GENERAL NOTES B.

B. ALL PIPING AND FITTINGS USED ON THIS PROJECT SHALL BE NEW AND MARKED WITH MANUFACTURER'S NAME; AND SHALL COMPLY WITH ALL
1 THE PLUMBING SYSTEM DESIGN, INSTALLATION AND MATERIALS SHALL CONFORM TO THE PLUMBING CODE AND AUTHORITIES HAVING APPLICABLE ASTM AND ANSI STANDARDS.
JURISDICTION. IN CASE OF CONFLICTS WITH CODES, DRAWINGS, OR SPECIFICATIONS, THE MOST STRINGENT SHALL PREVAIL. PLUMBING FIXTURE AND EQUIPMENT SPECIFICATIONS LINETYPE LEGEND
c. PIPING SHALL NOT BE SUPPORTED BY WIRES, BAND IRON, CHAINS, OR FROM OTHER PIPING, NOR BY VERTICAL EXPANSION BOLTS. SUPPORT PIPING SYMBOL DESCRIPTION
WITH INDIVIDUAL HANGERS FROM CONCRETE INSERTS, WELDED SUPPORTS, OR BEAM CLAMPS OF PROPER CONFIGURATION AND LOADING DESIGN
MINIMUM ROUGH-IN
2 BEFORE COMMENCEMENT OF WORK, THE CONTRACTOR SHALL VERIFY THE EXACT LOCATIONS, ELEVATIONS AND CHARACTERISTICS OF ALL UTILITIES COLD WATER PIPING (C)
AND PIPING, AND SHALL IMMEDIATELY NOTIFY THE ARCHITECT OF ANY DISCREPANCIES. REQUIREMENTS FOR EACH LOCATION; REPLACE IF NOT SUITABLE. FOLLOW MANUFACTURER'S SAFE LOADING RECOMMENDATIONS. SUSPEND WITH CONNECTION SIZES FIXTURE UNIT TALLIES
RODS OF SUFFICIENT LENGTH FOR SWING, USING PROPER DIAMETER ROD FOR PIPE SIZE. PROVIDE OVERSIZED HANGERS WHERE MIN. HOT WATER PIPING (H)
INSULATION/SUPPORTS MUST PASS BETWEEN PIPE AND HANGER. PROVIDE CONTINUOUS SUPPORT OR EXTRA SUPPORTS FOR PLASTIC PIPE PER TAG: DESCRIPTION: MIN. MIN. MIN. COUNT COLD HOT
3 THESE DRAWINGS DO NOT INCLUDE ALL NECESSARY SAFETY REQUIREMENTS. CONTRACTOR TO COMPLY TO THE SAFETY REQUIREMENTS SET FORTH HOT COMB. SAN COLD SOFT WATER PIPING (CSW)
MANUFACTURER'S REQUIREMENTS. HANGERS, WHEN ATTACHED TO JOISTS, SHALL ONLY BE PLACED AT THE TOP OR BOTTOM CHORD PANEL POINT. COLD VENT DRAIN WATER WATER
BY THE LOCAL AUTHORITIES HAVING JURISDICTION.
ONLY CONCENTRIC TYPE HANGERS ARE PERMISSIBLE; C" TYPE NOT PERMITTED ON JOISTS. PROVIDE RISER CLAMPS FOR EACH RISER AT EACH FLOOR.
SUPPLY SFU DFU
SIZE: SIZE: SIZE: SFU SFU HOT SOFT WATER PIPING (HSW)
USE TRAPEZE HANGERS WHERE A GROUP OF PIPING CAN BE INSTALLED. SIZE:
4 ALL PLUMBING WORK SHALL BE INSTALLED SO AS TO AVOID INTERFERENCE WITH ELECTRICAL EQUIPMENT, MECHANICAL EQUIPMENT AND DECK PLATE CLEANOUT, SIOUX CHIEF MANUFACTURING #834-4PNR "FINISH LINE" ADJUSTABLE ON-GRADE DECK PLATE HIGH PRESSURE SPRAYER PIPING (HP SPRAY)
STRUCTURAL FRAMING, SKYLIGHTS, ETC. VENT PIPING (V)
SECTION 221000 - VALVES CLEANOUT. BODY SHALL BE CONSTRUCTED OF PVC WITH NICKEL BRONZE TOP AND SHALL FEATURE A 4" SOLVENT WELD
DPCO --- --- --- 4" 3 0 0 0 0
A. BALL VALVES 4 INCHES AND UNDER SHALL BE LEAD FREE, TWO PIECE, BRASS BODY, FULL PORT WITH HARD CHROME PLATED BRASS BALL. WATTS CONNECTION. SANITARY OR WASTE PIPING
5 COORDINATE ALL LOCATIONS, SIZES AND ELEVATIONS OF ALL SLEEVES THROUGH WALLS, BEAMS, SLABS AND FOOTING WITH STRUCTURAL AND LFFBV-3C SERIES. (SAN or W)
ARCHITECTURAL DRAWINGS. FLOOR DRAIN, SIOUX CHIEF MFG "FINISH LINE" #832-xPNR ON GRADE DRAIN WITH SCHEDULE 40 PVC HUB CONNECTION.
FD-A --- --- 2" 4" 6 0 0 0 36 NATURAL GAS PIPING (G)
PROVIDE WATERLESS TRAP SEAL MAINTENANCE DEVICE AT EACH LOCATION.
B. CHECK VALVES 2-1/2 IN. AND LARGER SHALL BE LEAD-FREE BRASS BODY, THREADED BONNET, BRASS DISC, 200 PSI MILWAUKEE UP967. CHECK
6 BEFORE FABRICATION OR INSTALLATION, THE CONTRACTOR SHALL VERIFY EXACT LOCATIONS OF ALL MECHANICAL EQUIPMENT AND EQUIPMENT VALVES 2 IN. AND SMALLER SHALL BE SILICON BRONZE ALLOY, Y-PATTERN, SWING CHECK, 200 PSI NON-SHOCK COLD WORKING PRESSURE. LAVATORY, AMERICAN STANDARD #0355.027 "LUCERNE" WALL HUNG VITREOUS CHINA LAVATORY WITH MOEN #8800 DOUBLE INDIRECT WASTE PIPING (IW) 11 COMFORT STREET
PROVIDED UNDER ANOTHER SECTION OF SPECIFICATIONS. EXACT ROUGH-IN LOCATIONS AND REQUIREMENTS SHALL BE COORDINATED IN FIELD. SCREWED ENDS, NIBCO T-413-Y-LF, THREADED ENDS, NIBCO S-413-Y-LF. WRIST BLADE HANDLE FAUCET, CHROME PLATED ANGLE SHUTOFF VALVES, RISER TUBES, TAILPIECE, P-TRAP ASSEMBLY, AND DIRECTION OF FLOW ROCHESTER, NEW YORK 14620
LAV 1/2" 1/2" 1 1/2" 1 1/2" 1 1.5 1.5 2 1 585-232-2800
GRID STRAINER WASTE ASSEMBLY. PROVIDE TRAP AND SUPPLY INSULATION KIT AT LOCATIONS DESIGNATED AS ACCESSIBLE ON
7 PIPING SUPPORTS. ALL PIPING TO BE SUPPORTED WITH HANGERS AND BRACKETS WHICH PROVIDE ISOLATION FROM FRAMING. EXISTING PIPING
C. BALANCING VALVES SHALL BE LEAD FREE CALIBRATED BALANCE VALVE WITH FACTORY PRE-SET FLOWRATE LIMIT OVER CONTROL RANGE. VALVE ARCHITECTURAL PLANS. THESE DOCUMENTS AND ALL IDEAS,
SHALL HAVE INTERNAL SEALS. VALVES SHALL BE STAINLESS STEEL, WITH A NICKEL PLATED BRASS COLLAR. BALANCE VALVES SIZES SHALL BE WATER CLOSET, AMERICAN STANDARD #2467.100 "CADET FLOWISE" FLOOR MOUNT VITREOUS CHINA 1.1 GPF WATER CLOSET PIPING TO BE REMOVED ARRANGEMENT, DESIGNS AND PLANS INDICATED
8 ALL FLOOR AND WALL PENETRATIONS MUST BE SEALED WATERTIGHT AND VERMIN PROOF. FACTORY PRE-SET AND SUITABLE FOR DIFFERENTIAL CONTROL RANGES OF 2-32 OR 5-60 PSI. DESIGN EQUIPMENT EQUAL TO VICTAULIC ICSS, TA THEREON OR PRESENTED THEREBY ARE OWNED
SERIES 76X.
WC WITH CHROME PLATED ANGLE SHUTOFF VALVE, RISER TUBE, WAX RING, HOLD DOWN BOLTS, AND OPEN FRONT SEAT LESS 1/2" --- 2" 4" 1 5 0 5 4
AND REMAIN THE PROPERTY OF KENNEDY
COVER. INSTALL PER ACCESSIBILITY REQUIREMENTS PIPING SYMBOLS MECHANICAL INC. AND NO PART THEREOF SHALL BE
9 EXACT LOCATIONS AND MOUNTING HEIGHTS OF PLUMBING FIXTURES SHALL BE OBTAINED FROM THE ARCHITECTURAL DRAWINGS.
D. HOSE THREAD DRAIN VALVES SHALL BE LEAD-FREE BRONZE BODY WITH INTERCHANGEABLE SOLID BRONZE WEDGE AND SCREWED-IN BONNET, WITH FIXTURE TOTALS : 11 11 6.5 1.5 7 41 SYMBOL DESCRIPTION UTILIZED BY ANY PERSON, FIRM, OR CORPORATION
HOSE THREAD END, BRASS CAP AND CHAIN, 600# WOG, 200 PSI, MILWAUKEE BA-100H FNPT X MALE HOSE OR BA-150H SOLDERED X MALE HOSE. FOR ANY PURPOSE WHATSOEVER EXCEPT WITH THE
10 SEE ARCHITECTURAL DRAWINGS FOR HANDICAP FIXTURE LOCATIONS AND MOUNTING HEIGHTS. INSULATE ALL EXPOSED HOT WATER AND DRAIN NOTE: ALL FIXTURES SUBJECT TO OWNER/ESTIMATOR REVIEW AND APPROVAL. ELBOW UP, ELBOW DOWN
BALL VALVE WITH BRASS CAP AND CHAIN ON HOSE END. SPECIFIC WRITTEN PERMISSION OF KENNEDY
PIPING BELOW HANDICAP LAVATORIES AND SINKS WITH INSULATING WRAP AND OFFSET P-TRAP AGAINST WALL. ALL FLUSH VALVES FOR HANDICAP
SHALL BE LOCATED ON HANDICAP WHEELCHAIR ACCESS SIDE OF STALL.
DROP CONNECTION MECHANICAL INC. ALL RIGHTS RESERVED.
SECTION 221900 - PLUMBING IDENTIFICATION ROLL DOWN
11 ALL CLEANOUTS SHALL BE INSTALLED WHERE READILY ACCESSIBLE. THE CONTRACTOR SHALL COORDINATE ALL CLEANOUT LOCATIONS OF A. PROVIDE THERMAL TRANSFER PRINTED SELF-ADHERING TYPE MARKERS WITH DIRECTIONAL FLOW ARROWS, AND UV RESISTANCE. MAKE: CREATIVE PIPING AND FIXTURE ACCESSORY SCHEDULE
SAFETY SUPPLY LABELTAC" TYPE PIPE MARKERS. "
P-TRAP
EQUIPMENT, CABINETS, ETC., WITH THE ARCHITECT PRIOR TO ANY INSTALLATION. TAG: MANUFACTURER: MODEL: SIZE: DESCRIPTION:
CLEANOUT (CO)
BALL VALVE WATTS LFFBV-3C AS INDICATED LEAD-FREE FULL PORT BALL VALVE
12 PLUMBING CONTRACTOR SHALL COORDINATE COMPLETE PLUMBING INSTALLATION AND REQUIREMENTS PRIOR TO SUBMITTING BID WITH ALL LOCAL SECTION 222500 - INSULATION CAP OR PLUG
DISTRICTS AND GOVERNING AUTHORITIES. INCLUDE ALL FINDINGS WITHIN THE BASE BID. A. REFER TO INSULATION SCHEDULE. CHECK VALVE VIEGA 2974ZL AS INDICATED LEAD-FREE SPRING CHECK VALVE
RPZ WATTS 957 4" REDUCED PRESSURE ZONE PRINCIPLE BACKFLOW PREVENTOR ASSEMBLY. INSTALL PER DOH UNION
13 PROVIDE ALL WORK IN COMPLIANCE WITH ALL LOCAL, STATE AND FEDERAL CODES. OBTAIN ALL REQUIRED PERMITS. B. INSULATE PIPING SYSTEMS INCLUDING FITTINGS, VALVES, FLANGES, UNIONS, STRAINERS, AND OTHER ATTACHMENTS INSTALLED IN PIPING SYSTEM, APPROVED SUBMISSION. FLOOR DRAIN (FD)
WHETHER EXPOSED OR CONCEALED. HB HOSE BIBB
14 FIELD VERIFY EXACT LOCATION, COMPOSITION AND CONDITION OF ALL PIPING, VALVES AND SYSTEMS AS REQUIRED FOR WORK OF THE CONTRACT.
C. PIPING IN EXTERIOR WALLS, SPACES, OVERHANGS, ATTICS, OR WHERE SUBJECT TO FREEZING: INSULATE PIPE WITH DOUBLE THE THICKNESS CALLED
SHUT OFF VALVE
15 PROVIDE ALL REQUIRED EXCAVATION, BACKFILL AND COMPACTION FOR ALL UNDERGROUND WORK. FOR. PIPING IN WALL CHASES: IN ADDITION TO THE ABOVE, PACK CHASE WITH LOOSE GLASS FIBER INSULATION. PLUMBING PUMP SCHEDULE CHECK VALVE
TAG: MANUFACTURER: MODEL: FLUID: GPM: HEAD (FT): VOLTS: AMPS: PH: HP: DESCRIPTION:
D. INSULATE DOMESTIC WATER PIPING PER IECC REQUIREMENTS.
16 REFER TO ARCHITECTURAL DRAWINGS AND THE PROJECT SPECIFICATIONS FOR PROJECT PHASING REQUIREMENTS. BP GRUNDFOS CRE 20-2 WATER 100 80 208 10.35 3Ø 5 VERTICAL MULTISTAGE CENTRIFUGAL PUMP WITH 30 GALLON ABBREVIATIONS AND TAGS
