LOADING TEST
METHOD STATEMENT
Company
Rev. Date Description Prepared by Checked by Approved by
Approval
Loading Test
Method Statement
3 PERMITS REQUIRED
Hot Work: No
Cold Work: Yes (Lifting Operation Permit)
Working at height: No
Confined Space/Entry Work: No
Electrical Isolation: No
Control System: No
1 of 2
Loading Test
Method Statement
2 of 2
APPENDIX – 3: TASK RISK ASSESSMENT
Page 1
RISK ANALYSIS RISK ANALYSIS
(NO CONTROLS) (CONTROLLED)
EVALUATION
No HAZARD RISK CONTROL MEASURES
S L RR S L R
8 8 64 4 6 24
Multiple coordinators
4. definition of Arrange pre-lifting meeting.
providing contra Property damage
assigned tasks
Safe working practice document and A
and dictionary Body injury
identification of lifting operator
responsibilities
instructions
6. Approaching Body injury 8 8 64 Pre-check of road path to lay down area and road 6 4 24 A
Property damage survey
and preparing Vehicle collision /
the truck for material damage
unloading the
equipment
Body injury 8 8 64 To hook the anchor points as reported in the 6 6 36 M
Property damage method statement
Safe working practice document
Inadequate lifting HSE inspection checklists
7. load hooking equipment Only authorised person within the area
Monitor lifting operation check crane
Page 2
RISK ANALYSIS RISK ANALYSIS
(NO CONTROLS) (CONTROLLED)
EVALUATION
No HAZARD RISK CONTROL MEASURES
S L RR S L R
Visual check of lifting gears before starting
Colour coding
To ensure suitability of equipment and safety
measures implementation
To start the lift very slowly to test the crane
balance.
RISK
RISK ANALYSIS ANALYSIS
(NO CONTROLS) (CONTROLLE
EVALUATION
No HAZARD RISK CONTROL MEASURES
D)
S L RR S L R
Hand and finger 8 6 48 Clearly definition of assigned tasks 6 4 24 A
injuries PPE according to tasks
Risk assessment evaluation of planned phases
of the activity
Personnel injuries Barricade the area
Restrict accesses to authorised persons only
Provide the appropriate PPE (Gloves )
8 8 64 Close supervision 6 6 36 M
Check outriggers stability
Property damage Follow method statement steps
8. load lifting Body injury Check lifting operation by competent Person
and loading on Crane over turn Check lifting parameters through crane’s
the truck computer
Provide suitable plates below outriggers
Stop lifting operations if the wind speed exceed
20 km/h
Property damage 8 8 64 Valid 3 rd party inspection certificate and colour 8 6 48 M
Body injury code
Use the lifting gears identified in the method
Loose lifting gear statement
failure Visual check of lifting gears before starting
Discarding the defected lifting gear
Close supervision
Page 3
RISK
RISK ANALYSIS ANALYSIS
(NO CONTROLS) (CONTROLLE
EVALUATION
No HAZARD RISK CONTROL MEASURES
D)
S L RR S L R
of the activities
To unhook the anchor points as reported in the
method statement
8 8 64
To lay down the basket
To unhook the rope from the basket and from the
crane on the ground level
Only authorised person inside the area
Use of PPE
Clearly definition of the assigned tasks
PPE according to tasks
Risk assessment evaluation of planned phases
of the activities
Personnel injuries Fatality 8 8 64 8 6 48 M
Only authorised person inside the area
10.Approaching
and preparing No one in the crane movement radius
the crane and
the truck for the
unloading in the
identified area Close supervision
Hand signals to crane operator by banks –man
Truck to be turned off and secured
Property damage
Vehicle collision Body injury 8 8 64 8 6 48 M
Page 4
RISK
RISK ANALYSIS ANALYSIS
(NO CONTROLS) (CONTROLLE
EVALUATION
No HAZARD RISK CONTROL MEASURES
D)
S L RR S L R
Close supervision
Competent rigger and dedicated banks-man
Use tag lines and cordon off the area
Load Failure Property damage 8 8 64 8 6 48 M
Body injury Hand signals to crane operator by banks-man
To proper hook and fix the basket.
Page 5
RISK
RISK ANALYSIS ANALYSIS
(NO CONTROLS) (CONTROLLE
EVALUATION
No HAZARD RISK CONTROL MEASURES
D)
S L RR S L R
Clearly definition of the assigned tasks
PPE according to tasks
Risk assessment evaluation of planned phases
of the activities
Use tag lines and cordon off the area
Use tag lines and cordon off the area
8 8 64 6 6 36 M
Personnel injuries Body injury
Only authorised person inside the area
To use guide ropes
No one under the boom radius area.
Guide the load with ropes
Close supervision
Visual check
To move the load a little in different vertical and
Not proper load horizontal direction to ensure the proper final
Property damage 8 8 64 position 6 6 36 M
final position Body injury
Page 6
RISK
RISK ANALYSIS ANALYSIS
(NO CONTROLS) (CONTROLLE
EVALUATION
No HAZARD RISK CONTROL MEASURES
D)
S L RR S L R
crane TBT involving crane operators , lifting
coordinator , riggers
Continuous monitoring during lifting of load
lines vertically , simultaneous information to
lifting coordinator
Page 7