safety rules and regulations shall be followed before and
during electrical inspections. Electrical Inspector shall stop,
look, listen and test before touching any electrical equipment.
Page 6 of 34
Document Responsibility: Inspection Engineering Standards Committee 00-SAIP-90
Issue Date: 24 April 2022
Next Planned Update: 24 April 2027 Maintenance Quality Requirements for High Voltage Electrical Assets
Safety Note: Inspecting electrical components and systems may pose risks
including death by electrocution as well as serious burns or other
injuries to personnel. These tasks shall be performed by properly
trained and equipped workers.
7 Inspection Strategy
Page 7 of 34
Document Responsibility: Inspection Engineering Standards Committee 00-SAIP-90
Issue Date: 24 April 2022
Next Planned Update: 24 April 2027 Maintenance Quality Requirements for High Voltage Electrical Assets
Activities
Equipment Major Minor PM PM External Repair
Criticality PM (%) (%) Inspection (%) (%)
A 100 25 25 100
B 75 15 15 75
C 25 0 0 25
Table 1: Maintenance Inspection Sampling Criteria
Page 8 of 34
Document Responsibility: Inspection Engineering Standards Committee 00-SAIP-90
Issue Date: 24 April 2022
Next Planned Update: 24 April 2027 Maintenance Quality Requirements for High Voltage Electrical Assets
7.2.7 For specific events that are not included as part of the annual
Inspection Schedule, POD Maintenance Planning Unit or
Field Engineering Unit shall submit RFI to notify PSIU for
providing the required inspection at least three (3) business
days prior to the time required for inspection.
Page 9 of 34
Document Responsibility: Inspection Engineering Standards Committee 00-SAIP-90
Issue Date: 24 April 2022
Next Planned Update: 24 April 2027 Maintenance Quality Requirements for High Voltage Electrical Assets
Page 10 of 34
Document Responsibility: Inspection Engineering Standards Committee 00-SAIP-90
Issue Date: 24 April 2022
Next Planned Update: 24 April 2027 Maintenance Quality Requirements for High Voltage Electrical Assets
7.4.2.3 Failure to reply back with the AP and ACD within the
provided period for Minor, Moderate and Major
notifications will result in notification escalation to
the next management level.
Page 11 of 34
Document Responsibility: Inspection Engineering Standards Committee 00-SAIP-90
Issue Date: 24 April 2022
Next Planned Update: 24 April 2027 Maintenance Quality Requirements for High Voltage Electrical Assets
7.5 Overdue PM
8 Responsibilities
All following roles and responsibilities are summarized in the Appendix F “Electrical
Inspection Roles and Responsibilities”.
Page 12 of 34
Document Responsibility: Inspection Engineering Standards Committee 00-SAIP-90
Issue Date: 24 April 2022
Next Planned Update: 24 April 2027 Maintenance Quality Requirements for High Voltage Electrical Assets
8.4.4 Set and pursue specific goals to achieve the quality KPI
targets.
Page 13 of 34
Document Responsibility: Inspection Engineering Standards Committee 00-SAIP-90
Issue Date: 24 April 2022
Next Planned Update: 24 April 2027 Maintenance Quality Requirements for High Voltage Electrical Assets
Page 14 of 34
Document Responsibility: Inspection Engineering Standards Committee 00-SAIP-90
Issue Date: 24 April 2022
Next Planned Update: 24 April 2027 Maintenance Quality Requirements for High Voltage Electrical Assets
Page 15 of 34
Document Responsibility: Inspection Engineering Standards Committee 00-SAIP-90
Issue Date: 24 April 2022
Next Planned Update: 24 April 2027 Maintenance Quality Requirements for High Voltage Electrical Assets
8.11 R&AMU
8.12.1 Issue RFI for any critical task that requires additional
inspection service.