SECTION 224100 - WATER SUPPLY
EXPANSION TANK, PRESSURE SENSORS, AND INTEGRAL PUMP SYMBOL DESCRIPTION
17 WHERE PIPING IS LOCATED OVER FOOTINGS AND/OR OTHER UNDERGROUND STRUCTURES, ROLL DOWN AS REQUIRED TO CONNECT TO SYSTEMS CONTROLLER.
NOTED. PROVIDE ALL REQUIRED OFFSETS, FITTINGS AND CONNECTIONS. A. TESTING AND FLUSHING AFF ABOVE FINISHED FLOOR
BV BALL VALVE
18 PROVIDE BALANCING VALVE ARRANGEMENTS AT EACH LOCATION WHERE MULTIPLE RISERS OR HORIZONTAL LOOPS INTERSECT. a. PROVIDE ALL NECESSARY ITEMS TO COMPLETE PROPER TESTING OF ALL DOMESTIC WATER PIPING. ISOLATE EXISTING SYSTEMS AS REQUIRED.
COTG CLEAN OUT TO GRADE
19 PITCH ALL SANITARY, WASTE AND STORM PIPING AS FOLLOWS: PIPING 2 1/2 AND SMALLER, PITCH AT 2 PERCENT (1/4" PER FOOT) MINIMUM, PIPING 4" b. FLUSH ALL WATERPIPING TO REMOVE DEBRIS, SEDIMENT, DIRT, RUST, CORROSION AND OTHER FOREIGN MATERIAL. UTILIZE OPEN PIPE ENDS DOMESTIC WATER HEATER SCHEDULE (E) EXISTING
AND LARGER, PITCH AT 1 PERCENT (1/8" PER FOOT) MINIMUM. WHEREVER POSSIBLE. WH BTU VENT PIPE H&C CONN.
TAG: MANUFACTURER: MODEL: WH WIDTH: VOLTS: AMPS: PH: WATTS: DESCRIPTION: EC ELECTRICAL CONTRACTOR
HEIGHT: INPUT: SIZE: SIZE: ERL EXISTING TO RELOCATE
20 COORDINATE PLUMBING SYSTEMS WITH WORK OF ALL OTHER TRADES PRIOR TO ANY FABRICATION OR INSTALLATION. c. CERTIFY IN WRITING THAT ALL REQUIRED DOMESTIC WATER TESTS HAVE BEEN CONDUCTED AND SUCCESSFULLY COMPLETED. SUBMIT ALL
CERTIFICATIONS TO THE OWNER'S REPRESENTATIVE. IWH-A NAVIEN NPE-210A 1'6" 2'5" 180,000 2" 3/4" 110 1.82 1Ø 200 CONDENSING TANKLESS WATER HEATER
ETR EXISTING TO REMAIN
IWH-B EEMAX INC. SPEX35 5-1/4" 9-3/4" --- --- 3/8" 240 15 1Ø 3500 ELECTRIC TANKLESS WATER HEATER
21 COORDINATE LOCATIONS OF ALL ROOF OPENINGS WITH STRUCTURAL, MECHANICAL, AND ARCHITECTURAL PLANS PRIOR TO ANY INSTALLATION. FD FLOOR DRAIN
SECTION 224110 - WASTE WATER SYSTEM
A. INTERIOR PIPING INSTALLATION: FPC FIRE PROTECTION CONTRACTOR
22 COORDINATE ALL VENT TERMINATIONS ABOVE ROOF WITH HVAC CONTRACTOR. ALL VENT TERMINATIONS ABOVE ROOF SHALL BE A MINIMUM 10'-0
(COMMERCIAL) AND 25'-0" (HEALTHCARE) AWAY FROM ANY HVAC OUTSIDE AIR INTAKE (ROOFTOP UNIT, LOUVER, ETC). OR AT LEAST 3 FEET ABOVE FS FLOOR SINK
WINDOW, DOOR, OPENING, AIR INTAKE OR VENT SHAFT. a. MINIMUM PITCH: PIPING 3 INCHES AND UNDER - 1/4 INCH PER FOOT, 4 INCHES AND LARGER - 1/8 INCH PER FOOT.
GC GENERAL CONTRACTOR
23 PROVIDE SCHEDULE 40 PIPE SLEEVES FOR ALL UNDERGROUND PIPING PASSING THROUGH OR UNDER FOOTINGS, WALLS, FOUNDATION WALLS, b. URINAL WASTE: COPPER IS NOT ALLOWED. PIPING MATERIAL TABLE LAV LAVATORY
SLABS FLOORS AND/OR UNDERGROUND STRUCTURES. REFER TO THE PROJECT SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. SERVICE PIPE MATERIALS FITTINGS CONNECTIONS MC MECHANICAL CONTRACTOR
c. THERMOPLASTIC SEWER PIPE:
DOMESTIC WATER INTERIOR CPVC TUBE PRESSURE PATTERN HUBBED SOLVENT SOCKET WELDED NTS NOT TO SCALE
24 PLATFORMS, CURBS, AND FLUSHINGS FOR PLUMBING EQUIPMENT SHALL BE AS INDICATED ON THE STRUCTURAL AND ARCHITECTURAL PLANS,
PIPING
UNLESS NOTED OTHERWISE, COORDINATE EXACT SIZES OF REQUIRED OPENINGS AND SUPPORTS FOR FURNISHED EQUIPMENT. · 1. PROTECT PLASTIC PIPES PASSING THROUGH CONCRETE FLOORS WITH ONE HALF INCH (1/2 IN.) OF INSULATION MATERIAL INSIDE SLEEVE.
PC PLUMBING CONTRACTOR
DOMESTIC WATER INTERIOR CPVC TUBE PRESSURE PATTERN GROOVED GROOVED MECHANICAL JOINT
PIPING SK SINK
25 MAINTENANCE LABEL SHALL BE AFFIXED TO ALL PLUMBING EQUIPMENT AND A MAINTENANCE MANUAL SHALL BE PROVIDED TO OWNER'S DOMESTIC WATER INTERIOR PEX TUBING ENGINEERED POLYMER / CRIMPED / EXPANSION
· 2. FIRE WALLS SHALL NOT BE PENETRATED BY PLASTIC PIPE. PIPING LEAD-FREE BRASS VTR VENT THROUGH ROOF
REPRESENTATIVE.
DOMESTIC WATER INTERIOR TYPE L COPPER TUBE WROT COPPER LEAD-FREE SOLDER
· 3. PIPE SHALL NOT BE INSTALLED WHEN THE TEMPERATURE IS BELOW 20 DEGREES F. PIPING WC WATER CLOSET
26 ALL HOSE BIBBS, WALL HYDRANTS AND MOP SERVICE BASINS SHALL BE EQUIPPED WITH APPROVED, PROPERLY INSTALLED ATMOSPHERIC TYPE WPCO WALL PLATE CLEANOUT Stamp:
VACUUM BREAKERS. INDIRECT WASTE SCHEDULE 40 DWV PVC PIPE DWV PATTERN HUBBED SOLVENT SOCKET WELDED
· 4. INSTALL PIPE ON FIRM, STABLE AND UNIFORM TRENCH BOTTOM AND COMPACTED TO A POINT THREE PIPE DIAMETERS ABOVE THE BOTTOM
OF THE PIPE. BACKFILL TO A DEPTH OF 1 FT. - 0 IN. ABOVE THE TOP OF THE PIPE SHALL BE FREE OF STONES GREATER THAN 1 IN. DIAMETER.
REMOVAL KEYNOTE
NATURAL GAS (ABOVE GRADE) CORRUGATED STAINLESS STEEL THREADED BRASS X MATING THREADED AND INTERLOCKED
27 COORDINATE WITH ELECTRICAL TRADE PRIOR TO ORDERING ELECTRICALL OPERATED EQUIPMENT FOR AVAILABLE VOLTAGES AT EQUIPMENT TUBING PROPRIETARY LOCK (PROPRIETARY)
LOCATIONS. NATURAL GAS (ABOVE GRADE) SCHEDULE 40 A53 STEEL PIPE 2" AND SMALLER MALLEABLE IRON, SCREWED (THREADED) AND INSTALLATION KEYNOTE
· 5. WHEN USED FOR INSIDE RAIN LEADER PIPING, A FIVE FOOT MINIMUM HORIZONTAL OFFSET MADE AT A 90 DEGREE ANGLE SHALL BE 2 1/2" AND OVER BUTT WELD WELDED
INSTALLED BETWEEN THE ROOF DRAIN AND THE VERTICAL RAIN LEADER. NATURAL GAS (ABOVE GRADE) SCHEDULE 40 A53 STEEL PIPE VIEGA MEGAPRESS G (2" AND COLD PRESS CONNECTION POINT OF DISCONNECTION
28 PIPE SIZE DISCREPANCIES BETWEEN FLOOR PLANS AND RISER DIAGRAMS LARGER PIPE SIZE INDICATED WILL TAKE PRECEDENCE. SMALLER)
-3'-4 1/2" ELEVATION
B. TESTING -3'-6 1/2" -FRACTIONAL, REFERENCING PLAN LEVEL
29 THESE PLANS INDICATE APPROXIMATE ROUGH-INS ONLY FOR EQUIPMENT NOT IN THIS SECTION (N.I.T.S.) EXACT ROUGH-IN DIMENSIONS MUST BE NATURAL GAS (BURIED) POLYETHYLENE TUBE SOCKETED POLYETHYLENE SELF-LOCKING SOCKET OR
OBTAINED FROM THE EQUIPMENT MANUFACTURER. THERMAL FUSED -TOP NUMBER DENOTES TOP OF ITEM
a. PROVIDE NECESSARY ITEMS TO COMPLETE PROPER TESTING OF WORK. -BOTTOM NUMBER DENOTES BOTTOM OF ITEM
SANITARY DWV (ABOVE GRADE) SCHEDULE 40 DWV PVC PIPE DWV PATTERN HUBBED SOLVENT SOCKET WELDED  688.42
30 ALL VALVES, UNIONS, ETC. TO BE SAME SIZE AS PIPE UNLESS OTHERWISE INDICATED ON DRAWINGS. ELEVATION
688.42 -GEOGRAPHIC, REFERENCING SEA LEVEL
b. TEST ALL SECTIONS OF STORM, SANITARY, WASTE AND VENT PIPING INSTALLED BY THIS PROJECT
SANITARY DWV (BURIED) SCHEDULE 40 DWV PVC PIPE DWV PATTERN HUBBED SOLVENT SOCKET WELDED -TOP NUMBER DENOTES TOP OF ITEM
31 UNIONS SHALL BE PROVIDED AND INSTALLED AFTER EACH SCREW-TYPE VALVE AND PRIOR TO EQUIPMENT CONNECTIONS. -BOTTOM NUMBER DENOTES BOTTOM OF ITEM
c. MAINTAIN 10 FEET HEAD OF WATER ABOVE HIGHEST POINT OF SECTION BEING TESTED FOR SIX HOURS. STORM WATER (ABOVE GRADE) SCHEDULE 40 DWV PVC PIPE DWV PATTERN HUBBED SOLVENT SOCKET WELDED
1 / P000 VIEW REFERENCE (DETAIL #/ PAGE NUMBER)
32 THE PLUMBING CONTRACTOR SHALL COORDINATE ALL REQUIREMENTS FOR ALL POINTS OF CONNECTION WITH THE GENERAL CONTRACTOR AND STORM WATER (BURIED) SCHEDULE 40 DWV PVC PIPE DWV PATTERN HUBBED SOLVENT SOCKET WELDED
OTHER TRADES PRIOR TO BID. d. FOR NEW INTERIOR PIPING, LEAKS OF ANY VOLUME DETECTED IN SEWERS OR IN FLOORS OR WALLS OF APPURTENANT STRUCTURES SHALL BE
PERMANENTLY STOPPED. SHOULD ANY LEAKS, DEFECTIVE JOINTS OR DEFECTIVE CONSTRUCTION BE FOUND, THEY SHALL BE PROMPTLY MADE GOOD. SUMP PUMP DISCHARGE SCHEDULE 40 DWV PVC PIPE DWV PATTERN HUBBED SOLVENT SOCKET WELDED
SHOULD ANY DEFECTIVE PIPES OR SPECIALS BE DISCOVERED, THEY SHALL BE REMOVED AND REPLACED WITH SOUND PIPES OR SPECIALS IN A
33 CONTRACTOR SHALL PROVIDE ALL VALVES AS REQUIRED BY STATE AND LOCAL CODES. SATISFACTORY MANNER AT THE CONTRACTOR'S EXPENSE. WATER SERVICE DUCTILE IRON WITH CEMENT BELL & SPIGOT MECHANICAL OR WITH GROOVED
LINING RUBBER GASKET
Client:
34 PROVIDE TEST TEES AT THE BASE OF ALL STORM, SANITARY, AND WASTE STACKS. e. PROVIDE WRITTEN CERTIFICATION THAT TESTS HAVE BEEN CONDUCTED AND SUCCESSFULLY COMPLETED. SUBMIT TO OWNER'S Royal Car Wash
REPRESENTATIVE.
35 MINIMUM SIZE OF SANITARY/WASTE PIPING BELOW SLAB SHALL BE 2".
SECTION 229900 - ADJUSTING AND BALANCING
36 PROVIDE FLOOR DRAIN TRAP SEALER ON ALL FLOOR DRAINS AS SPECIFIED. 1 ADJUSTING AND BALANCING SHALL BE ACCOMPLISHED AS SOON AS THE SYSTEMS ARE COMPLETE AND BEFORE OWNER TAKES POSSESSION.
2851 Monroe Avenue
Rochester, NY 14618
37 PLUMBING SYSTEMS AND ALL COMPONENTS THAT ARE DESIGNED AND/OR INTENDED TO DELIVER POTABLE WATER FOR HUMAN CONSUMPTION 2 PRIOR TO BALANCING ADJUST BALANCING DEVICES FOR FULL FLOW; FILL, VENT AND CLEAN PLUMBING SYSTEMS, CLEAN ALL FOULED STRAINERS.
SHALL BE THIRD-PARTY TESTED AND CERTIFIED AS "LEAD FREE" FOR NOT EXCEEDING THE MAXIMUM ALLOWABLE LEAD CONTENT PER THE NSF/ANSI
372 STANDARD.
3 INITIAL ADJUSTMENT AND BALANCING TO QUANTITIES AS CALLED FOR OR AS DIRECTED BY THE ENGINEER, TO SATISFY JOB CONDITIONS.

