TEFOMA BATCH PLANT
Page 1 of 1
CONCRETE
ITEM NUMBER DATE CAST CUBE NO. NO. OF CUBES 3 DAYS STRENGTH 7 DAYS STRENGTH 14 DAYS STRENGTH 21 DAYS STRENGTH 28 DAYS STRENGTH SOURCE OF CUBE SLUMP REQUIRED CONCRETE GRADE
1 31-Mar-22 13-24 9 -- 23.1 26.0 -- 25.8 Stoneridge culvert(0+040) 107mm 30
2 03-Apr-22 25-36 12 34.5 40.1 41.3 -- 40.2 Hopely culvert Ch(1+440) 110mm 30
3 04-Apr-22 37-48 12 11.6 15.8 16.2 -- 19.6 Bridge 2_Glenorah_Abutment wingwall base NA 35
4 04-Apr-22 49-60 12 12.7 16.3 17.9 -- 20.8 Hopely pipe encasing Ch(0+020) NA 30
5 12-Apr-22 61-72 9 10.1 10.4 -- -- 23.6 Forbes culverts ch(3+240); ch(3+230) 170mm 20
6 13-Apr-22 73-78 and 103-108 6 19.7 -- -- -- 35.8 Bridge 02 Pier 03_mass concrete 65mm 35
7 17-Apr-22 79-90 12 11.8 20.7 28.5 -- 32.2 Bridge 02 Chitungwiza Abutment mass concrete 60mm; 150mm;80mm 20
8 21-Apr-22 91-102 12 19.9 22.8 31.5 -- 30.8 Bridge 02, Pier 03, Base 140mm;150mm;90mm;210mm 35
10 27-Apr-22 115-126 12 12.3 15.3 25.7 -- Bridge 2, East Abutment wingwall 130mm;140mm;125mm;65mm 20
11 01-May-22 127-138 12 19.5 29.1 31.7 -- Bridge 2, Chitungwiza Abutment base 140mm;170mm;220mm;30mm 35
12 05-May-22 139-150 12 20.9 25.7 29.1 -- Bridge 2, Chitungwiza Abutment Wingwall base 80mm;190mm;150mm 35
20
21
22
23
24
25
26
Remarks by Lab:
COMPLETED BY:
(LAB) NAME SIGNATURE DATE & TIME
RECEIVED BY:
(SITE) NAME SIGNATURE DATE & TIME