13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield,
Hebei
1. APPLICATION
Ram Bop is a key part of well-control equipment. It’s used for controlling
wellhead pressure during well drilling, workovering and testing, etc., effectively
preventing well blowout and realizing civilized and safe construction. It can be used
for the following:
☆ With proper pipe ram sealing the annular space between casing and drilling
string when there is pipe in the hole.
☆ With blind ram, completely sealing wellhead when there is no pipe in the
hole.
☆ When in emergent condition, the shear ram will cut off pipe in the well and
close wellhead.
☆ When the well head is closed, with killing manifold and choke manifold
connected to the spool and the outlet of the body doing mud circulating,
choking and releasing, well killing and well cleaning, etc..
☆ With killing manifold and choke manifold, effectively controlling bottom hole
pressure to achieve balance of bottom hole pressure.
2. TECHNICAL PARAMETER
1)Model Indication
××× ××-——××
Product code
FZ- single ram BOP
2FZ- double ram BOP
3FZ- Three ram BOP
2
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield,
Hebei
3
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield,
Hebei
4
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield,
Hebei
5
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield,
Hebei
3. WORKING PRINCIPLE
Figure 3 Hydraulic pressure oil path figure while opening and closing ram
When pressure oil of hydraulic pressure system is pumped into the closing
cavity of left and right cylinder, it pushes the piston with the ram shaft and ram
assembly to move to the center along the orbit limited by the body ram chamber,
realizing well sealing. When pressure oil is pumped into the opening cavity of left
and right cylinder, it pushes the piston with the ram shaft and left and right ram
assembly to move away from the center, opening the wellhead. The ram switch is
controlled by the conversion valve of the hydraulic pressure system. Normally,
opening and closing operation can be accomplished in 3~5 seconds (but related to
the hydraulic control system state, pipe line specification and distance). The inner
oil pipe of BOP is cross-circuit. Two brackets are at the same level position. Pay
attention to the open (O) and close (C) mark on the body when connecting pipes.
(Sees figure 4)
6
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield,
Hebei
Ram BOP has four sealing parts in order to shut off the wellhead effectively.
The ram top seal and body seal; the ram front seal and pipe column, body and
sealing between the pipe and the ram front seal; sealing between the body and the
side door; sealing between the ram shaft and the side door. Procedure of the ram
sealing divided into two steps: First the ram shaft affected by hydraulic oil pushes
the ram front seal rubber to press the front part of sealing distorted. Over
compression between the top seal rubber and the body seals the top part and
accomplishes primary sealing. Second when there is pressure in the well, the well
pressure pushes the ram front seal front back part of the ram to extrude distortion
more deeply, at the same time, well pressure pushes the ram up against the body
seal face, thus making reliable sealing. This is called "well pressure assisting
sealing".
7
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield,
Hebei
Main pressure-bearing assemblies such as the body and the side door are cast
with alloy steel of high strength and high toughness and properly heat treated
before leaving the factory, the BOP is water pressure tested to ensure safety
during operating under working pressure.
There are high supporting ribs and oblique plane for settling sand sloping to
the well hole at the bottom of the ram cavity of the body, desanding autoly
when opening and closing the ram, reducing friction of the ram. It is also
helpful for well pressure assisting ram seal.
Using floating ram sealing can reduce the resistance force of opening and
closing the ram, wearing of the ram rubbers, prolonging the ram life and also
preventing rustiness between the body and the ram, accessible for changing.
Hydraulic pipe is used with buried structure to avoid damaging the pipe during
installation, transporting and operating.
Size of outer coupling conforms to API 16A specification.
8
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield,
Hebei
List 6: RAM ASSEMBLY PARTS LIST
No 1 2 3 4 5
Nam Ram Ram
Ram block Carrier Ram screw screw
e assembly Packer
Qty.