38 ALL EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE EQUIPMENT MANUFACTURER'S RECOMMENDATIONS AND APPLICABLE
CODES, PROVIDE ALL FITTINGS, VALVES, AND OTHER DEVICES REQUIRED FOR A COMPLETE WORKABLE INSTALLATION.
5 TEST, ADJUST AND RECORD THE FOLLOWING: HOT WATER RE-CIRCULATING AND CIRCULATION PUMPS: CHECK ROTATION, GPM, RUNNING SUCTION
PRESSURE, RUNNING DISCHARGE PRESSURE, RUNNING LOAD AMPS, RPM - MOTOR, COMPLETE NAMEPLATE MOTOR AND PUMP.
Passero Associates
242 West Main Street, Suite 100 (585) 325-1000
Rochester, NY 14614 Fax: (585) 325-1691
39 INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS, TRAPS, FLANGES AND OTHER APPURTENANCES REQUIRING ACCESS ARE ACCESSIBLE.
Project Manager Peter Wehner, AIA
Project Architect Timothy Geier, AIA
SECTION 220100 - BASIC PLUMBING REQUIREMENTS Designer
A. TEST ALL PIPING PER ALL APPLICABLE CODES AND STANDARDS.
No. Date By Description
B. ALL WORK SHALL CONFORM TO ALL APPLICABLE CODES AND STANDARDS.

C. PROVIDE FIRESTOPPING AT ALL FIRE AND SMOKE WALL PENETRATIONS. COMMERCIAL PIPE INSULATION REQUIREMENTS:
C404.4 Insulation of piping. Piping from a water heater to the termination of the heated water fixture supply pipe shall be
D. APPLY AND INSTALL MATERIALS, EQUIPMENT, AND SPECIALTIES IN ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS. CONFLICTS insulated in accordance with Table C403.2.10. On both the inlet and outlet piping of a storage water heater or heated water
storage tank, the piping to a heat trap or the first 8 feet (2438 mm) of piping, whichever is less, shall be insulated. Piping
BETWEEN THE MANUFACTURER'S INSTRUCTIONS AND THE CONTRACT DOCUMENTS SHALL BE REFERRED TO THE OWNER'S REPRESENTATIVE FOR that is heat traced shall be insulated in accordance with Table C403.2.10 or the heat trace manufacturer’s instructions. Tubular pipe
RESOLUTION. insulation shall be installed in accordance with the insulation manufacturer’s instructions. Pipe insulation shall be continuous except where
the piping passes through a framing member. The minimum insulation thickness requirements of this section shall not supersede any

E. THE DRAWINGS ARE DIAGRAMMATIC, UNLESS DETAILED DIMENSIONED DRAWINGS ARE INCLUDED. DRAWINGS SHOW APPROXIMATE LOCATIONS OF
greater insulation thickness requirements necessary for the protection of piping from freezing temperatures or the protection of personnel
against external surface temperatures on the insulation.
COMMERCIAL HOT WATER PIPING MAXIMUM LENGTH REQUIREMENTS:
EQUIPMENT, AND FIXTURES. Exception: Tubular pipe insulation shall not be required
on the following: C404.5 Efficient heated water supply piping. Heated water supply piping shall be in accordance with Section C404.5.1
1. The tubing from the connection at the termination of the fixture supply piping to a plumbing fixture or or C404.5.2. The flow rate through 1/4-inch (6.4 mm) piping shall be not greater than 0.5 gpm (1.9 L/m). The flow rate UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING
F. DUE TO SMALL SCALE OF DRAWINGS, IT IS NOT POSSIBLE TO INDICATE ALL OFFSETS, FITTINGS, CHANGES IN ELEVATION, ETC. VERIFY FINAL LOCATIONS plumbing appliance. through 5/16-inch (7.9 mm) piping shall be not greater than 1 gpm (3.8 L/m). The flow rate through 3/8-inch (9.5 mm) piping shall be not IS IN VIOLATION OF STATE EDUCATION LAW ARTICLE 145
FOR ROUGH-INS WITH FIELD MEASUREMENTS AND WITH THE EQUIPMENT BEING CONNECTED. VERIFY EXACT LOCATION AND ELEVATIONS AT WORK 2. Valves, pumps, strainers and threaded unions in piping that is 1 inch (25 mm) or less in nominal diameter. greater than 1.5 gpm (5.7 L/m). SECTION 7209 AND ARTICLE 147 SECTION 7307, THESE PLANS
SITE PRIOR TO ANY ROUGH IN WORK. DO NOT SCALE PLANS. IF FIELD CONDITIONS, DETAILS, CHANGES IN EQUIPMENT OR SHOP DRAWING 3. Piping from user-controlled shower and bath mixing valves to the water outlets. C404.5.1 Maximum allowable pipe length method. The maximum allowable piping length from the nearest source REQUIRED IECC COMPLIANCE ARE COPYRIGHT PROTECTED. ©

