"The cost of poor quality consists of all costs that would disappear if there were no deficiencies." J.M. Juran
1. 2. 3. 4. 5. 6.
(calculated) (calculated) (calculated) (calculated)
$0 $0 0 $0
$0
$0
$0
$0
$0Insert any defect,
1. 2. Insert all 3. Insert what you 4. Insert how ma
$0
inefficiency, consequences that are consider the cost of this consequence
$0
installation issues, related to this issue. this consequence. happens for this d
$0
etc. inefficiency, etc.
$0
$0
$0
$0
© Advanced Energy 2014 All rights reserved
4. Insert how many times 5. Insert the number 6. Insert what you feel is
this consequence of houses you do per the percentage of houses
happens for this defect, year having this problem
inefficiency, etc.
The Cost of Poor Quality (COPQ)
"The cost of poor quality consists of all costs that would disappear if there were no deficiencies." J.M. Juran
1. 2. 3. 4. 5. 6.
(calculated) (calculated) (calculated) (calculated)
Ex: Return
trip to
weather Quality
strip an attic assurance call
hatch from Program 6 1 $6 $201 286 40% 114 $22,994
Scheduling 9 2 $18 25 What is the loaded rate for the Project
How long does the call take? 10 mins.
Rework 60 1 $60 Manager ($35/hr*)?
Truck How long does it take to coordinate with the homeowner and schedule a crew? 15
expenses and minutes ($35/hr*)
Mileage 15 1 $15
Time and materals: Drive to and from the site? 60 minutes ($30/hr*) Time
Lost production 90 1 $90 spent on-site? 60 minutes ($30/hr*)
Document & Maintenance/mileage/insurane for the vehicle - see Cost Areas of Doing Business - if
Report 6 1 $6 we assume 10 miles each way? ($1.5/mile)
Customer care
call 6 1 $6
Lost Production: Time Spent Correcting Issue, steals from other projects. Calculate the
$0
lost production (billable rate) for the time spent on rework: 90 minutes ($60/hr)
Based on 1 worker; more workers costs go up accordingly
How long to document the issue and send proof of fix to program/client? 10 minutes
Lost Production: Time Spent Correcting Issue, steals from other projects. Calculate the
lost production (billable rate) for the time spent on rework: 90 minutes ($60/hr)
$0 Based on 1 worker; more workers costs go up accordingly
$0
$0
How long to document the issue and send proof of fix to program/client? 10 minutes
$0 ($30/hr*)
$0
$0 How long to call the homeowner to confirm any repairs made and that the job is
$0 complete? 10 minutes ($35/hr*)
© Advanced Energy 2014 All rights reserved
Key Take-away:
If this loss did not exist it
would be pure profit, a new
ect
truck, vacation to Tahiti, down
payment on a foam rig, etc.
ew? 15
Time
0 minutes
Use the Cost Areas of Doing Business
alculate the worksheet, and consult with your
60/hr) accountant and payroll, to get accurate
numbers.
0 minutes
ob is
The Cost of Poor Quality (COPQ)
"The cost of poor quality consists of all costs that would disappear if there were no deficiencies." J.M. Juran
1. 2. 3. 4. 5. 6.
(calculated) (calculated) (calculated) (calculated)
$0 $0 0 $0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
© Advanced Energy 2014 All rights reserved
1. 2. 3. 4. 5. 6.
(calculated) (calculated) (calculated) (calculated)
$0 $0 0 $0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
© Advanced Energy 2014 All rights reserved
1. 2. 3. 4. 5. 6.
(calculated) (calculated) (calculated) (calculated)
$0 $0 0 $0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
© Advanced Energy 2014 All rights reserved
1. 2. 3. 4. 5. 6.
(calculated) (calculated) (calculated) (calculated)
$0 $0 0 $0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0