This is the Poperty of School of civil Engineering

This Channel are Manageing By SM Hedaetullah And N.J.


Disha (B.Sc. In Civil Engineering)
Support us And stay connected
This file is only for edicational Perpose. Pls don't misuse it.

Enter the Requried Value in "Blue Box" To Estimate"


Cement Sand
Enter the ratio of Morter Have to use = 1 4
Enter The total volume of Brick Work = 1093 cft
Price of One Brick = 9$
Price of one bag Cement = 450 $ Total Cost Requried
Price of 1cft sand= 25 $ 153239

Total Bricks Need= 13116 Nos


Requirment Of Cement = 61.21 Bags
Requirment Of Sand = 306.0 cft
neering
And N.J.

l Cost Requried
$
This is the Poperty of School of civil Engineer
This Channel are Manageing By SM Hedaetullah And
Disha (B.Sc. In Civil Engineering)
Support us And stay connected
This file is only for edicational Perpose. Pls don't misuse it.

Enter the Requried Value in "Blue Box" To Estimate"


Cement Sand
Requred Ratio of Morter= 1 1.5

Enter The Total wet Volume Of RCC= 400 cft

Requirment Of Cement= 87.3 Bags


Requirment Of Sand= 163.6 cft
Requriment Of Khoa= 327.3 cft
Requirment of Bricks To Make the Khoa which is needed= 2945 Nos

Steel Calculation From RCC


% of Steel= 1.00%
Steel Reqired= 890.0 Kg
civil Engineering
edaetullah And N.J.
neering)
ected
n't misuse it.

Khoa/Stone
3 5.5 To Calculate cost Of this work Enter the Prices flowing:

600 Prices of one bag Cement= $500.00


Price of one cft (1cft) sand= $20.00
Prices of One cft (1cft) khoa/stone= $90.00
Price of one kg steel= $78.00

Total Cost= $145,784


Prices flowing:

784
SU Design And Consulting Pvt. Ltd.
Project: 2 story building for boktiyar Munshi (Here 1 story Full cost)
Location: Munshi para, Hiron, Kotalipara, Gopalgonaj
Estimator: Engr. Hedaetullah (Anik)
Desinger: Engr. Hedaetullah (Anik)
Contract Us: 8801763603339/ 8801303998715

Foundation/Footing total cost with 2.75" Brick


solling & 2.5" CC casting
Sr. No. Material List Quantity Aprx. Prices Toral
1 Cement 131 Bags 400 TK 52280 TK
Sand (coarse) 245 cft 57 TK 13965 TK
2 Sand (Local) 97 cft 35 TK 3378 TK
3 Stone chips 490 cft 171 TK 83790 TK
4 Brick chips 113 cft 70 TK 7875 TK
5 0 mm Bar 0.000 Tons 62000 TK 0 TK
Used Steel
6 0 mm Bar 0.000 Tons 62000 TK 0 TK
Bar
7 16 mm Bar 1.082 Tons 62000 TK 67084 TK
11 Bricks 1656 Nos 9 TK 14904 TK
12
13 Total cost 243276 TK
SU Design And Consulting Pvt. Ltd.
Project: 2 story building for boktiyar Munshi (Here 1 story Full cost)
Location: Munshi para, Hiron, Kotalipara, Gopalgonaj
Estimator: Engr. Hedaetullah (Anik)
Desinger: Engr. Hedaetullah (Anik)
Contract Us: 8801763603339/ 8801303998715

Columns total cost (Except tiles or fnishing)


Sr. No. Material List Quantity Aprx. Prices
1 Cement 45 Bags 400 TK
Sand (Coarse) 84 cft 57 TK
2 Sand (Local) 0 cft 35 TK
3 Stone chips 169 cft 171 TK
4 Brick chips 0 cft 70 TK
5 10 mm Bar G-460 0.287 Tons 62000 TK
Used Steel
6 12 mm Bar 0.000 Tons 62000 TK
Bar
7 16 mm Bar 1.144 Tons 62000 TK
11 Bricks 0 Nos 9 TK
12
13 Total cost
td.
story Full cost)
algonaj

15

fnishing)
Toral
17800 TK
4760 TK
0 TK
28899 TK
0 TK
17794 TK
0 TK
70928 TK
0 TK

140181 TK
SU Design And Consulting Pvt. Ltd.
Project: 2 story building for boktiyar Munshi (Here 1 story Full cost)
Location: Munshi para, Hiron, Kotalipara, Gopalgonaj
Estimator: Engr. Hedaetullah (Anik)
Desinger: Engr. Hedaetullah (Anik)
Contract Us: 8801763603339/ 8801303998715

Beams total cost (Except tiles or fnishing)


Sr. No. Material List Quantity Aprx. Prices
1 Cement 96 Bags 400 TK
Sand (coarse) 180 cft 57 TK
2 Sand (local) 0 cft 35 TK
3 Stone chips 360 cft 171 TK
4 Brick chips 0 cft 70 TK
5 10 mm Bar G-460 0.662 Tons 62000 TK
Used Steel
6 0 mm Bar 0.000 Tons 62000 TK
Bar
7 16 mm Bar G-500 1.430 Tons 62000 TK
11 Bricks 0 Nos 9 TK
12
13 Total cost
Ltd.
1 story Full cost)
palgonaj

