PROJECT:
PROPOSED DESIGN, BUILT AND COMPLETE FOR THE ENTRANCE
STATEMENT FOR RESIDENTIAL HOUSE AT PERSIARAN PUNCAK
BESTARI 2, PUNCAK ALAM, 42300 BANDAR PUNCAK ALAM,
SELANGOR DARUL EHSAN FOR MESSRS MAJLIS PERBANDARAN
KUALA SELANGOR.
PREPARED BY:
PREPARED FOR:
1
PROPOSED DESIGN, BUILT AND COMPLETE FOR THE ENTRANCE SIGNAGE
STATEMENT AT PERSIARAN PUNCAK BESTARI 2, PUNCAK ALAM, 42300
BANDAR PUNCAK ALAM, SELANGOR DARUL EHSAN FOR MESSRS MAJLIS
PERBANDARAN KUALA SELANGOR.
Cost estimate
BILL 1: PRELIMINARIES
PAGE BQ1 / 1 / 7
2
PROPOSED DESIGN, BUILT AND COMPLETE FOR THE ENTRANCE SIGNAGE
STATEMENT AT PERSIARAN PUNCAK BESTARI 2, PUNCAK ALAM, 42300
BANDAR PUNCAK ALAM, SELANGOR DARUL EHSAN FOR MESSRS MAJLIS
PERBANDARAN KUALA SELANGOR.
Cost estimate
BILL 1: PRELIMINARIES
PAGE BQ1 / 2 / 7
3
PROPOSED DESIGN, BUILT AND COMPLETE FOR THE ENTRANCE SIGNAGE
STATEMENT AT PERSIARAN PUNCAK BESTARI 2, PUNCAK ALAM, 42300
BANDAR PUNCAK ALAM, SELANGOR DARUL EHSAN FOR MESSRS MAJLIS
PERBANDARAN KUALA SELANGOR.
Cost estimate
BILL 1: PRELIMINARIES
PAGE BQ1 / 3 / 7
4
BANDAR PUNCAK ALAM, SELANGOR DARUL EHSAN FOR MESSRS MAJLIS
PERBANDARAN KUALA SELANGOR.
Cost estimate
BILL 1: PRELIMINARIES
PAGE BQ1 / 4 / 7
AS BUILT DRAWING
a) A set of "As-Built Drawings" L/S 1 FOC
encompassing all areas
installed following the
completion of the work must
be created by the contractor.
These plans must reflect the
precise position of all installed
planting and be drawn to the
same scale as the original
planting plans. The landscape
architect must give her or his
approval before the managing
director of the contractor signs
and stamps.
5
BANDAR PUNCAK ALAM, SELANGOR DARUL EHSAN FOR MESSRS MAJLIS
PERBANDARAN KUALA SELANGOR.
Cost estimate
BILL 1: PRELIMINARIES
PAGE BQ1 / 5 / 7
6
BANDAR PUNCAK ALAM, SELANGOR DARUL EHSAN FOR MESSRS MAJLIS
PERBANDARAN KUALA SELANGOR.
Cost estimate
BILL 1: PRELIMINARIES
PAGE BQ1 / 6 / 7
7
BANDAR PUNCAK ALAM, SELANGOR DARUL EHSAN FOR MESSRS MAJLIS
PERBANDARAN KUALA SELANGOR.
Cost estimate
BILL 1: PRELIMINARIES
PAGE BQ1 / 7 / 7
8
Cost estimate
BILL 2: SOFT LANDSCAPE WORKS
PAGE BQ2 / 1 / 9
SOFT LANDSCAPING
NOTES:
9
Cost estimate
BILL 2: SOFT LANDSCAPE WORKS
PAGE BQ2 / 2 / 9
PLANTING WORKS
B 1.0 PLANTING HOLE
PREPARATION
To supply and plant, which includes
digging a planting hole, removing
unwanted earth, and filling it with
enriched fertilized or compost
mixtures. This includes everything
needed for the planting process, as
well as for sitting, tree protection, and
other tasks. Non-conformance or
failure of plants to establish 2 weeks
upon installation shall be subjected
to replacement of plants or species
at contractor's cost.
