END OF WELL PERFORMANCE SUMMARY REPORT

OCANO 05 - Rig 00609

WELL PERFORMANCE SUMMARY


OCANO 05

NABORS DRILLING

This report is intended for general informational purposes only and is provided for convenience. This report is provided “as is,” and
neither Nabors Corporate Services, Inc. nor any of its affiliates (collectively, “Nabors”) makes any representation or warranty,
expressed or implied, statutory or otherwise, concerning this report or any information or data in this report, including any
representations or warranties concerning the merchantability, fitness for a particular purpose, quality, accuracy or completeness of
this report or any information or data in this report, or that this report or any information or data in this report is error-free. To the
extent not prohibited by applicable law, Nabors shall in no event be liable for any liability, loss, damage, expenses, or claims
arising out of or related to the use, modification, or distribution of, or the reliance on, this report or any information or data in this
report.

* - Proprietary, Patent Pending 1 06/20/2017


END OF WELL PERFORMANCE SUMMARY REPORT
OCANO 05 - Rig 00609

Summary
WELL NAME: OCANO 05
ACCEPTANCE DATE:
SPUD DATE: 5/19/2017
RELEASE DATE: 6/23/2017

Well Summary Tripping Connections


DAYS ON WELL 31.1 AVG RIH CON. TIME 2.10 MINS
TOTAL WELL DEPTH 11,750 FT RIH CON. TIME (TARGET) 2.10 MINS
TOTAL DEPTH/DAY 378 FT/DAY AVG POOH CON. TIME 2.45 MINS
ROTARY DRILLING ROP 81 FT/HR POOH CON. TIME (TARGET) 2.30 MINS
SLIDE DRILLING ROP 792 FT/HR AVG RIH REAMING CON. TIME 4.49 MINS
PLAN DAYS 30.0 DAYS AVG POOH REAMING CON. TIME 5.31 MINS
ACTUAL DAYS 31.1 DAYS AVG P/U DP CON. TIME 3.63 MINS
DAYS AHEAD/BEHIND (1.1) DAYS AVG L/D DP CON. TIME MINS
4.56

Rig Move / Drilling Plan Average BOP Time


WAIT TIME ON RIG MOVE - HRS BOP N/U TIME 4.50 HRS
RIG MOVE TIME - DAYS BOP N/D TIME HRS
RIG MOVE TARGET - DAYS BOP TESTING TIME 1.00 HRS
DAYS AHEAD/BEHIND - DAYS
Casing Speed (Jts/Hr)
SKID TIME 0.00 HRS
CAS. RUN TARGET # OF CAS.
SKID DISTANCE 0.00 CASING SIZE
FT SPEED (JTS/HR) SPEED JOINTS
9.625 12.37 14 227
N/A 5.29 14 62
Drilling Connections
AVG WTS CON. TIME 7.33 MINS
WTS CON. TIME (TARGET) 0.50 MINS
AVG STS CON. TIME 4.42 MINS
STS CON. TIME (TARGET) 3.00 MINS
Fuel Efficiency
TOTAL FUEL USED 63,906 GAL
AVG STW CON. TIME 3.19 MINS
OPT. FUEL USED 56,857 GAL
STW CON. TIME (TARGET) 2.00 MINS
POTENTIAL SAVINGS 7,049 GAL
AVG WTW CON. TIME 14.95 MINS ENGINE MANAGEMENT EFFICIENCY % 89%
AVG PUMPS ON TIME 54.10 SECS FUEL CONSUMPTION/DAY 2,056 GAL

Tripping Service Quality: Downtime and Invisible Lost Time (ILT)


AVG RIH TRIP SPEED 1,322 FT/HR TOTAL DOWNTIME EVENTS 0
RIH TRIP SPEED (TARGET) 1,530 FT/HR TOTAL DOWNTIME HOURS 0.00 HRS
AVG POOH TRIP SPEED 1,520 FT/HR TOTAL DT % 0.00%
POOH TRIP SPEED (TARGET) 1,530 FT/HR
# RIH TRIPS 9 TOTAL ILT HOURS* 36.00 HRS
# POOH TRIPS 6 TOTAL ILT %* 4.83%

