Checklst Attachment Compiled Iwp 4473

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 11

NLNG TRAIN7

Project

INSTALLATION WORK PACKAGE (IWP)


Concrete Works for Equipment Foundation

IWP-A01-WP2.5-010-FI-LC-101-CV02-101
Concrete Works for Equipment Foundation (7-V-1432) - Lean Concrete

1 08-11-2022 Noel Talo Seokwon Yoon Cheolhwan Kim ISSUE FOR INFORMATION

ISSUE DATE PREPARED CHECKED BY(WFP APPROVED DESCRIPTION


BY(WFP) Lead) BY((Supt/Supv))

CWA: A01-WP2.5-010 CWA Description: New Complete Train

UNIT: 1400 UNIT Description: New Complete Train

DISCIPLINE: Civil-General Level 3 Activity ID:CA01-2.5LC10-1050

Planned Start Date: 2023-01-26 Forecast Start Date:2022-11-14

Planned Finish Date: 2023-01-31 Forecast Finish Date: 2022-11-15

Key Quantity: 1.54 - UOM: M3 Planned Manhours:


NLNG TRAIN7
Project

Concrete Works for Equipment


Foundation
IWP-A01-WP2.5-010-FI-LC-101-CV02-101
Page 2 of 2

IWP Checklist

Checklist

Item Description Included (Y/N) Remarks

1 Working Area Summary Y

2 List of detail items to be installed Y

3 List of Drawings for Construction Y

4 Supply for Concrete by JV Y

5 Constraints Check Sheet Y

6 Special Requirement, if required N

7 Construction Drawings Y

Powered by TCPDF (www.tcpdf.org)


NLNG TRAIN7
Project

Concrete Works for Equipment


Foundation
IWP-A01-WP2.5-010-FI-LC-101-CV02-101
1 of 7

1. Working Area Summary :

Powered by TCPDF (www.tcpdf.org)


NLNG TRAIN7
Project

Concrete Works for Equipment


Foundation
IWP-A01-WP2.5-010-FI-LC-101-CV02-101
2 of 7

2. List of detail items to be installed :

Powered by TCPDF (www.tcpdf.org)


NLNG TRAIN7
Project

Concrete Works for Equipment


Foundation
IWP-A01-WP2.5-010-FI-LC-101-CV02-101
3 of 7

3. List of Drawings for Construction :

Powered by TCPDF (www.tcpdf.org)


NLNG TRAIN7
Project

Concrete Works for Equipment


Foundation
IWP-A01-WP2.5-010-FI-LC-101-CV02-101
4 of 7

4. Supply for Concrete by JV :

Powered by TCPDF (www.tcpdf.org)


NLNG TRAIN7
Project

Concrete Works for Equipment


Foundation
IWP-A01-WP2.5-010-FI-LC-101-CV02-101
5 of 7

5. Constraints Check Sheet :

Powered by TCPDF (www.tcpdf.org)


NLNG TRAIN7
Project

Concrete Works for Equipment


Foundation
IWP-A01-WP2.5-010-FI-LC-101-CV02-101
6 of 7

6. Special Requirement, if required :

Powered by TCPDF (www.tcpdf.org)


NLNG TRAIN7
Project

Concrete Works for Equipment


Foundation
IWP-A01-WP2.5-010-FI-LC-101-CV02-101
7 of 7

7. Construction Drawings :

Powered by TCPDF (www.tcpdf.org)


NLNG TRAIN7
Project

Concrete Works for Equipment


Foundation
IWP-A01-WP2.5-010-FI-LC-101-CV02-101
Page 1 of 2

Close Out:

Planned Finish Date 2023-01-31 Actual Finish Date

Punch list / Item not installed

Component Identifier Description Reason not installed

Lessons Learned

Comments and Suggestions for Improvement (related to general Construction activities or WFP process)

Superintendent / Supervisor Signature: ________________________________________

Date: _____________/_____________/______________
NLNG TRAIN7
Project

Concrete Works for Equipment


Foundation
IWP-A01-WP2.5-010-FI-LC-101-CV02-101
Page 2 of 2

NOTES

Powered by TCPDF (www.tcpdf.org)

You might also like