Size 1 1 1 2 2
C.S.O. 11814.07.01 11814.07.01.01 11814.07.01.02
2 3/8" 11814.07.02 11814.07.02.01 11814.07.02.02
2 7/8" 11814.07.03 11814.07.03.01 11814.07.03.02
3 1/2" 11814.07.04 11814.07.04.01 11814.07.04.02
4 1/2" 11814.07.05 11814.07.05.01 11814.07.05.02
5" 11814.07.06 11814.07.06.01 11814.07.06.02 GB70-85
11814.07.01.03 11814.07.01.04
5 1/2" 11814.07.07 11814.07.07.01 11814.07.07.02 M12X65
6 5/8" 11814.07.08 11814.07.08.01 11814.07.08.02
7" 11814.07.09 11814.07.09.01 11814.07.09.02
9 5/8" 11814.07.10 11814.07.10.01 11814.07.10.02
9 7/8" 11814.07.11 11814.07.11.01 11814.07.11.02
7 5/8" 11814.07.12 11814.07.12.01 11814.07.12.02
9
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield,
Hebei
13 5/8”-10000psi Shear ram can cut pipe in the well and completely shuts off the
well. And It can also be used as normal C.S.O. ram. Shear ram can be installed in
the normal BOP.
10
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield,
Hebei
List 8 Part List of Shear Ram Assembly
No. P/N Description Qty. Notes
1 11814.23.01 Upper ram block 1
2 11148.09.01.01.00 Upper seal 2
3 11148.09.10.01.02A Upper Seal blade 1
4 11148.09.10.01.03 M27×3 Bolt 4
Back seal,
5 11148.09.10.01.04 1
Upper Seal blade
6 11148.09.10.01.05.00A Top blade seal 1
7 11148.09.10.01.06 Line-up pin 2
8 11814.23.02 Seal Down ram block 1
9 11148.09.10.01.08.00 Seal down blade seal 1
10 11148.09.10.01.09 Seal down blade 1
11 11148.09.10.01.10 M20×50 bolt 4
The shear ram can also be function as CSO ram for normal operation. The working
pressure of hydraulic control system is 8.4~10.5Mpa. Shear ram can be used to
seal working pressure to Max. 10000psi.
11
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield,
Hebei
Seal system between bonnet and ram shaft are double directions seal,and seal
well pressure by W-combined seal ring,seal hydraulic control pressure by W-seal
ring. See figure 8.
List 10: RAM SHAFT SEAL STRUCTURE PARTS LIST
Item Part number Description Qty.
1 11814.14 Scraper ring 1
12
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield,
Hebei
5 11814.18 Spacer 1
The seal system between ram shaft and bonnet is divided to two parts. One part is
used to seal off well pressure, and another seal off control pressure. The
secondary seal system is between the two parts. Usually, the seal here is very
reliable because it has several different seal rings and O-ring in the middle. But
they occasionally would be damaged for some reason. In this case, when shut well,
there will be leaking. So we need the secondary seal system to treat it emergently.
During a well is shut off, if there is liquid flowing out from the seeing hole (at the
bottom part of the bonnet), indicating that the seal rings has been damaged and
13
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield,
Hebei
we can know that the seal on well side or the seal on control side is damaged from
the liquid. At this time, immediately remove the plug of the grease injection pore,
install club-shaped in the pore, and then turn the screw clock wisely with an inner
hex wrench to inject the tightened plug, and inject the secondary seal grease
across the radial hole of the check valve and supporting seal sleeve in the circular
seam so as to achieve the seal remedy.
Caution to use secondary seal system:
◇ To prevent the grease from being solidified after long time, we do not put
grease in BOP in factory. And while the BOP is not used, it is also without this
grease. Only before the BOP is used in site, put in the grease. And after a well is
completed and the BOP is inspected and repaired, take out and clean the grease.
◇ Get special tool ready.
◇ During working should often notice the following notice hole plug (on it there is
little hole) if there is liquid flowing out.
◇ Don’t inject too much grease when seal ring is damaged. Proper inject quantity
is that there is no liquid flowing out. Because the secondary seal grease is more
frictional and with granule substance, it impairs the ram shaft when it returns.
◇ Inspect BOP after secondary seal being used and clean it to avoid it drying in
the hole.
14
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield,
Hebei
15
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield,
Hebei
List 12: LOCKING SHAFT SEAL STRUCTURE PARTS LIST
Item P/N Description Qty.
1 GB893.1 Block Ring 95 1
2 F751.14.21Thrust shaft sleeve 1
3 F751.14.20W-ring 3
4 F751.14.19Impact ring 1
5 Dust protecting ring 1
F751.14.18
bracket
6 F751.14.17 Dust protecting ring 1
Note:Quantity shown for one locking shaft.