a) Palm (5000mm x 5000mm x
5000mm) NOS 1 25.00 25.00
b) Tree (3000mm x 3000mm x
3000mm) NOS 2 25.00 50.00
c) Shrub (300mm x 250mm x
100mm)
d) Groundcovers (1000mm x NOS 56 10.00 560.00
1000mm x 1000mm)
10
Cost estimate
BILL 2: SOFT LANDSCAPE WORKS
PAGE BQ2 / 3 / 9
b) Shrubs :
450mm x 450mm x 450mm NOS 0 30.00 60.00
c) Groundcovers :
150mm x 150mm x 150mm m² 17.42 10.00 174.20
11
Cost estimate
BILL 2: SOFT LANDSCAPE WORKS
PAGE BQ2 / 4 / 9
4.0 MULCHING
12
Cost estimate
BILL 2: SOFT LANDSCAPE WORKS
PAGE BQ2 / 5 / 9
PLANT MATERIAL
C
1.0 TREES, PALMS & SHRUBS
PLANTING
Provide and plant trees in
accordance with the instructions
provided. All plant materials must be
free of all diseases and infertility, and
their trunks must be straight.
Tree :
a) Plumeria rubra NOS 2
Shrubs :
a) Acalypha siamensis NOS 36
b) Calathea lutea NOS 4
c) Hymenocallis speciosa NOS 16
Palm :
a) Ravenala madagascariensis NOS 1
13
Cost estimate
BILL 2: SOFT LANDSCAPE WORKS
PAGE BQ2 / 6 / 9
Turfs / groundcovers :
a) Zoysia matrella m² 17.42
14
Cost estimate
BILL 2: SOFT LANDSCAPE WORKS
PAGE BQ2 / 7 / 9
D MAINTENANCE WORKS
NOTES :
After the practical completion of the
contract, allow for the provision of the
upcoming maintenance, which is
listed below, on a monthly basis to all
landscaped areas for a period of
Twelve (12) MONTHS. If the
maintenance listed below is not
completed to the required standards,
deductions will be made from the
- - - -
monthly maintenance.
1. All labor, supplies, equipment,
machinery, tools, transportation,
and administrative support for
these works.
2. Temporarily store the tools, tree
stakes, and materials needed to
finish the project.
3. After receiving the Certificate of
Practical Completion,
maintenance must begin.
1.0 WATERING
Watering all trees, shrubs, planting
beds, and maintaining moisture - - - -
levels of 20% to 30%, with the
exception of certain plants that don't
need a lot of water (twice per day).
15
Cost estimate
BILL 2: SOFT LANDSCAPE WORKS
PAGE BQ2 / 8 / 9
2.0 WEEDING
3.0 FIRMING UP
4.0 FERTILIZING
16
Cost estimate
BILL 2: SOFT LANDSCAPE WORKS
PAGE BQ2 / 9 / 9
NOS 59 0
B. PLANT MATERIAL
17
PROPOSED DESIGN, BUILT AND COMPLETE FOR THE ENTRANCE SIGNAGE
STATEMENT AT PERSIARAN PUNCAK BESTARI 2, PUNCAK ALAM, 42300
BANDAR PUNCAK ALAM, SELANGOR DARUL EHSAN FOR MESSRS MAJLIS
PERBANDARAN KUALA SELANGOR.
Cost estimate
BILL 3: HARD LANDSCAPE WORKS
PAGE BQ3 / 1 / 4
18
PROPOSED DESIGN, BUILT AND COMPLETE FOR THE ENTRANCE SIGNAGE
STATEMENT AT PERSIARAN PUNCAK BESTARI 2, PUNCAK ALAM, 42300
BANDAR PUNCAK ALAM, SELANGOR DARUL EHSAN FOR MESSRS MAJLIS
PERBANDARAN KUALA SELANGOR.
Cost estimate
BILL 3: HARD LANDSCAPE WORKS
PAGE BQ3 / 2 / 4
19
PROPOSED DESIGN, BUILT AND COMPLETE FOR THE ENTRANCE SIGNAGE
STATEMENT AT PERSIARAN PUNCAK BESTARI 2, PUNCAK ALAM, 42300
BANDAR PUNCAK ALAM, SELANGOR DARUL EHSAN FOR MESSRS MAJLIS
PERBANDARAN KUALA SELANGOR.
Cost estimate
BILL 3: HARD LANDSCAPE WORKS
PAGE BQ3 / 3 / 4
4.0 OTHERS
Any other items or work not specified
but shown on the drawings or
included in the design summary and
specifications, or essential to the - - - -
proper execution and completion of
the upgrade work, please specify
20
PROPOSED DESIGN, BUILT AND COMPLETE FOR THE ENTRANCE SIGNAGE
STATEMENT AT PERSIARAN PUNCAK BESTARI 2, PUNCAK ALAM, 42300
BANDAR PUNCAK ALAM, SELANGOR DARUL EHSAN FOR MESSRS MAJLIS
PERBANDARAN KUALA SELANGOR.
Cost estimate
BILL 3: HARD LANDSCAPE WORKS
PAGE BQ3 / 4 / 4
1. SIGNAGE 6,672.87
2. 3D LETTER FONT 19-20 4,536.00
3. BOLLARD & BENCHES 310.00
21
BANDAR PUNCAK ALAM, SELANGOR DARUL EHSAN FOR MESSRS MAJLIS
PERBANDARAN KUALA SELANGOR.
Cost estimate
BILL 4 : ELECTRICAL WORKS
PAGE BQ4 / 1 / 5
MDB-1 NO. 1
EMDB NO. 1
22
BILL 4 : ELECTRICAL WORKS
PAGE BQ4 / 2 / 5
23
BILL 4 : ELECTRICAL WORKS
PAGE BQ4 / 3 / 5
GROUNDING SYSTEM
24
PAGE BQ4 / 4 / 5
25
PROPOSED DESIGN, BUILT AND COMPLETE FOR THE ENTRANCE SIGNAGE
STATEMENT AT PERSIARAN PUNCAK BESTARI 2, PUNCAK ALAM, 42300
BANDAR PUNCAK ALAM, SELANGOR DARUL EHSAN FOR MESSRS MAJLIS
PERBANDARAN KUALA SELANGOR.
Cost estimate
BILL 4: ELECTRICAL WORKS
PAGE BQ4 / 5 / 5
26
BANDAR PUNCAK ALAM, SELANGOR DARUL EHSAN FOR MESSRS MAJLIS
PERBANDARAN KUALA SELANGOR.
Cost estimate
BILL 5: COMPULSORY MAINTENANCE
PAGE BQ5 / 1 / 5
27
Cost estimate
BILL 5 : COMPULSORY MAINTENANCE
PAGE BQ5 / 2 / 5
A SOFTSCAPE WORKS
Watering
The Landscape Contractor shall
water all trees, palms, shrubs,
groundcover, herbaceous plants and
other planting areas as often as
necessary to keep the ground moist
all around and to the full depth of the
roots.
Weeding
All planting beds are to be kept in a
weed free condition with a weeding
operation as per maintenance
schedule or more regularly as
required. All weeds, stones and
rubbish collected from this operation
shall be removed from the site by the
Landscape Contractor.
Pruning
i.Pruning is to be done with the cut
just above and sloping away from an
outward facing healthy bud.
ii. Removal of branches is to be done
by cutting flush with the adjoining
stem and in such a way that no part
of the stem is damaged or torn.
iii. Ragged edges of bark are to be
trimmed with a sharp knife.
iv. Any cuts or wounds over 25mm
diameter are to be painted with an
28
BILL 5 : COMPULSORY MAINTENANCE
PAGE BQ5 / 3 / 5
Mulching
An additional 25m deep mulching
layer is to be spread over all planted
areas (except groundcover and turf),
once every 6 months or as specified
in Maintenance Schedule
29
PAGE BQ5 / 4 / 5
HARDSCAPE WORKS
Cost estimate
BILL 5 : COMPULSORY MAINTENANCE
30
PAGE BQ5 / 5 / 5
Cost estimate
BILL 2 : FINAL SUMMARY
PAGE BQ6 / 1 / 1
31
NO DESCRIPTION PAGE NUMBER AMOUNT (RM)
32