* - Proprietary, Patent Pending 2 06/20/2017


END OF WELL PERFORMANCE SUMMARY REPORT
OCANO 05 - Rig 00609

Operations Pie Chart

06 07 09
23.17% 1.24% 0.27% 10
0.09%
11
05 0.73%
5.86% 12
03 10.49%
2.56% 14
0.60%
15
0.27%
20
0.05%
02 21
21.98% 0.09%
22
0.92%
01
31.68%

TOTAL OPERATING HRS 1,092.00 HRS


CODE DESCRIPTION HOURS % CODE DESCRIPTION HOURS %
01 RIG UP & TEAR DOWN 346.00 31.68% 14 NIPPLE UP B.O.P. 6.50 0.60%
02 DRILL ACTUAL 240.00 21.98% 15 TEST B.O.P. 3.00 0.27%
03 REAMING 28.00 2.56% 16 DRILL STEM TEST 0.00 0.00%
04 CORING 0.00 0.00% 17 PLUG BACK 0.00 0.00%
05 COND MUD & CIRCULATE 64.00 5.86% 18 SQUEEZE CEMENT 0.00 0.00%
06 TRIPS 253.00 23.17% 19 FISHING 0.00 0.00%
07 LUBRICATE RIG 13.50 1.24% 20 DIRECTIONAL WORK 0.50 0.05%
08 DOWNTIME 0.00 0.00% 21 WAITING TIME 1.00 0.09%
09 CUT OFF DRILLING LINE 3.00 0.27% 22 MEETINGS, SAFETY 10.00 0.92%
10 DEVIATION SURVEY 1.00 0.09% 23 WELL CONTROL 0.00 0.00%
11 WIRE LINE LOGS 8.00 0.73% 24 COMPLETION 0.00 0.00%
12 RUN CASING & CEMENT 114.50 10.49% 25 BILLING CODES 0.00 0.00%
13 WAIT ON CEMENT 0.00 0.00%

* - Proprietary, Patent Pending 3 06/20/2017


END OF WELL PERFORMANCE SUMMARY REPORT
OCANO 05 - Rig 00609

Planned Days vs Actual Curve

DAYS
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29

2,000

4,000

6,000
DEPTH (FT)

8,000

10,000

12,000

14,000

PLANNED HOLE DEPTH BIT DEPTH ACTUAL HOLE DEPTH SECTION DEPTH

# OF RIH TRIPS - CASED HOLE - 9 # OF POOH TRIPS - CASED HOLE - 6

# OF RIH TRIPS - OPEN HOLE - 1 # OF POOH TRIPS - OPEN HOLE - 5

SECTION DEPTH 1: 10,790 FT


SECTION DEPTH 2: 11,748 FT

* - Proprietary, Patent Pending 4 06/20/2017


END OF WELL PERFORMANCE SUMMARY REPORT
OCANO 05 - Rig 00609

Drilling - ROP VS Hole Depth

ROP (FT/HR)

0 200 400 600 800


0

1000

2000

3000
HOLE DEPTH (FT)

4000

Avg. Rotary ROP


(Feet/Hr)
5000
Avg. Sliding ROP
(Feet/Hr)

6000

7000

8000

9000

10000

TOTAL DRILL DEPTH: 11,750 FT


AVERAGE ROTARY ROP: 81 FT/HR
AVERAGE SLIDING ROP: 792 FT/HR

* - Proprietary, Patent Pending 5 06/20/2017


END OF WELL PERFORMANCE SUMMARY REPORT
OCANO 05 - Rig 00609

Drag Plot Torque Plot


REAM UP REAM DOWN TRIPPING POOH TRIPPING RIH DRILLING REAM UP
REAM DOWN DRILLING TORQUE TREND

HOOKLOAD (KLBS) TORQUE (FTLBS)

0 100 200 300 400 500 0 5000 10000 15000 20000 25000 30000 35000 40000
0 0

4000 4000
DEPTH (FT)

DEPTH (FT)

8000 8000

12000 12000

* - Proprietary, Patent Pending 6 06/20/2017


END OF WELL PERFORMANCE SUMMARY REPORT
OCANO 05 - Rig 00609

Bit Summary
IADC Code DULL Code

Distance Drilled
Reason Pulled

Accum Hours
Depth OUT
Depth IN
Sl. No.
MFGR

Hours
JETS

Gage
Type

MDC

ODC
OCS

ROP
DSS
Size

TFA
Loc
ICS

B/S
1

4
14/1 0.60 1 47 317 270 7 7 39
XR+C RD332 4/14/
1 1 5
PS 4 14/0/ W
0/0/0 0 1 G E I NO BHA 0.60 1 317 500 183 0 7
T
16 SMITH
14/1
SDI5 4/14/
JM530
19MH S 1 2 3 14/0/ 1.29 8 500 7,024 6,524 67 74 98
9
PX 15/1
5/15