715

nishing)
Toral
38400 TK
10260 TK
0 TK
61560 TK
0 TK
41044 TK
0 TK
88660 TK
0 TK

239924 TK
SU Design And Consulting Pvt. Ltd.
Project: 2 story building for boktiyar Munshi (Here 1 story Full cost)
Location: Munshi para, Hiron, Kotalipara, Gopalgonaj
Estimator: Engr. Hedaetullah (Anik)
Desinger: Engr. Hedaetullah (Anik)
Contract Us: 8801763603339/ 8801303998715

Slabs total cost (Except tiles or fnishing)


Sr. No. Material List Quantity Aprx. Prices
1 Cement 143 Bags 400 TK
Sand (coarse) 269 cft 57 TK
2 Sand (Local) 0 cft 35 TK
3 Stone chips 537 cft 171 TK
4 Brick chips 0 cft 70 TK
5 10 mm Bar G-500 2.000 Tons 62000 TK
Used Steel
6 0 mm Bar 0.000 Tons 62000 TK
Bar
7 0 mm Bar 0.000 Tons 62000 TK
11 Bricks 0 Nos 9 TK
12
13 Total cost
Ltd.
1 story Full cost)
palgonaj

715

nishing)
Toral
57321 TK
15315 TK
0 TK
91892 TK
0 TK
124000 TK
0 TK
0 TK
0 TK

288528 TK
SU Design And Consulting Pvt. Ltd.
Project: 2 story building for boktiyar Munshi (Here 1 story Full cost)
Location: Munshi para, Hiron, Kotalipara, Gopalgonaj
Estimator: Engr. Hedaetullah (Anik)
Desinger: Engr. Hedaetullah (Anik)
Contract Us: 8801763603339/ 8801303998715

Floor total cost (3 layer of BS 3"[1:6], B-CC 3"1:3:6] , S-CC


1.5"[1:3:5(6mm stone)])
Sr. No. Material List Quantity Aprx. Prices
1 Cement 60 Bags 400 TK
2 Sand (coarse) 0 cft 57 TK
3 Sand (Local) 262 cft 35 TK
4 Stone chips (6mm) 110 cft 171 TK
5 Brick chips 235 cft 70 TK
6 10 mm Bar G-500 0.000 Tons 62000 TK
Used Steel
7 12 mm Bar 0.000 Tons 62000 TK
Bar
8 16 mm Bar 0.000 Tons 62000 TK
9 Bricks 3156 Nos 9 TK
10
11 Total cost
Ltd.
1 story Full cost)
palgonaj

715

C 3"1:3:6] , S-CC

Toral
24000 TK
0 TK
9170 TK
18810 TK
16450 TK
0 TK
0 TK
0 TK
28404 TK

96834 TK
SU Design And Consulting Pvt. Ltd.
Project: 2 story building for boktiyar Munshi (Here 1 story Full cost)
Location: Munshi para, Hiron, Kotalipara, Gopalgonaj
Estimator: Engr. Hedaetullah (Anik)
Desinger: Engr. Hedaetullah (Anik)
Contract Us: 8801763603339/ 8801303998715

Brcik Work/ Brick Wall Cost


Sr. No. Material List Quantity Aprx. Prices
1 Cement 92 Bags 400 TK
2 Sand (Coarse) 0 cft 57 TK
3 Sand (Local) 506 cft 35 TK
4 Stone chips (6mm) 0 cft 171 TK
5 Brick chips 0 cft 70 TK
6 10 mm Bar G-500 0.000 Tons 62000 TK
Used Steel
7 12 mm Bar 0.000 Tons 62000 TK
Bar
8 16 mm Bar 0.000 Tons 62000 TK
9 Bricks 13116 Nos 9 TK
10
11 Total cost
Ltd.
1 story Full cost)
palgonaj

715

st
Toral
36800 TK
0 TK
17710 TK
0 TK
0 TK
0 TK
0 TK
0 TK
118044 TK

172554 TK
SU Design And Consulting Pvt. Ltd.
Project: 2 story building for boktiyar Munshi (Here 1 story Full cost)
Location: Munshi para, Hiron, Kotalipara, Gopalgonaj
Estimator: Engr. Hedaetullah (Anik)
Desinger: Engr. Hedaetullah (Anik)
Contract Us: 8801763603339/ 8801303998715
Total work area: 1452 Sq.ft.
Total approximate cost 2225091 TK

Full building Materils cost


Sr. No. Material List Quantity Aprx. Prices
1 Cement 567 Bags 400 TK
Sand (Coarse) 778 cft 57 TK
2 Sand (Local) 865 cft 35 TK
stone chips (6mm) 109 cft 171 TK
3 Stone chips 1556 cft 171 TK
4 Brick chips 113 cft 70 TK
5 10 mm Bar G-460 1.000 Tons 62000 TK
Used Steel
6 10 mm Bar G-500 2.000 Tons 62000 TK
Bar
7 16 mm Bar G-500 3.656 Tons 62000 TK
11 Bricks 17928 Nos 9 TK
12
13 Total cost

Other materials and worker cost (Aproximate)


14 Worker cost 15%
15 Doors and windows cost 10%
16 Electric work cost 8%
17 Plumbing work 10%
18 Movemnet cost 2%
19 Extra cost 3%
20 tiles 4%
21 0%
total
Ltd.
1 story Full cost)
palgonaj

cost per sq ft= 1400


8715

2225091 TK

t
Toral
226800 TK
44346 TK
30275 TK
18639 TK
266076 TK
7875 TK
62000 TK
124000 TK
226672 TK
161352 TK

1168035 TK

roximate)
304920
203280
162624
203280
40656
60984
81312
0
1057056