PERANCANGAN SUPPLY CHAIN BATUBARA UNTUK PEMBANGKIT LISTRIK TENAGA UAP DI

INDONESIA DENGAN
MEMPERTIMBANGKAN HUB
MERLIANI AVITA, Hari Agung Yuniarto, S.T., M.Sc., Ph.D
Universitas Gadjah Mada, 2015 | Diunduh dari http://etd.repository.ugm.ac.id/

DAFTAR PUSTAKA

Anggayana, K., 2002, Genesa Batubara, Departemen Teknik Pertambangan, FIKTM,


Institut Teknologi Bandung, Bandung.

American Society of Testing Materials, 1981, Standard Classification of Coals by


Rank, Annual Book of ASTM Standards, American Society of Testing
Materials, Philadeplhia.

Boardman, Anthony E., 2001, Cost-Benefit Analysis, International Encyclopedia of


The Social & Behavioral Sciences, 2nd edition, Vol.5, pp. 47-54.

Chen, Weishing, et al., 1995, Optimal Scheduling Plan for A Coal Shipment
Problem: An Efficient Approach, 17th International Conference on Computers
and Industrial Engineering, Elsevier Science Ltd., Inggris.

Chopra, Sunil, Meindl, Peter, 2007, Supply Chain Management: Strategy, Planning,
and Operation, Third Edition, Pearson Prentice Hall, USA.

Cornish, Rosie, 2007, Cluster Analysis, Mathematics Learning Support Centre.

Coventry, Timothy Edward Jan, 1999, Controlled Coal Blending for Power Station
Optimisation, University of Johannesburg, Afrika Selatan.

El-Wakil, M. M., 1985, Powerplant Technology, McGraw-Hill Book Company,


Singapore.

Favorsea Industrial Channel, 2013, Coal Storage and Blending Facilities, Beijing.

Hudson, Scott, 2003, Success with Hub and Spoke Distribution, Supply Chain
Resource Cooperative, North Carolina, diakses online pada 15 April 2015
<http://scm.ncsu.edu/scm-articles/article/success-with-hub-and-spoke-
distribution>

Lan, Yu-hua, Li, Yi-song, 2010, The Method of Cluster and Entropy Apply in City
Distribution Center Location, Internasional Conference on Educational and
Network Technology.

87
PERANCANGAN SUPPLY CHAIN BATUBARA UNTUK PEMBANGKIT LISTRIK TENAGA UAP DI
INDONESIA DENGAN
MEMPERTIMBANGKAN HUB 88
MERLIANI AVITA, Hari Agung Yuniarto, S.T., M.Sc., Ph.D
Universitas Gadjah Mada, 2015 | Diunduh dari http://etd.repository.ugm.ac.id/

Murti, S.J., et al., 2004, Penentuan Jumlah dan Lokasi Gudang Yang Optimal Dengan
Menggunakan Metode Cluster, Performa, Vol. 3, No. 1, pp 1-8.

Nugroho, Agus Adhi, 2014, Analisa Pengaruh Kualitas Batubara Terhadap Biaya
Pembangkitan (Studi Kasus di PLTU Rembang), Media Ekektrika, Vol. 7, No.
1.

PT Perusahaan Listrik Negara (Persero), 2013, Laporan Kajian Derating PLTU


Batubara Jawa-Madura-Bali PT Perusahaan Listrik Negara (Persero).

PT Perusahaan Listrik Negara (Persero), 2015, Statistik PLN 2014.

PT Perusahaan Listrik Negara (Persero), 2015, Penetapan Penyesuaian Tarif Tenaga


Listrik Bulan Juni 2015.

PT Perusahaan Listrik Negara (Persero), 2015, Rencana Usaha Penyediaan Tenaga


Listrik PT PLN (Persero) 2015-2024.

Rencher, Alvin C., 2002, Methods of Multivariate Analysis, John Wiley & Sons, Inc.,
Canada.

Republik Indonesia, 2012, Peraturan Presiden Republik Indonesia Nomor 26 Tahun


2012 Tentang Cetak Biru Pengembangan Sistem Logistik Nasional, Indonesia.

Sekretariat Perusahaan PT Perusahaan Listrik Negara (Persero), 2014, Statistik PLN.

Shail, M.S. Sodha, et al., 1994, Effect of Coal Properties on The Specific Coal
Consumption in A Typical Thermal Power Station in India, Energy Conversion
Management, Vol. 35, No. 7, pp. 597-603.

Shih, L.H., 1997, Planning of Fuel Coal Imports Using a Mixed Integer Programming
Model, International Journal of Production Economics 51, pp. 243-249.

Shuo, Liu, et al., 2012, Research On Coal Transportation Network Optimization,


Future Communication, Computing, Control and Management, Vol.2, pp. 285-
291.

Tarquin, Blank, 2005, Engineering Economy, 6th Edition, McGraw Hill, USA

Watkins, Thayer, 2010, An Introduction to Cost Benefit Analysis, San Jose State
University, USA, diakses online pada 14 Juli 2015
<http://www.sjsu.edu/faculty/watkins/cba.htm>.
PERANCANGAN SUPPLY CHAIN BATUBARA UNTUK PEMBANGKIT LISTRIK TENAGA UAP DI
INDONESIA DENGAN
MEMPERTIMBANGKAN HUB 89
MERLIANI AVITA, Hari Agung Yuniarto, S.T., M.Sc., Ph.D
Universitas Gadjah Mada, 2015 | Diunduh dari http://etd.repository.ugm.ac.id/

Winston, W. L., 1994, Introduction to Operation Research: Applications and


Algorithms, Duxbury Press, USA.
Yu, Yang, et al., 2011, Location Selection Of Railway Logistics Center of Eastward
Coal Transportation Form Xinjiang, International Conference of Chinese
Transportation Professionals 2011, Cina.

Zamuda, Craig D., Sharpe, Mark A., 2007, A Case for Enhanced Use of Clean Coal
in India: An Essential Step Towards Energy Security and Environmental
Protection, India

Zang, Yujie, et al., 2010, Balanced Transportation Model Used in the Coal Inventory
and Railway Transportation Joint Optimization Problem, International
Conference of Chinese Transportation Professionals 2010, Cina.