The ram lock assembly of this type of BOP is manual-lock. Manual lock system
16
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield,
Hebei
closes and locks the ram by the manual wheel. It consists of locking shaft, ram
shaft, manual operating rod and hand wheel, etc.. Its application is to seal the well
for a long time, lock the rams in closing position after close the rams with hydraulic
system. At this time, the hydraulic pressure can be released. After closing the rams
with hydraulic pressure, turn the hand wheel to the right, drive the locking shaft
rotating through operating rod. Because the locking shaft shoulder presses against
the cylinder head, it cannot go back, thus it can only drive the ram shaft to move
toward the wellhead center and locking the rams. Manual-lock system can only
close the rams, but cannot open the rams. If you want to open the rams closed by
manual system, you must unlock the system to original position and then open the
ram with hydraulic pressure. It is the only method to open the rams. The operation
procedure is as following:
a. Turn the hand wheel to the left until dead end, then turn back 1/8-1/4 circle to
avoid the locking shaft from blocking at the unlocking position because of
temperature change.
Body
17
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield,
Hebei
Figure 13 Seal ring of bonnet
O-ring 3 seals bonnet and body, O-ring 4 seals frame of bonnet seal ring and
outside of bonnet seal ring channel. Rubber spring (consisting of two parts) is used
to set up pressure contact between bonnet seal ring and body to easy for initial
seal. This structure forms complete seal. When bonnet bears pressure, there is
clearance between it & body, its seal ring put against body surface as result of
bearing pressure to compensate this clearance. Therefore, large pre-tight force do
not need for bonnet bolt.
▲!Caution:Bonnet seal ring is directional and install it according to figure 11. Two
pieces rubber springs shall be put on two disconnect ional transversal groove on
frame end and this surface on the bottom of seal ring groove.
List 14 Bonnet seal ring part list
4.9 Bracket
The bracket connects the body and the bonnet. It is the rotation axis of opening
and closing the bonnet. It is also the hydraulic oil interconnection channel between
the body and the bonnet. For structure, see figure 14.
18
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield,
Hebei
19
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield, Hebei
22
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield,
Hebei
Read this section first before BOP installation. Structure, function and caution have
been introduced in above-mentioned chapters and this section for installation and
operation.
6.2 Installation
(1)After tests, every connection bolt is fixed once again avoiding unbalanced
23
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield,
Hebei
distribution. See the tightening torque of flange bolt from list 15 or 16.
(2)Connect hydraulic hose and pay attention to “ open &close” mark on BOP
body.
6.1.3 After Ram BOP installed on wellhead, inspect the following before
6.2 Operation
24
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield,
Hebei
operation.
3) After reaching objective interval, the rams should be opened and closed
one time every day to see if they are flexible lock in normal condition. After
the drill string is pulled out of the well, blind ram open and close test is
needed. When there is string in hole, do not close blind ram.
Test media is plain water or drilling fluid. After pressure keeping steadily, begin to
account time.
Test procedure:
A. Install BOP on the test platform and connect open & closed hydraulic hoses
with BOP. Connect lines from high-pressure tester to test platform or BOP outlets.
B. Put drill pipe inside BOP and make sure it connected with test platform reliable
during testing pipe ram to avoid being squeezed out from BOP. There is no drill
pipe inside BOP during CSO & shear rams.
C. Close ram with hydraulic operation pressure 1,200psi ~ 1,500psi and put
hydraulic operation handle on “close ram” opposition.
D. Raise well pressure to 200psi to 300ps and keep pressure for 10min,check
weather there is leak or not in seal parts.
F. Raise well pressure to 10,000psi and keep pressure for 10min,check weather
there is leak or not in seal parts.
G. Reduce well pressure to zero and open ram,check ram wearing and seal parts
weather there is no leak or not, record results.
Test variable ram with Max. size & Min. size drill pipe and test procedure same as
above. Close well by Variable ram through hydraulic operation not manual
operation.
25
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield,
Hebei
C. Reduce well pressure to zero and put hydraulic operation handle on “close ram”
opposition.
D. Raise well pressure to 200psi to 300ps and keep pressure for 10min,check
weather there is leak or not in seal parts.
