Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

 

Coordonnées
Prudhomme Nimy
www.linkedin.com/in/prudhomme- RF Performance and Optimization engineer chez Huawei
nimy-32872734 (LinkedIn) Kinshasa, République démocratique du Congo

Principales compétences Résumé


Microsoft Outlook
- 12 years esperiences in telecommucation.
Microsoft Excel
IMaster
March 2009 to December 2010:
Languages RF installations, Logistic and Acceptance.
. Installations BTS HUAWEI 312, 3012A and 3012AE with TIGO
Anglais (Professional Working)
project phase 1 and 2 Kinshasa and Bas-Congo DRC
Français (Full Professional)
.Dismantling and reinstallation TIGO DRC projects Phase 1 & 2.
.Optimization TIGO project
.Installation APM30H, RRU, Battery cabinet, Duplexor and GSM
Antenna in the project swap HUAWEI/ VODACOM

December 2010 to March 2011:


Designer (drawing with Autocad)
-March 2012 to july 2014:
Core Network PS
. Monitoring Data 3G, GGSN/SGSN and PS KPI 2G/3G with ZTE
DRC branch office/ORANGE DRC project.
. Monitoring IN (OCS) with ZTE/ORANGE DRC project.

July 2014 to july 2018 :


RF Optimization Engineer at HUAWEI Technologies (RDC)
VODACOM RDC projects: Audit(BenchMark) 2G/3G, Wimax SSV,
3G SSV, LTE SSV new sites, Network optimization 2G,3G and LTE
(Kinshasa, bas Congo, Lubumbashi and Goma), Managed The Rf
physical audit 2G3G.
ORANGE DRC Project: LTE SSV New sites and customer complaint
Team leader. Drive Test Team leader and Technical Support for 3G
U900 & LTE FDD Vodacom project.

Specialist:
- Genex Probe and Genex Assistant.
- Mapinfo, U2000 and PRS Huawei software.
- Alarms Monitoring (Core NetWork PS and OCS)
- Core PS KPI's reporting.
  Page 1 of 4
   

- Data 3G Monitoring tools: CACTI and Netnumen U31 ZTE


software.
- OCS Alarms reporting;
- LMT Huawei software
- site Master.
- word, excell, PPT and Autocad.
- BTS Hardware installation

August 2018 to curent


RF Performance and Optimzation Engineer (NPM Orange DRC)
- Data collection and manage Daily KPI's report(2G, 3G and
4G)whole network level, région level, contrôler level etc..., NPM
(Network performance Management) weekly & Monthly contractual
KPI's (2G, 3G and 4G)
Manage KPI's report for New sites activation (2G, 3G and 4G) and
others spécial Request from Customer ou Huawei top management.
prépare RF 3G/4G planning, Nbrs planning 3G/4G Manage license
upgrade for CE Congestion, RRC license, Max TX power, Diversity,
Sccpch, 4G KPIs analysis and Other task related to Optimization or
Performance.
-Tools: Huawei U2020, MAOS, PRS, Imaster MAE, Unet, OMstar,
Google hearth and Nastar.

Expérience
Huawei
8 ans 9 mois

4G optimization Engineer
juillet 2022 - Present (9 mois)
Kinshasa, Congo (RDC)

RF Performance and Optimization engineer


août 2018 - août 2022 (4 ans 1 mois)
Kinshasa

Radio network Optimization Engineer 2G/3G/Wimax/LTE


juillet 2014 - août 2018 (4 ans 2 mois)
Kinshasa

ZTE

  Page 2 of 4
   

Technical support engineer


mars 2012 - juillet 2014 (2 ans 5 mois)
democratic republic of congo/kinshasa

Monitoring OCS, 3G links (All DRC), GGSN/SGSN/HLR, and PS Reporting


ZTE/ORANGE DRC project.

HANTAN GROUP
Designer
novembre 2010 - janvier 2011 (3 mois)
Kinshasa

Many drawings with Autocad for the TIGO project swap

GILUTECH
bss engineer and designer
avril 2009 - novembre 2010 (1 an 8 mois)
kinshasa/ RDC

Installation, logistic, acceptance, optimisation and field maintenance of Tigo


sites RDC et designer of many project Vodacom swap, TIGO swap and OCPT
Vsat intallations.

Formation
ISTA
Technician Engineer, Industrial Electronics Technology/
Technician · (2004 - 2008)

ISTA Ndolo
Ingénieur technicien, Electronique industriel · (2004 - 2008)

Activité
02/11/2023, Rabih Farah a ajouté un candidat à Technicien Drive
Test 2G/3G/4G

02/11/2023, Rabih Farah a mis à jour un candidat depuis Technicien


Drive Test 2G/3G/4G

02/11/2023, Message envoyé par Rabih Farah

  Page 3 of 4
   

02/11/2023, a mis à jour un candidat depuis Technicien Drive Test


2G/3G/4G

03/08/2023, Vu par Rabih Farah

  Page 4 of 4

You might also like