Professional Documents
Culture Documents
Scope - of - Work 1
Scope - of - Work 1
External Wall
Wall Finishes ZAHEEM
Internal Wall
External Floor
Floor Finishes HAZIM
Internal Floor
Staircase Finishes SINRU
External Ceiling
Ceiling Finishes AINA
ARCHITECTURE Internal Ceiling
WORK Roof Finishes ANGEL
Door & Window HAZIQ
Precast Manhole
Plumbing Work Connection Pipe ANGEL
Drain Pipe
Sanitary fitting HAZIQ
Cold Water Plumbing AINA
Excavation
Site preparation &Earthwork Angel
Disposal of water
Laying Pipe Culvert
Laying Precast V Drain
Road work AINA
Manhole
Connecting to existing manhole
Drainage work HAZIM
Laying 150mm M.S Pipe
EXTERNAL WORK RC Chamber for air and sluice valve
Water recticulation ZAHEEM
Bulkmeter
Connecting to existing main water supply
Rubble retaining wall
Retaining wall ANGEL, SINRU
RC Retaining wall
Laying sewer pipe
Sewerage Reticulation Manhole HAZIQ
Septic tank
Turfing SINRU
BILL OF QUANTITIES
Bill No.1 - Preliminaries ZAHEEM
Bill No.2 - Pilling Works AINA
Bill No.3 - Main Building Works SINRU
Bill No.4 - External Works HAZIQ
Bill No.5 - Provisional Sum ANGEL
Bill No.6 - Prime Cost Sum HAZIM
Summary HAZIQ
APPENDICES
Appendix A - Form of Guarantee for
Angel
Performance Bond
Appendix B - Form of Banker
ZAHEEM
Appendix C
Guarantee for- Schedule of Day Works
Tender Bond
Rates AINA
Appendix D - Schedule of Rates for
Building Materials
Appendix E - Tender Submission HAZIM
Form HAZIQ
Appendix F - List of Drawings SINRU