Page 16 of 34
Document Responsibility: Inspection Engineering Standards Committee 00-SAIP-90
Issue Date: 24 April 2022
Next Planned Update: 24 April 2027 Maintenance Quality Requirements for High Voltage Electrical Assets
Deficiency
Description / Work Order Remarks on
found?
Deficiencies
Pre-Work
1. Equipment is part of SAP PM strategy
2. PM checklist is up-to-date and available
3. Qualified manpower assigned
4. PM materials inspected
Test Equipment are available, certified and
5.
operational
During Work
6. Crew is following the PM checklist steps
Equipment manuals/best practice/ acceptance
7.
criteria are followed
8. Work condition is safe
9. Grounding is installed
10. Attended equipment is maintainable
Equipment test results according to ITP are within
11.
acceptable limits
Equipment test results are approved by PSED
12.
Maintenance Engineer (During equipment repair)
Post-Work
13. Equipment is returned to normal condition
If any, abnormal readings, test results and
14.
conditions addressed and resolved
15. Housekeeping has been performed
POST-PM
All test results are entered and filed in
16.
SAP/Equipment History
17. Drawings are updated and followed
Page 17 of 34
Document Responsibility: Inspection Engineering Standards Committee 00-SAIP-90
Issue Date: 24 April 2022
Next Planned Update: 24 April 2027 Maintenance Quality Requirements for High Voltage Electrical Assets
Page 18 of 34
Document Responsibility: Inspection Engineering Standards Committee 00-SAIP-90
Issue Date: 24 April 2022
Next Planned Update: 24 April 2027 Maintenance Quality Requirements for High Voltage Electrical Assets
Def. List of
Description
found Equipment with
Deficiencies
A Ventilation sufficient and effective
B Battery cell/bank identified
Verify adequacy of battery support racks, mounting,
C
anchorage, alignment, and grounding.
D Electrolyte level acceptable
E Standard building temperature maintained
F Lighting acceptable
Terminal and connection acceptable (including intercell
G
connector
and terminal covers or busbar insulation)
H Personal protective equipment available and properly stored
I Color coding correct
J Door closer – Panic hardware – Door sealant, are in good
condition.
K Dry chemical fire extinguisher installed outside the battery
room.
L UPS/Battery charger active alarms
M Eyewash, shower is available and functional
N Working space provided
O Drain clean
P Battery case in good condition
Q Warning signs are available
R Audible and visual alarm are installed and functional (if
applicable)
Page 19 of 34
Document Responsibility: Inspection Engineering Standards Committee 00-SAIP-90
Issue Date: 24 April 2022
Next Planned Update: 24 April 2027 Maintenance Quality Requirements for High Voltage Electrical Assets
Def.
Description List of Equipment with
found
Deficiencies
UPS One-line diagram are installed inside UPS system
A
room.
UPS system switching procedure are installed on UPS
B
cabinet
C UPS Display-screen is functional.
Checked UPS cabinet display for any standing alarms
D
and
none found
Checked Substation annunciator panel for any
E
UPS/Battery
related standing alarms and none found
F Checked UPS room temperature level
G Checked UPS cooling fans functionality – visually
Confirmed UPS systems room is dust-free with good
H
housekeeping
Checked that UPS components are replaced on their
I replacement cycle as per manufacturer PM
recommendations for that particular UPS
model.
Checked that all installed DC/AC Capacitors have a
J manufacturing date and replaced every 7~10 years
or less
depending on manufacturer’s recommendations
Checked that Battery rooms are dust-free with proper
K
housekeeping.
Checked the replacement of AC/DC PSU every
L
10 years.
M Filters (if provided) are in place and vents are clear
Def.