E. Raise well pressure to Max. rated working pressure 10,000psi and keep
pressure for 10min,check weather there is leak or not in seal parts.
F. Reduce well pressure to zero and turn locking shaft anti clock-wise to unlock
position, then turn 1/8~1/4 circles clock-wise.
G. Open ram through hydraulic operation system,check ram wearing and seal
parts weather there is no leak or not, record results.
6.2.2 Operation, Inspection and Testing Procedures for the Shear Ram
A. The pressure of the hydraulic oil in the accumulator group of the hydraulic
control system shall be maintained at 19 to 21MPa.
B. Lock the braking device of the drilling winch after ensuring that such drilling
tools as the drill pipe joint and the drill collar are not in the cutting position of the
shear ram blowout preventer.
C. Close the annular blowout preventer and the pipe ram blowout preventer above
the shear ram blowout preventer.
D. Open the main blowing out pipe line to release the pressure.
E. Install the corresponding fixed clamps (the well installed with the shear ram
blowout preventer shall be equipped with one corresponding fixed clamp for the
drill pipe) on the appropriate positions on the drill pipe (above the rotary disc) and
connect and fix it to the driller with steel cable.
A. Switch the handle of the by-pass valve of the hydraulic control system to “Open”
and allow the high pressure oil of the accumulator group directly into the manifold.
26
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield,
Hebei
B. Switch the handle of the three potential four-way valve of the shear ram in the
hydraulic control system to “Close” and perform the cutting of the drill pipe.
C. Observe the variations in the pressure indicated on the pressure gauge of the
hydraulic control manifold. The pressure shall drop when the closure of the ram
begin, it shall increase and be stabilized after the cutting has began. The pressure
shall drop suddenly at the moment when it is cut and then increase and be
stabilized. This can be used to judge the cutting operation is successful or not.
E. Close the by-pass valve of the hydraulic control system and adjust the pressure
of the manifold of the remote control console to the set value.
The shear ram assembly shall be taken out after each cutting operation and
thoroughly inspected. The inspection items include:
A. Appearance:
There shall not be any cracks on any part of the cutter body and there
shall not be any such defects as notches or ridges on the blade.
There shall not be any obvious defects on the rubber sealing element.
There shall not be any defects on the binding face between the upper and
the lower cutter bodies or on the mounting groove of the cutter body seal
that can affect the sealing performance.
After the cutting operation the liquid penetrant examination shall be performed all
the processing elements of the shear ram to check if there are any defects on the
surface. The inspection results shall be recorded. The parts need to be tested (as
shown by the bold line in the drawing) and the testing requirements are described
below.
There shall not be any faulty indications on the blade of the cutter body
and the binding surface between the upper and the lower cutter bodies.
There shall not be any faulty indications on the mounting groove of the
rubber sealing element.
27
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield,
Hebei
C. Maintenance
There shall not be any welded parts on the cutter body of the shear ram.
Mild ridges or deformations on the blade can be finely grinded with an oil
stone or a polisher and the original shape of the blade shall be kept
(because the shape of the blade will affect the cutting performance
directly).
The rubber sealing element of the cutter body shall be changed even if
there is only a minor defect on it.
D. Management
A dedicated file shall be kept for the use of each pair of shear rams to
record their use and inspection histories in detail.
According to the specification of API Spec 16A, the service life of a shear
ram is normally three cutting operations. It will be tested once before
being released from the factory and then it can be used only twice
afterwards (cutting tests are not allowed in rehearsal blowout preventing
exercises or daily blowout prevention operations). After being used in the
well it shall be disposed of and it shall be replaced by a new ram. If the
results of the test after three cutting operations conform to the
requirement of no surface defects, it is allowed to be used again. However,
the additional cutting operations shall not be more than twice.
A. Install the blowout preventer on the seat of the testing pile and connect the open
and closure pipe lines to the preventer. Connect the pipe lines from the high
pressure test pump to the seat of the testing pile or the side outlet of the blowout
preventer.
B. The open pipe line, the closure pipe line and the well pressure pipe line shall be
equipped with at least one pressure transmitter each. All the pressure transmitters
shall be connected with the data collecting system to allow the permanent record.
