Hse Plan
Hse Plan
: FGS-020822-HSE-01
Revision : 01 Pages
PROJECT HEALTH AND SAFETY PLAN th
08 Jan.
Date of issue : 1 of 17
2022
CONTROLLED DOCUMENT
__________________________________________________________________________________
ISSUED FOR
INFORMATION
Document No. : FGS-020822-HSE-01
Revision : 01 Pages
PROJECT HEALTH AND SAFETY PLAN th
08 Jan.
Date of issue : 2 of 17
2022
Revision Initials
__________________________________________________________________________________
Document No. : FGS-020822-HSE-01
Revision : 01 Pages
PROJECT HEALTH AND SAFETY PLAN th
08 Jan.
Date of issue : 3 of 17
2022
Contents
1. Purpose...................................................................................................................................5
2. Objectives...............................................................................................................................5
Environmental, Health and Safety Policy..............................................................................................5
3. Structure and Responsibility...................................................................................................6
3.1. Organisational Structure.................................................................................................6
3.2. Duties & Responsibilities in Environmental, Health and Safety...........................6
a. Project Management Staff (Engineers…)...................................................................6
b. HSE Lead..............................................................................................................................6
c. HSE Supervisor..................................................................................................................7
4. Planning..................................................................................................................................8
4.1. PROJECT SPECIFIC RISKS.............................................................................................8
4.2. Work Method Statement.....................................................................................................8
4.3. Environmental Aspects and Impact Analysis...................................................................8
4.4. In-House Safety Rules and Regulations..........................................................................8
4.5. Safe Work Practices............................................................................................................9
5. Implementation and Operation...............................................................................................9
5.1. Competence, Training and Awareness...................................................................................9
5.1.1. In-house FGS Project Safety Induction Training................................................................9
5.1.2. Drills and Exercises.............................................................................................................9
5.1.3. Training Records.................................................................................................................9
5.1.4. HSE Promotions..................................................................................................................9
5.1.5. Communication, Participation and Consultation...............................................................10
5.1.6. Meetings............................................................................................................................10
5.1.7. Warning Signs and Lights.................................................................................................11
5.1.8. HSE Campaign..................................................................................................................11
5.1.9. Emmergency Contact........................................................................................................11
5.2. Implemaentation...................................................................................................................11
5.2.1. Maintenance Regime of Machinery & Equipment............................................................11
5.2.2. Control of Movement & Use of Hazardous Substances and Chemicals...........................12
5.2.3. Temporary Electrical Installation......................................................................................12
5.2.4. Portable Electrical Tools...................................................................................................12
5.2.5. Hot Works / Compressed Gas Cylinders...........................................................................13
5.2.6. Fall Protection...................................................................................................................13
5.2.7. Housekeeping....................................................................................................................13
5.2.8. Fire Fighting Control.........................................................................................................14
5.2.9. Evironmental Working Condition.....................................................................................14
5.2.10. Authorized Operators for Machinery & Vehicles.........................................................14
5.2.11. Operational Risk Control...............................................................................................15
5.2.12. PPE................................................................................................................................15
__________________________________________________________________________________
Document No. : FGS-020822-HSE-01
Revision : 01 Pages
PROJECT HEALTH AND SAFETY PLAN th
08 Jan.
Date of issue : 4 of 17
2022
6. Checking:..............................................................................................................................16
6.1 Safety Inspections.................................................................................................................16
6.2 HSE Committee Inspection..................................................................................................16
6.3 HSE Report to Project Manager...........................................................................................16
6.4 Routine HSE Inspections......................................................................................................16
6.5 Remedial Actions..................................................................................................................16
6.6 Incident Investigation, Nonconformity, Corrective and Preventive Action.........................17
6.7 Control of Records................................................................................................................17
7. Management Review............................................................................................................17
8.1 Management Review Inputs.................................................................................................17
8.2 Management Review Outputs...............................................................................................18
8. List of Appendix...................................................................................................................18
__________________________________________________________________________________
Document No. : FGS-020822-HSE-01
Revision : 01 Pages
PROJECT HEALTH AND SAFETY PLAN th
08 Jan.
Date of issue : 5 of 17
2022
1. Purpose
This plan sets down in clear and unambiguous terms the “FGS LLC” management approach
and commitment to Health, Safety and Environmental (HSE).
The purpose of this plan is to comply to the ISO 14001:2004, USACE Safety Manual EM
381-1-1. and OHSAS 18001:2007 standards requirements and provide direction for the
implementation of the HSE plan within the project organisation
2. Objectives
To comply with the authorities’ legislations, code of practices and other statutory
requirements, rules and regulations, standards and procedures.
To identify and comply with duties and responsibilities of individual for safety, health
and environmental control.
To provide safe and healthy conditions of employment for all project employees.
To provide site works that do not endanger members of the public, site staff,
subcontractors and workers.
To provide for the thorough investigation into incidents and establish safeguards to
prevent recurrence. To equip all site staff, subcontractors and workers with the
knowledge and skills in environment, health & safety to achieve a high level of safety
and health awareness and apply them to prevent accidents at their workplace.
This policy shall be available to all interested parties.
__________________________________________________________________________________
Document No. : FGS-020822-HSE-01
Revision : 01 Pages
PROJECT HEALTH AND SAFETY PLAN th
08 Jan.
Date of issue : 6 of 17
2022
b. HSE Lead
Responsible for implementing HSE policy and programmes of the project. Implements
HSE trainings and campaign programmes and all HSE activivities.
Lead the whole HSE team on all Health, Safety, Environment, and Security matters.
Being responsible for the Health, Safety and Environment (HSE) supervision at
construction site; Supervise and enforce the implementation of HSE regulations/
policies on construction site;
Regularly reviews implementation of the site HSE plan and safety performance during
construction
Act as a coordinator in the implementation of the labour safety programs to raise the
awareness of the workers and engineers, and inspect the performance of labour safety
policies at the construction site;
Supervise all subcons’ performance and enforce the rules. Evaluate the obedience of
the labour safety regulations, risks and unforseen dangers relating to labour safety at
the construction site;
__________________________________________________________________________________
Document No. : FGS-020822-HSE-01
Revision : 01 Pages
PROJECT HEALTH AND SAFETY PLAN th
08 Jan.
Date of issue : 7 of 17
2022
Ensure that all safety requirements are compliance with statutory regulations; Be in
charged of all FGS HSE Mannual & Procedures and HSE legal requirements.
Accountable to company’s top management and authority for the implementation of
the safety and health management system in the projectsite.
Monitors the overall HSE performance of the project, identifying unsafe conditions and
procedures and recommending corrective actions. Responsible for the establishment
and maintenance of all HSE record-keeping systems and will liaise with Authorities
with regard to any HSE matters.
Compile project HSE reports as required by OHS regulations.
Review Method Statement, Job Risk Assessment.
Conduct kick-off meeting with subcontractors reviewing their readiness on HSE
programs.
Prepare and conduct safety meeting.
Carry out incident investigation and report.
Prepare emergency response plan, conduct training and act as an incident
commander
Performs other related duties as assigned.
c. HSE Supervisor
Being responsible for the Health, Safety and Environment (HSE) supervision at
construction site; Supervise and enforce the implementation of HSE regulations/
policies on construction site;
Regularly reviews implementation of the site HSE plan and safety performance during
construction
Responsible for implementing HSE policy and programmes of the project.
Act as a coordinator in the implementation of the labour safety programs to raise the
awareness of the workers and engineers, and inspect the performance of labour safety
policies at the construction site;
Monitors the overall HSE performance of the project, identifying unsafe conditions and
procedures and recommending corrective actions.
Ensure that all safety requirements are compliance with statutory regulations;
__________________________________________________________________________________
Document No. : FGS-020822-HSE-01
Revision : 01 Pages
PROJECT HEALTH AND SAFETY PLAN th
08 Jan.
Date of issue : 8 of 17
2022
Prepare safety training, safety meeting, inspect and handle/ check labour safety
reports as required by Superiors;
Evaluate the obedience of the labour safety regulations, risks and unforseen dangers
relating to labour safety at the construction site;
Performs other related duties as assigned.
4. Planning
__________________________________________________________________________________
Document No. : FGS-020822-HSE-01
Revision : 01 Pages
PROJECT HEALTH AND SAFETY PLAN th
08 Jan.
Date of issue : 9 of 17
2022
significance of these aspects and risks and implementing necessary control measure.
Refer to FGS HSE Standard on environmental protection.
Revision : 01 Pages
PROJECT HEALTH AND SAFETY PLAN th
08 Jan.
Date of issue : 10 of 17
2022
HSE Training Records will be kept in the project HSE section. The HSE Officer will be
responsible for updating and maintaining HSE training records.