Description List of Equipment with
found
Deficiencies
A Temperature normal
B Warning sign installed
C Transformer sealed (dust and moisture protected)
D Grounds and bonds properly connected
E Bolts installed properly
F Sun shield for outdoor installation in good condition
G Transformer perimeter fence secured
H Equipment properly identified
I Transformer sound normal
J Pressure temperature gauges in good condition
K Equipment/fence properly grounded
L Transformer bushing good (no signs of leak)
M Silica gel filter in good condition
N Equipment cleanliness maintained
O Transformer yard is in good condition
P Transformer Oil collector Pit is empty and in good
condition
Q Bus Duct is in good condition and no signs of seal
breakdown
Deficiency
Description Remarks on
found?
Deficiencies
PLANNING STAGE
1. Poles are not leaning, having large cracks, broken or deteriorated
2. There are no signs of burns on poles, cross-arms or other pole hardware
There is no significant pollution or dirt on the OH line insulators or electrical
3.
equipment
4. OH lines are not obstructed by any foreign objects, structures, etc.
There is no vulnerability due to remoteness, ongoing works or any special
5.
circumstances
Poles grounding wire/rod and fittings are in good condition, not damages or
6.
loose
7. There is no sand accumulation around the poles or close to OH lines
8. There no low sagging of OH line conductors
9. There are no broken or damaged pole hardware
There are no broken or damaged conductor hardware, insulators or loose
10.
live fittings or jumpers
There is no damaged electrical equipment (transformers, arrestors,
11.
insulators, fuses, links, etc.)
12. There are no damaged, "downed" or broken conductors
Anchor, guy wires are in a good condition, tension is proper; fittings and
13.
connections are ok
Safe clearances from trees, ground, structures and surroundings to live
14.
parts are maintained
Clearances between live parts and conductors of different phases are
15.
maintained
Clearances between live parts and grounding wires and guy wires are
16.
maintained
No signs of tracking or flashover marks on transformers, insulators, cutouts
17.
and arresters
18. There is no clear violations of a specific Saudi Aramco current Standards
There is no abnormal noise, corona discharge, fizzing sound or other
19.
abnormality on the OH lines or equipment
Riser poles have no blown fuses, sign of flashovers or damage on cables,
20.
terminations, arrestors or other hardware
21. Poles/towers foundations are in good condition
Deficiency
Description Remarks on
found?
Deficiencies
PLANNING STAGE
1. Poles/Towers are not leaning, dented or broken
There are no signs of burns/carbon on poles/towers body or
2.
hardware
There is no significant pollution or dirt on the OH line insulators or
3.
electrical equipment
4. OH lines are not obstructed by any foreign objects, structures, etc.
There is no vulnerability due to remoteness, ongoing works or any
5.
special circumstances
Poles/towers grounding wire/rod and fittings are in good condition,
6.
not damages or loose
There is no sand accumulation around the poles/towers or close
7.
to OH lines
8. There no low sagging of OH line conductors
9. There are no broken or damaged pole/towers hardware
There are no broken or damaged conductor or shield-wire
10.
hardware, insulators or loose live fittings or jumpers
There is no damaged electrical equipment (transformers,
11.
arrestors, insulators, fuses, links, etc.)
12. There are no damaged, "downed" or broken conductors
Safe clearances from trees, ground, structures and surroundings
13.
to live parts are maintained
Clearances between live parts and conductors of different phases
14.
are maintained
15. Clearances between live parts and steel structures are maintained
No signs of tracking or flashover marks on transformers,
16.
insulators, cutouts and arresters
There is no clear violations of a specific Saudi Aramco current
17.
Standards
There is no abnormal noise, corona discharge, fizzing sound or
18.
other abnormality on the OH lines or equipment
Riser poles have no blown fuses, sign of flashovers or damage on
19.
cables, terminations, arrestors or other hardware
20. Poles/towers foundations are in good condition
Def.
Description List of Equipment with
found
Deficiencies
A Tray grounded properly, as per design requirements
B Tray splicing plate in good condition
Bonding jumpers installed and trays are grounded at
C
both
ends
D Tray covers and bands installed
E Expansion joint available
F Barriers (separation) installed
G Conduit entering cable tray grounded properly
H Supports are in good condition
I Tray general condition is acceptable
Def.