20/2
0/20/
SDI5 JM030
S 1 2 3 20/2 2.15 12 7,024 7,044 20 1 75 20
19 2
0/20/
20/0

14/1
4/14/
XZ61 JM909 14/1
M 2 3 3 1.27 15 7,044 9,263 2,219 55 129 41
6 3 4/13/
13/1
3
12.2
SMITH
5
15/1
5/15/
JM135 15/1
Z519 M 2 2 3 1.34 19 9,263 10,496 1,233 30 159 42
3 5/15/
14/1
4

15/1
MSI5
5/15/
19LM
M 2 2 3 JH6696 15/1 1.21 23 10,496 10,796 300 23 181 13
HSBP
5/15/
XX
15/0

12/1
MSI6 2/12/
16UP M 2 3 3 JF5762 12/1 0.66 25 10,796 10,915 119 8 189 16
X 2/12/
0/0
8.5 SMITH
12/1
MSI6 2/12/
16MU M 2 3 3 JH5579 12/1 0.66 30 10,915 11,750 835 37 226 23
BPXX 2/12/
0/0

* - Proprietary, Patent Pending 7 06/20/2017


END OF WELL PERFORMANCE SUMMARY REPORT
OCANO 05 - Rig 00609

Tripping & Connection Summary


Performance By Tour
Drilling Connection (Weight to Weight)
Time (Minutes)
# of Cons.
0.00 8.00 16.00 24.00
VITE 9.64 5.55 4.35 18
CANDO 9.98 4.82 4.40 58

TIPAN 4.87 3.88 2.04


79

Weight To Slip To Slip Slip To


Slip Weight
Tripping Connection
Time (Minutes)
# of Cons.
0.00 0.80 1.60 2.40 3.20
2.14
VITE
2.77 222
2.01
CANDO 2.62 340
2.16
TIPAN
2.33 424
RIH Tripping POOH Tripping
Connection Connection

Tripping Speed (Cased Hole)


FT/HR
Trip Distance
0 800 1600 2400
VITE 1237
1207
13,671
1368
CANDO 1600 23,622
1353
TIPAN 30,225
1523

Tripping Speed RIH Tripping Speed


(Cased) POOH (Cased)

Metric Measure Distance


Average Tripping Speed (Cased Hole)
RIH 1,322 FT/HR 41,385 FT
POOH 1,520 FT/HR 26,133 FT
Average Tripping Speed (Cased Hole + Open Hole)
RIH 1,351 FT/HR 46,221 FT
POOH 1,319 FT/HR 38,409 FT
Tubular Handling
Pickup Drillpipe Speed FT/HR 0 FT
Laydown Drillpipe Speed FT/HR 0 FT
Avg. Pickup BHA Time* 2.14 HRS
Avg. Laydown BHA Time** 1.14 HRS
*Calculated Using Code 6.C From IADC Tour Sheet
**Calculated Using Code 6.D From IADC Tour Sheet
Driller names are captured from the payroll data submitted on the myWells tour sheet reports. Only the four drillers with the most tours worked are
displayed.

* - Proprietary, Patent Pending 8 06/20/2017


END OF WELL PERFORMANCE SUMMARY REPORT
OCANO 05 - Rig 00609

Drilling (Weight To Weight) Connection Details


Weight to Slip (Mins) Slip to Slip (Mins) Slip to Weight (Mins) Total Time (Mins) Pump on Time (Secs)

Avg: 7.33 Avg: 4.42 Avg: 3.19 Avg: 14.95 Avg: 54

0 40 80 120 0 8 16 24 0 8 16 24 0 40 80 120 0 80 160 240


517
609
672
701
1000 793
801
886
929
972
976
...
...
...
...
...
...
...
...
...
...
...
...
...
2000 ...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
3000 ...
...
...
...
...
...
...
...
DEPTH (FT)

...
...
...
...
...
...
...
...
...
...
4000 ...
...
...
...
...
...
...
...
...
...
...
...
5000 ...
...
...
...
...
...
...
...
...
...
6000 ...
...
...
...
...
...
...
...
...
...
...
...
7000 ...
...
...
...
...
...
...
...
...
...
...
8000 ...
...
...
...
...
...
...
...
...
...
...
...
9000 ...
...
...
...
...
...
...
...
...
...
10000 ...
...
...
...
...
...
...
11000 ...
...
...
...
...
12000 ...
...
...
...

SINGLE PUMPS ON
BLOCK MOVING TIME BLOCK STATIONARY TIME MULTIPLE PUMPS ON/OFF

* - Proprietary, Patent Pending 9 06/20/2017


END OF WELL PERFORMANCE SUMMARY REPORT
OCANO 05 - Rig 00609

Tripping - Detail*
Trips - RIH
2,000
TRIPPING SPEED (FT/HR)

1,600

1,200

800

400

0
5/30/2017 11:34:30 PM

6/13/2017 12:00:33 AM

6/14/2017 12:01:15 PM

6/17/2017 11:44:28 PM
6/1/2017 12:00:42 AM

6/4/2017 10:11:10 AM

6/8/2017 12:01:43 AM

6/13/2017 2:53:48 AM

6/14/2017 1:59:37 PM

6/18/2017 1:30:24 AM
RIH Tripping Speed
RIH Tripping Speed - RIH - OPEN+CASED
RIH Tripping Speed - - CASED RIH Tripping Speed
Target
CASED OPEN Target - CASED

RIH TRIPPING SPEED TARGET - CASED: 1,530 FT/HR

Trips - POOH
1,800
TRIPPING SPEED (FT/HR)

1,600
1,400
1,200
1,000
800
600
400
200
0
5/31/2017 11:58:35 AM

6/10/2017 10:58:36 AM

6/13/2017 11:43:24 PM

6/17/2017 12:01:08 AM
5/23/2017 8:45:57 AM

6/3/2017 11:56:53 PM

6/10/2017 3:57:57 PM

6/17/2017 2:40:00 AM
6/3/2017 3:15:43 PM

6/4/2017 2:21:15 AM

6/7/2017 8:16:05 AM

POOH Tripping Speed - POOH - OPEN+CASED POOH-Tripping Speed


POOH Tripping Speed POOH Tripping Speed
CASED OPEN Target - CASED Target - CASED

POOH TRIPPING SPEED TARGET - CASED: 1,530 FT/HR


*ONLY TRIPS THAT WERE OVER 1000' INSIDE OF CASED/OPEN HOLE WERE CONSIDERED, TIME REPORTED IS TRIP END TIME

* - Proprietary, Patent Pending 10 06/20/2017


END OF WELL PERFORMANCE SUMMARY REPORT
OCANO 05 - Rig 00609

Connection - Histograms
POOH RIH
200 350
Target - 2.30 Target - 2.10
300
160
# OF CONNECTIONS

# OF CONNECTIONS
250

120
200

150
80

100
40
50

0 0
1 1.5 2 2.5 3 3.5 4 4.5 5 5.5 6 1 1.5 2 2.5 3 3.5 4 4.5 5 5.5 6

AVERAGE CONNECTION TIME: 2.45 MINS AVERAGE CONNECTION TIME: 2.10 MINS
# OF CONNECTIONS: 457 # OF CONNECTIONS: 529

POOH - Reaming Connection RIH - Reaming Connection


60 60

50 50
# OF CONNECTIONS

# OF CONNECTIONS

40 40

30 30

20 20

10 10

0 0
1 1.5 2 2.5 3 3.5 4 4.5 5 5.5 6 1 1.5 2 2.5 3 3.5 4 4.5 5 5.5 6

AVERAGE CONNECTION TIME: 5.31 MINS AVERAGE CONNECTION TIME: 4.49 MINS
# OF CONNECTIONS: 170 # OF CONNECTIONS: 206

P/U Connection L/D Connection


7 3

6 3

2
# OF CONNECTIONS

# OF CONNECTIONS

5
2
4
2
3
1
2
1

1 0

0 0
1 1.5 2 2.5 3 3.5 4 4.5 5 5.5 6 1 1.5 2 2.5 3 3.5 4 4.5 5 5.5 6

AVERAGE CONNECTION TIME: 3.63 MINS AVERAGE CONNECTION TIME: 4.56 MINS
# OF CONNECTIONS: 16 # OF CONNECTIONS: 11

* - Proprietary, Patent Pending 11 06/20/2017


END OF WELL PERFORMANCE SUMMARY REPORT
OCANO 05 - Rig 00609

Avg. BOP Time


BOP N/U
5
4.50
4.00
4
Hours

0
5/30/2017
13 5/8 5K

BOP N/U Time (hrs) BOP N/U Time


Target
BOP N/U Time Actual BOP N/U Time Target

BOP N/D
Hours

BOP N/D Time Actual BOP N/D Time Target

BOP Testing
5

4.00
4
Hours

1.00
1

0
5/30/2017
13 5/8 5K

BOP Testing Time (hrs) BOP Testing Time


Target
BOP Testing Time Actual BOP Testing Time Target

* - Proprietary, Patent Pending 12 06/20/2017


END OF WELL PERFORMANCE SUMMARY REPORT
OCANO 05 - Rig 00609

Casing Connection Details

Run Casing
Run Casing Speed
Speed Jts/Hr
(Jts/Hr) CasingConnection
Casing ConnectionTime
Time(Mins)
(Mins)
JTS/HR MINS
0 4 8 12 16 0 2 3

7,000 7,000
5.29 2.88
N/A N/A
CASING SIZE

CASING SIZE
DEPTH (FT)

DEPTH (FT)

10,800 10,800
12.37 2.40
9.625 9.625

CASING SPEED: 9.61 JTS/HR TOTAL JOINTS RUN: 289 AVERAGE CON. TIME: 2.53 MINS

*Casing joints ran above 1000' of depth may not have been detected, actual and reported number of joints may vary.

* - Proprietary, Patent Pending 13 06/20/2017


END OF WELL PERFORMANCE SUMMARY REPORT
OCANO 05 - Rig 00609

Fuel Report
240 240

OPTIMAL FUEL CONSUMPTION (GAL/HR)


FUEL CONSUMPTION (GAL/HR)

200 200

160 160

120 120

80 80

40 40

0 0
1 6 12 18 23 28 33 38 43
Fuel Optimal Fuel
Consumption Consumption

TOTAL FUEL USED: 63,906 GALS POTENTIAL FUEL SAVINGS: 7,049 GALS
OPTIMAL FUEL USED: 56,857 GALS ENGINE MANAGEMENT EFFICIENCY %: 88.97%

Fuel Used and Total Hours by Engines


Engines Hours Fuel Consumed (Gal) Average Engine Load
Engine 1 429 11,111 21%
Engine 2 641 14,502 0%
Engine 3 400 11,923 23%
Engine 4 649 15,566 30%
Engine 5 487 10,804 22%
Sum Total 2,607 63,906

Summary - Engines Running


0 2 4 6

Total Number of Engines 5.0

Avg. Number of Engines


3.1
Running
Optimum Number of
2.0
Engines Running

* - Proprietary, Patent Pending 14 06/20/2017


END OF WELL PERFORMANCE SUMMARY REPORT
OCANO 05 - Rig 00609

SQ: Downtime and Invisible Loss Time Summary


SQ Incident Count by Event ALLSQ Incident Time
SQ INCIDENT TIME by
BY Event (Hrs)
ACTIVITY (HRS)

BOP

CONNECTION

DRILLING
CONNECTION
(WtW)

RUN
CASING

TRIPPING

24 16 8 0 0 8 16 24 32

Light Significant Serious Major

SQ Incident Count SQ Incident Time (Hrs)


Event Major Serious Significant Light Event Major Serious Significant Light
BOP 1 BOP 0.50
CONNECTION 4 1 6 8 CONNECTION 0.02 0.23 0.25 0.13
DRILLING CONNECTION (WtW) 23 1 DRILLING CONNECTION (WtW) 25.86 0.05
RUN CASING 4 RUN CASING 11.45
TRIPPING 2 5 5 TRIPPING 2.12 2.53 0.62