C. Hang a testing drill pipe about 1.2m (4ft) in length vertically above the blowout
preventer and then put it down into the well. It is allowed to loosely straighten the
28
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield,
Hebei
pipe below the ram to avoid over bending during the cutting operation. When
cutting the drill pipe, the connection of the drill pipe should be avoided.
D. Set the pressure of the manifold of the hydraulic control system to 21MPa
(3,000psi) and close the ram and cut the drill pipe with one operation. The
pressure at the moment the drill pipe is cut can be obtained from the rapid variation
of the pressure during the cutting operation.
E. Improve the pressure inside the well to 1.4MPa to 2.1MPa (200psi to 300psi)
and keep the pressure to stabilized for 10 minutes. Check if there are any leakages
and the sealing is judged as passed if there are no leakages.
F. Improve the well pressure to the maximum nominal working pressure of the
blowout preventer, 105MPa (15,000psi) and keep the pressure to stabilized for 10
minutes. Check if there are any leakages again and the sealing is judged as
passed if there are no leakages.
G. Reduce the well pressure to zero and open the ram. Check the worn condition
of the shear ram of the blowout preventer and the condition of the sealing element
and record the results.
Not install ram or put bonnet on open position. Caution: Not to extend ram shaft
contacting body and fix BOP on the ground to avoid leaning as result of center of
gravity excursion due to two side outlets open at same time.
B. Test close chamber,test pressure is 21MPa (3,000psi) and keeps pressure for
29
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield,
Hebei
D. Test open chamber,test pressure is 21MPa (3,000psi) and keeps pressure for
10min check weather there is no leak or not, record results.
6.3 Caution
7. MAINTENANCE
BOP shall be cleared completely after every testing at site. Replace damaged parts
in time, anoint so as to prevent rust after cleaned ram chamber and ram of body,
(suggest to oil them by synthetic complex aluminium grease), and oil connecting
thread part by thread grease.
30
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield,
Hebei
scratched.
3) While replacing ram rubber, first upwards prize top seal, then forward
dismount face seal, last replace new rubber. Assembling order is contrary
to disassembling.
▲! Caution:Do not hammer frame of bonnet seal ring to avoid damage because
it is soft. Follow the procedure to disassemble bonnet seal ring.
(1) Put two screws M12 into frame of bonnet seal ring and then squeeze it from
seal ring groove.
(2) Replace O-ring and rubber spring in the back.
(3) Coat grease on frame surface of bonnet seal ring & groove and put the
frame inside the groove. Put two screw M12 through the hole on the frame
and tighten on the bonnet, then press the frame into the groove.
(4) Take two screws M12.
(5)Coat grease on the seal ring groove of frame outside end and put on O-ring.
Bonnet hinge bracket is either side door rotating shaft or hydraulic oil
passage. When seal ring damaged, there will be oil losing. At this moment, it is
necessary to disassembly the hinge bracket and checking steps as follows:
31
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield,
Hebei
5) Check hinge bracket O-rings and replace all O-rings if possible. Verify seal
side intact, repair or replace them in time if existing damage.
6)When installation, coat lubricant on related surface, and insert side door
gently. Take care of the locating port, fit two dowel pins first, then four bolts.
7.4.1 Procedure
For ram shaft seal, piston seal, locking shaft seal, if leaking oil, they shall be
repaired and checked as the following steps:
a) If ram is not opened fully, open the rams completely through hydraulic
pressure. If side door is opened fully, close side door and at least
screw a bolt at the opposite from hinge bracket.
b) Put a clean basin under cylinder, to prevent oil from flowing on ground.
c) Remove cylinder cover studs and nuts. Screw off cylinder cover
locking shaft.
d) Drive out locking shaft from cylinder cover.
e) Remove cylinder.
f) Release fixed screw in piston locking cap (No.17)
g) Remove piston locking cap, and take down the piston.
h) Open side door, take off ram and pull out ram shaft.
i) Remove retainer, take out ram shaft sealing ring, and take down
locking shaft sealing ring in cylinder cover in the same way.
32
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield,
Hebei
treatment method as on cylinder. If coating peeling off, that will cause leakage. So
must change new parts.
(3) Seal ring.
Check sealing parts and O-rings to ensure no scratch. If there is, change them.
(4) Piston
When there is 0.2mm scratch on piston movement sealing surface, change it and it
is not allowed to emerge obvious scratch on other surfaces.
