SCHEDULE OF BID ITEMS

PROJECT TITLE : PROPOSED AFREIGHT WAREHOUSE - Phase 1


LOCATION : 8230 Juanita St. Sucat Parañaque City Page 1 of 5
ITEM DESCRIPTION QTY. UNIT MAT'L. LABOR TOTAL
NO. TOT. COST COST COST
100 PRELIMINARIES
101 Mobilization / Demobilization
102 Permits and Licences
103 Bonds and Insurances
104 Overhead and Supervision / Tech. Support Staff
105 Tools and Equipments
106 Security and Safety Provisions
107 Temporary Facilities and Utilities
108 Survey Services and Layout
109 Materials Testing
110 Shop Drawings and Submittals
111 Others (pls. specify)
SUB-TOTAL PRELIMINARIES

200 SITE WORKS


201 Layout and Staking
202 Structural Excavations
203 Sheet Piling and Shoring
204 Backfilling and Compaction
205 Gravel Fill
206 Disposal of Excavated Materials
207 Trimming Works
208 Dewatering Works
209 Soil Poisoning
210 Vapor Barier
211 (Others (pls. specify)
SUB-TOTAL SITE WORKS

Page 2 of 5
ITEM DESCRIPTION QTY. UNIT MAT'L. LABOR TOTAL
NO. TOT. COST COST COST
300 FOUNDATION WORKS
301 Formworks
302 Rebars
303 Concrete works
304 Others (pls. specify)
LEAN CONCRETE (FC' = 1500 PSI)
SUB-TOTAL FOUNDATION WORKS

400 STRUCTURAL CONCRETE WORKS ( note: items to be calibrated by contractor)


401 Columns
Rebars
Formworks
Concrete works
402 Beams
SUSPENDED BEAMS AND FOOTING TIE BEAMS
Rebars
Formworks
Concrete works
403 Slab on Grade
Rebars
Formworks
Concrete works
404 R.C. Walls and Retaining Walls (Contractor to confirm if required)
Rebars
Formworks
Concrete works
405 Stairs
Rebars
Formworks
Concrete works
406 Others as indicated in the Plans (pls. specify)
SUB-TOTAL STRUCTURAL CONCRETE WORKS

500 STRUCTURAL STEEL WORKS, ROOFING WORKS


501 Roof Framing,Steel trusses/rafters & purlins
502 Long Span Roofing Sheets and Bended Accessories
503 Steel Columns and beams
Others as indicated in the Plans (pls. specify)
SUB-TOTAL STRUCTURAL STEEL / ROOFING WORKS
Page 3 of 5
ITEM DESCRIPTION QTY. UNIT MAT'L. LABOR TOTAL
NO. TOT. COST COST COST
600 ARCHITECTURAL WORKS
601 MASONRY
CHB wall, 150mm thk.
Others as indicated in the Plans (pls. specify)

602 METAL WORKS


Storm louvers with Stainless Steel Bird screen ( Gauge 14 - .081" thick )
50 mm X 50 mm welded wire with Stainless steel Bird screen
Hot dipped galvanized 300 MM Width X 1200 MM Length trench covers
- 3 mm x 38 Flat bar @ 25 MM.O.C.
- 3 mm X 38 MM X 38 MM angle bar frame
Stair Nosing
Others as indicated in the Plans (pls. specify)

603 WATER PROOFING,THERMAL & MOISTURE PROTECTION


Cementitous water proofing - for Plastring ( positive side)
0.50 MM thk. Pre painted G.I roofing ( 280 KPH resistant) - Hi rib profile
Ga. 24 Pre painted G.I . Gutter , Flashing & Accessories
Fire Rated Foil Faced Bubble type insulation( for Roofing)
PU Fire Rated Sandwich panel ( Installation requirements Verify manufacturer's standard)
Others as indicated in the Plans (pls. specify)

604 SUPPLY & INSTN. OF DOORS,WINDOWS


Metal Doors
Wood Doors ( Phase 2)
Glass Doors (Phase 2)
Glass Windows and store fronts (Phase 2)
Roll Up Door ( Phase 2)
Others as indicated in the Plans (pls. specify)

605 FLOOR FINISHES


FF1- Option1 - 50 mm thk Concrete Topping with Non Skid Traffic type Epoxy paint
Option 2 - 50 mmm thk. Concrete Topping with Floor hardener & Transparent Sealer
FF 2 Option 1 - 50mm thk. Concrete Topping with 50 mm X 50 mm anglre bar nosing epoxy non skid paint
Option 2- 50mm thk. Concrete Topping with 50 mm X 50 mm anglre bar nosing Floor Hardener and Transparent
sealer
Others as indicated in the Plans (pls. specify)

606 WALL FINISHES


Plain Cement Plaster with Semi Gloss Paint Finish ( interior)

Plain Cement Plaster with Semi Gloss Paint Finish with moisture resistant admixture(exterior) with 20 mm groove
Ceramic Tile Finish ( phase 2 )
Others as indicated in the Plans (pls. specify)
607 CEILING FINISHES
Gypsum Board Ceiling ( phase 2)
Rubbed Finish (Slab/Beam Soffit) ( phase 2)
Ficem board ceiling ( phase 2)
Acoustic board ceiling ( phase 2)

Others as indicated in the Plans (pls. specify)


Page 4 of 5
ITEM DESCRIPTION QTY. UNIT MAT'L. LABOR TOTAL
NO. TOT. COST COST COST
608 TOILET COUNTER TOPS , ENCLOSURES , LOCKERS , ETC. ( phase 2)

Others as indicated in the Plans (pls. specify)

609 SUPPLY & INSTN. OF TOILET FIXTURES /ACCESSORIES ( phase 2)


Water Closets
Urinals
Lavatory
Lavatory Faucets
Shower Set
Paper Holder
Soap Dish
Floor Drain Strainers
Facial Mirrors on Ficemboard Backing
Others as indicated in the Plans (pls. specify)

610 PAINTING
Walls
Ceiling
Slab / Beam Soffit
Others as indicated in the Plans (pls. specify)
SUB-TOTAL ARCHITECTURAL WORKS
700 ELECTRICAL WORKS ( by contractor)
701 SERVICE ENTRANCE & SUB-FEEDERS
702 POWER DISTRIBUTION/LIGHTING SYSTEM
703 TELEPHONE SYSTEM
704 PANEL BOARDS & CIRCUIT BREAKERS
705 CABLE TV SYSTEM
706 FIRE ALARM & DETECTION SYSTEM
707 SECURITY & BURGLAR ALARM SYSTEM
708 MISCELLANEOUS ELECTRICAL WORKS
Others as indicated in the Electrical Plans (pls. specify)
SUB-TOTAL ELECTRICAL WORKS

Page 5 of 5
ITEM DESCRIPTION QTY. UNIT MAT'L. LABOR TOTAL
NO. TOT. COST COST COST
1000 I.T. INSTALLATIONS ( verify with client)
(Specify details)
SUB-TOTAL I.T. INSTALLATIONS

1100 SANITARY-PLUMBING WORKS ( by Contractor)


1101 Complete Water line System
1102 Complete Sewer lines and vent System
1103 Complete Drainage lines and sump pit system
1104 Water pumps, Tanks and Fittings
1105 Trench drain steel grating covers
Others as indicated in the Plumbing Plans (pls. specify)
SUB-TOTAL SANITARY PLUMBING WORKS

1200 SANITARY - FIRE PROTECTION SYSTEM ( by Contractor)


1201 Complete Fire sprinkler system
1202 Fire Hose Cabinets
1203 Wet / Dry Stand Pipe
Others as indicated in the Fire Protection Plans (pls. specify)
1204 WATER PUMPS, TANKS AND FITTINGS
SUB-TOTAL FIRE PROTECTION SYSTEM

1300 AIRCONDITIONING & MECHANICAL WORKS ( by Contractor)


1301 Airconditioning System ( phase 2)
1301.1 Aircon Piping and drains ( phase 2)
1301.2 ACCU Steel Service Platforms ( Phase 2)
Others as indicated in the Mechanical Plans (pls. specify)
SUB-TOTAL AIRCONDITIONING SYSTEM

1302 Mechanical ventilating System


1302.1 Metal Ducting ,Air grills and Accessories
1302.2 Fans, Motors and Controls
Others as indicated in the Mechanical Plans (pls. specify)
SUB-TOTAL MECH. VENTILATING SYSTEM

1500 OTHER ITEMS NOT MENTIONED ABOVE BUT ARE


NECESSARY TO COMPLETE THE PROJECT AS
CALLED FOR IN THE PLANS AND SPECIFICATIONS.
SUB-TOTAL OTHERS