INFORMATION REQUIRE A SIGNIFICANT CHANGE TO THE ORIGINAL DOCUMENTS, CONTACT THE OWNER'S REPRESENTATIVE FOR APPROVAL BEFORE
4. Cold-water piping of a demand recirculation water system.
5. Tubing from a hot drinking-water heating unit to the water outlet.
RESIDENTIAL PIPE INSULATION REQUIREMENTS: of heated water to the termination of the fixture supply pipe shall be in accordance with the following. Where the
piping contains more than one size of pipe, the largest size of pipe within the piping shall be used for determining the CODE SECTION COMPLIANCE
PROCEEDING. ALL EQUIPMENT LOCATIONS SHALL BE COORDINATED WITH OTHER TRADES TO ELIMINATE INTERFERENCE WITH REQUIRED 6. Piping at locations where a vertical support of the piping is installed. R403.5.3 Hot water pipe insulation (Prescriptive). Insulation maximum allowable length of the piping in Table C404.5.1.
CLEARANCES FOR EQUIPMENT MAINTENANCE AND INSPECTIONS. 7. Piping surrounded by building insulation with a thermal resistance (R-value) of not less than R-3. for hot water piping with a thermal resistance, Rvalue, 1. For a public lavatory faucet, use the “Public lavatory faucets” column in Table C404.5.1. C103.2.1 REFERENCE MECHANICAL AND PLUMBING DOCUMENTS FOR DUCT
TABLE C403.2.10
MINIMUM PIPE INSULATION THICKNESS (IN INCHES) (a,c)
of not less than R-3 shall be applied to the following:
1. Piping 3/4 inch (19.1 mm) and larger in nominal
2. For all other plumbing fixtures and plumbing appliances, use the “Other fixtures and appliances” column in Table C404.5.1.
C404.5.2 Maximum allowable pipe volume method.
AND PIPE INSULATION MATERIALS, FOR ALL OTHER INSULATION
MATERIALS ARCHITECTURAL DOCUMENTS GENERAL NOTES,
G. PROVIDE REQUIRED SUPPORTS, BEAMS, ANGLES, HANGERS, RODS, BASES, BRACES, AND OTHER ITEMS TO PROPERLY SUPPORT CONTRACT WORK. diameter. The water volume in the piping shall be calculated in accordance with Section C404.5.2.1. Water heaters, circulating C103.2.5 REFERENCE MECHANICAL AND PLUMBING DOCUMENTS FOR

FLUID OPERATING
INSULATION CONDUCTIVITY
NOMINAL PIPE OR TUBE SIZE
(inches)
2. Piping serving more than one dwelling unit.
3. Piping located outside the conditioned space.
water systems and heat trace temperature maintenance systems shall be considered sources of heated water.
The volume from the nearest source of heated water to the termination of the fixture supply pipe shall be as follows: C103.2.9
EQUIPMENT TYPES, SIZES AND EFFICIENCIES
REFERENCE MECHANICAL AND PLUMBING SPECIFICATIONS FOR
LEGEND,
H. PLUMBING SYSTEMS AND ALL COMPONENTS THAT ARE DESIGNED AND/OR INTENDED TO DELIVER POTABLE WATER FOR HUMAN CONSUMPTION 4. Piping from the water heater to a distribution manifold. 1. For a public lavatory faucet: not more than 2 ounces (0.06 L). SEALING AND INSULATION LOCATIONS
SHALL BE THIRD-PARTY TESTED AND CERTIFIED AS "LEAD FREE" FOR NOT EXCEEDING THE MAXIMUM ALLOWABLE LEAD CONTENT PER THE NSF/ANSI
372 STANDARD.
TEMPERATURE
RANGE AND USAGE
Conductivity Mean Rating
1 to 11/2
<
5. Piping located under a floor slab.
6. Buried piping.
2. For other plumbing fixtures or plumbing appliances; not more than 0.5 gallon (1.89 L).
C404.5.2.1 Water volume determination. The volume shall be the sum of the internal volumes of pipe, fittings, valves, meters and
C303.3 OPERATION AND MAINTENANCE MANUAL SHALL BE PROVIDED TO
OWNER BY CONTRACTOR FOR ALL EQUIPMENT
SCHEDULES -
to 4 to 7. Supply and return piping in recirculation systems manifolds between the nearest source of heated water and the termination of the fixture supply pipe. The volume in the piping shall be
Btu · in./(h · ft2 · °F)b
I. INCLUDE IN BID ALL LABOR, MATERIALS, TOOLS, PLANT, TRANSPORTATION, EXCAVATION, EQUIPMENT, INSURANCE, PERMITS, AND ALL NECESSARY
(°F) Temperature, °F < 1 11/2 < 4 < 8 ≤ 8 other than demand recirculation systems. determined from the “Volume” column in Table C404.5.1. The volume contained within fixture shutoff valves, within flexible water supply
connectors to a fixture fitting and within a fixture fitting shall not be
C403.2.10 ALL PIPING INSULATION CRITERIA HAS BEEN MET, REFERENCE
MECHANICAL / PLUMBING DOCUMENTS PLUMBING
> 350 0.32 – 0.34 250 4.5 5 5 5 5 included in the water volume determination. Where heated water is supplied by a recirculating system or heat-traced piping, the volume C403.2.11 MECHANICAL SYSTEMS SHALL BE COMMISSIONED AS REQUIRED
AND RELATED ITEMS REQUIRED TO PROVIDE COMPLETE AND OPERATIONAL SYSTEMS SHOWN AND DESCRIBED. shall include the portion of the fitting on the branch pipe that supplies water to the fixture. C404.2 ALL WATER HEATING EQUIPMENT MEETS OR EXCEEDS MINIMUM
251 – 350 0.29 – 0.32 200 3 4 4.5 4.5 4.5
TABLE C404.5.1 EFFICIENCIES, REFERENCE PLUMBING DOCUMENTS
SECTION 220150 - EXCAVATION AND BACKFILL 201 – 250 0.27 – 0.30 150 2.5 2.5 2.5 3 3 PIPING VOLUME AND MAXIMUM PIPING LENGTHS C404.4 ALL DOMESTIC HOT WATER PIPING INSULATION CRITERIA HAS BEEN
MET, REFERENCE PLUMBING DOCUMENTS
A. ORDINARY FILL: WELL-GRADED, NATURAL SOIL, MEETING THE FOLLOWING REQUIREMENTS: 141 – 200 0.25 – 0.29 125 1.5 1.5 2 2 2
VOLUME
MAXIMUM PIPING
LENGTH (feet)
Royal Car Wash - Chili Avenue
105 – 140 0.21 – 0.28 100 1 1 1.5 1.5 1.5 NOMINAL (liquid Public Other
PIPE SIZE ounces per
a. FREE OF ORGANIC AND OTHER COMPRESSIBLE MATERIALS, DEBRIS AND FROZEN MATERIALS, AND OF STONES LARGER THAN 4 IN. MAXIMUM lavatory fixtures and
40 – 60 0.21 – 0.27 75 0.5 0.5 1 1 1 (inches) foot length)
faucets appliances
DIMENSION.
< 40 0.20 – 0.26 50 0.5 1 1 1 1.5 1/4 0.33 6 50
Town/City: Gates
5/16 0.5 4 50
b. BE OF SUCH NATURE AND CHARACTER THAT IT CAN BE COMPACTED TO THE SPECIFIED DENSITIES. For SI: 1 inch = 25.4 mm, °C = [(°F) - 32]/1.8. 3/8 0.75 3 50 County: Monroe State:New York
a. For piping smaller than 11/2 inches and located in partitions within conditioned spaces, reduction of these thicknesses by 1 inch shall 1/2 1.5 2 43
be permitted (before Project No.:
c. FREE OF HIGHLY PLASTIC CLAYS, OF MATERIALS SUBJECT TO DECAY, DECOMPOSITION, OR DISSOLUTION, AND OF CINDERS, ASH AND OTHER thickness adjustment required in footnote b) but not to a thickness less than 1 inch. 5/8 2 1 32
CORROSIVE MATERIALS. b. For insulation outside the stated conductivity range, the minimum thickness (T) shall be determined as follows:
T = r{(1 + t/r)K/k – 1}
3/4
7/8
3
4
0.5
0.5
21
16
2019772.0001
where: 1 5 0.5 13
d. MAXIMUM DRY DENSITY OF NOT LESS THAN 115 LBS. PER CU. FT. T = minimum insulation thickness, Drawing No.:
r = actual outside radius of pipe, 1 1/4 8 0.5 8

e. MATERIAL FROM EXCAVATION ON THE SITE MAY BE USED AS ORDINARY FILL IF IT MEETS THE ABOVE REQUIREMENTS.
t = insulation thickness listed in the table for applicable fluid temperature and pipe size,
K = conductivity of alternate material at mean rating temperature indicated for the applicable fluid temperature (Btu · in/h · ft2 · °F) and
k = the upper value of the conductivity range listed in the table for the applicable fluid temperature.
1 1/2
2 or larger
11
18
0.5
0.5
6
4 P000
c. For direct-buried heating and hot water system piping, reduction of these thicknesses by 11/2 inches (38 mm) shall be permitted For SI: 1 inch = 25.4 mm, 1 foot = 304.8 mm,
SECTION 220600 - PIPING SYSTEMS & ACCESSORIES (before thickness adjustment 1 liquid ounce = 0.030 L, 1 gallon = 128 ounces. Date:
A. REFER TO PIPING MATERIAL SCHEDULE. required in footnote b but not to thicknesses less than 1 inch (25 mm).