7.4.3 Cylinder assembly installation
Installation step are reversal disassembly steps of it. But note the following items.
(1) Check if there are burs and sharp edges on parts. If there is, get rid of them
to prevent seal ring from scratch, and keep parts clean.
(2) When setting seal ring, lubricate seal ring area and related area for easy
assembly.
(3) Take care of lip seal rings' direction; ensure lip mouth against pressure side.
⑸ Watch piston is put completely or not when fixing locking cap of piston. Piston
should contact rounding-off of ram shaft tightly. After turning locking cap tightly,
fixed it by formed punch and turning fixing screws.
33
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield,
Hebei
34
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield,
Hebei
35
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield,
Hebei
36
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield,
Hebei
APPENDIX
List 1 RECOMMENDED TORQUE FOR DIFFERENT SIZES OF BOLTS AND
SCREWS (METRIC UNIT)
Size of Tightening Size of Tightening Size of Tightening
bolts and torque bolts and torque bolts and torque
screws N·m screws N·m screws N·m
M12 80 M33×3 1292 M52×3 5505
M16 153 M36×3 1737 M38×3 7892
M20 266 M39×3 2272 M64×3 10885
M22 424 M42×3 2910 M70×3 14549
M27 643 M45×3 3654 M76×3 18957
M30×3 930 M48×3 4516 M80×3 21565
Tightening toque
P/N Description Wrench size S
N·m
11187.03 Bonnet bolt M80×4 74 8411
11148.02A Nut M39×3 55 2272
37
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield,
Hebei
List 4 Wrench Size for bonnet bolt or connecting nut between cylinder
and cylinder cover
Wrench Wrench
Nut size size S
Nut size size S
ENGLISH ENGLIS
Metric UNIT
Metric H UNIT
1
M12 1/2-13UNC 22 M42×3 65
5/8-8UN
1
M16 5/8-11UNC 27 M45×3 68
3/4-8UN
1
M20 3/4-10UNC 32 M48×3 74
7/8-8UN
M22 7/8-9UNC 36 M50×3 2-8UN 77
M24 1-8UN 41 M52×3 77
2
M27 41 M58×3 88
1/4-8UN
2
M30×3 1 1/8-8UN 46 M64×3 98
1/2-8UN
2
M33×3 1 1/4-8UN 50 M70×3 105
3/4-8UN
M36×3 1 3/8-8UN 55 M76×3 3-8UN 115
M39×3 1 1/2-8UN 60 M80×3 125
38
13 5/8”-10000psi Ram BOP Rong Sheng Machinery Manufacture LTD. OF Huabei Oilfield,
Hebei
d S(㎜) M(㎜)
Wt.
P/N Metric English Metric Tolerance Metric Tolerance e(㎜)
㎏
Size Size
11706.01 M12 1/2 22 12 ±0.3 25.4 0.03
0
11706.02 M16 5/8 27 16 ±0.35 31.1 0.05
-0.21
11706.03 M20 3/4 30 19 34.6 0.07
11706.04 M22 7/8 36 22 41.6 0.1
11706.05 M24 1 41 25 ±0.42 47.3 0.19
0
11706.06 M27 41 28 47.3 0.19
-0.25
11706.07 M30X3 1 1/8 46 28 53.1 0.25
11706.08 M33X3 1 1/4 50 31 57.7 0.32
11706.09 M36X3 1 3/8 55 34 63.5 0.42
11706.10 M39X3 1 1/2 60 37 69.3 0.54
±0.5
11706.11 M42X3 1 5/8 65 41 75.1 0.7
0
11706.12 M45X3 1 3/4 68 44 78.5 0.8
-0.3
11706.13 M48X3 1 7/8 74 47 86.6 1.02
11706.14 M50X3 2 77 50 88.9 1.67
11706.15 M52X3 77 50 88.9 1.67
11706.16 M58X3 2 1/4 88 56 101.6 1.78
11706.17 M64X3 2 1/2 98 0 63 113.1 2.32
±0.6
11706.18 M70X3 2 3/4 105 -0.35 68 121.2 2.78
11706.19 M76X3 3 115 75 132.8 3.7
11706.20 M80X3 3 1/4 125 0 81 144.3 4.89
-0.4
39