Professional Documents
Culture Documents
Suwal Dam Estimate RWSLIP
Suwal Dam Estimate RWSLIP
Name of work : Rehabilitation of Surwal Medium Irrigation project Under RWSLIP, Tehsil &Dist. -Sawai
Madhopur .
ABSTRACT OF COST
Rehabilitation of Earthen Dam
Total 36843536.59
Government of Rajasthan
Water Resources Department
Name of work : Rehabilitation of Surwal Medium Irrigation project Under RWSLIP, Tehsil &Dist. -Sawai
Madhopur .
Detailed Estimate
Rehabilitation of Earthen Dam
TOTAL AVERAGE
TOTAL FILLING AVERAGE CUTTING TOTAL CUTTING TOTAL FILLING
RD Length CUTTING
AREA (SQM) AREA (SQM)
FILLING AREA
VOUME (CUM) VOLUME (CUM)
AREA (SQM) (SQM)
TOTAL AVERAGE
TOTAL FILLING AVERAGE CUTTING TOTAL CUTTING TOTAL FILLING
RD Length CUTTING
AREA (SQM) AREA (SQM)
FILLING AREA
VOUME (CUM) VOLUME (CUM)
AREA (SQM) (SQM)
sand
18.74
37.47
37.47
37.47
43.35
49.77
50.94
52.97
53.96
53.82
54.32
52.1
50.25
51.11
51.36
50.7
50.45
49.77
49.17
50.19
47.25
43.77
44.21
45.02
52.58
53.67
47.82
47.9
49.94
52.14
51.45
50.94
51.32
57.9
58.07
62.67
73.25
73.4
67.11
60.69
61.23
60.89
60.27
60.6
60.53
60.39
59.37
58.38
57.11
55.86
56.19
57.66
59.36
59.04
58.17
57.39
57.71
59.12
61.01
62.9
53.49
44.39
45.83
46.52
46.95
46.82
45.72
44.06
42.68
42.02
44.12
46.11
45.32
42.24
39.63
39.78
39.54
37.52
36.56
36.66
4085.62
SURWAL IRRIGATION PROJECT
COT EARTH WORK STATEMENT
Annexure -B
Area (m2) Avg area Distance Volume (Cum)
chainage
cutting filling cutting filling (m) cutting filling
1140 30.5644 30.5644 0 0 0 0 0
1170 30.7669 30.7669 30.66565 30.66565 30 919.97 919.97
1200 30.7159 30.7159 30.7414 30.7414 30 922.24 922.24
1230 30.43 30.43 30.57295 30.57295 30 917.19 917.19
1260 31.2937 31.2937 30.86185 30.86185 30 925.86 925.86
1290 25.9569 25.9569 28.6253 28.6253 30 858.76 858.76
1320 30.0582 30.0582 28.00755 28.00755 30 840.23 840.23
1350 56.9676 56.9676 43.5129 43.5129 30 1305.39 1305.39
1380 56.6935 56.6935 56.83055 56.83055 30 1704.92 1704.92
1410 57.107 57.107 56.90025 56.90025 30 1707.01 1707.01
1440 31.8372 31.8372 44.4721 44.4721 30 1334.16 1334.16
1470 31.9397 31.9397 31.88845 31.88845 30 956.65 956.65
1500 32.6656 32.6656 32.30265 32.30265 30 969.08 969.08
1530 30.0587 30.0587 31.36215 31.36215 30 940.86 940.86
1560 30.1564 30.1564 30.10755 30.10755 30 903.23 903.23
1590 30.2542 30.2542 30.2053 30.2053 30 906.16 906.16
1620 29.9612 29.9612 30.1077 30.1077 30 903.23 903.23
1650 30.1564 30.1564 30.0588 30.0588 30 901.76 901.76
1680 28.4591 28.4591 29.30775 29.30775 30 879.23 879.23
1710 28.649 28.649 28.55405 28.55405 30 856.62 856.62
1740 31.7518 31.7518 30.2004 30.2004 30 906.01 906.01
1770 31.9515 31.9515 31.85165 31.85165 30 955.55 955.55
1800 32.1518 32.1518 32.05165 32.05165 30 961.55 961.55
1830 29.4588 29.4588 30.8053 30.8053 30 924.16 924.16
1860 29.5533 29.5533 29.50605 29.50605 30 885.18 885.18
1890 29.2711 29.2711 29.4122 29.4122 30 882.37 882.37
1920 28.9886 28.9886 29.12985 29.12985 30 873.9 873.9
1950 27.7489 27.7489 28.36875 28.36875 30 851.06 851.06
1980 28.6975 28.6975 28.2232 28.2232 30 846.7 846.7
2000 29.5096 29.5096 29.10355 29.10355 20 582.07 582.07
TOTAL 28321.1 28321.1
Name of work : Rehabilitation of Surwal Medium Irrigation project Under RWSLIP, Tehsil &Dist.
-Sawai Madhopur .
Abstract of Cost
Repair & Renovation of Waste Weir
S.No. BSR Referance Items Qty. Unit RATE AMOUNT
Excavation including loading unloading disposal and
dressing of excavated rock within initial lead of 50m and
Ch. No-V & Item lift upto 1.5m in dry or moist including dressing of
1 No 2(b) & P.No- excavated area, de-watering wherever required complete in 7473.9 Cum 229 1711523.10
12 all respect.Hard rock not requiring blasting
Total 2691217.35
Name of work : Rehabilitation of Surwal Medium Irrigation project Under RWSLIP, Tehsil &Dist. -Sawai
Madhopur .
Detailed estimate
Repair & Renovation of Waste Weir
S.No. Items No L W H Qty.
Excavation including loading unloading disposal and dressing of
excavated rock within initial lead of 50m and lift upto 1.5m in dry or
moist including dressing of excavated area, de-watering wherever
1 required complete in all respect.Hard rock not requiring blasting
Area
Bye Wash 5 30 49.826 7473.9 Cum
Plaster in cement sand mortar 1:4 including racking of joints, smooth
finishing & curing etc. complete including all leads of all construction
materials of thickness: 20mm