2
PIPE INSULATION REQUIREMENTS (PER IECC)
1
HOT WATER PIPING MAXIMUM LENGTH REQUIREMENTS (PER IECC) June 25, 2020
15 16 10 7 10

5 4
FD-A

2" V
FD-A 4" W

4" SAN (OI)


3" V

2" V
8 DPCO
6
DPCO 4" SAN (OI) 4" SAN (OI) 6" SAN (OI) 6" SAN (OI) 6" SAN (OI)
FD-A FD-A FD-A
6 8

N
6" SAN (OI)

SA
7 7 7 DPCO

4"
FD-A
14
11 COMFORT STREET
2" SAN 4" SAN 4" SAN 4" SAN 4" SAN 4" SAN
ROCHESTER, NEW YORK 14620
585-232-2800
13 11 9 3
THESE DOCUMENTS AND ALL IDEAS,
ARRANGEMENT, DESIGNS AND PLANS INDICATED

4" SLEEVE
12

6" SAN (OI)


THEREON OR PRESENTED THEREBY ARE OWNED
AND REMAIN THE PROPERTY OF KENNEDY

4" SLEEVE
4" SLEEVE

2" SLEEVE
4" SAN
4" SLEEVE 4" SLEEVE 3 3 MECHANICAL INC. AND NO PART THEREOF SHALL BE

4" SLEEVE
UTILIZED BY ANY PERSON, FIRM, OR CORPORATION

VE
EE
4" SLEEVE

SL
FOR ANY PURPOSE WHATSOEVER EXCEPT WITH THE

4"
SPECIFIC WRITTEN PERMISSION OF KENNEDY
MECHANICAL INC. ALL RIGHTS RESERVED.
3

6" SAN (OI) 8" SLEEVE

4" SLEEVE
3
2

4" SAN 6" SLEEVE

FOUNDATION PLAN - PLUMBING


1
3/16" = 1'-0"
GAS METER (BY
UTILITY CO.)

FLAP GATE WITH


36 35 34 33 18 RODENT SCREEN 18
31 30 29
20

8" IW
1 1/2" C 1 1/2" CSW
FD-A 19
1" G 2" G FLOW

1 1/2" CSW

2" V

2" V
1 1/2" C

4" C
FD-A

3/4" G

2" G
2" G
21 DPCO

1" CA
3" V

FLOW
FLOW 3/4" C 3/4" C 4" C 20

FLOW
DPCO

FLOW
FLOW 3/4" HSW 2" V

FLOW
FD-A FD-A FD-A 21 2
2" G 2" G 2" G 2" G 1" G 1" G

3/4" C
4" C 4" C 4" C 4" C FLOW 3/4" C FLOW P101
FD-A
37 IWH-A IWH-A
1 1/2" HSW 1 1/2" HSW 1 1/2" HSW 1 1/2" HSW FLOW
Stamp:
1 1/2" CSW 1 1/2" CSW 1 1/2" CSW 1" CSW DPCO
39 3
1" G

1 1/2" HSW
1

1 1/2" G

1 1/2" HSW
1 1/2" CSW
1" CA 1" CA 1" CA 1" CA 1" CA 1" CA

1 1/2" HSW

1 1/2" HSW
1 1/2" C

1 1/2" C
1 1/2" C

FLOW
1" C

1" C
3/4" HSW

1/2" CA
1/2" CA

1" CSW

1/2" CA
1" CSW
1" HSW
1/2" CA
1/2" CA

1" HSW
1" CSW
3" V

1/2" CA
3/4" C

1/2" CA
P101

1" G
LAV WC
IWH-B XT
3 1 1/4" C
1" G 1/2" HP SPRAY 1/2" HP SPRAY BP
28 32 27 27 26

3/4" HSW
38 3 24 23 23 23 25 24 23 22 41 23

3/4" C
1" G
17 40 17
23 3 23
1/2" HP SPRAY 1/2" HP SPRAY

20 3 20

6
P101
3/4" HSW
3/4" C

Client:
Royal Car Wash

3/4" HSW
3/4" C
2851 Monroe Avenue
Rochester, NY 14618
17 17
3
1/2" HP SPRAY 1/2" HP SPRAY

40 40 Passero Associates
242 West Main Street, Suite 100 (585) 325-1000
Rochester, NY 14614 Fax: (585) 325-1691

Project Manager Peter Wehner, AIA


Project Architect Timothy Geier, AIA
FIRST FLOOR PLAN - PLUMBING Designer
2
3/16" = 1'-0" No. Date By Description

# FOUNDATION PLUMBING PLAN DRAWING NOTES # FOUNDATION PLUMBING PLAN DRAWING NOTES # FOUNDATION PLUMBING PLAN DRAWING NOTES # FOUNDATION PLUMBING PLAN DRAWING NOTES

1 4" SANITARY SEWER TO SITE - REFER TO CIVIL PLANS FOR CONTINUATION. 14 2" SANITARY UP. 25 DROP 1" COLD SOFT WATER AND 1" HOT SOFT WATER TO CAR WASH PROCESS EQUIPMENT. REFER TO SECTION 35 DROP 1" COMPRESSED AIR TO COMPRESSED AIR DRYER (BY CAR WASH EQUIPMENT VENDOR). PROVIDE SHUTOFF
VIEW AT INTERIOR PROCESS EQUIPMENT WALL. REFER TO SONNY'S CAR WASH EQUIPMENT DRAWINGS FOR VALVE AS POINT OF CONNECTION.
2 6" OIL-LADEN SANITARY TO OIL INTERCEPTOR - REFER TO CIVIL PLANS FOR CONTINUATION. 15 3" VENT UP. DIMENSIONS AND DETAILS.
36 3" VENT DOWN. UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING

3 P.C. TO PROVIDE SLEEVES AS SHOWN FOR CAR WASH PROCESS EQUIPMENT VENDOR CONVENIENCE. REFER TO 16 4" OIL-LADEN SANITARY WITH P-TRAP UP TO STANDPIPE DRAIN. 26 DROP 1" COLD SOFT WATER TO CAR WASH PROCESS EQUIPMENT. REFER TO SECTION VIEW AT INTERIOR IS IN VIOLATION OF STATE EDUCATION LAW ARTICLE 145
SECTION 7209 AND ARTICLE 147 SECTION 7307, THESE PLANS
SONNY'S CAR WASH EQUIPMENT DRAWINGS FOR DIMENSIONS AND DETAILS. PROCESS EQUIPMENT WALL. REFER TO SONNY'S CAR WASH EQUIPMENT DRAWINGS FOR DIMENSIONS AND 37 DROP 1/2" COLD AND 4" SANITARY TO WATER CLOSET. ARE COPYRIGHT PROTECTED. ©
DETAILS.
17 DROP 3/4" COLD, 3/4" HOT SOFT WATER DOWN TO WASHDOWN HOSE CONNECTION. PROVIDE ISOLATION AND
4 4" WATER MAIN TO SITE (BY SITE CONTRACTOR). REFER TO CIVIL PLANS FOR CONTINUATION. CHECK VALVES PER DETAIL 6, SHEET P101. 38 DROP 1/2" HIGH PRESSURE SPRAY WATER PIPING DOWN TO CAR WASH EQUIPMENT. REFER TO SONNY'S CAR
27 DROP 1" COLD WATER TO CAR WASH PROCESS EQUIPMENT. REFER TO SECTION VIEW AT INTERIOR PROCESS
EQUIPMENT WALL. REFER TO SONNY'S CAR WASH EQUIPMENT DRAWINGS FOR DIMENSIONS AND DETAILS.
WASH EQUIPMENT DRAWINGS FOR DIMENSIONS AND DETAILS. FLOOR PLANS -
5 4" WATER MAIN UP (BY SITE CONTRACTOR). 18 2" VENT DOWN.
28 SPILL CONDENSATE DRAINAGE FROM WATER HEATERS THROUGH 2" PHYSICAL AIR GAP TO 4" STANDPIPE DRAIN.
39 DROP 1/2" COLD, 2" WASTE DOWN, AND 2" VENT RISE TO LAVATORY. BRANCH 1/2" COLD TO POINT-OF-USE PLUMBING
6 4" SANITARY WITH P-TRAP UP TO FLOOR DRAIN. 19 4" WATER MAIN DOWN. WATER HEATER. ROUTE 1/2" HOT FROM POINT-OF-USE WATER HEATER TO FAUCET PIPING.

29 DROP 1 1/2" COLD SOFT WATER TO WATER SOFTENER (BY CAR WASH EQUIPMENT VENDOR). PROVIDE SHUTOFF 40 DROP 1/2" HIGH PRESSURE SPRAY WATER PIPING DOWN TO WASH GUN. REFER TO SONNY'S CAR WASH
7 4" OIL-LADEN SANITARY WITH P-TRAP UP TO FLOOR DRAIN. 20 DROP 1" GAS TO UNIT HEATER (BY M.C.). PROVIDE SHUTOFF VALVE, UNION, TEE & DIRT LEG, AND FINAL VALVE AS POINT OF CONNECTION.
CONNECTION TO UNIT. EQUIPMENT DRAWINGS FOR DIMENSIONS AND DETAILS.
8 4" OIL-LADEN SANITARY UP TO DECK PLATE CLEANOUT. 30 PROVIDE NORMALLY CLOSED BYPASS VALVE.
21 4" VENT UP THROUGH ROOF. TERMINATE RISER AT 18" ABOVE ROOF SURFACE. 41 BOOSTER PUMP AND EXPANSION TANK ARE AN ADD ALTERNATE AND SHALL BE PROVIDED IF WATER PRESSURE
DELIVERED TO CAR WASH EQUIPMENT IS DEEMED INSUFFICIENT.
9 4" SANITARY UP TO DECK PLATE CLEANOUT. 31 DROP 1 1/2" COLD WATER TO WATER SOFTENER (BY CAR WASH EQUIPMENT VENDOR). PROVIDE SHUTOFF VALVE
Royal Car Wash - Chili Avenue
22 4" COLD DOWN TO BOOSTER PUMP. PROVIDE NORMALLY CLOSED BYPASS VALVE. BRANCH 1 1/4" ON AS POINT OF CONNECTION.
10 2" VENT UP. DISCHARGE RISER TO ADJACENT EXPANSION TANK. PROVIDE SHUTOFF VALVES, UNIONS, AND PRESSURE
GAUGES ON EACH RISER. REFER TO SECTION VIEW AT INTERIOR PROCESS EQUIPMENT WALL. Town/City: Gates
32 REFER TO ENLARGED SECTION VIEW ON P101 FOR WATER HEATER PIPING ARRANGEMENT.
11 6" OIL-LADEN SANITARY TO TRASH SEPARATOR PIT. REFER TO SONNY'S CAR WASH EQUIPMENT DRAWINGS FOR County: Monroe State:New York
DIMENSIONS AND DETAILS. 23 DROP 1/2" COMPRESSED AIR. PROVIDE SHUTOFF VALVE. REFER TO SONNY'S CAR WASH EQUIPMENT DRAWINGS
FOR DIMENSIONS AND DETAILS. 33 DROP 3/4"GAS TO SNOW MELT BOILER SYSTEM (BY M.C.). PROVIDE SHUTOFF VALVE, UNION, TEE & DIRT LEG, AND Project No.:

FINAL CONNECTION TO UNIT. COORDINATE WITH M.C.


12 4" SANITARY WITH P-TRAP UP TO STANDPIPE DRAIN. GENERAL NOTE:
2019772.0001
24 DROP 1 1/2" COLD AND 1 1/2" HOT SOFT WATER TO VALVED BRANCHES FOR CAR WASH PROCESS EQUIPMENT.
34 4" STANDPIPE DRAIN DOWN. ALL CAR WASH EQUIPMENT WATER
REFER TO SECTION VIEW AT INTERIOR PROCESS EQUIPMENT WALL. REFER TO SONNY'S CAR WASH EQUIPMENT Drawing No.:
INLETS SHALL BE EQUIPPED WITH
13 4" SANITARY UP TO WATER CLOSET. DRAWINGS FOR DIMENSIONS AND DETAILS.
INTEGRAL BACKFLOW PROTECTION P100
FEATURES OR BE PROVIDED WITH
SUCH BY CAR WASH EQUIPMENT Date:

VENDOR
June 25, 2020
"C
3 /4 1" G
3 /4
"C

3/4" C
"C
3 /4

4" V
1" G
1" G
3 /4
"C 2" G

1/2" C
2" V 3" V
1 /2
"C "C
/4 3 /4
3/4" C

1 /2 3 "C
"C
3" V
"C
3 /4

1/2" C

2" V
2" G 11 COMFORT STREET
1" C IWH-A 3" V ROCHESTER, NEW YORK 14620
1" C
585-232-2800

1" C
4" C "G

1/2" C
2" G
3/4

3/4" G
LAV G LAV TO DISTRIBUTION PIPING THESE DOCUMENTS AND ALL IDEAS,
/2"
11

1" C
IWH-B C ARRANGEMENT, DESIGNS AND PLANS INDICATED
/2" -REFER TO FLOOR PLANS

3" V
2" SAN
3/4

1 1/2" G
11 FD-A
"G THEREON OR PRESENTED THEREBY ARE OWNED
1" C 11
/2" 4" C WC AND REMAIN THE PROPERTY OF KENNEDY

4" SAN
WC 1" C G 2" S
AN MECHANICAL INC. AND NO PART THEREOF SHALL BE

1 1/2" C
1" C 4" S DPCO
TEST/CLEANOUT TEE
UTILIZED BY ANY PERSON, FIRM, OR CORPORATION
2" G AN
1" C "C FD-A FOR ANY PURPOSE WHATSOEVER EXCEPT WITH THE
4" C
1/2

3" V
1 4" S SPECIFIC WRITTEN PERMISSION OF KENNEDY

1 1/2" C
AN

4" SAN (OI)


4" SAN (OI) MECHANICAL INC. ALL RIGHTS RESERVED.

1" C
V
3"

1" C

4" SAN
4" C
11
/2 "
C 4" S
AN
C 2" G
/2" C
1 1 1/2" 4" S
1 FD-A

2" G
AN
(OI
)

1 1/2" C

4" SAN (OI)


1 1/2" C
4" C
2" G
2" G
4" S
AN 2" V

4" V
(OI
)
GAS METER (BY 4" C FD-A
UTILITY CO.) 1" G 4" C 2" V
1" G 1" G 2" V

2" V
4" SAN (OI)
1" G 4" C 3/4 N (O
I) 6" S
4" C "C 6 " SA
AN
(OI
1" G )
1" G

4" C
4" C
11

2" V
/4 " "C BALL VALVE TO FACILITATE

1 1/4" C
3/4

4" C
C RPZ
6" S
TEST/CLEANOUT TEE SEASONAL CHANGE

4" C

2" V
AN FD-A
(OI
) (TYPICAL)
XT DPCO

4" SAN (OI)


"C
3/4 TEST/CLEANOUT TEE

3/4" C
V
2" SPRING CHECK VALVE

2" V
FD-A
4" S
V (TYPICAL)

4" SAN (OI)


AN 2" N
A

4" W
BP
4" SAN 4 S
"
DPCO

BOILER DRAIN WITH


AN
4" S I) INTEGRAL VACUUM
4" W N (O
" SA
6 BREAKER AND
3/4" HOSE CONNECTION
(TYPICAL)

FIRST FLOOR
0' - 0"
ISOMETRIC VIEW - DOMESTIC WATER AND NATURAL GAS ISOMETRIC VIEW - DRAIN, WASTE, AND VENT SECTION AT TYPICAL WASHDOWN HOSE Stamp:
4 3 6
1/2" = 1'-0"
# DETAILS AND ENLARGEMENTS DRAWING NOTES # DETAILS AND ENLARGEMENTS DRAWING NOTES # DETAILS AND ENLARGEMENTS DRAWING NOTES