* - Proprietary, Patent Pending 15 06/20/2017


END OF WELL PERFORMANCE SUMMARY REPORT
OCANO 05 - Rig 00609

Downtime Pie Chart

TOTAL DT HRS 0.00 HRS


TOTAL HRS ON WELL 746.00 HRS
DOWNTIME % 0.00%
CODE - DESCRIPTION HOURS % CODE - DESCRIPTION HOURS %
8.A - INSTRUMENTATION 0.00 8.M - OPS/CONTRACT ISSUES 0.00
8.B - TOP DRIVE 0.00 8.N - POWER GENERATOR 0.00
8.C - MUD PUMP 0.00 8.O - ELECTRIC MOTOR 0.00
8.D - ENGINES 0.00 8.P - POWERED CATWALK 0.00
8.E - SCR/ELECTRICAL 0.00 8.Q - POWERED WRENCH 0.00
8.F - DRAWWORKS 0.00 8.R - TUBULARS 0.00
8.G - MUD SYSTEM 0.00 8.S - TRIPPING 0.00
8.H - BOP/CHOKE 0.00 8.T - FISHING 0.00
8.I - HOISTING/LIFTING 0.00 8.U - STUCK PIPE 0.00
8.J - CRANE 0.00 8.V - OPERATOR ERROR 0.00
8.K - WAITING ON CREWS 0.00 8.W - WAITING ON PARTS 0.00
8.L - HOISTING/LIFTING/CRANE 0.00 8.Z - OTHER EQUIPMENT 0.00

* - Proprietary, Patent Pending 16 06/20/2017


END OF WELL PERFORMANCE SUMMARY REPORT
OCANO 05 - Rig 00609

ILT SUMMARY*
TRIPPING AND CONNECTION ILT 38.50 HOURS TOTAL ILT 36.00 HOURS
BOP ILT (2.50) HOURS TOTAL HOURS ON WELL 746.00 HOURS
SKIDDING ILT 0.00 HOURS TOTAL ILT % 4.83%

ILT/IST BY DRILLER*
Trip Speed (Cased Hole)
TOTAL ILT IST
ACTIVITY DRILLER TARGET ACTUAL
DISTANCE (FT) (HOURS) (HOURS)
VITE 1,530 1,237 12,183 1.89 0.00
RIH TRIPPING CANDO 1,530 1,368 16,647 1.29 0.00
SPEED (FT/HR) TIPAN 1,530 1,353 12,555 1.07 0.00

VITE 1,530 1,207 1,488 0.26 0.00


CANDO 1,530 1,600 6,975 0.00 0.20
POOH TRIPPING
SPEED (FT/HR) TIPAN 1,530 1,523 17,670 0.06 0.00

Connection Time
# OF ILT IST
ACTIVITY DRILLER TARGET ACTUAL
CONNECTIONS (HOURS) (HOURS)
VITE 2.10 2.14 184 0.00 0.14
RIH CANDO 2.10 2.01 206 0.05 0.00
CONNECTION TIPAN 2.10 2.16 139 0.00 0.01
TIME (MINS)

VITE 2.30 2.77 38 0.08 0.00


POOH CANDO 2.30 2.62 134 0.27 0.00
CONNECTION TIPAN 2.30 2.33 285 0.04 0.00
TIME (MINS)

VITE 5.50 19.55 18 4.21 0.00


WEIGHT TO CANDO 5.50 19.19 58 13.24 0.00
WEIGHT
CONNECTION TIPAN 5.50 10.79 79 6.96 0.00
TIME (MINS)

Run Casing Speed


ILT IST
ACTIVITY DRILLER TARGET ACTUAL # OF JOINTS
(HOURS) (HOURS)
VITE 14 0 0 0.00 0.00
CASING CANDO 14 14 185 0.32 0.00
RUNNING TIPAN 14 6 104 9.11 0.00
(JTS/HR)

ILT/IST FROM OTHER ACTIVITIES*


AVERAGE AVERAGE NUMBER OF TOTAL ILT TOTAL IST
TARGET VALUE EVENTS (HOURS) (HOURS)

BOP N/U (HOURS) 4.00 4.50 1 0.50 0.00


BOP N/D (HOURS) 0.00 0 0.00 0.00
BOP TEST (HOURS) 4.00 1.00 1 0.00 3.00
SKID RIG (HOURS) 0.00 0.00 0 0.00 0.00

* - Proprietary, Patent Pending 17 06/20/2017


END OF WELL PERFORMANCE SUMMARY REPORT
OCANO 05 - Rig 00609

SQKPI Incident Definition

* - Proprietary, Patent Pending 18 06/20/2017


END OF WELL PERFORMANCE SUMMARY REPORT
OCANO 05 - Rig 00609

Metric Definitions and Sources

* - Proprietary, Patent Pending 19 06/20/2017

You might also like