Professional Documents
Culture Documents
Apri S: Data Sheet
Apri S: Data Sheet
APRI
I
NSPECTI
ONRANGE
TUBESI
ZE 7mm -1
00mm (
0.27”-5.
9”)
diamet
er
LENGTH Upt
o25m (
82’)
,i
finspect
edfr
om oneend
Upt
o50m (
164’
),i
finspec
tedf
rom bot
hends
DETECTABLEDEFECTS
For8mm -63.
5mm (
⁄
”-2
⁄
”)t
ubes
HOLES Mi
ni
mum di
amet
er1
mm (
0.
039”
)
BL
OKAGES Mi
ni
mum of5%ofc
ros
ssec
ti
on
EROSION Mi
ni
mum of1
0%ofwal
lt
hic
knes
s
&PITTI
NG
For63.
5mm -1
00mm (
2⁄
”-4”
)tubes
HOLES Mi
ni
mum di
amet
er3mm (
0.
11
8”)
BL
OCKAGES Mi
ni
mum of1
0%ofc
ros
ssec
ti
on
EROSION Mi
ni
mum 20%ofwal
lt
hic
knes
s
&PITTI
NG
TUBECONFI
GURATI
ON
Anyc onfi
gurati
onincl
udi
ng:
U-bends,finnedtubes
,twi
st
edt
ubes
,mul
t
ipl
ebendsands
pir
alwoundt
ubes
.
TUBEMATERI
AL
Anymateri
ali
ncl
udi
ng:
Metal
s(f
err
ousandnon-
fer
rous
)&non-
met
als(
graphi
t
e,c
ompos
it
es)
I
NSPECTI
ONSPEED
1
0secondspert
ube
(
dependi
ngontubesi
ze,
lengt
handc
onfi
gur
ati
on)
AL
GORI
THM
Pat
entedAcoust
icPul
seRefl ect
omet
ry(APR)
tec
hnol
ogy
f
eatur
ingspeci
al
ized,
propr
ietar
yal
gori
t
hmsforNDTins
pec
ti
on.
SOFTWARE
DataAc quisi
tionSoft
ware
Ext
ernalnotebook/l
aptopcomputerconnectedtohandhelddevi
ce.
Sophis
ti
c at
edAPRI Ssoft
wareins
tal
ledincomput ers
hal
lbeutil
i
zedfor
i
nspecti
ons etup,pr
obes t
atusmonit
ori
ng,testdatar
ecordi
ng.
PORTAL
Excl
usi
vefori
nteract
i
veanal
ysisusi
ngs ophi
st
ic
atedalgor
it
hmsbas
ed
onart
ific
iali
ntel
l
igence&deepl ear
ningwhic
has s
istt
ogenerat
e
qual
it
yandintui
ti
verepor
tbasedonus erneeds.
Seamlessi
nter
acti
onamongserv
iceprovi
ders
,as
s etownersand
manufac
turer
stoenhancest
heuserexperi
encet
ot r
acktheinspec
ti
on
act
iv
it
ies,r
eport
sandothers
upportper
tai
ni
ngtoinspect
ion.
REPORTI
NG
Cus
tomizabl
e,gr
aphi
calonl
i
ner
epor
ts.
(
Output
:PDForHTML )
PHYSI
CALCHARACTERI
STI
CS
Compac
t,r
uggedandl
i
ght
wei
ghtdes
ign.
TOTALBOXWEI
GHT 1
4.88l
bs(
6.
75Kg)
BOXDI
MENSI
ONS 450Lx320W x200H(
mm)
(
17.
7”x1
2.6”x7
.8”
)
POWERI
NPUT TEMPERATURERANGE
Dual
vol
t
ages
yst
em (
11
0V/
220V) -
10°
Cto+
50°
C(1
4°Ft
o122°
F)
CERTI
FICATI
ONS STANDARDS
CEDec l
arat
ionofConf ormit
y; ASTM E2906/
E2906M-1
8
Saf
etyCerti
ficat
eI EC61 010; ASMEBPVC.V-201
9-Ar
ti
cl
e18
EMCT estCert
ifi
c ate;
CompanyQual i
tySy st
em
cer
ti
fiedtoISO9001 :
2008
OGY
NOL
TECH
TO
I N
SPEC USINGACOUSTICPULSE
REFLECTOMETRY(
APR)
EIN
TUB
Acoust
ic Pulse Refl
ec t
omery (APR) i
s a s peci
al
is
ed
t
echnologythatmeasur
esthe ensui
ng r
eflec
tionfr
om t
he
sur
fac
eabnor mal
it
i
esbys endi
ngs oundpulsesdownthe
t
ubeus ingai
rasamedium.
Anyc hangesi
nthec r
osssecti
onalar
eainthet
ubularsys
tem
generatesareflec
tion.Thesereflect
i
onsaregenerat
edfrom
t
hec hangeingeometryinthet
ubewhens oundtr
avelsdown
t
hetube.
APRI
S al
gori
t
hmsi
ofdef
ect.
denti
fy
,cl
assi
fy
,andrepor
tthel
ocat
ionandsi
ze
KEYUNI
QUEFEATURES
I
NSPECTSANYSHAPE, ULTRAFASTANDSAVES USER-
FRI
ENDLY
SI
ZEANDMATERIAL! COST! SOFTWARE!
APRIS has the c apabi
lityt o Shutdownsinpl
ant
sar
eamajor APRISsof
twareissi
mpletouse
examine tubes of di fferent di
srupti
onindai
l
yoper
ati
onand wit
hani nt
uit
i
v etube mappi
ng
geometri
c such as U- bend, ar
eex pensi
ve. f
uncti
on.
twis
tedands pi
ralwoundt ube.
Materi
al such as f er r
ous, Maint
enanceteamshav eat i
ght Theadv ancesoft
warei ssmart
nonferr
ous, gr aphite and schedul
e duri
ng shutdown t o enoughtodetecttubediameter
plast
ic does not hav e any i
nspectt he heat ex
c hangers which al
lows y
ou t o do t
ube
i
mpac t on APR t echnol ogy andboil
ers. sheetmappinginmi nutes
.
APRIS (Acousti
c Pul s
e Theinterac
ti
veanaly
sisf
eatur
e
Reflec t
ometry Inspec ti
on al
lows you and operat
orsto
System)us es APR t echnol ogy generate prel
i
minaryreport
s
with apatented algor i
thm t hat on-si
te.
exami neseacht ubei njus t10
seconds . Thi
s speedy Buil
tonart
ifici
alint
elli
genc ethat
examinati
on al
lows the i
nteract
s wi th y ou when
maintenancet eam t or educ e detecti
ng, c l
as s
ifyi
ng, and
overti
me, meet t he pl ant’s si
zing defect
s.Y ou c an then
t
urnaround s chedul e and generateacustomisedr eport.
reduceunplanneddownt i
me.
TALCYON PTE L TD
30 Toh Guan Road East
,#01-01/
02 Ent
er pri
se Hub,Singapore 608577
(
65)6559 4080 | sal es@tal
cyon.com | www. t
alcyon.
com
01
Tubemappi
ng
02
Sendss
oundpul
se
03
Det
ectdef
ect
s
I
nterac
ti
v
04
eanalys
is;
Gener
atereport
APRI
S SPECI
FICATI
ONS
TubeConfigur
ati
on U-
bends
,finnedt
ubes
,twi
st
edt
ubes
,mul
t
ipl
ebendsands
pir
alwoundt
ubes
TubeMat
eri
al Fer
rousandnon-
fer
rousmet
al;Gr
aphi
t
e,c
ompos
it
es,
pol
ymer
s
TubeI
DRange 7mm t
o100mm (
⁄
”to4”
)
Max
.TubeL
engt
h Upt
o25m (
f
rom oneend)
.Upt
o50m (
f
rom t
woends
).
I
nspec
tionRange 8mm t
o63.
5mm (
⁄
”t
o2.
5”)
Tubes 63.
5mm t
o100mm (
2.5”t
o4”
)Tubes
Mi
n.Hol
eDi
amet
er 1
mm (
⁄
”) 3mm (
⁄
”)
Mi
n.Bl
ockages 5%ofc
ros
ssec
ti
onr
educ
ti
on 1
0%ofc
ros
ssec
ti
onr
educ
ti
on
Mi
n.Wal
lLos
s 1
0%ofwal
lt
hic
knes
s 20%ofwal
lt
hic
knes
s
I
nspec
tionSpeed 1
0sec
ondspert
ube
Repor
ts T
ubes
heetmappi
ng,
cus
tomi
zabl
erepor
t.PDFf
ormat
APRI
SWei
ght Handhel
ddev
ice:
1.24Kg(
2.
73l
bs);T
otal
wei
ghtwi
t
hbox
:6.
75Kg(
14.
88l
bs)
Sof
twar
e APRI
SMeas
urement(
PTSM)
anddat
aanal
ysi
ssof
twar
e(PTSA)
PCOS Wi
ndows7
,10
I
nputVol
tage 1
10-
220V,
50-
60Hz
T
emper
atur
eRange -
10°t
o+50°C(
14°t
o122°F)
CEDeclar
ati
onofConfor
mity;Saf
etyCer
ti
ficat
eIEC61
010;
EMCT
estCer
ti
ficat
e;
Compl
i
anc
e
CompanyQuali
t
ySystem cert
i
fiedtoISO9001:
2015
ASTM E2906/
E2906M-1
8
St
andar
dsCode
ASMEBPVC.V-201
9-Ar
ti
cl
e18
Tubeoughttobecleanedpri
ort
otheins
pecti
on.
Cl
eani
ngRequi
rement I
fthecl
eaningmethodinvol
veswat
erjet
ti
ng,
blowdr
yingisr
ecommendedt oavoi
dwaterst
agant
i
on.
TALCYON PTE L TD
30 Toh Guan Road East
,#01-01/
02 Ent
er pri
se Hub,Singapore 608577
(
65)6559 4080 | sal es@tal
cyon.com | www. t
alcyon.
com
APRIS FT Procedure
Doc#: FT 001 Rev:1
APRIS TRANSCEIVER functional test performed with Demo Rig (10pcs). Details measurement data
and signal as follows,
S/N of APRIS Transceiver: ASG210007, S/N of POE: PSG210007
Inspection Date: 21-May-2022
APRIS FT Procedure
Doc#: FT 001 Rev:1
Details:
Tubes Hole Wall Loss Blockage
No. Position Size Position Wall Reduction Position Cross Section
Reduction
1 Flawless Tube
2 300mm 67% (ID12mm)
3 600mm ᴓ1mm
4 100mm 55% (ID WL)
5 1000mm ᴓ2mm 300mm 40%(ID16.5m
m)
6 600mm ᴓ2mm
7 Flawless Tube
8 1000mm ᴓ2mm 300mm 10% (ID
20.2mm)
9 1000mm ᴓ1mm 300mm 20% (ID
19mm)
10 200mm 80%(Pit(P))
300mm 60% (Pit (P))
400mm 40% (P)
550mm 20% (P)
1100mm 20%(WL/Erosion
)
Demo Rig Configuration
Outer Diameter of the tube 1in.(25.4mm)
Thickness of the tube 0.08in.(2.11mm)
Length of the tube 47.2in.(1200mm)
Configuration Straight
Material Aluminum
APRIS FT Procedure
Doc#: FT 001 Rev:1
3. Blockage
Tube Position Size APR Tolerance
# Intensity
2 11.8in(300mm) 67% 6.07 +/-10%
5 11.8in(300mm) 40% 4.06 +/-10%
8 11.8in(300mm) 10% 1.17 +/-10%
9 11.8in(300mm) 20% 2.11 +/-10%
APRIS FT Procedure
Doc#: FT 001 Rev:1
Tube #2:
APRIS FT Procedure
Doc#: FT 001 Rev:1
Tube #3:
Tube #4:
APRIS FT Procedure
Doc#: FT 001 Rev:1
Tube #5
Tube#6:
APRIS FT Procedure
Doc#: FT 001 Rev:1
Tube #7
Tube #8
APRIS FT Procedure
Doc#: FT 001 Rev:1
Tube #9
Tube #10