1 DROP 1/2" COMPRESSED AIR. PROVIDE SHUTOFF VALVE. REFER TO SONNY'S CAR 8 STANDPIPE DRAIN TO RECEIVE DISCHARGE FROM AIR COMPRESSORS AND
PROVIDE MASTER HEADER SHUTOFF VALVE, UNION, AND DIRT LEG. WASH EQUIPMENT DRAWINGS FOR DIMENSIONS AND DETAILS. COMPRESSED AIR DRYER. 12 2" NATURAL GAS TO GAS METER (BY UTILITY COMPANY). PROVIDE SHUTOFF VALVE
AT METER. COORDINATE WITH UTILITY COMPANY.
MAIN DISTRIBUTION PIPING
-REFER TO FLOOR PLANS 2 DROP 1 1/2" COLD AND 1 1/2" HOT SOFT WATER TO VALVED BRANCHES FOR CAR 9 PROVIDE 1" VALVE CONNECTION FOR AIR COMPRESSORS AND DRYER (BY CAR WASH
AND ISOMETRIC VIEWS WASH PROCESS EQUIPMENT. REFER TO SONNY'S CAR WASH EQUIPMENT EQUIPMENT VENDOR). 13 PROVIDE INCOMING WATER SERVICE EQUIPMENT PER FINAL APPROVED WATER
DRAWINGS FOR DIMENSIONS AND DETAILS. SERVICE AND BACKFLOW PREVENTION PLAN DOCUMENTS.
ROUTE COMBUSTION AIR 10 DROP 3/4"GAS TO SNOW MELT BOILER SYSTEM (BY M.C.). PROVIDE SHUTOFF VALVE,
INTAKE AND EXHAUST PIPING 3 DROP 1" COLD SOFT WATER AND 1" HOT SOFT WATER TO CAR WASH PROCESS UNION, TEE & DIRT LEG, AND FINAL CONNECTION TO UNIT. COORDINATE WITH M.C. 14 REFER TO FIRST FLOOR PLAN NOTES REGARDING BOOSTER PUMP.
2" G 4" C 1 1/2" HSW 1" CA
THROUGH ROOF PER EQUIPMENT. REFER TO SONNY'S CAR WASH EQUIPMENT DRAWINGS FOR
MANUFACTURER AND DIMENSIONS AND DETAILS. 11 DROP 1 1/2" COLD WATER AND 1 1/2" COLD SOFT WATER TO WATER SOFTENER (BY
CODE REQUIREMENTS CAR WASH EQUIPMENT VENDOR). PROVIDE SHUTOFF VALVE AS POINT OF
4 DROP 1" COLD SOFT WATER TO CAR WASH PROCESS EQUIPMENT. REFER TO CONNECTION. PROVIDE NORMALLY CLOSED BYPASS VALVE. Client:
1 1/2" HSW
1 1/2" CSW

1 1/2" G

IWH-A IWH-A IWH-A IWH-A


SONNY'S CAR WASH EQUIPMENT DRAWINGS FOR DIMENSIONS AND DETAILS. SW
"H
3/4 Royal Car Wash
PROVIDE SHUTOFF VALVE
AND UNION AT SUPPLY CONNECTION
5 DROP 1" COLD WATER TO CAR WASH PROCESS EQUIPMENT. REFER TO SONNY'S CAR
(TYPICAL) 3/4
WASH EQUIPMENT DRAWINGS FOR DIMENSIONS AND DETAILS. GENERAL NOTE: "H
1 1/2" G 1 1/2" G 3/4" G
2851 Monroe Avenue

3/4" HSW
SW SW
3/4" HSW

3/4" CSW

"H
ALL CAR WASH EQUIPMENT WATER 3/4

INLETS SHALL BE EQUIPPED WITH


Rochester, NY 14618
1 1/2" HSW 1 1/2" HSW 1 1/2" HSW 3/4" HSW 6 PROVIDE 1/2" STAINLESS STEEL PIPING FOR HIGH PRESSURE SPRAY GUNS. REFER TO
1 1/2" CSW 1 1/2" CSW 1 1/2" CSW 3/4" CSW
3/4" HOT AND COLD SOFT WATER SONNY'S CAR WASH EQUIPMENT DRAWINGS FOR DIMENSIONS AND DETAILS. INTEGRAL BACKFLOW PROTECTION

1/2" HP SPRAY
1 /2
BRANCHES TO WATER HEATER FEATURES OR BE PROVIDED WITH "H
PS
1 /2 PRA
(TYPICAL) SUCH BY CAR WASH EQUIPMENT " Y
SECTION AT INSTANTANEOUS WATER HEATER BANK 7 PROVIDE BALL VALVE ON EACH SUPPLY DROP. ONLY ONE VALVE SHALL BE OPENED 1/2" HP SPRAY HP SP
7 VENDOR RAY
3/8" = 1'-0" ACCORDING TO SEASONAL WEATHER TEMPERATURES AND APPROPRIATE PROCESS
WATER TEMPERATURE.
3/4" HSW
Passero Associates
11 A 242 West Main Street, Suite 100 (585) 325-1000
1" C/2" H 1" C

1/2" HP SPRAY
Rochester, NY 14614 Fax: (585) 325-1691
MAIN DISTRIBUTION PIPING A SW

1" CA
1/2" CA
1 /2 Y

IWH-A
PRA Peter Wehner, AIA
Project Manager
-REFER TO FLOOR PLANS "H
PS PS
1" C
A HSW

IWH-A
Project Architect Timothy Geier, AIA
PRA 4 "H
AND ISOMETRIC VIEWS Y " SLEE 1 /2 /2"

IWH-A
Designer
VE 11

IWH-A
11

1 1/2" CSW
/2" No. Date By Description
HS
1" CW
A 11
/2 "
1" G CSW

1/2" CA
1/2" HP SPRAY
1/2" HP SPRAY
1" C
1" C
7 4"
SLEE
P101 4" VE 11
1 1/2" HSW

1 1/2" HSW

1 1/2" HSW

CSW
1 1/2" C

/2 "
1 1/2" C

1 1/2" C

1" HSW
1" HSW

1" HSW
1/2" CA

1/2" CA

1/2" CA

1/2" CA

1/2" CA

1/2" CA
1" CSW

1" CSW

1" CSW

1" HSW

1/2" CA
SLE E
EV CSW /2"

1 1/2" CSW
4" C

4" C

1" C

1" C

EV LE
E "S 11

1/2" CA
4
1" C

1/2" HP SPRAY
1/2" HP SPRAY
4" SLEEVE

1" CSW
7 A
1 1/4" C
7 1
1 1 1 7

1/2" CA

1" HSW
1 1/4" C
4" C

3 3 7

1" HSW
1 1 1

1" CSW
14 3 3 UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING

1" CSW
4 5 5

1/2" CA
1" C
4" SLEEVE

4" SLEEVE

4" SLEEVE

4" SLEEVE

4" SLEEVE

4" SLEEVE

4" SLEEVE
IS IN VIOLATION OF STATE EDUCATION LAW ARTICLE 145

1 1/2" HSW
A 11
6

1 1/2" HSW
/2 "
2 HS
SECTION 7209 AND ARTICLE 147 SECTION 7307, THESE PLANS
2" C

4" SAN

W ARE COPYRIGHT PROTECTED. ©


2" C

E
2 SLE
EV
4"
BP XT

FIRST FLOOR DETAILS AND


0' - 0"
SECTION AT INTERIOR PROCESS EQUIPMENT WALL
ENLARGEMENTS -
2 1" C

1/2" CA
3/16" = 1'-0"
A
PLUMBING

1/2" CA
SW
"H
3 /4
3/4" G

E VE
SLE
4" C

4"
SW Royal Car Wash - Chili Avenue
1 1/2" CSW

3/4" HSW
"H
1" CA

3 /4
1 1/2" C

10
2" V

VE
2" G

2" V

S LEE Town/City: Gates


4"
3" V

County: Monroe State:New York

3/4" HSW
9
1 1/2" C 1 1/2" CSW 13 Project No.:

11 RPZ
2019772.0001
4" SAN (OI)

12
8 Drawing No.:
TEST/CLEANOUT TEE TEST/CLEANOUT TEE
TEST/CLEANOUT TEE FIRST FLOOR P101
0' - 0"
Date:

SECTION AT EXTERIOR PROCESS EQUIPMENT WALL ISOMETRIC VIEW - CAR WASH PIPING SYSTEMS
1
3/16" = 1'-0"