Processes and Procedures
on Acceptance Test and
Inspection for Building Fire
Service Installations
2
Provision of fire services installation
and equipment
3
Relevant Standard for each installations
4
Relevant Standard for each installations (con’t)
Sprinkler System
FOC Rules for Automatic Sprinkler Installations (FOC 29 Edition)
LPC Rules for Automatic Sprinkler Installations
FSD Circular Letter No. 4/1996 (Improvised Sprinkler System)
5
Document list for inspection required (if applicable):
6
A recommended document list for inspection is shown on
below (if applicable):
h. Connection of DTL
7
FH/HR Acceptance Test
A. Fixed Fire Pump
8
FH/HR Acceptance Test (con’t)
A. Fixed Fire Pump (con‟t)
Flow and pressure test
Figure for equipment arrangement for testing of fire pumps
(common method)
R/F
P1
Testing Requirement :
P2 P1 Pressure gauge
310 kPa
P2 Pressure gauge
G/F All FH pressure ≤ 850 kPa
9
FH/HR Acceptance Test (con’t)
A. Fixed Fire Pump (con‟t)
Flow and pressure test (con‟t)
10
FH/HR Acceptance Test (con’t)
D. FH Intermediate Booster Pump
Measure the
Connect fire Remote Duty running pressure
engine to FS “start” pump and flow rate at
inlet at a at FS operate the highest point
pressure 8 bars inlet of HR outlet
Functional test
and measure
static pressure
at critical points
11
FH/HR Acceptance Test (con’t)
D. FH Intermediate Booster Pump (con‟t)
Figure for typical arrangement for
testing of intermediate booster pumps
P
F F 900 l /m/
P 310 (kPa)
Fire Engine
maintain pressure
800kPa
12
FH/HR Acceptance Test (con’t)
D. FH Intermediate Booster Pump (con‟t)
Figure for typical arrangement for
testing of intermediate booster pumps
P
F F 900 l /m/
P 310 (kPa)
Fire Engine
maintain pressure
800kPa
13
FH/HR Acceptance Test (con’t)
14
Secondary power supply test
Automatic
Equipment
Operate all Switch off changeover
“normal” status
Systems in to
maintained
full load power “Secondary
without
condition supply supply”
interruption
within 15 sec.
as before
15
Secondary power supply test (con’t)
Electrical Schematic Diagram for FSIs
FS and Sprinkler
pumps
Automatic
changeover switch
Normal power
supply switch
Secondary power
supply switch
16
Emergency lighting test
Self-contained type
Emergency Luminaries
Self-contained type
Emergency Luminaries
(Recessed arrangement)
17
Sprinkler System Test
18
Sprinkler System Test (con’t)
A. Sprinkler Pump (con‟t)
System pressure & flow test ( Proving test)
19
Sprinkler System Test (con’t)
B. Sprinkler Pump functional test
20
Sprinkler System Test (con’t)
C. Sprinkler System functional test
21
Ventilation/Air Conditioning Control Systems
(VAC control systems)
22
VAC Control Systems (con’t)
Method „ A‟
Method „ B‟
Method „ C‟
23
Portable Fire Extinguisher
Labelling of Fire Extinguisher
24
Observations during compliance check
25
Observations during compliance check
26
Observations during compliance check
27
Observations during compliance check
28
Observations during compliance check
29
Points to Note