Professional Documents
Culture Documents
RECTO146 y
RECTO146 y
CROSSING
ZAMORA ST.
S.W. NO CANAL EXISTING 60 X 60 OPEN CANAL
RECTO AVE.
EXISTING SIDEWALK
MATCH LINE
1 STRAIGHT LINE DIAGRAM
SCALE: 1:400 MTS
ELEV. = 85.182
ELEV. = 85.181
ELEV. = 85.162
ELEV. = 85.095
ELEV. = 84.789
ELEV. = 84.414
RIGHT
SIDE
SIDEWALK R-S
ROAD PROFILE
85.00
HORIZONTAL = 1:400 MTS
= 1:100 MTS
TOP R-S
84.00
83.00
VERTICAL
82.00
SCALE:
81.00
80.00
INT. ZAMORA ST.
1
MATCH LINE
0+002.50 EDGE
0+000
0+034
0+060
0+132
0+000
0+020
0+040
0+060
0+080
0+100
0+120
0+010
0+030
0+050
0+070
0+090
0+110
0+130
PROJECT TITLE : PREPARED BY: CHECKED & REVIEWED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET NO :
REPUBLIC OF THE PHILIPPINES
CITY OF SANTIAGO
1 OF 2
CITY ENGINEERING OFFICE CONSTRUCTION OF DRAINAGE CANAL ROLANDO D. VALDEZ
PLANNING AND DESIGN SECTION (RECTO AVE.) ENGINEER - I
DOMINADOR V. VAQUILAR JR. EUGENE B. CHILAGAN BENEDICT B. PANGANIBAN ENGR. JOSEPH S. TAN DATE:
SAN ANDRES, SANTIAGO CITY, PHILIPPINES
TEL NOS. (078) 305-2761 LOCATION: ROSARIO, SANTIAGO CITY ARTURO C. SISON III ENGINEER - II ENGINEER - II CITY ENGINEER CITY MAYOR
ENGINEERING ASSISTANT