This daily activity report summarizes work done on the 5th day at a power plant job site. Key activities included dismantling induced draft fans and motors, with fan disassembly 45% complete due to crane issues. Other tasks like dismantling boiler feed pump instruments were 95% complete. The report also outlines the plan for the next day, with a focus on completing fan disassembly, further pump dismantling, and turbine cylinder work. Photographs from the 5th day of work are also included.
This daily activity report summarizes work done on the 5th day at a power plant job site. Key activities included dismantling induced draft fans and motors, with fan disassembly 45% complete due to crane issues. Other tasks like dismantling boiler feed pump instruments were 95% complete. The report also outlines the plan for the next day, with a focus on completing fan disassembly, further pump dismantling, and turbine cylinder work. Photographs from the 5th day of work are also included.
This daily activity report summarizes work done on the 5th day at a power plant job site. Key activities included dismantling induced draft fans and motors, with fan disassembly 45% complete due to crane issues. Other tasks like dismantling boiler feed pump instruments were 95% complete. The report also outlines the plan for the next day, with a focus on completing fan disassembly, further pump dismantling, and turbine cylinder work. Photographs from the 5th day of work are also included.
This daily activity report summarizes work done on the 5th day at a power plant job site. Key activities included dismantling induced draft fans and motors, with fan disassembly 45% complete due to crane issues. Other tasks like dismantling boiler feed pump instruments were 95% complete. The report also outlines the plan for the next day, with a focus on completing fan disassembly, further pump dismantling, and turbine cylinder work. Photographs from the 5th day of work are also included.
CUSTOMER : PLTU KUPANG BARU DAY : ( 5th ) Sunday EQUIPMENT : N/A RATE POWER : 18MW OEM : N/A TAG No. : Unit #1
DESCRIPTION TARGET ACTUAL REMARKS
Induced Draft Fan A & B Pekerjaan di area TURBIN 1. Disassembly Fan 70% 45% Terkendala Crane masih Motor Induced Draft Fan A & B dalam perbaikan dan pengetesan beban. 1. Disassembling Motor 100% 50% Boiler Feed Pump #2 1. Dismantling Peralatan Instrument 100% 95% 2. Disassembly Pompa 50% 0% Lube Oil System BFWP #2 1. Dismantling Peralatan Instrument, Kabel Control dan Power 100% 100% Motor Boiler Feed Pump #1 1. Dismantling Peralatan Instrument, Kabel Control dan Power 100% 95% Turbine Cylinder 1. Melepas Upper Casing 100% 95%
PLANNING FOR Monday, 26 September 2022 TARGET
Induced Draft Fan A & B 1. Disassembly Fan 100% Motor Induced Draft Fan A & B 1. Disassembling Motor 35% Boiler Feed Pump #2 1. Dismantling Peralatan Instrument 100% 2. Disassembly Pompa 50% Lube Oil System BFWP #2 1. Pembersihan Tanki Minyak 100% 2. Pembersihan Cooler Pelumas 100% Motor Boiler Feed Pump #1 1. Dismantling Peralatan Instrument, Kabel Control dan Power 100% Turbine Cylinder 1. Melepas Upper Casing 100% 2. Bersihkan dan periksa ruang uap 50% PREPARED BY APPROVED BY CUSTOMER BY
PT. SURYA SAKTI SUKSES PT. SURYA SAKTI SUKSES PT. SMS ENERGY
THIS MATERIAL IS THE EXCLUSIVE PROPERTY OF PT. SURYA SAKTI SUKSES
DAILY ACTIVITY REPORT
DAY : 5th