Asif (1) - 3 Final PDF
Asif (1) - 3 Final PDF
Civil Engineer
Om plaza, K.C.Road Chatribari,
Guwahati-781001, Assam (India)
Trident Developers EmaiI: info@tridentdeveloper.com
Date. :24.01.2023
FORM NO. 2
[ Prescribed under rule 3 (3))
CERTIFICATE OF STABILITY
1. Name of : MAHINDRA MSTC RECYCLING PRIVATE LlMlTED
Factory
2 Village town & District in : Dag No. 25,791,799 Patta No. 38,237,245
,wShich Factory is situated Vill - Katonipara, Mouza - Modartola,
P.O.- Deuduar-781101,Dist - Kamrup,Assam
3. Full Postal : Dag No. 25,791,799 Patta No. 38,237,245
address of Vill - Katonipara, Mouza - Modartola,
factory ., P.O.- Deuduar-781101,Dist - Kamrup,Assam
4. Name of the : Director: Mr. Vijay Arora
Occupier of the
Factory
5. Name of the manufacturing process : Registered Vehicle Scraping Facility ( RVSF)
I certify that I have inspected the factory shed/warehouse of which has been approved by the Gaon
Panchayat. I have examined the various parts including the foundation with special reference to the machine
plant etc. that have been installed. I am the opinion that the Factory shed/Warehouse which has been
constructed taken into use is an accordance with the plans approved by the Gaon Panchayat. That it is
structurally sound and that it's stability will not be endangered by its use as a part of Manufacturing of
Registered Vehicle Scrapping Facility (RVSF) for which the machinery plant etc. installed are intended.
Signature