PROJECT REPORT

Project: Al farjaan Market Market: 2

SHOP PIPING CABLE


NUMBER 2 TONNES
IN Nos G1 G2 M1
1 3      
2 3    
3 3      
4 3    
5 3      
6 3  
7 3      
8 3
9 3    

1.5
ROOM NO TONNES PIPING CABLE
IN Nos G1 G1
Pump
Room 1

Electrical
Room 1
Security
Room 1
Total 3

Remark:

 Shop 8 sleeve not ready.


 Shop2 ground floor pipe line sleeve concrete blocked.
 Shop 4 first floor pipe line sleeve concrete blocked.
 Shop 6 ground& first floor pipe line sleeve concrete blocked.
 Telecom, electrical and security room (1.5 tones) rooms not ready.