Description List of Equipment with
found
Deficiencies
A Conduits are mechanically in good condition
B Unused openings are sealed/closed properly
C PVC coating application in good condition
D Grounds and bonds in good condition
E Conduit fittings in good condition
F Covers installed
G Bushings on conduit ends available
H Threads in good condition
I Flexible conduit in good condition
J Conduit runs continuous and not broken
K Conduits supports adequate
L Conduits supports in good condition
M Support clamps in good condition
Electrical markers for underground cables/conduits are
N sufficient
Def.
Description List of Equipment with
found
Deficiencies
A Cover bolts and gaskets installed
B Unused openings sealed correctly
C Unit in good condition
D Supports adequate
E Area application approved (NEMA 3, 4, 7, etc.)
Enclosure sealed completely (no signs of moisture
F
and dust
penetration)
G Ground connection and bonds properly connected
H Junction Box accessible
I Bushing, Mayer hub and threads engaged properly
J Outlet enclosure in good condition
K Bus box in good condition
Tag numbers of terminal and equipment junction
L
boxes
legible and unobscured
Def.
Description List of Equipment with
found
Deficiencies
Ground and lightning protection systems connections
A
are in
good condition
B Conductors and conduits sizes and quantity are
acceptable
C Ground color code as per standard
D Minimum ground conductor is acceptable
E HV equipment frames connected to grounding grid
F All vessels and tanks grounded properly
G Fence grounded properly
Grounding rods, and cable connections to ground
H
rods are in good condition
I Bonding installed and in good condition
Def.
Description List of Equipment with
found
Deficiencies
A Lamp wattage acceptable
B Sockets in good condition
C Reflectors in good condition
D Wiring normal temperature
E Grounds and bonds in good condition
F Lighting guards in good condition
G Lighting illumination is sufficient (measured)
Exit and emergency lighting fixtures are functioning and
H in good condition.
Def.
Description List of Equipment with
found
Deficiencies
A Cables properly identified
B Cables racked properly
C Cable splicing correct and in good condition
D Ground connection secured and in good condition
E Rack supports in good condition
F Conduit end sealant in good condition
G Manhole entry sealant in good condition
H Ladder in good condition
I Housekeeping maintained
J Physical condition is accepted
FREQUENCY
Item # Description of Item External inspection Internal Inspection
Interval Scope Interval Scope
1. Electrical Equipment & Assets (Counted)
General
1.1 PS-Owned Buildings & Facilities Annually N/A N/A
Inspection
1.2 Substations Quarterly Checklist B.1 N/A N/A
Battery Rooms/banks, UPS System and DC
1.3 Quarterly Checklist B.2.A Annually Checklist B.2.B
System
1.4 Transformers & High Voltage Switchyard Quarterly Checklist B.3 N/A N/A
1.5 Wooden-Poles HV Overhead Power Lines Annually Checklist B.4 N/A N/A
1.6 Steel-Poles HV Overhead Power Lines Annually Checklist B.5 N/A N/A
2.6 HV Cables Manholes & Duct banks 2 Years Checklist B.11 N/A N/A
Page 30 of 34
Document Responsibility: Inspection Engineering Standards Committee 00-SAIP-90
Issue Date: 24 April 2022
Next Planned Update: 24 April 2027 Maintenance Quality Requirements for High Voltage Electrical Assets
Page 31 of 34
Document Responsibility: Inspection Engineering Standards Committee 00-SAIP-90
Issue Date: 24 April 2022
Next Planned Update: 24 April 2027 Maintenance Quality Requirements for High Voltage Electrical Assets
QAU Supervisor
PSIU Inspector
Asset Owner
PSID Head
PSIU Head
R&AMU
Activity Description
No.
R S
3 Report observed deficiencies R S I A
6 Escalate unresolved DN R R A A A A
R
7 Register Equipment in SAP S A
9 Close DN in SAP A A R