Professional Documents
Culture Documents
Daily Work Load - 24-Feb-2023
Daily Work Load - 24-Feb-2023
Evening of 24-Feb-23
Daily Work Load Morning of 25-Feb-23
01-Mar
02-Mar
24-Feb
25-Feb
26-Feb
27-Feb
28-Feb
S/N A/C Reg
24-Feb 25-Feb Task Task Card No. Planned Date
1 8Q-MAD X No Yes
4 8Q-MAI X Yes No
6 8Q-MAN X Yes No
7 8Q-MAO X Yes No
8 8Q-MAP X No No
14 8Q-MBB X No Yes Replace RH Engine compressor P3 filter element 230101 - 149 24-Feb-2023
15 8Q-MBC X Yes No
27 8Q-TAJ X No Yes
28 8Q-TAK X No Yes
29 8Q-TAL X No No
30 8Q-TAM X No Yes
31 8Q-TAN X Yes No
38 8Q-TAV X Yes No
39 8Q-TAZ X Yes No
43 8Q-TMF X No No
44 8Q-TMG X No No
45 8Q-TMH X No Yes
46 8Q-TMI X Yes No
48 8Q-TMK X Yes Yes Compass swing Card update 230061 - 193 24-Feb-2023
49 8Q-TML X No Yes ECTM Callout for RH Engine (SN:PC-E51246): Carry out troubleshooting for high Oil temperature 230269-05 24-Feb-2023
50 8Q-TMN X - - 24(PM)-25 Feb: EMMA
51 8Q-TMO X No Yes
No Yes
Loadmeter (Pre mod 6/2028) due for replacement 230281-156
53 8Q-TMQ X 24-Feb-2023
Replace Voltmeter (Pre mod 6/2028) 230281-157
No -
Hydraulic filter element Rx (No overnight) 230286 - 120
54 8Q-TMR X 24-Feb-2023
25(PM)-26 Feb: EMMA
55 8Q-TMS X No No
59 8Q-TMX X No Yes
60 8Q-TMY X Yes No
61 8Q-TMZ X No No
Total/Dy 8 2 9 9 11 11 9 24-Feb-23 25
ADDITIONAL NOTES: * DI and Compressor Wash should be carried out on all aircrafts in base in the evening.
* Routine A&E and Float-50 should be carried out on all aircrafts if it is due today.
* Priority should be given to aircrafts scheduled for overnight.