MOBILE AND CRAWLER CRANE PRE-MOBILISATION

CHECKLIST
CHECKLIST

Vehicle Information
Asset No. / Registration No. Asset description
Hours / Km Date of Hours/Km
Project name Next Service due (Hours/Km)
Contractor/supplier Manufacturer
Is the machine classified as a road-going ‘heavy vehicle’ for the purposes of heavy vehicle laws? Yes ☐ No ☐
If you answered ‘Yes’ to this question please inform project person responsible for logistics.
Owner / Supplier Laing
PART A – Laing O’Rourke Minimum Requirements for Plant O’Rourke
YES NO Approved
Enclosed sealed aircon cabin or open cabin if so designed ☐ ☐ ☐
Fire extinguisher minimum 6 kgs (Class ABE) tagged and tested within 6 months ☐ ☐ ☐
A small extinguisher minimum of 1kg dry chemical (class ABE) located within the cabin and identified decal ☐ ☐ ☐
on the door
Flasher amber beacon visible from 360 degrees ☐ ☐ ☐
Reverse/Travel/Slewing alarm ☐ ☐ ☐
Load charts displayed within cabin ☐ ☐ ☐
Overhead power line signage affix in cabin ☐ ☐ ☐
Lockable batter isolation switch c/w identification decal ☒ ☐ ☐
Emergency stop (with decal) easily and safely accessible from outside plant ☒ ☐ ☐
Guarding (lockable door and/or limit switch and/or guarding over parts ☐ ☐ ☐
Safety signage in place for pinch points, reeving winch, warnings, emergency ect ☒ ☐ ☐
SWL/WLL displaced externally ☐ ☐ ☐
Handrails on walkways and upper decks where personnel access is required ☒ ☐ ☐
Safe access to the machine (three points of contact) ☐ ☐ ☐
Seatbelt fitted and in good condition (if road registered, fitted to carrier only) ☒ ☐ ☐
UHF radio fitted and operational ☒ ☐ ☐
Wheel chocks with carrying mounts (for rubber tyred equipment) ☒ ☐ ☐
External boom angle indicator operational ☐ ☐ ☐
Load moment indicator (LMI) ☒ ☐ ☐
Anti-two block system (A2B0 ☒ ☐ ☐
External rated capacity lighting (Christmas tree lighting) ☐ ☐ ☐
Free fall functionally of the crane has been de-activated or positively locked out ☒ ☐ ☐
Outrigger Packing ☒ ☐ ☐
Hold Point: Confirm Project specific / Client addition requirements Signature:

Owner / Laing
Supplier O’Rourke
PART B – Condition of Plant and Equipment
YE NO Approved
S
General cleanliness inside and outside is acceptable ☐ ☐ ☐

Function test crane (boom, winch, slew, outriggers, tracking, A2B, LMI) ☐ ☐ ☐

© Laing O’Rourke Rev. 01 23/07/2020 https://nextgearsms.com/ MOBILE AND CRAWLER CRANE PRE-MOBILISATION CHECKLIST – CHECKLIST Page 1 of 3
Any existing damage e.g. Boom and lattice section (list detail in comments) ☐ ☐ ☐

Braking and steering system functional ☐ ☐ ☐

Exhaust system in good condition ☐ ☐ ☐

Free of visible oil/water leaks ☐ ☐ ☐

Check hydraulic and fuel system hoses and fittings for wear and damage ☒ ☐ ☐

Tyres in good condition ☒ ☐ ☐

The plant and equipment has been inspected prior to arrival ☒ ☐ ☐

Plant/equipment is free from weeds and seeds ☒ ☐ ☐

Owner / Laing
Supplier O’Rourke
PART C – Compliance documentation
YE NO Approved
S
Road registration papers, sticker and plates (where applicable) ☐ ☐ ☐
Operators Manual specific to make and model ☐ ☐ ☐
Plant Risk Assessment specific to make and model ☒ ☐ ☐
Daily Pre-start book specific to asset type ☐ ☐ ☐
Service / Maintenance history (minimum of 3 months records) ☐ ☐ ☐
Plant registration ☐ ☐ ☐
Design registration ☐ ☐ ☐
Crane log book ☒ ☐ ☐
Hook block and rope certificates ☐ ☐ ☐
Cranesafe annual inspection report ☐ ☐ ☐
Cranesafe green sticker affixed to window of crane ☒ ☐ ☐
Lifting devices register and certificates ☐ ☐ ☐
Hook block retaining guidance documents ☒ ☐ ☐
Change management documents available for any modification ☒ ☐ ☐

Hold Point: Confirm Project specific / Client addition requirements Signature:

☐ ☐ ☐
Comments: For items ticked No give reason in the comments section below
Notes on minimum requirements exceptions; list additional included asset or serial numbers; any further information:

Pre-mobilisation declaration (Equipment owner / supplier)

© Laing O’Rourke Rev. 01 23/07/2020 https://nextgearsms.com/ MOBILE AND CRAWLER CRANE PRE-MOBILISATION CHECKLIST – Page 2 of 3
CHECKLIST Page 2 of 3
Date of Hours / Km at Ignition, toolbox and panel keys present with Yes ☐
final final report: machine?
report: No ☐

I declare that this machine is in a safe condition, is free from defect and is fit for purpose:
Name: Position: Signature: Date:
Signed and accepted by project:
Name: Position: Signature: Date: