Revised Udaipur - Bagafa TL-OPGW
Revised Udaipur - Bagafa TL-OPGW
Note: The Above drum length will adhere to route length plus length required for Sag Splicing and service loop etc, which is 6 % as per contract agreement volume
B,Technical Specification for Fibre Optic Cabling under T/L Packages, Clause 1.2.1 (Page 1140)
POWER GRID CORPORATION OF INDIA LIMITED
TEEMS INDIA TOWERLINES PVT. LTD. CHENNAI
132 KV D/C TRANSMISSION LINE FROM UDAIPUR - BAGAFA
BOQ for OPGW Hardware Fittings
Quantity As Per Surplus Total
S.NO Description of Material
Schedule Quantity Quantity
11 Installation hardware set for above 48 Fibre Optic Approach Cable (Set) 2 0 2
POWER GRID CORPORATION OF INDIA LIMITED
TEEMS INDIA TOWERLINES PVT. LTD. CHENNAI
132 KV D/C TRANSMISSION LINE FROM UDAIPUR TO BAGAFA
OPGW Drum Schedule
Tower Span
Sl No Tower No Sectional Length Drum Length Drum No
Type length (m)
1 GAT. GAT.
40
2 AP1 DD+0
310
3 AP2 DD+3
281
4 AP4 DB+9
95
5 AP5 DB+0
208
6 AP6 DC+9
491
7 AP7 DD+9
366
8 AP7A DB+9 3816 4045 UDP - BGF 01
356
9 AP8 DD+3
240
10 8/1 DB+0
323
11 8/2 DB+3
395
12 AP9 DC+3
309
13 AP10 DB+0
234
14 AP11 DD+0
168
15 AP12 DD+0
254
16 AP13 DB+0
260
17 AP14 DC+0
168
18 AP15 DD+0
222
19 AP16 DD+0
256
20 AP17 DC+0
216
21 AP18 DC+9
256
22 AP19 DD+9
270
23 19/1 DB+0
3806 4033 UDP - BGF 02
POWER GRID CORPORATION OF INDIA LIMITED
TEEMS INDIA TOWERLINES PVT. LTD. CHENNAI
132 KV D/C TRANSMISSION LINE FROM UDAIPUR TO BAGAFA
OPGW Drum Schedule
246 3806 4033 UDP - BGF 02
24 AP20 DD+3
121
25 AP21 DB+0
271
26 AP22 DB+3
98
27 AP23 DD+0
114
28 AP24 DD+0
301
29 AP25 DB+0
271
30 AP26 DB+0
277.73
31 26/1 DA+6
203.943
32 AP27 DD+3
324.75
33 27/1 DB+3
274.804
34 27/2 DA+3
261.176
35 AP28 DC+0
291.216
36 28/1 DB+0
297.015
37 AP29 DB+0
329.205
38 29/1 DB+0
367.38 3381 3583 UDP - BGF 03
39 AP30 DB+0
135.706
40 30/1 DB+3
352.49
41 AP31 DC+0
157.197
42 AP32 DD+0
271.679
43 32/1 DB+0
199.674
44 32/2 DB+3
118.985
45 AP33 DD+0
256.988
46 33/1 DB+3
320.681
47 AP34 DC+3
306.904
48 AP35 DB+0
34 27/2 DA+3 33 1
3928 4014
Slope Minimum Standard Double Double Down Installation
Tower Tower Span Individual Length Tower Down Splicing Extra Required OPGW FIBRE
OPGW Suspensio Tension Tension Vibration Lead hardware
Sl No Joint Box load Fibre Optic OPTIC
No Type length (m) Sag(m) (Span+ Height Length Length Length Drum Drum n Clamp Dead End Fittings fittings Damper Clamp OPGW - set for
Sag) m Length Length for OPGW Tension accessories accessories for OPGW assembly OPGW OPGW - Distributio APPROACH above 24
(Set) Clamp for of OPGW of OPGW (Nos) for OPGW on OFC on n Panel CABLE 24 Fibre ,
OPGW(Set) for Joint Box for Pass (Nos) Tower Tower (FODP): Fibre
Indoor (DWSM) - Fibre Optic
Location Through Type (set) Km Approach
(Set) (Set) Cable.(set)
Note: 1.) Quantities are arrived based on approved site survey report
2.) The above drum length will adhere to route length plus length required for sag splicing and service loop etc, which is 6% as per contract agreement Volume B, Technical Specification for fibre Optic cabling under T/L Package
3.) For a OPGW drum length sag is considered as 1.5 %, Down Lead length - 10 meter, Splicing Length - 10 Mtr.