SITE: BASEVIEW HOMES 2021 2022

NOVEMBER DECEMBER JANUARY

28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Activities
III. THIRD FLOOR/ROOF DECK
3. Rough-ins (Walls)
a. Electrical
b. Sanitary and Plumbing
6. Plastering
a. CHB Walls
b. Openings - Windows
IV. STAIR CASE (2nd floor level)
d. Wood Planks
e. Tubular Railing Frame
IV. CARPENTRY WORKS
1. Installation
a. Door jambs
b. Door Panels
V. GLASS WORKS
1. Installation
a. Frames
b. Glass
c. Glass railing
d. Shower Enclosure
VII. LIGHT STEEL WORKS
1. Installation
a. Ceiling Works
i. Furring
ii. Gypsum Board
iii. Roof Eaves
VIII. FLOOR FINISHES
1. Installation
a. Ceramic/Wood Tiles
b. Waterproofing - Toilet Floors
c. Toilet Tiles
IX. WALL FINISH
1. Installation
b. Toilet Tiles
X. PAINTING WORKS
1. Skimcoat
2. Finishing Paints
XI. PLUMBING WORKS
1. Installation
a. Fixtures
b. Septic Tank
c. Manhole / Catch Basin
XII. ELECTRICAL WORKS
1. Installation
a. Panel Board
b. Rough-in
c. Lighting Fixtures
XIII. CABINETRY
1. Installation
a. Bedrooms
b. Kitchen `
c. Toilets
XIV. OTHERS
1. Gate
2. Fence
3.Paint Finishing
4. Grills
5. Clearing and cleaning
XV. PRIORITY WORKS
MASTER BEDROOM
1. TILE WORKS
2. CEILING WORKS
3. PAINT WORKS
4. CABINETRY
5. ELECTRICAL
6. PLUMBING
KITCHEN AREA
1. TILE WORKS
2. CEILING WORKS
3. PAINT WORKS
4. CABINETRY
5. ELECTRICAL
6. PLUMBING
7. CONCRETING