5.1.6. Meetings
Daily / Weekly Tool Box Meeting
- These meetings held between Sub-contractors’ Supervisors / Foremen and the
workers shall be topical and held on a daily / weekly basis, “FGS” will if necessary
arrange an extraordinary meeting to discuss any urgent HSE matters, such as major
incident / accident.
- Tool-Box meetings will be conducted daily by the respective supervisors every
morning before work commences. The Sub-contractors’ Supervisors/Foremen will:
Carry out the training to workers
Encourage and motivate their workers to achieve high standards of safety at all
times
Monthly HSE Committee Meetings
__________________________________________________________________________________
Document No. : FGS-020822-HSE-01
Revision : 01 Pages
PROJECT HEALTH AND SAFETY PLAN th
08 Jan.
Date of issue : 11 of 17
2022
5.2. Implemaentation
__________________________________________________________________________________
Document No. : FGS-020822-HSE-01
Revision : 01 Pages
PROJECT HEALTH AND SAFETY PLAN th
08 Jan.
Date of issue : 12 of 17
2022
maintained in safe operating condition at all times. The Security will stop all delivery of
machine and equipment at the check point and inform the Project HSE team for inspection
and tagging accordingly. Refer to FGS/PCD/SA/01 Security.
All records of the inspections and maintenance must be kept available on site for verification
purpose.
The proper Maintenance Regime System must include the following machinery and
equipment commonly deployed at the worksite:
Lifting machineries.
Lifting platforms.
Lifting gears such as chains, ropes, chain slings, web slings, wire rope slings, shackles,
hooks and mancages.
Lifting appliances such as chain blocks, set of chain blocks, level blocks, pulleys and
gin wheels.
Construction equipment including bulldozers, excavators, dumpers, telescopic handler
and bobcat.
Cutting machines, bending machines and grinders.
Electricity generators, welding generators and air compressors.
Power driven hand tools such as electrical / pneumatic drills, hammers, grinders and
cutters.
Explosive powered tools, e.g. Hilti and Ramset, etc.
Emergency equipment including alarms, fire extinguishers, fire fighting facilities.
Special equipment such as cartridge guns and high pressure water jets.
Storage containers, such as gas cylinders, fuel storage tanks, chemical storage
containers including paint and solvents.
Refer to FGS/PCD/SA/06 Safety Equipment Check
__________________________________________________________________________________
Document No. : FGS-020822-HSE-01
Revision : 01 Pages
PROJECT HEALTH AND SAFETY PLAN th
08 Jan.
Date of issue : 13 of 17
2022
by competent person.
Refer to FGS/PCD/SA/06 Safety Equipment Check
5.2.5. Housekeeping
Adequate measures will be taken to ensure that all building materials are stored or
stacked in a safe and orderly manner without obstructing any passageway or place of
work and will not be placed too near to any edge of a floor or a platform.
All debris generated if highly flammable / combustible in nature will be appropriately
disposed off from the site immediately. All other debris generated will be cleared away
from access ways, staircases, scaffolds, roof tops and working platforms so as not to
cause unnecessary obstruction / hazard and disposed off from the site periodically.
Sufficient containers will be provided at designated locations for the collection disposal of
debris and rubbish.
Refer to:
a. FGS/PCD/SA/13 Helth Safety and Environmental Policy
__________________________________________________________________________________
Document No. : FGS-020822-HSE-01
Revision : 01 Pages
PROJECT HEALTH AND SAFETY PLAN th
08 Jan.
Date of issue : 14 of 17
2022
Most Effective
__________________________________________________________________________________
Document No. : FGS-020822-HSE-01
Revision : 01 Pages
PROJECT HEALTH AND SAFETY PLAN th
08 Jan.
Date of issue : 15 of 17
2022
6. Checking:
To measure performance and to monitor and ensure compliance to the HSE plan
Revision : 01 Pages
PROJECT HEALTH AND SAFETY PLAN th
08 Jan.
Date of issue : 16 of 17
2022
Revision : 01 Pages
PROJECT HEALTH AND SAFETY PLAN th
08 Jan.
Date of issue : 17 of 17
2022
7. Management Review
8. List of Appendix
Apendixes to be issued prior construction site construction.
__________________________________________________________________________________