Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PROPOSED DRAINAGE

CROSSING
ZAMORA ST.
S.W. NO CANAL EXISTING 60 X 60 OPEN CANAL

RECTO AVE.
EXISTING SIDEWALK

MATCH LINE
1 STRAIGHT LINE DIAGRAM
SCALE: 1:400 MTS
ELEV. = 85.182

ELEV. = 85.181
ELEV. = 85.162

ELEV. = 85.095

ELEV. = 84.789

ELEV. = 84.414
RIGHT
SIDE

SIDEWALK R-S
ROAD PROFILE

85.00
HORIZONTAL = 1:400 MTS
= 1:100 MTS

TOP R-S

84.00

83.00
VERTICAL

60 X 60 CANAL / END NO CANAL L-S

82.00
SCALE:

81.00

END OF SIDEWALK R-S


0+003.50 DRAINAGE CROSSING

0+009.30 START NO CANAL L-S

80.00
INT. ZAMORA ST.
1

MATCH LINE
0+002.50 EDGE
0+000

0+034

0+060

0+132
0+000

0+020

0+040

0+060

0+080

0+100

0+120
0+010

0+030

0+050

0+070

0+090

0+110

0+130
PROJECT TITLE : PREPARED BY: CHECKED & REVIEWED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET NO :
REPUBLIC OF THE PHILIPPINES
CITY OF SANTIAGO
1 OF 2
CITY ENGINEERING OFFICE CONSTRUCTION OF DRAINAGE CANAL ROLANDO D. VALDEZ
PLANNING AND DESIGN SECTION (RECTO AVE.) ENGINEER - I
DOMINADOR V. VAQUILAR JR. EUGENE B. CHILAGAN BENEDICT B. PANGANIBAN ENGR. JOSEPH S. TAN DATE:
SAN ANDRES, SANTIAGO CITY, PHILIPPINES
TEL NOS. (078) 305-2761 LOCATION: ROSARIO, SANTIAGO CITY ARTURO C. SISON III ENGINEER - II ENGINEER - II CITY ENGINEER CITY MAYOR
ENGINEERING ASSISTANT